EQUIPMENTS AND PLANT. 8-7-1 The Contractor shall furnish, maintain and operate at his expense all tools plants and equipments make it available always at the site viz., Machinery gauges, pyrometer a set of three camber boards, spirit levels, templates for super elevation, strings & stakes, fish line (thin cotton twine) to 60 meter length, Straight edge 3m length, 15 meter tape, Brooms, special tools and equipment for sprinkling water, sign, Barricades, red flags danger lights and other devices for protecting the green surfaces, a bitumen boiler with sprayer attached for tack coat, equipment for transport of mixture power roller 8 to 10 tonnes, etc., which are necessary for proper execution of the works on a scale that would be adequate to ensure satisfactory rate of progress in accordance with the time stipulated in the tender notice.
Appears in 5 contracts
EQUIPMENTS AND PLANT. 8-7-1 The Contractor shall furnish, maintain and operate at his expense all tools plants and equipments make it available always at the site viz., Machinery gauges, pyrometer a set of three camber boards, spirit levels, templates for super elevation, strings & stakes, fish line (thin cotton twine) to 60 meter length, Straight edge 3m length, 15 meter tape, Brooms, special tools and equipment for sprinkling water, sign, Barricades, red flags danger lights and other devices for protecting the green surfaces, a bitumen boiler with sprayer attached for tack coat, equipment for transport of mixture power roller 8 to 10 tonnes, etc., which are necessary for proper execution of the works on a scale that would be adequate to ensure satisfactory rate of progress in accordance with the time stipulated in the tender notice.
Appears in 1 contract
Samples: Construction Contract