Extra Tow Truck Sample Clauses

Extra Tow Truck. In the event an extra tow truck is required to safely impound a vehicle, the fee shall be equal to 1.75 times the applicable impound fee. In the event an extra drivers is required to safely impound a vehicle the fee shall be equal to 1.5 times the applicable impound fee.
AutoNDA by SimpleDocs

Related to Extra Tow Truck

  • Technical Standards Applicable to a Wind Generating Plant i. Low Voltage Ride-Through (LVRT) Capability A wind generating plant shall be able to remain online during voltage disturbances up to the time periods and associated voltage levels set forth in the standard below. The LVRT standard provides for a transition period standard and a post-transition period standard.

  • Synchronous Generation The Interconnection Customer shall design its Small Generating Facility to maintain a composite power delivery at continuous rated power output at the Point of Interconnection at a power factor within the range of 0.95 leading to 0.95 lagging, unless the NYISO or the Transmission Owner in whose Transmission District the Small Generating Facility interconnects has established different requirements that apply to all similarly situated generators in the New York Control Area or Transmission District (as applicable) on a comparable basis, in accordance with Good Utility Practice.

  • Traffic Measurement and Billing over Interconnection Trunks 6.1 For billing purposes, each Party shall pass Calling Party Number (CPN) information on at least ninety-five percent (95%) of calls carried over the Interconnection Trunks.

  • Transportation Charges The cost of transporting Employees and Material necessary for the Mining Operations.

  • Television Equipment Recycling Program If this Contract is for the purchase or lease of covered television equipment, then Contractor certifies that it is compliance with Subchapter Z, Chapter 361 of the Texas Health and Safety Code related to the Television Equipment Recycling Program.

  • Non-Synchronous Generation The Interconnection Customer shall design its Small Generating Facility to maintain a composite power delivery at continuous rated power output at the high-side of the generator substation at a power factor within the range of 0.95 leading to 0.95 lagging, unless the NYISO or the Transmission Owner in whose Transmission District the Small Generating Facility interconnects has established a different power factor range that applies to all similarly situated non-synchronous generators in the control area or Transmission District (as applicable) on a comparable basis, in accordance with Good Utility Practice. This power factor range standard shall be dynamic and can be met using, for example, power electronics designed to supply this level of reactive capability (taking into account any limitations due to voltage level, real power output, etc.) or fixed and switched capacitors, or a combination of the two. This requirement shall only apply to newly interconnecting non-synchronous generators that have not yet executed a Facilities Study Agreement as of September 21, 2016.

  • Accessories, Spare Parts and Tools 1. In determining whether all the non-originating materials used in the production of a good undergo the applicable change in tariff classification or a specific manufacturing or processing operation set out in Annex 2, accessories, spare parts or tools delivered with the good that form part of the good's standard accessories, spare parts or tools, shall be disregarded, provided that:

  • Petroleum Storage Systems A. At Company’s expense, Company will at all times comply with all federal, state, and local requirements, including but not limited to, the regulations of the FDEP as stated in Chapters 62-761 and 62-762, FAC, the requirements of the Federal Oil Pollution Prevention regulation found in Title 40 of the Code of Federal Regulations Part 112 (40 CFR part 112), as well as the requirements of the Environmental Protection Commission of Hillsborough County (EPC), as may be amended or replaced, pertaining to petroleum storage tank and piping system construction, operation, inspection, and compliance monitoring programs; release detection methods and procedures; maintenance; and preventative maintenance programs. Company will be responsible for all spillage, overflow, or escape of gases, petroleum or petroleum products, and for all fines and penalties in connection therewith. All petroleum storage systems will be registered by Company, and Company will display the registration placard as required by law.

  • Access Toll Connecting Trunk Group Architecture 9.2.1 If CBB chooses to subtend a Verizon access Tandem, CBB’s NPA/NXX must be assigned by CBB to subtend the same Verizon access Tandem that a Verizon NPA/NXX serving the same Rate Center Area subtends as identified in the LERG.

  • Computer Equipment Recycling Program If this Contract is for the purchase or lease of computer equipment, then Contractor certifies that it is in compliance with Subchapter Y, Chapter 361 of the Texas Health and Safety Code related to the Computer Equipment Recycling Program and the Texas Commission on Environmental Quality rules in 30 TAC Chapter 328.

Time is Money Join Law Insider Premium to draft better contracts faster.