Force Majeure. Notice of Delay, and No Damages for Delay. The Contractor will not be responsible for delay resulting from its failure to perform if neither the fault nor the negligence of the Contractor or its employees or agents contributed to the delay, and the delay is due directly to fire, explosion, earthquake, windstorm, flood, radioactive or toxic chemical hazard, war, military hostilities, terrorism, civil emergency, embargo, riot, strike, violent civil unrest, or other similar cause wholly beyond the Contractor’s reasonable control, or for any of the foregoing that affect subcontractors or suppliers if no alternate source of supply is available to the Contractor. The foregoing does not excuse delay which could have been avoided if the Contractor implemented any risk mitigation required by the Contract. In case of any delay the Contractor believes is excusable, the Contractor will notify the Department in writing of the delay or potential delay and describe the cause of the delay either (1) within ten (10) calendar days after the cause that created or will create the delay first arose, if the Contractor could reasonably foresee that a delay could occur as a result, or (2) if delay is not reasonably foreseeable, within five (5) calendar days after the date the Contractor first had reason to believe that a delay could result. The foregoing will constitute the Contractor’s sole remedy or excuse with respect to delay. Providing notice in strict accordance with this paragraph is a condition precedent to such remedy. No claim for damages will be asserted by the Contractor. The Contractor will not be entitled to an increase in the Contract price or payment of any kind from the Department for direct, indirect, consequential, impact or other costs, expenses or damages, including but not limited to costs of acceleration or inefficiency, arising because of delay, disruption, interference, or hindrance from any cause whatsoever. If performance is suspended or delayed, in whole or in part, due to any of the causes described in this paragraph, after the causes have ceased to exist the Contractor will perform at no increased cost, unless the Department determines, in its sole discretion, that the delay will significantly impair the value of the Contract to the State of Florida or to Customers, in which case the Department may (1) accept allocated performance or deliveries from the Contractor, provided that the Contractor grants preferential treatment to Customers and the Department with respect to commodities or contractual services subjected to allocation, or (2) purchase from other sources (without recourse to and by the Contractor for the related costs and expenses) to replace all or part of the commodity or contractual services that are the subject of the delay, which purchases may be deducted from the Contract quantity, or (3) terminate the Contract in whole or in part.
Appears in 983 contracts
Samples: Supplemental Contract, Alternate Contract Source Agreement, Information Technology Staff Augmentation Services
Force Majeure. Notice of Delay, and No Damages for Delay. The Contractor will not be responsible for delay resulting from its failure to perform if neither the fault nor the negligence of the Contractor or its employees or agents contributed to the delay, delay and the delay is due directly to fire, explosion, earthquake, windstorm, flood, radioactive or toxic chemical hazard, war, military hostilities, terrorism, civil emergency, embargo, riot, strike, violent civil unrest, or other similar cause wholly beyond the Contractor’s reasonable control, or for any of the foregoing that affect subcontractors or suppliers if no alternate source of supply is available to the Contractor. The foregoing does not excuse delay which could have been avoided if the Contractor implemented any risk mitigation required by the Contract. In case of any delay the Contractor believes is excusable, the Contractor will notify the Department in writing of the delay or potential delay and describe the cause of the delay either (1) within ten (10) calendar days after the cause that created creates or will create the delay first arose, if the Contractor could reasonably foresee that a delay could occur as a result, or (2) if delay is not reasonably foreseeable, within five (5) calendar days after the date the Contractor first had reason to believe that a delay could result. The foregoing will constitute the Contractor’s sole remedy or excuse with respect to delay. Providing notice in strict accordance with this paragraph is a condition precedent to such remedy. No claim for damages will be asserted by the Contractor. The Contractor will not be entitled to an increase in the Contract price or payment of any kind from the Department for direct, indirect, consequential, impact or other costs, expenses or damages, including but not limited to costs of acceleration or inefficiency, arising because of delay, disruption, interference, or hindrance from any cause whatsoever. If performance is suspended or delayed, in whole or in part, due to any of the causes described in this paragraph, after the causes have ceased to exist the Contractor will perform at no increased cost, unless the Department determines, in its sole discretion, that the delay will significantly impair the value of the Contract to the State of Florida or to Customers, in which case the Department may (1) accept allocated performance or deliveries from the Contractor, provided that the Contractor grants preferential treatment to Customers and the Department with respect to commodities or contractual services subjected to allocation, or (2) purchase from other sources (without recourse to and by the Contractor for the related costs and expenses) to replace all or part of the commodity or contractual services that are the subject of the delay, which purchases may be deducted from the Contract quantity, or (3) terminate the Contract in whole or in part.
Appears in 285 contracts
Samples: Information Technology Staff Augmentation Services Contract, Information Technology Staff Augmentation Services, Information Technology Staff Augmentation Services
Force Majeure. Notice of Delay, and No Damages for Delay. The Contractor will shall not be responsible for delay resulting from its failure to perform if neither the fault nor the negligence of the Contractor or its employees or agents contributed to the delay, delay and the delay is due directly to fireacts of God, explosionwars, earthquakeacts of public enemies, windstormstrikes, floodfires, radioactive or toxic chemical hazard, war, military hostilities, terrorism, civil emergency, embargo, riot, strike, violent civil unrestfloods, or other similar cause wholly beyond the Contractor’s reasonable control, or for any of the foregoing that affect subcontractors or suppliers if no alternate source of supply is available to the Contractor. The foregoing does not excuse delay which could have been avoided if the Contractor implemented any risk mitigation required by the Contract. In case of any delay the Contractor believes is excusable, the Contractor will shall notify the Department Customer in writing of the delay or potential delay and describe the cause of the delay either (1) within ten (10) calendar days after the cause that created creates or will create the delay first arose, if the Contractor could reasonably foresee that a delay could occur as a result, or (2) if delay is not reasonably foreseeable, within five (5) calendar days after the date the Contractor first had reason to believe that a delay could result. The foregoing will constitute the Contractor’s sole remedy or excuse with respect to delayTHE FOREGOING SHALL CONSTITUTE THE CONTRACTOR’S SOLE REMEDY OR EXCUSE WITH RESPECT TO DELAY. Providing notice in strict accordance with this paragraph is a condition precedent to such remedy. No claim for damages will damages, other than for an extension of time, shall be asserted by against the ContractorCustomer. The Contractor will shall not be entitled to an increase in the Contract price or payment of any kind from the Department Customer for direct, indirect, consequential, impact or other costs, expenses or damages, including but not limited to costs of acceleration or inefficiency, arising because of delay, disruption, interference, or hindrance from any cause whatsoever. If performance is suspended or delayed, in whole or in part, due to any of the causes described in this paragraph, after the causes have ceased to exist the Contractor will shall perform at no increased cost, unless the Department Customer determines, in its sole discretion, that the delay will significantly impair the value of the Contract to the State of Florida or to Customers, in which case the Department Customer may (1) accept allocated performance or deliveries from the Contractor, provided that the Contractor grants preferential treatment to Customers and the Department with respect to commodities or contractual services products subjected to allocation, or (2) purchase from other sources (without recourse to and by the Contractor for the related costs and expenses) to replace all or part of the commodity or contractual services products that are the subject of the delay, which purchases may be deducted from the Contract quantity, or (3) terminate the Contract in whole or in part.
Appears in 19 contracts
Samples: Contract, Standard Contract, Standard Contract
Force Majeure. Notice of Delay, and No Damages for Delay. The Contractor will not be responsible for delay resulting from its failure to perform if neither the fault nor the negligence of the Contractor or its employees or agents contributed to the delay, and the delay is due directly to fire, explosion, earthquake, windstorm, flood, radioactive or toxic chemical hazard, war, military hostilities, terrorism, civil emergency, embargo, riot, strike, violent civil unrest, or other similar cause wholly beyond the Contractor’s reasonable control, or for any of the foregoing that affect subcontractors or suppliers if no alternate source of supply is available to the Contractor. The foregoing does not excuse delay which could have been avoided if the Contractor implemented any risk mitigation required by the Contract. In case of any delay the Contractor believes is excusable, the Contractor will notify the Department in writing of the delay or potential delay and describe the cause of the delay either (1) within ten (10) calendar days after the cause that created or will create the delay first arose, if the Contractor could reasonably foresee that a delay could occur as a result, or (2) if delay is not reasonably foreseeable, within five (5) calendar days after the date the Contractor first had reason to believe that a delay could result. The foregoing will constitute the Contractor’s sole remedy or excuse with respect to delay. Providing notice in strict accordance with this paragraph is a condition precedent to such remedy. No claim for damages will be asserted by the Contractor. The Contractor will not be entitled to an increase in the Contract price or payment of any kind from the Department for direct, indirect, consequential, impact or other costs, expenses or damages, including but not limited to costs of acceleration or inefficiency, arising because of delay, disruption, interference, or hindrance from any cause whatsoever. If performance is suspended or delayed, in whole or in part, due to any of the causes described in this paragraph, after the causes have ceased to exist the Contractor will perform at no increased cost, unless the Department determines, in its sole discretion, that the delay will significantly impair the value of the Contract to the State of Florida or to Customers, in which case the Department may (1) accept allocated performance or deliveries from the Contractor, provided that the Contractor grants preferential treatment to Customers and the Department with respect to commodities or contractual services subjected to allocation, or (2) purchase from other sources (without recourse to and by the Contractor for the related costs and expenses) to replace all or part of the commodity or contractual services that are the subject of the delay, which purchases may be deducted from the Contract quantity, or (3) terminate the Contract in whole or in part.
Appears in 12 contracts
Samples: Information Technology Staff Augmentation Services, Information Technology Staff Augmentation Services, Information Technology Staff Augmentation Services
Force Majeure. Notice of Delay, and No Damages for Delay. The Contractor will not be responsible for delay resulting from its failure to perform if neither the fault nor the negligence of the Contractor or its employees or agents contributed to the delay, delay and the delay is due directly to fire, explosion, earthquake, windstorm, flood, radioactive or toxic chemical hazard, war, military hostilities, terrorism, civil emergency, embargo, riot, strike, violent civil unrest, or other similar cause wholly beyond the Contractor’s reasonable control, or for any of the foregoing that affect subcontractors or suppliers if no alternate source of supply is available to the Contractor. The foregoing does not excuse delay which could have been avoided if the Contractor implemented any risk mitigation required by the Contract. In case of any delay the Contractor believes is excusable, the Contractor will notify the Department in writing of the delay or potential delay and describe the cause of the delay either (1) within ten (10) calendar days after the cause that created creates or will create the delay first arose, if the Contractor could reasonably foresee that a delay could occur as a result, or (2) if delay is not reasonably foreseeable, within five (5) calendar days after the date the Contractor first had reason to believe that a delay could result. The foregoing will constitute the Contractor’s sole remedy or excuse with respect to delay. Providing notice in strict accordance with this paragraph is a condition precedent to such remedy. No claim for damages will be asserted by the Contractor. The Contractor will not be entitled to an increase in the Contract price or payment of any kind from the Department for direct, indirect, consequential, impact or other costs, expenses or damages, including but not limited to costs of acceleration or inefficiency, arising because of delay, disruption, interference, or hindrance from any cause whatsoever. If performance is suspended or delayed, in whole or in part, due to any of the causes described in this paragraph, after the causes have ceased to exist the Contractor will perform at no increased cost, unless the Department determines, in its sole discretion, that the delay will significantly impair the value of the Contract to the State of Florida or to CustomersDepartments, in which case the Department may (1) accept allocated performance or deliveries from the Contractor, provided that the Contractor grants preferential treatment to Customers and the Department Departments with respect to commodities or contractual services subjected to allocation, or (2) purchase from other sources (without recourse to and by the Contractor for the related costs and expenses) to replace all or part of the commodity or contractual services that are the subject of the delay, which purchases may be deducted from the Contract quantity, or (3) terminate the Contract in whole or in part.
Appears in 10 contracts
Samples: Participating Addendum, Participating Addendum, Participating Addendum
Force Majeure. Notice of Delay, and No Damages for Delay. The Contractor will not be responsible for delay resulting from its failure to perform if neither the fault nor the negligence of the Contractor or its employees or agents contributed to the delay, delay and the delay is due directly to fire, explosion, earthquake, windstorm, flood, radioactive or toxic chemical hazard, war, military hostilities, terrorism, civil emergency, embargo, riot, strike, violent civil unrest, or other similar cause wholly beyond the Contractor’s 's reasonable control, or for any of the foregoing that affect subcontractors or suppliers if no alternate source of supply is available to the Contractor. The foregoing does not excuse delay which could have been avoided if the Contractor implemented any risk mitigation required by the Contract. In case of any delay the Contractor believes is excusable, the Contractor will notify the Department in writing of the delay or potential delay and describe the cause of the delay either (1) within ten (10) calendar days after the cause that created creates or will create the delay first arose, if the Contractor could reasonably foresee that a delay could occur as a result, or (2) if delay is not reasonably foreseeable, within five (5) calendar days after the date the Contractor first had reason to believe that a delay could result. The foregoing will constitute the Contractor’s 's sole remedy or excuse with respect to delay. Providing notice in strict accordance with this paragraph is a condition precedent to such remedy. No claim for damages will be asserted by the Contractor. The Contractor will not be entitled to an increase in the Contract price or payment of any kind from the Department for direct, indirect, consequential, impact or other costs, expenses or damages, including but not limited to costs of acceleration or inefficiency, arising because of delay, disruption, interference, or hindrance from any cause whatsoever. If performance is suspended or delayed, in whole or in part, due to any of the causes described in this paragraph, after the causes have ceased to exist the Contractor will perform at no increased cost, unless the Department determines, in its sole discretion, that the delay will significantly impair the value of the Contract to the State of Florida or to CustomersDepartments, in which case the Department may (1) accept allocated performance or deliveries from the Contractor, provided that the Contractor grants preferential treatment to Customers and the Department Departments with respect to commodities or contractual services subjected to allocation, or (2) purchase from other sources (without recourse to and by the Contractor for the related costs and expenses) to replace all or part of the commodity or contractual services that are the subject of the delay, which purchases may be deducted from the Contract quantity, or (3) terminate the Contract in whole or in part.
Appears in 8 contracts
Samples: Construction and Industrial Equipment Contract, Construction and Industrial Equipment Contract, Construction and Industrial Equipment Contract
Force Majeure. Notice of Delay, and No Damages for Delay. The Contractor will not be responsible for delay resulting from its failure to perform if neither the fault nor the negligence of the Contractor or its employees or agents contributed to the delay, delay and the delay is due directly to fire, explosion, earthquake, windstorm, flood, radioactive or toxic chemical hazard, war, military hostilities, terrorism, civil emergency, embargo, riot, strike, violent civil unrest, or other similar cause wholly beyond the Contractor’s reasonable control, or for any of the foregoing that affect subcontractors or suppliers if no alternate source of supply is available to the Contractor. The foregoing does not excuse delay which could have been avoided if the Contractor implemented any risk mitigation required by the Contract. In case of any delay the Contractor believes is excusable, the Contractor will notify the Department in writing of the delay or potential delay and describe the cause of the delay either (1) within ten (10) 10 calendar days after the cause that created creates or will create the delay first arose, if the Contractor could reasonably foresee that a delay could occur as a result, or (2) if delay is not reasonably foreseeable, within five (5) calendar days after the date the Contractor first had reason to believe that a delay could result. The foregoing will constitute the Contractor’s sole remedy or excuse with respect to delay. Providing notice in strict accordance with this paragraph is a condition precedent to such remedy. No claim for damages will be asserted by the Contractor. The Contractor will not be entitled to an increase in the Contract price or payment of any kind from the Department for direct, indirect, consequential, impact or other costs, expenses or damages, including but not limited to costs of acceleration or inefficiency, arising because of delay, disruption, interference, or hindrance from any cause whatsoever. If performance is suspended or delayed, in whole or in part, due to any of the causes described in this paragraph, after the causes have ceased to exist the Contractor will perform at no increased cost, unless the Department determines, in its sole discretion, that the delay will significantly impair the value of the Contract to the State of Florida or to Customers, in which case the Department may (1) accept allocated performance or deliveries from the Contractor, provided that the Contractor grants preferential treatment to Customers and the Department with respect to commodities or contractual services subjected to allocation, or (2) purchase from other sources (without recourse to and by the Contractor for the related costs and expenses) to replace all or part of the commodity or contractual services that are the subject of the delay, which purchases may be deducted from the Contract quantity, or (3) terminate the Contract in whole or in part.
Appears in 7 contracts
Samples: Floorcovering & Installation Services Contract, State Term Contract, Floorcovering & Installation Services Contract
Force Majeure. Notice of Delay, and No Damages for Delay. The Contractor will not be responsible for delay resulting from its failure to perform if neither the fault nor the negligence of the Contractor or its employees or agents contributed to the delay, and the delay is due directly to fire, explosion, earthquake, windstorm, flood, radioactive or toxic chemical hazard, war, military hostilities, terrorism, civil emergency, embargo, riot, strike, violent civil unrest, or other similar cause wholly beyond the Contractor’s 's reasonable control, or for any of the foregoing that affect subcontractors or suppliers if no alternate source of supply is available to the Contractor. The foregoing does not excuse delay which could have been avoided if the Contractor implemented any risk mitigation required by the Contract. In case of any delay the Contractor believes is excusable, the Contractor will notify the Department in writing of the delay or potential delay and describe the cause of the delay either (1) within ten (10) calendar days after the cause that created or will create the delay first arose, if the Contractor could reasonably foresee that a delay could occur as a result, or (2) if delay is not reasonably foreseeable, within five (5) calendar days after the date the Contractor first had reason to believe that a delay could result. The foregoing will constitute the Contractor’s 's sole remedy or excuse with respect to delay. Providing notice in strict accordance with this paragraph is a condition precedent to such remedy. No claim for damages will be asserted by the Contractor. The Contractor will not be entitled to an increase in the Contract price or payment of any kind from the Department for direct, indirect, consequential, impact or other costs, expenses or damages, including but not limited to costs of acceleration or inefficiency, arising because of delay, disruption, interference, or hindrance from any cause whatsoever. If performance is suspended or delayed, in whole or in part, due to any of the causes described in this paragraph, after the causes have ceased to exist the Contractor will perform at no increased cost, unless the Department determines, in its sole discretion, that the delay will significantly impair the value of the Contract to the State of Florida or to Customers, in which case the Department may (1) accept allocated performance or deliveries from the Contractor, provided that the Contractor grants preferential treatment to Customers and the Department with respect to commodities or contractual services subjected to allocation, or (2) purchase from other sources (without recourse to and by the Contractor for the related costs and expenses) to replace all or part of the commodity or contractual services that are the subject of the delay, which purchases may be deducted from the Contract quantity, or (3) terminate the Contract in whole or in part.
Appears in 6 contracts
Samples: Alternate Contract Source Agreement, Participating Addendum, State Term Contract
Force Majeure. Notice of Delay, and No Damages for Delay. The Contractor Broker will not be responsible for delay resulting from its failure to perform if neither the fault nor the negligence of the Contractor Broker or its employees or agents contributed to the delay, delay and the delay is due directly to fireacts of God, explosionwars, earthquakeacts of public enemies, windstormstrikes, floodfires, radioactive or toxic chemical hazard, war, military hostilities, terrorism, civil emergency, embargo, riot, strike, violent civil unrestfloods, or other similar cause wholly beyond the ContractorBroker’s reasonable control, or for any of the foregoing that affect subcontractors or suppliers if no alternate source of supply is available to the Contractor. The foregoing does not excuse delay which could have been avoided if the Contractor implemented any risk mitigation required by the ContractBroker. In case of any delay the Contractor Broker believes is excusable, the Contractor will Broker shall notify the Department or Customer in writing of the delay or potential delay and describe the cause of the delay either (1) within ten (10) calendar 10 days after the cause that created creates or will create the delay first arose, if the Contractor Broker could reasonably foresee that a delay could occur as a result, or (2) if delay is not reasonably foreseeable, within five (5) calendar days after the date the Contractor Broker first had reason to believe that a delay could result. The foregoing will shall constitute the ContractorBroker’s sole remedy or excuse with respect to delay. Providing notice in strict accordance with this paragraph is a condition precedent to such remedy. No claim for damages will be asserted by the ContractorBroker. The Contractor Broker will not be entitled to an increase in the Contract price or payment of any kind from the Department or Customer for direct, indirect, consequential, impact or other costs, expenses or damages, including but not limited to costs of acceleration or inefficiency, arising because of delay, disruption, interference, or hindrance from any cause whatsoever. If performance is suspended or delayed, in whole or in part, due to any of the causes described in this paragraph, after the causes have ceased to exist the Contractor will Broker shall perform at no increased cost, unless the Department or Customer determines, in its sole discretion, that the delay will significantly impair the value of the Contract to the State of Florida or to Customers, in which case the Department or Customer may (1) accept allocated performance or deliveries from the ContractorBroker, provided that the Contractor Broker grants preferential treatment to Customers and the Department with respect to commodities or contractual services subjected to allocation, or (2) purchase from other sources (without recourse to and by the Contractor Broker for the related costs and expenses) to replace all or part of the commodity or contractual services that are the subject of the delay, which purchases may be deducted from the Contract quantity, or (3) terminate the Contract in whole or in part.
Appears in 4 contracts
Samples: Government Crime Insurance Contract, Contract for Commercial Automobile Insurance, Commercial Automobile Insurance Contract
Force Majeure. Notice of Delay, and No Damages for Delay. The Contractor will shall not be responsible for delay resulting from its failure to perform if neither the fault nor the negligence of the Contractor or its employees or agents contributed to the delay, delay and the delay is due directly to fireacts of God, explosionwars, earthquakeacts of public enemies, windstormstrikes, floodfires, radioactive or toxic chemical hazard, war, military hostilities, terrorism, civil emergency, embargo, riot, strike, violent civil unrestfloods, or other similar cause wholly beyond the Contractor’s reasonable control, or for any of the foregoing that affect subcontractors or suppliers if no alternate source of supply is available to the Contractor. The foregoing does not excuse delay which could have been avoided if the Contractor implemented any risk mitigation required by the Contract. In case of any delay the Contractor believes is excusable, the Contractor will shall notify the Department in writing of the delay or potential delay and describe the cause of the delay either (1) within ten (10) calendar days after the cause that created creates or will create the delay first arose, if the Contractor could reasonably foresee that a delay could occur as a result, ; or (2) if delay is not reasonably foreseeable, within five (5) calendar days after the date the Contractor first had reason to believe that a delay could result. The foregoing will constitute the Contractor’s sole remedy or excuse with respect to delayTHE FOREGOING SHALL CONSTITUTE THE CONTRACTOR’S SOLE REMEDY OR EXCUSE WITH RESPECT TO DELAY. Providing notice in strict accordance with this paragraph is a condition precedent to such remedy. No claim for damages will damages, other than for an extension of time, shall be asserted by against the ContractorDepartment. The Contractor will shall not be entitled to an increase in the Contract price or payment of any kind from the Department for direct, indirect, consequential, impact or other costs, expenses or damages, including but not limited to costs of acceleration or inefficiency, arising because of delay, disruption, interference, or hindrance from any cause whatsoever. If performance is suspended or delayed, in whole or in part, due to any of the causes described in this paragraph, after the causes have ceased to exist the Contractor will shall perform at no increased cost, unless the Department determines, in its sole discretion, that the delay will significantly impair the value of the Contract to the State of Florida or to CustomersDepartment, in which case the Department may (1) accept allocated performance or deliveries from the Contractor, provided that the Contractor grants preferential treatment to Customers and the Department with respect to commodities or contractual services products subjected to allocation, or ; (2) purchase from contract with other sources (without recourse to and by the Contractor for the related costs and expenses) to replace all or part of the commodity products or contractual services that are the subject of the delay, which purchases may be deducted from the Contract quantity, ; or (3) terminate the Contract in whole or in part.
Appears in 2 contracts
Samples: Standard Contract, Standard Contract
Force Majeure. Notice of Delay, and No Damages for Delay. The Contractor will not be responsible for delay resulting from its failure to perform if neither the fault nor the negligence of the Contractor or its employees or agents contributed to the DocuSign Envelope ID: C56728DD-40F6-4DC3-87AD-209C3B95BBC2 delay, and the delay is due directly to fire, explosion, earthquake, windstorm, flood, radioactive or toxic chemical hazard, war, military hostilities, terrorism, civil emergency, embargo, riot, strike, violent civil unrest, or other similar cause wholly beyond the Contractor’s reasonable control, or for any of the foregoing that affect subcontractors or suppliers if no alternate source of supply is available to the Contractor. The foregoing does not excuse delay which could have been avoided if the Contractor implemented any risk mitigation required by the Contract. In case of any delay the Contractor believes is excusable, the Contractor will notify the Department in writing of the delay or potential delay and describe the cause of the delay either (1) within ten (10) calendar days after the cause that created or will create the delay first arose, if the Contractor could reasonably foresee that a delay could occur as a result, or (2) if delay is not reasonably foreseeable, within five (5) calendar days after the date the Contractor first had reason to believe that a delay could result. The foregoing will constitute the Contractor’s sole remedy or excuse with respect to delay. Providing notice in strict accordance with this paragraph is a condition precedent to such remedy. No claim for damages will be asserted by the Contractor. The Contractor will not be entitled to an increase in the Contract price or payment of any kind from the Department for direct, indirect, consequential, impact or other costs, expenses or damages, including but not limited to costs of acceleration or inefficiency, arising because of delay, disruption, interference, or hindrance from any cause whatsoever. If performance is suspended or delayed, in whole or in part, due to any of the causes described in this paragraph, after the causes have ceased to exist the Contractor will perform at no increased cost, unless the Department determines, in its sole discretion, that the delay will significantly impair the value of the Contract to the State of Florida or to Customers, in which case the Department may (1) accept allocated performance or deliveries from the Contractor, provided that the Contractor grants preferential treatment to Customers and the Department with respect to commodities or contractual services subjected to allocation, or (2) purchase from other sources (without recourse to and by the Contractor for the related costs and expenses) to replace all or part of the commodity or contractual services that are the subject of the delay, which purchases may be deducted from the Contract quantity, or (3) terminate the Contract in whole or in part.
Appears in 2 contracts
Samples: Participating Addendum, Participating Addendum
Force Majeure. Notice of Delay, and No Damages for Delay. DocuSign Envelope ID: F3E6A3C5-71E8-4CD4-A63A-0D8A90091493 The Contractor will not be responsible for delay resulting from its failure to perform if neither the fault nor the negligence of the Contractor or its employees or agents contributed to the delay, and the delay is due directly to fire, explosion, earthquake, windstorm, flood, radioactive or toxic chemical hazard, war, military hostilities, terrorism, civil emergency, embargo, riot, strike, violent civil unrest, or other similar cause wholly beyond the Contractor’s reasonable control, or for any of the foregoing that affect subcontractors or suppliers if no alternate source of supply is available to the Contractor. The foregoing does not excuse delay which could have been avoided if the Contractor implemented any risk mitigation required by the Contract. In case of any delay the Contractor believes is excusable, the Contractor will notify the Department in writing of the delay or potential delay and describe the cause of the delay either (1) within ten (10) calendar days after the cause that created or will create the delay first arose, if the Contractor could reasonably foresee that a delay could occur as a result, or (2) if delay is not reasonably foreseeable, within five (5) calendar days after the date the Contractor first had reason to believe that a delay could result. The foregoing will constitute the Contractor’s sole remedy or excuse with respect to delay. Providing notice in strict accordance with this paragraph is a condition precedent to such remedy. No claim for damages will be asserted by the Contractor. The Contractor will not be entitled to an increase in the Contract price or payment of any kind from the Department for direct, indirect, consequential, impact or other costs, expenses or damages, including but not limited to costs of acceleration or inefficiency, arising because of delay, disruption, interference, or hindrance from any cause whatsoever. If performance is suspended or delayed, in whole or in part, due to any of the causes described in this paragraph, after the causes have ceased to exist the Contractor will perform at no increased cost, unless the Department determines, in its sole discretion, that the delay will significantly impair the value of the Contract to the State of Florida or to Customers, in which case the Department may (1) accept allocated performance or deliveries from the Contractor, provided that the Contractor grants preferential treatment to Customers and the Department with respect to commodities or contractual services subjected to allocation, or (2) purchase from other sources (without recourse to and by the Contractor for the related costs and expenses) to replace all or part of the commodity or contractual services that are the subject of the delay, which purchases may be deducted from the Contract quantity, or (3) terminate the Contract in whole or in part.
Appears in 1 contract
Samples: State Term Contract
Force Majeure. Notice of Delay, and No Damages for Delay. The Contractor will not be Neither Party is responsible for a delay resulting from its failure to perform if neither the fault nor the negligence of the Contractor Party or its employees or agents contributed to the delay, and the delay is due directly to fireacts of God, explosionwars, earthquakeacts of public enemies, windstormstrikes, floodfires, radioactive or toxic chemical hazardfloods, war, military hostilities, terrorism, civil emergency, embargo, riot, strike, violent civil unrestpandemics, or other similar cause wholly beyond the ContractorParty’s reasonable control, or for any of the foregoing that affect subcontractors or suppliers if no alternate source of supply is available to the Contractor. The foregoing does not excuse delay which could have been avoided if the Contractor implemented any risk mitigation required by the Contract. In case of any delay the Contractor CONTRACTOR believes is excusableexcusable under this provision, the Contractor CONTRACTOR will notify the Department COUNTY in writing of the delay or potential delay and describe the cause of the delay either (either: 1) within ten (10) calendar days after the cause that created creates or will create the delay first arose, if the Contractor CONTRACTOR could not reasonably foresee that a delay could occur as a result; or, or (2) if delay is not reasonably foreseeable, within five (5) calendar days after the date the Contractor CONTRACTOR first had reason to believe that a delay could result. The foregoing will constitute the Contractor’s sole remedy or excuse with respect to delayTHE FOREGOING CONSTITUTES THE CONTRACTOR’S SOLE REMEDY OR EXCUSE WITH RESPECT TO DELAY. Providing notice in strict accordance with this paragraph is a condition precedent to such remedy. No claim for damages damages, other than for an extension of time, will be asserted by against the ContractorCOUNTY. The Contractor CONTRACTOR will not be entitled to an increase in the Contract price or payment of any kind from the Department COUNTY for direct, indirect, consequential, impact or other costs, expenses or damages, including but not limited to costs of acceleration or inefficiency, arising because of delay, disruption, interference, or hindrance from any cause whatsoever. If performance is suspended or delayed, in whole or in part, due to any of the causes described in this paragraph, after the causes have ceased to exist the Contractor CONTRACTOR will perform at no increased cost. Notwithstanding the above, unless if the Department COUNTY determines, in its sole discretion, that the delay will significantly impair the value of the Contract Agreement to the State of Florida or to CustomersCOUNTY, in which case the Department COUNTY may (1) accept allocated performance or deliveries from the ContractorCONTRACTOR, provided that the Contractor CONTRACTOR grants preferential treatment to Customers and the Department COUNTY with respect to commodities or contractual services products subjected to allocation, ; or (2) may purchase from other sources (without recourse to and by the Contractor CONTRACTOR for the related costs and expenses) to replace all or part of the commodity Products or contractual services Services that are the subject of the delay, which purchases may be deducted from the Contract Agreement quantity, ; or (3) may terminate the Contract Agreement in whole or in part.
Appears in 1 contract
Samples: Goods & Services Agreement
Force Majeure. Notice 18.1 Neither party of Delay, and No Damages this Contract shall be liable to the other for Delay. The Contractor will not be responsible for delay resulting from its any cost or damages if the failure to perform if neither the Contract arises out of causes beyond the control and without the fault nor the or negligence of the Contractor parties. Such causes may include, but are not restricted to, acts of nature, fires, quarantine restrictions, strikes and freight embargoes. In all cases, the failure to perform shall be totally beyond the control and without any fault or its employees negligence of the party.
18.2 In the event of delay from the foregoing causes, the party shall take all reasonable measures to mitigate any and all resulting delay or agents contributed to disruption in the delay, and party’s performance obligation under this Contract. If the delay is due directly excusable under this section, the delay shall not result in any additional charge or cost under the Contract to fire, explosion, earthquake, windstorm, flood, radioactive or toxic chemical hazard, war, military hostilities, terrorism, civil emergency, embargo, riot, strike, violent civil unrest, or other similar cause wholly beyond the Contractor’s reasonable control, or for any of the foregoing that affect subcontractors or suppliers if no alternate source of supply is available to the Contractor. The foregoing does not excuse delay which could have been avoided if the Contractor implemented any risk mitigation required by the Contracteither party. In the case of any delay that the Contractor Vendor believes is excusableexcusable under this section, the Contractor will Vendor shall notify the Department County in writing of the delay or potential delay and describe the cause of the delay either either: (1) within ten (10) calendar days after the cause that created or will create the delay first arose, if the Contractor Vendor could reasonably foresee that a delay could occur as a result, ; or (2) if delay is not reasonably foreseeable, within five (5) calendar days after the date the Contractor Vendor first had reason to believe that a delay could result, if the delay is not reasonably foreseeable. The foregoing will constitute the Contractor’s sole remedy or excuse with respect to delayTHE FOREGOING SHALL CONSTITUTE THE VENDOR’S SOLE REMEDY OR EXCUSE WITH RESPECT TO DELAY. Providing notice in strict accordance with this paragraph section is a condition precedent to such remedy. The County, in its sole discretion, shall determine if the delay is excusable under this section and shall notify the Vendor of its decision in writing. No claim for damages will damages, other than for an extension of time, shall be asserted by against the ContractorCounty. The Contractor will Vendor shall not be entitled to an increase in the Contract price or payment of any kind from the Department County for direct, indirect, consequential, impact impact, or other costs, expenses or damages, including but not limited to costs of acceleration or inefficiency, inefficiency arising because of delay, disruption, interference, or hindrance from any cause whatsoever. If performance is suspended or delayed, in whole or in part, due to any of the causes described in this paragraph, after the causes have ceased to exist the Contractor will perform at no increased cost, unless the Department determines, in its sole discretion, that the delay will significantly impair the value of the Contract to the State of Florida or to Customers, in which case the Department may (1) accept allocated performance or deliveries from the Contractor, provided that the Contractor grants preferential treatment to Customers and the Department with respect to commodities or contractual services subjected to allocation, or (2) purchase from other sources (without recourse to and by the Contractor for the related costs and expenses) to replace all or part of the commodity or contractual services that are the subject of the delay, which purchases may be deducted from the Contract quantity, or (3) terminate the Contract in whole or in part.in
Appears in 1 contract
Force Majeure. Notice of Delay, and No Damages for Delay. DocuSign Envelope ID: 5CBE0C16-6D1D-4041-A211-2C6AB59FA8E4 The Contractor will not be responsible for delay resulting from its failure to perform if neither the fault nor the negligence of the Contractor or its employees or agents contributed to the delay, and the delay is due directly to fire, explosion, earthquake, windstorm, flood, radioactive or toxic chemical hazard, war, military hostilities, terrorism, civil emergency, embargo, riot, strike, violent civil unrest, or other similar cause wholly beyond the Contractor’s reasonable control, or for any of the foregoing that affect subcontractors or suppliers if no alternate source of supply is available to the Contractor. The foregoing does not excuse delay which could have been avoided if the Contractor implemented any risk mitigation required by the Contract. In case of any delay the Contractor believes is excusable, the Contractor will notify the Department in writing of the delay or potential delay and describe the cause of the delay either (1) within ten (10) calendar days after the cause that created or will create the delay first arose, if the Contractor could reasonably foresee that a delay could occur as a result, or (2) if delay is not reasonably foreseeable, within five (5) calendar days after the date the Contractor first had reason to believe that a delay could result. The foregoing will constitute the Contractor’s sole remedy or excuse with respect to delay. Providing notice in strict accordance with this paragraph is a condition precedent to such remedy. No claim for damages will be asserted by the Contractor. The Contractor will not be entitled to an increase in the Contract price or payment of any kind from the Department for direct, indirect, consequential, impact or other costs, expenses or damages, including but not limited to costs of acceleration or inefficiency, arising because of delay, disruption, interference, or hindrance from any cause whatsoever. If performance is suspended or delayed, in whole or in part, due to any of the causes described in this paragraph, after the causes have ceased to exist the Contractor will perform at no increased cost, unless the Department determines, in its sole discretion, that the delay will significantly impair the value of the Contract to the State of Florida or to Customers, in which case the Department may (1) accept allocated performance or deliveries from the Contractor, provided that the Contractor grants preferential treatment to Customers and the Department with respect to commodities or contractual services subjected to allocation, or (2) purchase from other sources (without recourse to and by the Contractor for the related costs and expenses) to replace all or part of the commodity or contractual services that are the subject of the delay, which purchases may be deducted from the Contract quantity, or (3) terminate the Contract in whole or in part.
Appears in 1 contract
Samples: Furniture Contract
Force Majeure. Notice of Delay, and No Damages for Delay. The Contractor will shall not be responsible for delay resulting from its failure to perform if neither the fault nor the negligence of the Contractor or Contractor, its officers, employees or agents contributed to the delay, such delay and the delay is due directly to fireacts of God, explosionwars, earthquakeacts of public enemies, windstormstrikes, flood, radioactive fires or toxic chemical hazard, war, military hostilities, terrorism, civil emergency, embargo, riot, strike, violent civil unrestfloods, or other similar cause wholly beyond the control of the Contractor’s reasonable control, or for any of the foregoing that which affect subcontractors or suppliers if and no alternate source of supply is available to the Contractor. The foregoing does not excuse delay which could have been avoided if the In such event, Contractor implemented any risk mitigation required by the Contract. In case of any delay the Contractor believes is excusable, the Contractor will shall notify the Department in writing Commissioner, by certified or registered mail, of the delay or potential delay and describe the cause of the delay cause(s) thereof either (1a) within ten (10) calendar days after the cause that created which creates or will create the delay first arose, arose if the Contractor could reasonably foresee that a delay could occur as a resultby reason thereof, or (2) b), if delay is not reasonably foreseeable, within five (5) calendar days after the date the Contractor first had reason to believe that a delay could result. The foregoing will shall constitute the Contractor’s sole remedy or excuse with respect to such delay. Providing notice in strict accordance with this paragraph is a condition precedent to such remedy. No claim for damages will be asserted by In the Contractor. The Contractor will not be entitled to an increase in the Contract price or payment of any kind from the Department for direct, indirect, consequential, impact or other costs, expenses or damages, including but not limited to costs of acceleration or inefficiency, arising because of delay, disruption, interference, or hindrance from any cause whatsoever. If event performance is suspended or delayed, in whole or in part, due to by reason of any of the aforesaid causes described in this paragraphor occurrences and proper notification is given the Commissioner, after the causes have ceased to exist any performance so suspended or delayed shall be performed by the Contractor will perform at no increased cost, promptly after such disabilities have ceased to exist unless it is determined in the Department determines, in its sole discretion, discretion of the Commissioner that the delay will significantly impair the value of the Contract contract to the State of Florida or to CustomersAuthorized Users, in which case whereupon the Department may (1) accept Commissioner may:
a. Accept allocated performance or deliveries from the Contractor. The Contractor, provided that the Contractor grants however, hereby agrees to grant preferential treatment to Customers and the Department State Agencies with respect to commodities or contractual services Product subjected to allocation, or (2) purchase ; and/or
b. Purchase from other sources (without recourse to and by the Contractor for the related costs and expensesexpenses thereof) to replace all or part of the commodity or contractual services that Products which are the subject of the delay, which purchases may be deducted from the Contract contract quantity; or
c. Terminate the contract or the portion thereof which is subject to delivery delays, and thereby discharge any unexecuted portion of the contract or (3) terminate the Contract in whole or in partrelative part thereof.
Appears in 1 contract
Force Majeure. Notice of Delay, and No Damages for Delay. The a. Contractor will shall not be responsible for delay resulting from its failure to perform if neither the fault nor the negligence of the Contractor or its employees employees, subcontractors, or agents contributed to the delay, delay and the delay is due directly to firesevere, explosionunanticipated natural events, earthquakewars, windstormacts of public enemies, floodstrikes, radioactive or toxic chemical hazardfires, warfloods, military hostilities, terrorism, civil emergency, embargo, riot, strike, violent civil unresthurricanes, or other similar cause wholly beyond the Contractor’s reasonable controlcontrol for which the Contractor can neither anticipate or prepare, or for any of the foregoing that affect subcontractors or suppliers if no alternate source of supply is available to the Contractor. The foregoing does not excuse delay which could have been avoided if the Contractor implemented any risk mitigation required by the Contract. In case of any delay the Contractor believes is excusable, the Contractor will shall notify the Department in writing of the delay or potential delay and describe the cause of the delay either (1) within ten (10) calendar days after the cause that created creates or will create the delay first arose, if the Contractor could reasonably foresee that a delay could occur as a result, or (2) if delay is not reasonably foreseeable, within five (5) calendar days after the date the Contractor first had reason to believe that a delay could result. The foregoing will constitute the Contractor’s sole remedy or excuse with respect to delayTHE FOREGOING SHALL CONSTITUTE CONTRACTOR’S SOLE REMEDY OR EXCUSE WITH RESPECT TO DELAY. Providing notice in strict accordance with this paragraph is a condition precedent to such remedy. .
b. No claim for damages will damages, other than for an extension of time, shall be asserted by the ContractorContractor against Department. The Contractor will shall not be entitled to an increase in the Contract price or payment of any kind from the Department for direct, indirect, consequential, impact or other costs, expenses or damages, including but not limited to costs of acceleration or inefficiency, arising because of delay, disruption, interference, or hindrance from any cause whatsoever. If performance is suspended or delayed, in whole or in part, due to any of the causes described in this paragraph, after the causes have ceased to exist the Contractor will shall perform at no increased cost, unless the Department determines, in its sole discretion, that the delay will significantly impair the value of the Contract to the State of Florida or to CustomersDepartment, in which case the Department may (1) accept allocated performance or deliveries from the Contractor, provided that the Contractor grants preferential treatment to Customers and the Department with respect to commodities or contractual services products subjected to allocation, or (2) purchase from other sources (without recourse to and by the Contractor for the related costs and expenses) to replace all or part of the commodity or contractual services products that are the subject of the delay, which purchases may be deducted from the Contract quantity, or (3) terminate the Contract in whole or in part.
c. If a State of Emergency is issued by the Governor for the location Facility, the Department at its sole discretion may pay a Contractor a mobilization to manually disconnect a remediation system from the power source, or to mobilize to a site if they were required to demobilize due to the Emergency. Only mobilization costs will be considered, no additional costs shall be paid. Contractors are required to secure all equipment, open excavations and investigative Derived Waste prior to leaving a site, therefore additional compensation for these activities will not be paid. Leased equipment is required to have the ability to be shutdown remotely via telemetry and additional compensation for these activities will not be paid.
Appears in 1 contract
Samples: Standard Contract
Force Majeure. Notice of Delay, and No Damages for Delay. DocuSign Envelope ID: 8F5B3E9F-F9B9-47AF-8788-C9DB4E99EDE5 The Contractor will not be responsible for delay resulting from its failure to perform if neither the fault nor the negligence of the Contractor or its employees or agents contributed to the delay, and the delay is due directly to fire, explosion, earthquake, windstorm, flood, radioactive or toxic chemical hazard, war, military hostilities, terrorism, civil emergency, embargo, riot, strike, violent civil unrest, or other similar cause wholly beyond the Contractor’s reasonable control, or for any of the foregoing that affect subcontractors or suppliers if no alternate source of supply is available to the Contractor. The foregoing does not excuse delay which could have been avoided if the Contractor implemented any risk mitigation required by the Contract. In case of any delay the Contractor believes is excusable, the Contractor will notify the Department in writing of the delay or potential delay and describe the cause of the delay either (1) within ten (10) calendar days after the cause that created or will create the delay first arose, if the Contractor could reasonably foresee that a delay could occur as a result, or (2) if delay is not reasonably foreseeable, within five (5) calendar days after the date the Contractor first had reason to believe that a delay could result. The foregoing will constitute the Contractor’s sole remedy or excuse with respect to delay. Providing notice in strict accordance with this paragraph is a condition precedent to such remedy. No claim for damages will be asserted by the Contractor. The Contractor will not be entitled to an increase in the Contract price or payment of any kind from the Department for direct, indirect, consequential, impact or other costs, expenses or damages, including but not limited to costs of acceleration or inefficiency, arising because of delay, disruption, interference, or hindrance from any cause whatsoever. If performance is suspended or delayed, in whole or in part, due to any of the causes described in this paragraph, after the causes have ceased to exist the Contractor will perform at no increased cost, unless the Department determines, in its sole discretion, that the delay will significantly impair the value of the Contract to the State of Florida or to Customers, in which case the Department may (1) accept allocated performance or deliveries from the Contractor, provided that the Contractor grants preferential treatment to Customers and the Department with respect to commodities or contractual services subjected to allocation, or (2) purchase from other sources (without recourse to and by the Contractor for the related costs and expenses) to replace all or part of the commodity or contractual services that are the subject of the delay, which purchases may be deducted from the Contract quantity, or (3) terminate the Contract in whole or in part.
Appears in 1 contract
Samples: Furniture Contract
Force Majeure. Notice of Delay, and No Damages for Delay. The Contractor will shall not be responsible for delay resulting from its failure to perform if neither the fault nor the negligence of the Contractor or its employees or agents contributed to the delay, delay and the delay is due directly to fireacts of God, explosionwars, earthquakeacts of public enemies, windstormstrikes, floodfires, radioactive or toxic chemical hazard, war, military hostilities, terrorism, civil emergency, embargo, riot, strike, violent civil unrestfloods, or other similar cause wholly beyond the Contractor’s reasonable control, or for any of the foregoing that affect subcontractors or suppliers if no alternate source of supply is available to the Contractor. The foregoing does not excuse delay which could have been avoided if the Contractor implemented any risk mitigation required by the Contract. In case of any delay the Contractor believes is excusable, the Contractor will shall notify the Department Customer in writing of the delay or potential delay and describe the cause of the delay either (1) within ten (10) calendar days after the cause that created creates or will create the delay first arose, if the Contractor could reasonably foresee that a delay could occur as a result, or (2) if delay is not reasonably foreseeable, within five (5) calendar days after the date the Contractor first had reason to believe that a delay could result. The foregoing will constitute the Contractor’s sole remedy or excuse with respect to delay. THE FOREGOING SHALL Providing notice in strict accordance with this paragraph is a condition precedent to such remedy. No claim for damages will damages, other than for an extension of time, shall be asserted by against the ContractorCustomer. The the Contractor will shall not be entitled to an increase in the Contract price or payment of any kind from the Department Customer for direct, indirect, consequential, impact or other costs, expenses or damages, including but not limited to costs of acceleration or inefficiency, arising because of delay, disruption, interference, or hindrance from any cause whatsoever. If performance is suspended or delayed, in whole or in part, due to any of the causes described in this paragraph, after the causes have ceased to exist the Contractor will shall perform at no increased cost, unless the Department Customer determines, in its sole discretion, that the delay will significantly impair the value of the Contract to the State of Florida or to Customers, in which case the Department Customer may (1) accept allocated performance or deliveries from the Contractor, provided that the Contractor grants preferential treatment to Customers and the Department with respect to commodities or contractual services products subjected to allocation, or (2) purchase from other sources (without recourse to and by the Contractor for the related costs and expenses) to replace all or part of the commodity or contractual services products that are the subject of the delay, which purchases may be deducted from the Contract quantity, or (3) terminate the Contract in whole or in part.
Appears in 1 contract
Samples: Hvac Equipment Maintenance, Repair and Installation/Replacement Services Agreement
Force Majeure. Notice of Delay, and No Damages for Delay. DocuSign Envelope ID: FB5E3D7E-9FCF-4812-B327-0438882184CB The Contractor will not be responsible for delay resulting from its failure to perform if neither the fault nor the negligence of the Contractor or its employees or agents contributed to the delay, and the delay is due directly to fire, explosion, earthquake, windstorm, flood, radioactive or toxic chemical hazard, war, military hostilities, terrorism, civil emergency, embargo, riot, strike, violent civil unrest, or other similar cause wholly beyond the Contractor’s 's reasonable control, or for any of the foregoing that affect subcontractors or suppliers if no alternate source of supply is available to the Contractor. The foregoing does not excuse delay which could have been avoided if the Contractor implemented any risk mitigation required by the Contract. In case of any delay the Contractor believes is excusable, the Contractor will notify the Department in writing of the delay or potential delay and describe the cause of the delay either (1) within ten (10) calendar days after the cause that created or will create the delay first arose, if the Contractor could reasonably foresee that a delay could occur as a result, or (2) if delay is not reasonably foreseeable, within five (5) calendar days after the date the Contractor first had reason to believe that a delay could result. The foregoing will constitute the Contractor’s 's sole remedy or excuse with respect to delay. Providing notice in strict accordance with this paragraph is a condition precedent to such remedy. No claim for damages will be asserted by the Contractor. The Contractor will not be entitled to an increase in the Contract price or payment of any kind from the Department for direct, indirect, consequential, impact or other costs, expenses or damages, including but not limited to costs of acceleration or inefficiency, arising because of delay, disruption, interference, or hindrance from any cause whatsoever. If performance is suspended or delayed, in whole or in part, due to any of the causes described in this paragraph, after the causes have ceased to exist the Contractor will perform at no increased cost, unless the Department determines, in its sole discretion, that the delay will significantly impair the value of the Contract to the State of Florida or to Customers, in which case the Department may (1) accept allocated performance or deliveries from the Contractor, provided that the Contractor grants preferential treatment to Customers and the Department with respect to commodities or contractual services subjected to allocation, or (2) purchase from other sources (without recourse to and by the Contractor for the related costs and expenses) to replace all or part of the commodity or contractual services that are the subject of the delay, which purchases may be deducted from the Contract quantity, or (3) terminate the Contract in whole or in part.
Appears in 1 contract
Samples: Alternate Contract Source Agreement
Force Majeure. Notice of Delay, and No Damages for Delay. DocuSign Envelope ID: A34DA2EA-3A4B-4835-9DDC-22192D3DA74B The Contractor will not be responsible for delay resulting from its failure to perform if neither the fault nor the negligence of the Contractor or its employees or agents contributed to the delay, and the delay is due directly to fire, explosion, earthquake, windstorm, flood, radioactive or toxic chemical hazard, war, military hostilities, terrorism, civil emergency, embargo, riot, strike, violent civil unrest, or other similar cause wholly beyond the Contractor’s reasonable control, or for any of the foregoing that affect subcontractors or suppliers if no alternate source of supply is available to the Contractor. The foregoing does not excuse delay which could have been avoided if the Contractor implemented any risk mitigation required by the Contract. In case of any delay the Contractor believes is excusable, the Contractor will notify the Department in writing of the delay or potential delay and describe the cause of the delay either (1) within ten (10) calendar days after the cause that created or will create the delay first arose, if the Contractor could reasonably foresee that a delay could occur as a result, or (2) if delay is not reasonably foreseeable, within five (5) calendar days after the date the Contractor first had reason to believe that a delay could result. The foregoing will constitute the Contractor’s sole remedy or excuse with respect to delay. Providing notice in strict accordance with this paragraph is a condition precedent to such remedy. No claim for damages will be asserted by the Contractor. The Contractor will not be entitled to an increase in the Contract price or payment of any kind from the Department for direct, indirect, consequential, impact or other costs, expenses or damages, including but not limited to costs of acceleration or inefficiency, arising because of delay, disruption, interference, or hindrance from any cause whatsoever. If performance is suspended or delayed, in whole or in part, due to any of the causes described in this paragraph, after the causes have ceased to exist the Contractor will perform at no increased cost, unless the Department determines, in its sole discretion, that the delay will significantly impair the value of the Contract to the State of Florida or to Customers, in which case the Department may (1) accept allocated performance or deliveries from the Contractor, provided that the Contractor grants preferential treatment to Customers and the Department with respect to commodities or contractual services subjected to allocation, or (2) purchase from other sources (without recourse to and by the Contractor for the related costs and expenses) to replace all or part of the commodity or contractual services that are the subject of the delay, which purchases may be deducted from the Contract quantity, or (3) terminate the Contract in whole or in part.
Appears in 1 contract
Samples: Furniture Contract
Force Majeure. Notice of Delay, and No Damages for Delay. DocuSign Envelope ID: 357AD5A2-BD41-424B-A705-8967AF2DF5BD The Contractor will not be responsible for delay resulting from its failure to perform if neither the fault nor the negligence of the Contractor or its employees or agents contributed to the delay, and the delay is due directly to fire, explosion, earthquake, windstorm, flood, radioactive or toxic chemical hazard, war, military hostilities, terrorism, civil emergency, embargo, riot, strike, violent civil unrest, or other similar cause wholly beyond the Contractor’s reasonable control, or for any of the foregoing that affect subcontractors or suppliers if no alternate source of supply is available to the Contractor. The foregoing does not excuse delay which could have been avoided if the Contractor implemented any risk mitigation required by the Contract. In case of any delay the Contractor believes is excusable, the Contractor will notify the Department in writing of the delay or potential delay and describe the cause of the delay either (1) within ten (10) calendar days after the cause that created or will create the delay first arose, if the Contractor could reasonably foresee that a delay could occur as a result, or (2) if delay is not reasonably foreseeable, within five (5) calendar days after the date the Contractor first had reason to believe that a delay could result. The foregoing will constitute the Contractor’s sole remedy or excuse with respect to delay. Providing notice in strict accordance with this paragraph is a condition precedent to such remedy. No claim for damages will be asserted by the Contractor. The Contractor will not be entitled to an increase in the Contract price or payment of any kind from the Department for direct, indirect, consequential, impact or other costs, expenses or damages, including but not limited to costs of acceleration or inefficiency, arising because of delay, disruption, interference, or hindrance from any cause whatsoever. If performance is suspended or delayed, in whole or in part, due to any of the causes described in this paragraph, after the causes have ceased to exist the Contractor will perform at no increased cost, unless the Department determines, in its sole discretion, that the delay will significantly impair the value of the Contract to the State of Florida or to Customers, in which case the Department may (1) accept allocated performance or deliveries from the Contractor, provided that the Contractor grants preferential treatment to Customers and the Department with respect to commodities or contractual services subjected to allocation, or (2) purchase from other sources (without recourse to and by the Contractor for the related costs and expenses) to replace all or part of the commodity or contractual services that are the subject of the delay, which purchases may be deducted from the Contract quantity, or (3) terminate the Contract in whole or in part.
Appears in 1 contract
Samples: State Term Contract
Force Majeure. Notice of Delay, and No Damages for Delay. The Contractor will shall not be responsible for delay resulting from its failure to perform if neither the fault nor the negligence of the Contractor or Contractor, its officers, employees or agents contributed to the delay, such delay and the delay is due directly to fireacts of God, explosionwars, earthquakeacts of public enemies, windstormstrikes, flood, radioactive fires or toxic chemical hazard, war, military hostilities, terrorism, civil emergency, embargo, riot, strike, violent civil unrestfloods, or other similar cause wholly beyond the control of the Contractor’s reasonable control, or for any of the foregoing that which affect subcontractors or suppliers if and no alternate source of supply is available to the Contractor. The foregoing does not excuse delay which could have been avoided if the In such event, Contractor implemented any risk mitigation required by the Contract. In case of any delay the Contractor believes is excusable, the Contractor will shall notify the Department in writing Commissioner, by certified or registered mail, of the delay or potential delay and describe the cause of the delay either cause(s) thereof either
(1a) within ten (10) calendar days after the cause that created which creates or will create the delay first arose, arose if the Contractor could reasonably foresee that a delay could occur as a resultby reason thereof, or (2) b), if delay is not reasonably foreseeable, within five (5) calendar days after the date the Contractor first had reason to believe that a delay could result. The foregoing will shall constitute the Contractor’s sole remedy or excuse with respect to such delay. Providing notice in strict accordance with this paragraph is a condition precedent to such remedy. No claim for damages will be asserted by In the Contractor. The Contractor will not be entitled to an increase in the Contract price or payment of any kind from the Department for direct, indirect, consequential, impact or other costs, expenses or damages, including but not limited to costs of acceleration or inefficiency, arising because of delay, disruption, interference, or hindrance from any cause whatsoever. If event performance is suspended or delayed, in whole or in part, due to by reason of any of the aforesaid causes described in this paragraphor occurrences and proper notification is given the Commissioner, after the causes have ceased to exist any performance so suspended or delayed shall be performed by the Contractor will perform at no increased cost, promptly after such disabilities have ceased to exist unless it is determined in the Department determines, in its sole discretion, discretion of the Commissioner that the delay will significantly impair the value of the Contract contract to the State of Florida or to CustomersAuthorized Users, in which case whereupon the Department may (1) accept Commissioner may:
a. Accept allocated performance or deliveries from the Contractor. The Contractor, provided that the Contractor grants however, hereby agrees to grant preferential treatment to Customers and the Department State Agencies with respect to commodities or contractual services Product pricing category subjected to allocation, or (2) purchase ; and/or
b. Purchase from other sources (without recourse to and by the Contractor for the related costs and expensesexpenses thereof) to replace all or part of the commodity or contractual services that Products which are the subject of the delay, which purchases may be deducted from the Contract contract quantity; or
c. Terminate the contract or the portion thereof which is subject to delivery delays, and thereby discharge any unexecuted portion of the contract or (3) terminate the Contract in whole or in partrelative part thereof.
Appears in 1 contract
Samples: Contract for the Acquisition of Proprietary Software and Related Services
Force Majeure. Notice of Delay, and No Damages for Delay. The Contractor will not be responsible for delay resulting from its failure to perform if neither the fault nor the negligence of the Contractor or its employees or agents contributed to the delay, delay and the delay is due directly to fire, explosion, earthquake, windstorm, flood, radioactive or toxic chemical hazard, war, military hostilities, terrorism, civil emergency, embargo, riot, strike, violent civil unrest, or other similar cause wholly beyond the Contractor’s 's reasonable control, or for any of the foregoing that affect subcontractors or suppliers if no alternate source of supply is available to the Contractor. The foregoing does not excuse delay which could have been avoided if the Contractor implemented any risk mitigation required by the Contract. In case of any delay the Contractor believes is excusable, the Contractor will notify the Department in writing of the delay or potential delay and describe the cause of the delay either (1) within ten (10) calendar days after the cause that created creates or will create the delay first arose, if the Contractor could reasonably foresee that a delay could occur as a result, or (2) if delay is not reasonably foreseeable, within five (5) calendar days after the date the Contractor first had reason to believe that a delay could result. The foregoing will constitute the Contractor’s 's sole remedy or excuse with respect to delay. Providing notice in strict accordance with this paragraph is a condition precedent to such remedy. No claim for damages will be asserted by the Contractor. The Contractor will not be entitled to an increase in the Contract price or payment of any kind from the Department for direct, indirect, consequential, impact or other costs, expenses or damages, including but not limited to costs of acceleration or inefficiency, arising because of delay, disruption, interference, or hindrance from any cause whatsoever. If performance is suspended or delayed, in whole or in part, due to any of the causes described in this paragraph, after the causes have ceased to exist the Contractor will perform at no increased cost, unless the Department determines, in its sole discretion, that the delay will significantly impair the value of the Contract to the State of Florida or to Customers, in which case the Department may (1) accept allocated performance or deliveries from the Contractor, provided that the Contractor grants preferential treatment to Customers and the Department with respect to commodities or contractual services subjected to allocation, or (2) purchase from other sources (without recourse to and by the Contractor for the related costs and expenses) to replace all or part of the commodity or contractual services that are the subject of the delay, which purchases may be deducted from the Contract quantity, or (3) terminate the Contract in whole or in part.
Appears in 1 contract
Force Majeure. Notice of Delay, and No Damages for Delay. DocuSign Envelope ID: 267FECA4-1C40-4BF4-B63F-3E496F93DB62 The Contractor will not be responsible for delay resulting from its failure to perform if neither the fault nor the negligence of the Contractor or its employees or agents contributed to the delay, and the delay is due directly to fire, explosion, earthquake, windstorm, flood, radioactive or toxic chemical hazard, war, military hostilities, terrorism, civil emergency, embargo, riot, strike, violent civil unrest, or other similar cause wholly beyond the Contractor’s reasonable control, or for any of the foregoing that affect subcontractors or suppliers if no alternate source of supply is available to the Contractor. The foregoing does not excuse delay which could have been avoided if the Contractor implemented any risk mitigation required by the Contract. In case of any delay the Contractor believes is excusable, the Contractor will notify the Department in writing of the delay or potential delay and describe the cause of the delay either (1) within ten (10) calendar days after the cause that created or will create the delay first arose, if the Contractor could reasonably foresee that a delay could occur as a result, or (2) if delay is not reasonably foreseeable, within five (5) calendar days after the date the Contractor first had reason to believe that a delay could result. The foregoing will constitute the Contractor’s sole remedy or excuse with respect to delay. Providing notice in strict accordance with this paragraph is a condition precedent to such remedy. No claim for damages will be asserted by the Contractor. The Contractor will not be entitled to an increase in the Contract price or payment of any kind from the Department for direct, indirect, consequential, impact or other costs, expenses or damages, including but not limited to costs of acceleration or inefficiency, arising because of delay, disruption, interference, or hindrance from any cause whatsoever. If performance is suspended or delayed, in whole or in part, due to any of the causes described in this paragraph, after the causes have ceased to exist the Contractor will perform at no increased cost, unless the Department determines, in its sole discretion, that the delay will significantly impair the value of the Contract to the State of Florida or to Customers, in which case the Department may (1) accept allocated performance or deliveries from the Contractor, provided that the Contractor grants preferential treatment to Customers and the Department with respect to commodities or contractual services subjected to allocation, or (2) purchase from other sources (without recourse to and by the Contractor for the related costs and expenses) to replace all or part of the commodity or contractual services that are the subject of the delay, which purchases may be deducted from the Contract quantity, or (3) terminate the Contract in whole or in part.
Appears in 1 contract
Samples: Furniture Contract
Force Majeure. Notice of Delay, and No Damages Neither the Coalition nor the Contractor shall be liable to the other for Delay. The Contractor will not be responsible for any delay resulting from its or failure to perform under the agreement if such delay or failure is neither the fault nor the negligence of the Coalition or the Contractor or its their employees or agents contributed to the delay, and agents. This holds true if the delay is due directly to fireacts of God, explosionwars, earthquakeacts of public enemies, windstormstrikes, floodfires, radioactive or toxic chemical hazard, war, military hostilities, terrorism, civil emergency, embargo, riot, strike, violent civil unrest, floods or other similar cause wholly beyond the Contractorparty’s reasonable control, or for any of the foregoing that affect affects subcontractors or suppliers if there is no available alternate source supply source. However, in the event of supply is available delay from the foregoing causes, the Coalition or the Contractor shall take all reasonable measures to mitigate any and all resulting delays or disruptions in the Coalition or the Contractor’s performance obligation under the agreement. The foregoing does If the delay is excusable under this paragraph, the delay will not excuse delay which could have been avoided if result in any additional charge or cost to either the Coalition or the Contractor implemented any risk mitigation required by under the Contractagreement. In the case of any delay the Contractor believes is excusableexcusable under this paragraph, the Contractor will shall notify the Department in writing of the delay or potential delay Coalition and describe the cause of the delay either (1) or potential delay in writing within ten (10) calendar days after the cause that created creates or will create the delay first arose, if the Contractor could reasonably foresee that a delay could occur as a result, or (2) if delay is not reasonably foreseeable, within five (5) calendar days after the date the Contractor first had reason to believe that a delay could resultdelay. The foregoing will constitute shall be the Contractor’s sole remedy or excuse with respect to regarding the delay. Providing The Contractor must provide notice in strict accordance compliance with this paragraph is a condition precedent section to such receive the remedy. No claim for damages The Coalition, in its sole discretion, will be asserted by determine if the Contractordelay is excusable under this paragraph and will notify the Contractor of the Coalition’s decision in writing. The Contractor will shall not be assert a claim for damages, other than for an extension of time, against the Coalition. The Contractor is not entitled to an increase in the Contract agreement price or payment of any kind from the Department Coalition for direct, indirect, consequential, impact or other costs, expenses or damages. These include, including but are not limited to to, costs of acceleration or inefficiency, arising because of inefficiency due to delay, disruption, interference, or hindrance from any cause whatsoever. If performance is any of the causes this section describes suspended or delayeddelayed performance, in whole or in part, due to any of the causes described in this paragraph, after the causes have ceased to exist exist, the Contractor will shall perform at no increased cost, unless the Department Coalition determines, in its sole discretion, that the delay will significantly impair the agreement’s value to the Coalition, OEL or the state. In which case, the Coalition may take any or all of the Contract to the State of Florida or to Customers, in which case the Department may (1) accept allocated performance or deliveries from the Contractor, provided that the Contractor grants preferential treatment to Customers and the Department with respect to commodities or contractual services subjected to allocation, or (2) purchase from other sources (without recourse to and by the Contractor for the related costs and expenses) to replace all or part of the commodity or contractual services that are the subject of the delay, which purchases may be deducted from the Contract quantity, or (3) terminate the Contract in whole or in part.following actions:
Appears in 1 contract
Samples: Primary Services Contract
Force Majeure. Notice of Delay, and No Damages for Delay. The Contractor will shall not be responsible for delay resulting from its failure to perform if neither the fault nor the negligence of the Contractor or its employees or agents contributed to the delay, delay and the delay is due directly to fireacts of God, explosionwars, earthquakeacts of public enemies, windstormstrikes, floodfires, radioactive or toxic chemical hazard, war, military hostilities, terrorism, civil emergency, embargo, riot, strike, violent civil unrestfloods, or other similar cause wholly beyond the Contractor’s reasonable control, or for any of the foregoing that affect subcontractors or suppliers if no alternate source of supply is available to the Contractor. The foregoing does not excuse delay which could have been avoided if the Contractor implemented any risk mitigation required by the Contract. In case of any delay the Contractor believes is excusable, the Contractor will shall notify the Department Customer in writing of the delay or potential delay and describe the cause of the delay either (1) within ten (10) calendar days after the cause that created creates or will create the delay first arose, if the Contractor could reasonably foresee that a delay could occur as a result, or (2) if delay is not reasonably foreseeable, within five (5) calendar days after the date the Contractor first had reason to believe that a delay could result. The foregoing will constitute the Contractor’s sole remedy or excuse with respect to delayTHE FOREGOING SHALL CONSTITUTE THE CONTRACTOR’S SOLE REMEDY OR EXCUSE WITH RESPECT TO DELAY. Providing notice in strict accordance with this paragraph is a condition precedent to such remedy. No claim for damages will damages, other than for an extension of time, shall be asserted by against the ContractorCustomer. The the Contractor will shall not be entitled to an increase in the Contract price or payment of any kind from the Department Customer for direct, indirect, consequential, impact or other costs, expenses or damages, including but not limited to costs of acceleration or inefficiency, arising because of delay, disruption, interference, or hindrance from any cause whatsoever. If performance is suspended or delayed, in whole or in part, due to any of the causes described in this paragraph, after the causes have ceased to exist the Contractor will shall perform at no increased cost, unless the Department Customer determines, in its sole discretion, that the delay will significantly impair the value of the Contract to the State of Florida or to Customers, in which case the Department Customer may (1) accept allocated performance or deliveries from the Contractor, provided that the Contractor grants preferential treatment to Customers and the Department with respect to commodities or contractual services products subjected to allocation, or (2) purchase from other sources (without recourse to and by the Contractor for the related costs and expenses) to replace all or part of the commodity or contractual services products that are the subject of the delay, which purchases may be deducted from the Contract quantity, or (3) terminate the Contract in whole or in part.
Appears in 1 contract
Samples: Hvac Equipment Maintenance, Repair and Installation/Replacement Services Agreement
Force Majeure. Notice of Delay, and No Damages for Delay. The Contractor will shall not be responsible for delay resulting from its failure to perform if neither the fault nor the negligence of the Contractor or its employees or agents contributed to the delay, delay and the delay is due directly to fireacts of God, explosionwars, earthquakeacts of public enemies, windstormstrikes, floodfires, radioactive or toxic chemical hazard, war, military hostilities, terrorism, civil emergency, embargo, riot, strike, violent civil unrestfloods, or other similar cause wholly beyond the Contractor’s reasonable control, or for any of the foregoing that affect subcontractors or suppliers if no alternate source of supply is available to the Contractor. The foregoing does not excuse delay which could have been avoided if the Contractor implemented any risk mitigation required by the Contract. In case of any delay the Contractor believes is excusable, the Contractor will shall notify the Department in writing of the delay or potential delay and describe the cause of the delay either (1) within ten (10) calendar days after the cause that created creates or will create the delay first arose, if the Contractor could reasonably foresee that a delay could occur as a result, or (2) if delay is not reasonably foreseeable, within five (5) calendar days after the date the Contractor first had reason to believe that a delay could result. The foregoing will constitute the Contractor’s sole remedy or excuse with respect to delayTHE FOREGOING SHALL CONSTITUTE THE CONTRACTOR’S SOLE REMEDY OR EXCUSE WITH RESPECT TO DELAY. Providing notice in strict accordance with this paragraph is a condition precedent to such remedy. No claim for damages will damages, other than for an extension of time, shall be asserted by against the ContractorDepartment. The Contractor will shall not be entitled to an increase in the Contract Agreement price or payment of any kind from the Department Customer for direct, indirect, consequential, impact or other costs, expenses or damages, including but not limited to costs of acceleration or inefficiency, arising because of delay, disruption, interference, or hindrance from any cause whatsoever. If performance is suspended or delayed, in whole or in part, due to any of the causes described in this paragraph, after the causes have ceased to exist the Contractor will shall perform at no increased cost, unless the Department determines, in its sole discretion, that the delay will significantly impair the value of the Contract Agreement to the State of Florida or to Customersthe Department, in which case the Department may (1) accept allocated performance or deliveries from the Contractor, provided that the Contractor grants preferential treatment to Customers and the Department with respect to commodities or contractual services products subjected to allocation, or (2) purchase from other sources (without recourse to and by the Contractor for the related costs and expenses) to replace all or part of the commodity or contractual services products that are the subject of the delay, which purchases may be deducted from the Contract Agreement quantity, or (3) terminate the Contract Agreement in whole or in part.
Appears in 1 contract
Samples: Agreement for Services
Force Majeure. Notice of Delay, and No Damages for Delay. The Contractor will A party (an “Affected Party”) shall not be responsible for delay resulting from its failure to perform perform, if neither the fault nor the negligence of the Contractor Affected Party or its employees or agents contributed to the delay, and the delay is due directly to fireacts of God, explosionwars, earthquakeacts of public enemies, windstormfires, flood, radioactive or toxic chemical hazard, war, military hostilities, terrorism, civil emergency, embargo, riot, strike, violent civil unrestfloods, or other similar cause wholly beyond the Contractor’s reasonable parties control, or for any of the foregoing that affect subcontractors or suppliers if no alternate source of supply is available to the Contractor. The foregoing does not excuse delay which could have been avoided if the Contractor implemented any risk mitigation required by the Contract. In case of any delay the Contractor an Affected Party believes is excusable, the Contractor will Affected Party shall notify the Department other in writing of the delay or potential delay and describe the cause of the delay either either: (1) within ten (10) two calendar days after the cause that created creates or will create the delay first arose, if the Contractor Affected Party could reasonably foresee that a delay could occur as a result, or (2) if delay is not reasonably foreseeable, within five (5) calendar days after the date the Contractor Affected Party first had reason to believe that a delay could result. The foregoing will constitute THE FOREGOING SHALL CONSTITUTE AN AFFECTED PARTY’S SOLE REMEDY OR If the ContractorAffected Party’s sole remedy performance is suspended or excuse with respect delayed, in whole or in part, due to delayany of the causes described in this paragraph, after the causes have ceased to exist, the Affected Party shall perform at no increased cost. Providing notice in strict accordance with this paragraph If the Citizens is a condition precedent to such remedy. No claim for damages will be asserted by the Contractor. The Contractor will Affected Party, Vendor shall not be entitled to an increase in the Contract price or payment of any kind from the Department Citizens for direct, indirect, consequential, impact or other costs, expenses or damages, including but not limited to costs of acceleration or inefficiency, arising because of delay, disruption, interference, or hindrance from any cause whatsoever. If performance Vendor is suspended or delayedthe Affected Party, in whole or in part, due to any of the causes described in this paragraph, after the causes have ceased to exist the Contractor will perform at no increased cost, unless the Department determines, in its sole discretion, that the delay will significantly impair the value of the Contract to the State of Florida or to Customers, in which case the Department may then Citizens may: (1) accept allocated performance or deliveries from the ContractorVendor, provided that the Contractor Vendor grants preferential treatment to Customers and the Department Citizens with respect to commodities or contractual services products subjected to allocation, ; or (2) purchase from other sources (without recourse to and by the Contractor Vendor for the related costs and expenses) to replace all or part of the commodity or contractual services products that are the subject of the delay, which purchases may be deducted from the Contract quantity, ; or (3) terminate the Contract in whole or in part.
Appears in 1 contract
Samples: Contract for Coordinating Counsel – Claims Litigation
Force Majeure. Notice of Delay, and No Damages for Delay. Delay (Future Awarded Projects): The Contractor will shall not be responsible for delay resulting from its failure to perform if neither the fault nor the negligence of the Contractor or its employees or agents contributed to the delay, delay and the delay is due directly to fireacts of God, explosionwars, earthquakeacts of public enemies, windstormstrikes, floodfires, radioactive or toxic chemical hazard, war, military hostilities, terrorism, civil emergency, embargo, riot, strike, violent civil unrestfloods, or other similar cause wholly beyond the Contractor’s reasonable control, or for any of the foregoing that affect subcontractors or suppliers Firms if no alternate source of supply is available to the Contractor. The foregoing does not excuse delay which could have been avoided if the Contractor implemented any risk mitigation required by the Contract. In case of any delay delay, the Contractor believes is excusable, the Contractor will shall notify the Department Island Transit in writing of the delay or potential delay and describe the cause of the delay either (1) within ten (10) calendar days after the cause that created creates or will create the delay first arose, if the Contractor could reasonably foresee that a delay could occur as a result, or (2) if delay is not reasonably foreseeable, within five (5) calendar days after the date the Contractor first had reason to believe that a delay could result. The foregoing will constitute the Contractor’s sole remedy or excuse with respect to delayTHE FOREGOING SHALL CONSTITUTE THE CONTRACTOR’S SOLE REMEDY OR EXCUSE FOR DELAY. Providing notice in strict accordance with strictly per this paragraph is a condition precedent to such remedy. No claim for damages will or additional charges, other than for an extension of time, shall be asserted by the Contractor. The Contractor will not be entitled to an increase in the Contract price or payment of any kind from the Department for direct, indirect, consequential, impact or other costs, expenses or damages, including but not limited to costs of acceleration or inefficiency, arising because of delay, disruption, interference, or hindrance from any cause whatsoeveragainst Island Transit. If performance is suspended or delayed, in whole or in part, due to any of the causes described in this paragraph, paragraph after the causes have ceased to exist exist, the Contractor will shall perform at no increased cost, cost unless the Department determinesIsland Transit agrees to, in its sole discretionwriting, that the delay will significantly impair the value to any modification of the Contract to the State of Florida or to Customers, in which case the Department may (1) accept allocated performance or deliveries from the Contractor, provided that the Contractor grants preferential treatment to Customers and the Department with respect to commodities or contractual services subjected to allocation, or (2) purchase from other sources (without recourse to and by the Contractor for the related costs and expenses) to replace all or part of the commodity or contractual services that are the subject of the delay, which purchases may be deducted from the Contract quantity, or (3) terminate the Contract in whole or in partcontract terms.
Appears in 1 contract
Samples: Professional Services Agreement
Force Majeure. Notice of Delay, and No Damages for Delay. The Contractor will not be responsible for delay resulting from its failure to perform if neither the fault nor the negligence of the Contractor or its employees or agents contributed to the delay, delay and the delay is due directly to fire, explosion, earthquake, windstorm, flood, radioactive or toxic chemical hazard, war, military hostilities, terrorism, civil emergency, embargo, riot, strike, violent civil unrest, or other similar cause wholly beyond the Contractor’s reasonable control, or for any of the foregoing that affect subcontractors or suppliers if no alternate source of supply is available to the Contractor. The foregoing does not excuse delay which could have been avoided if the Contractor implemented any risk mitigation required by the Contract. In case of any delay the Contractor believes is excusable, the Contractor will notify the Department Customer in writing of the delay or potential delay and describe the cause of the delay either (1) within ten (10) calendar days after the cause that created creates or will create the delay first arose, if the Contractor could reasonably foresee that a delay could occur as a result, or (2) if delay is not reasonably foreseeable, within five (5) calendar days after the date the Contractor first had reason to believe that a delay could result. The foregoing will constitute the Contractor’s sole remedy or excuse with respect to delay. Providing notice in strict accordance with this paragraph is a condition precedent to such remedy. No claim for damages will be asserted by the Contractor. The Contractor will not be entitled to an increase in the Contract price or payment of any kind from the Department Customer for direct, indirect, consequential, impact or other costs, expenses or damages, including but not limited to costs of acceleration or inefficiency, arising because of delay, disruption, interference, or hindrance from any cause whatsoever. If performance is suspended or delayed, in whole or in part, due to any of the causes described in this paragraph, after the causes have ceased to exist the Contractor will perform at no increased cost, unless the Department Customer determines, in its sole discretion, that the delay will significantly impair the value of the Contract to the State of Florida or to Customers, in which case the Department Customer may (1) accept allocated performance or deliveries from the Contractor, provided that the Contractor grants preferential treatment to Customers and the Department with respect to commodities or contractual services subjected to allocation, or (2) purchase from other sources (without recourse to and by the Contractor for the related costs and expenses) to replace all or part of the commodity or contractual services that are the subject of the delay, which purchases may be deducted from the Contract quantity, or (3) terminate the Contract in whole or in part.
Appears in 1 contract
Samples: Temporary Administrative and Light Industrial Staff Contract
Force Majeure. Notice of Delay, and No Damages for Delay. The Contractor will not be Neither Party is responsible for a delay resulting from its failure to perform if neither the fault nor the negligence of the Contractor Party or its employees or agents contributed to the delay, and the delay is due directly to fireacts of God, explosionwars, earthquakeacts of public enemies, windstormstrikes, floodfires, radioactive or toxic chemical hazardfloods, war, military hostilities, terrorism, civil emergency, embargo, riot, strike, violent civil unrestpandemics, or other similar cause wholly beyond the ContractorParty’s reasonable control, or for any of the foregoing that affect subcontractors or suppliers if no alternate source of supply is available to the Contractor. The foregoing does not excuse delay which could have been avoided if the Contractor implemented any risk mitigation required by the Contract. In case of any delay the Contractor CONTRACTOR believes is excusableexcusable under this provision, the Contractor CONTRACTOR will notify the Department COUNTY in writing of the delay or potential delay and describe the cause of the delay either (either: 1) within ten (10) calendar days after the cause that created creates or will create the delay first arose, if the Contractor CONTRACTOR could not reasonably foresee that a delay could occur as a result; or, or (2) if delay is not reasonably foreseeable, within five (5) calendar days after the date the Contractor CONTRACTOR first had reason to believe that a delay could result. The foregoing will constitute the Contractor’s sole remedy or excuse with respect to delayTHE FOREGOING CONSTITUTES THE CONTRACTOR’S SOLE REMEDY OR EXCUSE WITH RESPECT TO DELAY. Providing notice in strict accordance with this paragraph is a condition precedent to such remedy. No claim for damages damages, other than for an extension of time, will be asserted by against the ContractorCOUNTY. The Contractor CONTRACTOR will not be entitled to an increase in the Contract price or payment of any kind from the Department COUNTY for direct, indirect, consequential, impact or other costs, expenses or damages, including but not limited to costs of acceleration or inefficiency, arising because of delay, disruption, interference, or hindrance from any cause whatsoever. If performance is suspended or delayed, in whole or in part, due to any of the causes described in this paragraph, after the causes have ceased to exist the Contractor CONTRACTOR will perform at no increased cost. Notwithstanding the above, unless if the Department COUNTY determines, in its sole discretion, that the delay will significantly impair the value of the Contract Agreement to the State of Florida or to CustomersCOUNTY, in which case the Department COUNTY may (1) accept allocated performance or deliveries from the ContractorCONTRACTOR, provided that the Contractor CONTRACTOR grants preferential treatment to Customers and the Department COUNTY with respect to commodities or contractual services products subjected to allocation, ; or (2) may purchase from other sources (without recourse to and by the Contractor CONTRACTOR for the related costs and expenses) to replace all or part of the commodity Products or contractual services Services that are the subject of the delay, which purchases may be deducted from the Contract Agreement quantity, ; or (3) may terminate the Contract Agreement in whole or in part.
Appears in 1 contract
Samples: Goods & Services Agreement
Force Majeure. Notice of Delay, and No Damages for Delay. Delay The Contractor will not be responsible for delay resulting from its failure to perform if neither the fault nor the negligence of the Contractor or its employees or agents contributed to the delay, delay and the delay is due directly to fireacts of God, explosionwars, earthquakeacts of public enemies, windstormstrikes, floodfires, radioactive or toxic chemical hazard, war, military hostilities, terrorism, civil emergency, embargo, riot, strike, violent civil unrestfloods, or other similar cause wholly beyond the Contractor’s reasonable control, or for any of the foregoing that affect subcontractors or suppliers if no alternate source of supply is available to the Contractor. The foregoing does not excuse delay which could have been avoided if the Contractor implemented any risk mitigation required by the Contract. In case of any delay the Contractor believes is excusable, the Contractor will notify the Department Customer in writing of the delay or potential delay and describe the cause of the delay either (1) within ten (10) calendar days after the cause that created creates or will create the delay first arose, if the Contractor could reasonably foresee that a delay could occur as a result, or (2) if delay is not reasonably foreseeable, within five (5) calendar days after the date the Contractor first had reason to believe that a delay could result. The foregoing will constitute the Contractor’s sole remedy or excuse with respect to delay. Providing notice in strict accordance with this paragraph is a condition precedent to such remedy. No claim for damages will be asserted by the Contractor. The Contractor will not be entitled to an increase in the Contract price or payment of any kind from the Department Customer for direct, indirect, consequential, impact or other costs, expenses or damages, including but not limited to costs of acceleration or inefficiency, arising because of delay, disruption, interference, or hindrance from any cause whatsoever. If performance is suspended or delayed, in whole or in part, due to any of the causes described in this paragraph, after the causes have ceased to exist the Contractor will perform at no increased cost, unless the Department Customer determines, in its sole discretion, that the delay will significantly impair the value of the Contract to the State of Florida or to Customers, in which case the Department Customer may (1) accept allocated performance or deliveries from the Contractor, provided that the Contractor grants preferential treatment to Customers and the Department with respect to commodities or contractual services subjected to allocation, or (2) purchase from other sources (without recourse to and by the Contractor for the related costs and expenses) to replace all or part of the commodity or contractual services that are the subject of the delay, which purchases may be deducted from the Contract quantity, or (3) terminate the Contract in whole or in part.
Appears in 1 contract
Samples: Contract
Force Majeure. Notice of Delay, and No Damages for Delay. DocuSign Envelope ID: 0C085FE4-CE16-425C-9779-75D5B40176EE The Contractor will not be responsible for delay resulting from its failure to perform if neither the fault nor the negligence of the Contractor or its employees or agents contributed to the delay, and the delay is due directly to fire, explosion, earthquake, windstorm, flood, radioactive or toxic chemical hazard, war, military hostilities, terrorism, civil emergency, embargo, riot, strike, violent civil unrest, or other similar cause wholly beyond the Contractor’s reasonable control, or for any of the foregoing that affect subcontractors or suppliers if no alternate source of supply is available to the Contractor. The foregoing does not excuse delay which could have been avoided if the Contractor implemented any risk mitigation required by the Contract. In case of any delay the Contractor believes is excusable, the Contractor will notify the Department in writing of the delay or potential delay and describe the cause of the delay either (1) within ten (10) calendar days after the cause that created or will create the delay first arose, if the Contractor could reasonably foresee that a delay could occur as a result, or (2) if delay is not reasonably foreseeable, within five (5) calendar days after the date the Contractor first had reason to believe that a delay could result. The foregoing will constitute the Contractor’s sole remedy or excuse with respect to delay. Providing notice in strict accordance with this paragraph is a condition precedent to such remedy. No claim for damages will be asserted by the Contractor. The Contractor will not be entitled to an increase in the Contract price or payment of any kind from the Department for direct, indirect, consequential, impact or other costs, expenses or damages, including but not limited to costs of acceleration or inefficiency, arising because of delay, disruption, interference, or hindrance from any cause whatsoever. If performance is suspended or delayed, in whole or in part, due to any of the causes described in this paragraph, after the causes have ceased to exist the Contractor will perform at no increased cost, unless the Department determines, in its sole discretion, that the delay will significantly impair the value of the Contract to the State of Florida or to Customers, in which case the Department may (1) accept allocated performance or deliveries from the Contractor, provided that the Contractor grants preferential treatment to Customers and the Department with respect to commodities or contractual services subjected to allocation, or (2) purchase from other sources (without recourse to and by the Contractor for the related costs and expenses) to replace all or part of the commodity or contractual services that are the subject of the delay, which purchases may be deducted from the Contract quantity, or (3) terminate the Contract in whole or in part.
Appears in 1 contract
Samples: Lawn Care Services Contract