FABRICATION AND ORDERING. Fabrication shall be started by the Contractor only after receiving approved Shop Drawings from the Architect/Engineer. Materials shall be ordered in accordance with approved Product Data. Work which is improperly fabricated, whether through incorrect Shop Drawings, faulty workmanship or materials, will not be acceptable.
Appears in 6 contracts
Samples: www.coloradomesa.edu, imlive.s3.amazonaws.com, imlive.s3.amazonaws.com
FABRICATION AND ORDERING. Fabrication shall be started by the Contractor Design/Build Entity only after receiving approved Shop Drawings from the Architect/Engineer. Materials shall be ordered in accordance with approved Product Data. Work which is improperly fabricated, whether through incorrect Shop Drawings, faulty workmanship or materials, will not be acceptable.
Appears in 1 contract
Samples: www.coloradomesa.edu
FABRICATION AND ORDERING. Fabrication shall be started by the Contractor Design/Build Entity only after receiving approved Shop Drawings from the Design Build Entity’s Architect/Engineer. Materials shall be ordered in accordance with approved Product Data. Work which is improperly fabricated, whether through incorrect Shop Drawings, faulty workmanship or materials, will not be acceptable.
Appears in 1 contract
Samples: www.bidnet.com