Final Location Design Clause Samples

Final Location Design. 3.3.1 The Contractor shall prepare Final Location Design of RB Geodetic Reference Network for construction and installation as designated in this Technical Specification. 3.3.2 The Contractor shall prepare mandatory document(-s) and present them for Client’s review and approval. 3.3.3 The Contractor shall carry all necessary tasks and procedures to get approvals from national institutions and from affected parties. This step shall include getting approvals from national Road Agencies and under- ground/overground utilities’ managers/operators where relevant. 3.3.4 The Final Location Design contains all the necessary approvals regarding the used point type, location and installation method, which is necessary for the establishment and construction of the points in the locations specified by RB RAIL AS in the pre-design. 3.3.5 The Contractor shall carry out all necessary activities at its own cost to obtain necessary Building Permits for all Construction Objects according to the national construction legislation when or if necessary. 3.3.6 The Contractor shall be responsible for the applications to receive the Building Permits (according to applica- ble national law, if needed) and provision of any relevant information that may affect the performance of the work. The Contractor is obliged to consider all the comments and remarks issued by the relevant authorities during building permit review process. Implementation of changes to the design solutions according to the comments and remarks must be agreed prior with the Client. When or if necessary. 3.3.7 The Contractor shall apply the best engineering practice to optimize the design solutions and achieve the best value for cost and quality for the RB Geodetic Reference Network. 3.3.8 When necessary and possible, a protective fence and/or a simpler type of sign post must be designed. The corresponding proposal with schemes or drawings must be attached to the Final Location Design and have to be approved by the Client and Affected Parties. For Pillar-monument sign post is not necessary. 3.3.9 Final Location Design of RB Geodetic Reference Network include:

Related to Final Location Design

  • Designated Equipment; Designated Locations The System and the Data Access Services shall be used and accessed solely on and through the Designated Configuration at the offices of the Fund or the Fund Accountants in ▇▇▇▇▇▇▇▇▇, ▇▇▇▇▇▇▇▇ ▇▇ ▇▇▇▇▇▇ ▇▇▇▇▇, ▇▇▇▇▇▇▇▇ (“Designated Locations”).

  • Work Location While employed by the Company hereunder, the Executive shall perform his duties (when not traveling or engaged elsewhere in the performance of his duties) at the offices of the Company in Bermuda. The Executive shall travel to such places on the business of the Company in such manner and on such occasions as the Company may from time to time reasonably require.

  • Principal Location Such Grantor’s mailing address and the location of its place of business (if it has only one) or its chief executive office (if it has more than one place of business), is disclosed in Exhibit A; such Grantor has no other places of business except those set forth in Exhibit A.

  • Project Location [Insert the location of the Project, if applicable]

  • Data Location 1.1. The CONTRACTOR shall not store or transfer non-public COUNTY data outside of the United States. This includes backup data and Disaster Recovery locations. The CONTRACTOR will permit its personnel and contractors to access COUNTY data remotely only as required to provide technical support. (Remote access to data from outside the continental United States is prohibited unless approved in advance and in writing by the County.) 1.2. The CONTRACTOR must notify the COUNTY in advance and in writing of any location changes to CONTRACTOR’s data center(s) that will process or store County data.