Flood Protection Clause Samples

Flood Protection. Task 4.1.1-
Flood Protection. Carrying out investments to enhance the flood protection measures in the Central Posavina retention area, including: construction and rehabilitation of dikes, construction and rehabilitation of overflow structures, and construction and rehabilitation of flood protection walls.
Flood Protection. (i) The Design shall include a detailed flood risk assessment and shall comply with any recommendations of such assessment. (ii) Flood protection and compensatory storage shall be provided where the Works encroach on the functional floodplain of main rivers where the functional floodplain is as defined in Scottish Planning Policy (SPP) (iii) Flood defences shall include appropriate freeboard including allowance for climate change, modelling inaccuracies, settlement, and erosion. (iv) Maintenance access shall be provided for flood defences and compensatory storage areas.
Flood Protection. As the City evaluates the infrastructure needs of the north side of Fargo, including road access and flood protection, the Park District agrees that it will plat the Edgewood Golf Course substantially in accordance with what is attached as Exhibit “D”, adjusted at such time as the City’s flood protection plans are finalized. Whether or not golf Course Avenue is specifically part of the levee system will be determined as the plans are finalized, taking into consideration the effect on local residents. Any flood protection improvements made by City may be part of an assessment district and assessed according to city policy.
Flood Protection. A preliminary flood risk assessment192 identified 559 geographical areas in the SR at significant flood risks associated with watercourses with a length of 1 286.5 km, 378 of which are geographical areas at a potentially significant flood risk and 181 are geographical areas in which floods may be assumed likely to 190 Source: Final report from the projectConsequences of Climate Change and Possible Adaptation Measures in Individual Sectors” (▇▇▇▇▇▇, ▇▇▇▇▇▇▇, ▇▇▇▇▇▇▇▇, 2011) - Chapter 5.8.4 Economic analysis of adaptation measures in the energy sector, p. 235),▇▇▇▇://▇▇▇.▇▇▇▇.▇▇/File/projekty/Zaverecna%20Sprava%20projektu%20Klim.%20zmena%20a%20Adaptacie%202012.pdf 191 ▇▇▇▇://▇▇▇.▇▇▇▇▇▇▇.▇▇/new/sk/sub/Geoisnomenu/geof/atlas_st_sv 192 ▇▇▇▇://▇▇▇.▇▇▇▇▇▇▇▇▇.▇▇/Rokovanie.aspx/BodRokovaniaDetail?idMaterial=19303 occur193. The specific flood protection measures in areas where flood risks have been identified will be subject to flood risk management plans and will be included in the updated river basin management plans. Taking flood risks into consideration in spatial planning and the process of authorisation of construction, so that it takes place in safe locations, as well as appropriate land use, rational management and preventive measures in forests and on agricultural land, which are important in respect of prevention of damage to production caused by floods and soil waterlogging, also play a major role. The use of the flood hazard and flood risk maps as other documentation within spatial planning activities and the preparation of spatial planning documentation will lay the groundwork for mitigating the risks of damage caused by floods.
Flood Protection. For actions after Phase 1, the same criteria will be applicable, but others will be relevant as well, including the following: 1. Readiness to proceed 2. Ability to utilize results from earlier applied studies and other new knowledge 3. Dependency on precedent actions 4. Dependency on adaptive management progress 5. Flood management requirements 6. Public access needs 7. Climate change 8. Sea level rise.
Flood Protection. CONTRACTOR shall comply, if applicable, with the flood insurance purchase requirements of Section 102a of the Flood Disaster Protection Act of 1973 (P.L. 93-234) which requires recipients in a special flood hazard area to participate in the program and to purchase flood insurance if the total cost of insurable construction and acquisition if $10,000.00 or more. (grant assurance provision)