Equipment Statement. Shop Drawings on equipment shall include the following written statement from the manufacturer of the equipment: 6.19.3.1 “This equipment submitted for approval shall perform as specified when installed in the arrangement shown on this drawing and in the Contract Documents and in conjunction with all other accessories such as flues, breechings, piping, controls, and equipment not furnished by this manufacturer, but required as an accessory or supplement to this equipment, providing that the accessory or supplementary items perform as specified and are installed as shown in the Contract Documents.” .1 The DB will be deemed to have included the above statement as required even if the associated Shop Drawing does not actually contain the statement. 6.19.3.2 This equipment statement shall not be required for Samples, Product Data, and other standard submittals that are not created specifically for this Project.
Appears in 2 contracts
Samples: Professional Services, Professional Services
Equipment Statement. Shop Drawings on equipment shall include the following written statement from the manufacturer of the equipment:
6.19.3.1 6.18.7.1 “This equipment submitted for approval shall perform as specified when installed in the arrangement shown on this drawing and in the Contract Documents and in conjunction with all other accessories such as flues, breechings, piping, controls, and equipment not furnished by this manufacturer, but required as an accessory or supplement to this equipment, providing that the accessory or supplementary items perform as specified and are installed as shown in the Contract Documents.”
.1 The DB CM will be deemed to have included the above statement as required even if the associated Shop Drawing does not actually contain the statement.
6.19.3.2 6.18.7.2 This equipment statement shall not be required for Samples, Product Data, and other standard submittals that are not created specifically for this Project.
Appears in 2 contracts
Samples: Professional Services, Construction Manager at Risk Agreement
Equipment Statement. Shop Drawings on equipment shall include the following written statement from the manufacturer of the equipment:
6.19.3.1 6.20.7.1 “This equipment submitted for approval shall perform as specified when installed by the Contractor in the arrangement shown on this drawing and in the Contract Documents and in conjunction with all other accessories such as flues, breechings, piping, controls, and equipment not furnished by this manufacturer, but required as an accessory or supplement to this equipment, providing that the accessory or supplementary items perform as specified and are installed as shown in the Contract Documents.”
.1 The DB Contractor will be deemed to have included the above statement as required even if the associated Shop Drawing does not actually contain the statement.
6.19.3.2 6.20.7.2 This equipment statement shall not be required for Samples, Product Data, and other standard submittals that are not created specifically for this Project.
Appears in 2 contracts
Samples: General Contracting Agreement, Standard Requirements for Public Facility Construction
Equipment Statement. Shop Drawings on equipment shall include the following written statement from the manufacturer of the equipment:
6.19.3.1 6.20.7.1 “This equipment submitted for approval shall perform as specified when installed by the CM in the arrangement shown on this drawing and in the Contract Documents and in conjunction with all other accessories such as flues, breechings, piping, controls, and equipment not furnished by this manufacturer, but required as an accessory or supplement to this equipment, providing that the accessory or supplementary items perform as specified and are installed as shown in the Contract Documents.”
.1 The DB CM will be deemed to have included the above statement as required even if the associated Shop Drawing does not actually contain the statement.
6.19.3.2 6.20.7.2 This equipment statement shall not be required for Samples, Product Data, and other standard submittals that are not created specifically for this Project.
Appears in 1 contract
Samples: Cm at Risk Contract
Equipment Statement. Shop Drawings on equipment shall include the following written statement from the manufacturer of the equipment:
6.19.3.1 6.20.7.1 “This equipment submitted for approval shall perform as specified when installed in the arrangement shown on this drawing and in the Contract Documents and in conjunction with all other accessories such as flues, breechings, piping, controls, and equipment not furnished by this manufacturer, but required as an accessory or supplement to this equipment, providing that the accessory or supplementary items perform as specified and are installed as shown in the Contract Documents.”
.1 The DB Contractor will be deemed to have included the above statement as required even if the associated Shop Drawing does not actually contain the statement.
6.19.3.2 6.20.7.2 This equipment statement shall not be required for Samples, Product Data, and other standard submittals that are not created specifically for this Project.
Appears in 1 contract
Samples: Standard Requirements for Public Facility Construction