Common use of Forecasting Requirements Clause in Contracts

Forecasting Requirements. 2.2.1 Within ninety (90) days of executing the Agreement, PBX shall provide Frontier a two (2)-year traffic forecast. This initial forecast will provide the amount of traffic to be delivered to and from Frontier pursuant to this Attachment, over the next eight (8) quarters. 2.2.2 Ongoing forecast requirements. Where the Parties are already exchanging traffic through a Third Party Tandem Switch in a LATA, PBX shall provide a new or revised traffic forecast when PBX develops plans or becomes aware of information that will materially affect the Parties’ exchange of traffic through such Third Party Tandem Switch in that LATA. Instances that require a new or revised forecast include, but are not limited to: (i) PBX plans to deploy a new switch; (ii) PBX plans to implement interconnection in accordance with the Interconnection Attachment or a new network architecture; (iii) PBX plans to rearrange its network; or (iv) PBX expects a significant change in traffic volume.

Appears in 2 contracts

Samples: Interconnection Agreement, Interconnection Agreement

AutoNDA by SimpleDocs

Forecasting Requirements. 2.2.1 Within ninety (90) days of executing the Agreement, PBX LNS shall provide Frontier Verizon a two (2)-year traffic forecast. This initial forecast will provide the amount of traffic to be delivered to and from Frontier Verizon pursuant to this Attachment, over the next eight (8) quarters. 2.2.2 Ongoing forecast requirements. Where the Parties are already exchanging traffic through a Third Party Tandem Switch in a LATA, PBX LNS shall provide a new or revised traffic forecast when PBX LNS develops plans or becomes aware of information that will materially affect the Parties’ exchange of traffic through such Third Party Tandem Switch in that LATA. Instances that require a new or revised forecast include, but are not limited to: (i) PBX LNS plans to deploy a new switch; (ii) PBX LNS plans to implement interconnection in accordance with the Interconnection Attachment or a new network architecture; (iii) PBX LNS plans to rearrange its network; or (iv) PBX LNS expects a significant change in traffic volume.

Appears in 1 contract

Samples: Service Agreement

Forecasting Requirements. 2.2.1 Within ninety (90) days of executing the Agreement, PBX Spectrotel shall provide Frontier a two (2)-year traffic forecast. This initial forecast will provide the amount of traffic to be delivered to and from Frontier pursuant to this Attachment, over the next eight (8) quarters. 2.2.2 Ongoing forecast requirements. Where the Parties are already exchanging traffic through a Third Party Tandem Switch in a LATA, PBX Spectrotel shall provide a new or revised traffic forecast when PBX Spectrotel develops plans or becomes aware of information that will materially affect the Parties’ exchange of traffic through such Third Party Tandem Switch in that LATA. Instances that require a new or revised forecast include, but are not limited to: (i) PBX Spectrotel plans to deploy a new switch; (ii) PBX Spectrotel plans to implement interconnection in accordance with the Interconnection Attachment or a new network architecture; (iii) PBX Spectrotel plans to rearrange its network; or (iv) PBX Spectrotel expects a significant change in traffic volume.

Appears in 1 contract

Samples: Carrier to Carrier Agreement

Forecasting Requirements. 2.2.1 Within ninety (90) days of executing the Agreement, PBX Threshold shall provide Frontier Verizon a two (2)-year traffic forecast. This initial forecast will provide the amount of traffic to be delivered to and from Frontier Verizon pursuant to this Attachment, over the next eight (8) quarters. 2.2.2 Ongoing forecast requirements. Where the Parties are already exchanging traffic through a Third Party Tandem Switch in a LATA, PBX Threshold shall provide a new or revised traffic forecast when PBX Threshold develops plans or becomes aware of information that will materially affect the Parties’ exchange of traffic through such Third Party Tandem Switch in that LATA. Instances that require a new or revised forecast include, but are not limited to: (i) PBX Threshold plans to deploy a new switch; (ii) PBX Threshold plans to implement interconnection in accordance with the Interconnection Attachment or a new network architecture; (iii) PBX Threshold plans to rearrange its network; or (iv) PBX Threshold expects a significant change in traffic volume.

Appears in 1 contract

Samples: Service Agreement

Forecasting Requirements. 2.2.1 Within ninety (90) days of executing the Agreement, PBX NHC shall provide Frontier Verizon a two (2)-year traffic forecast. This initial forecast will provide the amount of traffic to be delivered to and from Frontier Verizon pursuant to this Attachment, over the next eight (8) quarters. 2.2.2 Ongoing forecast requirements. Where the Parties are already exchanging traffic through a Third Party Tandem Switch in a LATA, PBX NHC shall provide a new or revised traffic forecast when PBX NHC develops plans or becomes aware of information that will materially affect the Parties’ exchange of traffic through such Third Party Tandem Switch in that LATA. Instances that require a new or revised forecast include, but are not limited to: (i) PBX NHC plans to deploy a new switch; (ii) PBX NHC plans to implement interconnection in accordance with the Interconnection Attachment or a new network architecture; (iii) PBX NHC plans to rearrange its network; or (iv) PBX NHC expects a significant change in traffic volume.

Appears in 1 contract

Samples: Service Agreement

Forecasting Requirements. 2.2.1 Within ninety (90) days of executing the Agreement, PBX KDL shall provide Frontier Verizon a two (2)-year traffic forecast. This initial forecast will provide the amount of traffic to be delivered to and from Frontier Verizon pursuant to this Attachment, over the next eight (8) quarters. 2.2.2 Ongoing forecast requirements. Where the Parties are already exchanging traffic through a Third Party Tandem Switch in a LATA, PBX KDL shall provide a new or revised traffic forecast when PBX KDL develops plans or becomes aware of information that will materially affect the Parties’ exchange of traffic through such Third Party Tandem Switch in that LATA. Instances that require a new or revised forecast include, but are not limited to: (i) PBX KDL plans to deploy a new switch; (ii) PBX KDL plans to implement interconnection in accordance with the Interconnection Attachment or a new network architecture; (iii) PBX KDL plans to rearrange its network; or (iv) PBX KDL expects a significant change in traffic volume.

Appears in 1 contract

Samples: Service Agreement

Forecasting Requirements. 2.2.1 Within ninety (90) days of executing the Agreement, PBX BLC shall provide Frontier Verizon a two (2)-year traffic forecast. This initial forecast will provide the amount of traffic to be delivered to and from Frontier Verizon pursuant to this Attachment, over the next eight (8) quarters. 2.2.2 Ongoing forecast requirements. Where the Parties are already exchanging traffic through a Third Party Tandem Switch in a LATA, PBX BLC shall provide a new or revised traffic forecast when PBX BLC develops plans or becomes aware of information that will materially affect the BLCSC comp v3.3 77 Parties' exchange of traffic through such Third Party Tandem Switch in that LATA. Instances that require a new or revised forecast include, but are not limited to: (i) PBX BLC plans to deploy a new switch; (ii) PBX BLC plans to implement interconnection in accordance with the Interconnection Attachment or a new network architecture; (iii) PBX BLC plans to rearrange its network; or (iv) PBX BLC expects a significant change in traffic volume.

Appears in 1 contract

Samples: Interconnection Agreement

Forecasting Requirements. 2.2.1 Within ninety (90) days of executing the Agreement, PBX CBB shall provide Frontier Verizon a two (2)-year traffic forecast. This initial forecast will provide the amount of traffic to be delivered to and from Frontier Verizon pursuant to this Attachment, over the next eight (8) quarters. 2.2.2 Ongoing forecast requirements. Where the Parties are already exchanging traffic through a Third Party Tandem Switch in a LATA, PBX CBB shall provide a new or revised traffic forecast when PBX CBB develops plans or becomes aware of information that will materially affect the Parties’ exchange of traffic through such Third Party Tandem Switch in that LATA. Instances that require a new or revised forecast include, but are not limited to: (i) PBX CBB plans to deploy a new switch; (ii) PBX CBB plans to implement interconnection in accordance with the Interconnection Attachment or a new network architecture; (iii) PBX CBB plans to rearrange its network; or (iv) PBX CBB expects a significant change in traffic volume.

Appears in 1 contract

Samples: Service Agreement

Forecasting Requirements. 2.2.1 Within ninety (90) days of executing the Agreement, PBX TWCIS shall provide Frontier Verizon a two (2)-year traffic forecast. This initial forecast will provide the amount of traffic to be delivered to and from Frontier Verizon pursuant to this Attachment, over the next eight (8) quarters. 2.2.2 Ongoing forecast requirements. Where the Parties are already exchanging traffic through a Third Party Tandem Switch in a LATA, PBX TWCIS shall provide a new or revised traffic forecast when PBX TWCIS develops plans or becomes aware of information that will materially affect the Parties’ exchange of traffic through such Third Party Tandem Switch in that LATA. Instances that require a new or revised forecast include, but are not limited to: (i) PBX TWCIS plans to deploy a new switch; (ii) PBX TWCIS plans to implement interconnection in accordance with the Interconnection Attachment or a new network architecture; (iii) PBX TWCIS plans to rearrange its network; or (iv) PBX TWCIS expects a significant change in traffic volume.

Appears in 1 contract

Samples: Service Agreement

Forecasting Requirements. 2.2.1 Within ninety (90) days of executing the Agreement, PBX Ymax shall provide Frontier Verizon a two (2)-year traffic forecast. This initial forecast will provide the amount of traffic to be delivered to and from Frontier Verizon pursuant to this Attachment, over the next eight (8) quarters. 2.2.2 Ongoing forecast requirements. Where the Parties are already exchanging traffic through a Third Party Tandem Switch in a LATA, PBX Ymax shall provide a new or revised traffic forecast when PBX Ymax develops plans or becomes aware of information that will materially affect the Parties’ exchange of traffic through such Third Party Tandem Switch in that LATA. Instances that require a new or revised forecast include, but are not limited to: (i) PBX Ymax plans to deploy a new switch; (ii) PBX Ymax plans to implement interconnection in accordance with the Interconnection Attachment or a new network architecture; (iii) PBX Ymax plans to rearrange its network; or (iv) PBX Ymax expects a significant change in traffic volume.

Appears in 1 contract

Samples: Service Agreement

Forecasting Requirements. 2.2.1 Within ninety (90) days of executing the Agreement, PBX CPV shall provide Frontier Verizon a two (2)-year traffic forecast. This initial forecast will provide the amount of traffic to be delivered to and from Frontier Verizon pursuant to this Attachment, over the next eight (8) quarters. 2.2.2 Ongoing forecast requirements. Where the Parties are already exchanging traffic through a Third Party Tandem Switch in a LATA, PBX CPV shall provide a new or revised traffic forecast when PBX CPV develops plans or becomes aware of information that will materially affect the Parties’ exchange of traffic through such Third Party Tandem Switch in that LATA. Instances that require a new or revised forecast include, but are not limited to: (i) PBX CPV plans to deploy a new switch; (ii) PBX CPV plans to implement interconnection in accordance with the Interconnection Attachment or a new network architecture; (iii) PBX CPV plans to rearrange its network; or (iv) PBX CPV expects a significant change in traffic volume.

Appears in 1 contract

Samples: Service Agreement

Forecasting Requirements. 2.2.1 Within ninety (90) days of executing the Agreement, PBX ECI shall provide Frontier Verizon a two (2)-year traffic forecast. This initial forecast will provide the amount of traffic to be delivered to and from Frontier Verizon pursuant to this Attachment, over the next eight (8) quarters. 2.2.2 Ongoing forecast requirements. Where the Parties are already exchanging traffic through a Third Party Tandem Switch in a LATA, PBX ECI shall provide a new or revised traffic forecast when PBX ECI develops plans or becomes aware of information that will materially affect the Parties’ exchange of traffic through such Third Party Tandem Switch in that LATA. Instances that require a new or revised forecast include, but are not limited to: (i) PBX ECI plans to deploy a new switch; (ii) PBX ECI plans to implement interconnection in accordance with the Interconnection Attachment or a new network architecture; (iii) PBX ECI plans to rearrange its network; or (iv) PBX ECI expects a significant change in traffic volume.

Appears in 1 contract

Samples: Service Agreement

Forecasting Requirements. 2.2.1 Within ninety (90) days of executing the Agreement, PBX Xxxx Tell shall provide Frontier a two (2)-year traffic forecast. This initial forecast will provide the amount of traffic to be delivered to and from Frontier pursuant to this Attachment, over the next eight (8) quarters. 2.2.2 Ongoing forecast requirements. Where the Parties are already exchanging traffic through a Third Party Tandem Switch in a LATA, PBX Xxxx Tell shall provide a new or revised traffic forecast when PBX Xxxx Tell develops plans or becomes aware of information that will materially affect the Parties’ exchange of traffic through such Third Party Tandem Switch in that LATA. Instances that require a new or revised forecast include, but are not limited to: (i) PBX Xxxx Tell plans to deploy a new switch; (ii) PBX Xxxx Tell plans to implement interconnection in accordance with the Interconnection Attachment or a new network architecture; (iii) PBX Xxxx Tell plans to rearrange its network; or (iv) PBX Xxxx Tell expects a significant change in traffic volume.

Appears in 1 contract

Samples: Interconnection Agreement

Forecasting Requirements. 2.2.1 Within ninety (90) days of executing the Agreement, PBX NexGen shall provide Frontier Verizon a two (2)-year traffic forecast. This initial forecast will provide the amount of traffic to be delivered to and from Frontier Verizon pursuant to this Attachment, over the next eight (8) quarters. 2.2.2 Ongoing forecast requirements. Where the Parties are already exchanging traffic through a Third Party Tandem Switch in a LATA, PBX NexGen shall provide a new or revised traffic forecast when PBX NexGen develops plans or becomes aware of information that will materially affect the Parties’ exchange of traffic through such Third Party Tandem Switch in that LATA. Instances that require a new or revised forecast include, but are not limited to: (i) PBX NexGen plans to deploy a new switch; (ii) PBX NexGen plans to implement interconnection in accordance with the Interconnection Attachment or a new network architecture; (iii) PBX NexGen plans to rearrange its network; or (iv) PBX NexGen expects a significant change in traffic volume.

Appears in 1 contract

Samples: Service Agreement

Forecasting Requirements. 2.2.1 Within ninety (90) days of executing the Agreement, PBX MTC shall provide Frontier Verizon a two (2)-year traffic forecast. This initial forecast will provide the amount of traffic to be delivered to and from Frontier Verizon pursuant to this Attachment, over the next eight (8) quarters. 2.2.2 Ongoing forecast requirements. Where the Parties are already exchanging traffic through a Third Party Tandem Switch in a LATA, PBX MTC shall provide a new or revised traffic forecast when PBX MTC develops plans or becomes aware of information that will materially affect the Parties’ exchange of traffic through such Third Party Tandem Switch in that LATA. Instances that require a new or revised forecast include, but are not limited to: (i) PBX MTC plans to deploy a new switch; (ii) PBX MTC plans to implement interconnection in accordance with the Interconnection Attachment or a new network architecture; (iii) PBX MTC plans to rearrange its network; or (iv) PBX MTC expects a significant change in traffic volume.

Appears in 1 contract

Samples: Telecommunications

Forecasting Requirements. 2.2.1 Within ninety (90) days of executing the Agreement, PBX NHC shall provide Frontier Verizon a two (2)-year traffic forecast. This initial forecast will provide the amount of traffic to be delivered to and from Frontier Verizon pursuant to this Attachment, over the next eight (8) quarters. 2.2.2 Ongoing forecast requirements. Where the Parties are already exchanging traffic through a Third Party Tandem Switch in a LATA, PBX NHC shall provide a new or revised traffic forecast when PBX NHC develops plans or becomes aware of information that will materially affect the Parties’ Parties exchange of traffic through such Third Party Tandem Switch in that LATA. Instances that require a new or revised forecast include, but are not limited to: (i) PBX NHC plans to deploy a new switch; (ii) PBX NHC plans to implement interconnection in accordance with the Interconnection Attachment or a new network architecture; (iii) PBX NHC plans to rearrange its network; or (iv) PBX NHC expects a significant change in traffic volume.

Appears in 1 contract

Samples: Interconnection Agreement

Forecasting Requirements. 2.2.1 Within ninety (90) days of executing the Agreement, PBX New Horizons shall provide Frontier Verizon a two (2)-year traffic forecast. This initial forecast will provide the amount of traffic to be delivered to and from Frontier Verizon pursuant to this Attachment, over the next eight (8) quarters. 2.2.2 Ongoing forecast requirements. Where the Parties are already exchanging traffic through a Third Party Tandem Switch in a LATA, PBX New Horizons shall provide a new or revised traffic forecast when PBX New Horizons develops plans or becomes aware of information that will materially affect the Parties’ exchange of traffic through such Third Party Tandem Switch in that LATA. Instances that require a new or revised forecast include, but are not limited to: (i) PBX New Horizons plans to deploy a new switch; (ii) PBX New Horizons plans to implement interconnection in accordance with the Interconnection Attachment or a new network architecture; (iii) PBX New Horizons plans to rearrange its network; or (iv) PBX New Horizons expects a significant change in traffic volume.

Appears in 1 contract

Samples: Service Agreement

Forecasting Requirements. 2.2.1 Within ninety (90) days of executing the Agreement, PBX TQCI shall provide Frontier Verizon a two (2)-year traffic forecast. This initial forecast will provide the amount of traffic to be delivered to and from Frontier Verizon pursuant to this Attachment, over the next eight (8) quarters. 2.2.2 Ongoing forecast requirements. Where the Parties are already exchanging traffic through a Third Party Tandem Switch in a LATA, PBX TQCI shall provide a new or revised traffic forecast when PBX TQCI develops plans or becomes aware of information that will materially affect the Parties’ exchange of traffic through such Third Party Tandem Switch in that LATA. Instances that require a new or revised forecast include, but are not limited to: (i) PBX TQCI plans to deploy a new switch; (ii) PBX TQCI plans to implement interconnection in accordance with the Interconnection Attachment or a new network architecture; (iii) PBX TQCI plans to rearrange its network; or (iv) PBX TQCI expects a significant change in traffic volume.

Appears in 1 contract

Samples: Telecommunications Agreement

Forecasting Requirements. 2.2.1 Within ninety (90) days of executing the Agreement, PBX BCN shall provide Frontier Verizon a two (2)-year traffic forecast. This initial forecast will provide the amount of traffic to be delivered to and from Frontier Verizon pursuant to this Attachment, over the next eight (8) quarters. 2.2.2 Ongoing forecast requirements. Where the Parties are already exchanging traffic through a Third Party Tandem Switch in a LATA, PBX BCN shall provide a new or revised traffic forecast when PBX BCN develops plans or becomes aware of information that will materially affect the Parties’ exchange of traffic through such Third Party Tandem Switch in that LATA. Instances that require a new or revised forecast include, but are not limited to: (i) PBX BCN plans to deploy a new switch; (ii) PBX BCN plans to implement interconnection in accordance with the Interconnection Attachment or a new network architecture; (iii) PBX BCN plans to rearrange its network; or (iv) PBX BCN expects a significant change in traffic volume.

Appears in 1 contract

Samples: Telecommunications

AutoNDA by SimpleDocs

Forecasting Requirements. 2.2.1 Within ninety (90) days of executing the Agreement, PBX Telrite shall provide Frontier Verizon a two (2)-year traffic forecast. This initial forecast will provide the amount of traffic to be delivered to and from Frontier Verizon pursuant to this Attachment, over the next eight (8) quarters. 2.2.2 Ongoing forecast requirements. Where the Parties are already exchanging traffic through a Third Party Tandem Switch in a LATA, PBX Telrite shall provide a new or revised traffic forecast when PBX Telrite develops plans or becomes aware of information that will materially affect the Parties’ exchange of traffic through such Third Party Tandem Switch in that LATA. Instances that require a new or revised forecast include, but are not limited to: (i) PBX Telrite plans to deploy a new switch; (ii) PBX Telrite plans to implement interconnection in accordance with the Interconnection Attachment or a new network architecture; (iii) PBX Telrite plans to rearrange its network; or (iv) PBX Telrite expects a significant change in traffic volume.

Appears in 1 contract

Samples: Service Agreement

Forecasting Requirements. 2.2.1 Within ninety (90) days of executing the Agreement, PBX BLC shall provide Frontier Verizon a two (2)-year traffic forecast. This initial forecast will provide the amount of traffic to be delivered to and from Frontier Verizon pursuant to this Attachment, over the next eight (8) quarters. 2.2.2 Ongoing forecast requirements. Where the Parties are already exchanging traffic through a Third Party Tandem Switch in a LATA, PBX BLC shall provide a new or revised traffic forecast when PBX BLC develops plans or becomes aware of information that will materially affect the Parties’ exchange of traffic through such Third Party Tandem Switch in that LATA. Instances that require a new or revised forecast include, but are not limited to: (i) PBX BLC plans to deploy a new switch; (ii) PBX BLC plans to implement interconnection in accordance with the Interconnection Attachment or a new network architecture; (iii) PBX BLC plans to rearrange its network; or (iv) PBX BLC expects a significant change in traffic volume.

Appears in 1 contract

Samples: Service Agreement

Forecasting Requirements. 2.2.1 Within ninety (90) days of executing the Agreement, PBX BLC shall provide Frontier Verizon a two (2)-year traffic forecast. This initial forecast will provide the amount of traffic to be delivered to and from Frontier Verizon pursuant to this Attachment, over the next eight (8) quarters. 2.2.2 Ongoing forecast requirements. Where the Parties are already exchanging traffic through a Third Party Tandem Switch in a LATA, PBX BLC shall provide a new or revised traffic forecast when PBX BLC develops plans or becomes aware of information that will materially affect the Parties’ Parties exchange of traffic through such Third Party Tandem Switch in that LATA. Instances that require a new or revised forecast include, but are not limited to: (i) PBX BLC plans to deploy a new switch; (ii) PBX BLC plans to implement interconnection in accordance with the Interconnection Attachment or a new network architecture; (iii) PBX BLC plans to rearrange its network; or (iv) PBX BLC expects a significant change in traffic volume.

Appears in 1 contract

Samples: Interconnection Agreement

Forecasting Requirements. 2.2.1 Within ninety (90) days of executing the Agreement, PBX Xxxxxx shall provide Frontier Verizon a two (2)-year traffic forecast. This initial forecast will provide the amount of traffic to be delivered to and from Frontier Verizon pursuant to this Attachment, over the next eight (8) quarters. 2.2.2 Ongoing forecast requirements. Where the Parties are already exchanging traffic through a Third Party Tandem Switch in a LATAXXXX, PBX Xxxxxx shall provide a new or revised traffic forecast when PBX Xxxxxx develops plans or becomes aware of information that will materially affect the Parties’ exchange of traffic through such Third Party Tandem Switch in that LATA. Instances that require a new or revised forecast include, but are not limited to: (i) PBX Xxxxxx plans to deploy a new switch; (ii) PBX Xxxxxx plans to implement interconnection in accordance with the Interconnection Attachment or a new network architecture; (iii) PBX Xxxxxx plans to rearrange its network; or (iv) PBX Xxxxxx expects a significant change in traffic volume.

Appears in 1 contract

Samples: Telecommunications

Forecasting Requirements. 2.2.1 Initial forecast requirements. Within ninety (90) days of executing the Agreement, PBX Alltel shall provide Frontier Verizon a two (2)-year traffic forecast. This initial forecast will provide the amount of traffic to be delivered to and from Frontier Verizon pursuant to this Attachment, over the next eight (8) quarters. 2.2.2 Ongoing forecast requirements. Where the Parties are already exchanging traffic through a Third Party Tandem Switch in a LATA, PBX Alltel shall provide a new or revised traffic forecast when PBX Alltel develops plans or becomes aware of information that will materially affect the Parties’ exchange of traffic through such Third Party Tandem Switch in that LATA. Instances that require a new or revised forecast include, but are not limited to: (i) PBX Alltel plans to deploy a new switch; (ii) PBX Alltel plans to implement interconnection in accordance with the Interconnection Two-Way Wireless Attachment or a new network architecture; (iii) PBX Alltel plans to rearrange its network; or (iv) PBX Alltel expects a significant change in traffic volume.

Appears in 1 contract

Samples: Agreement

Forecasting Requirements. 2.2.1 Within ninety (90) days of executing the Agreement, PBX MHT shall provide Frontier Verizon a two (2)-year traffic forecast. This initial forecast will provide the amount of traffic to be delivered to and from Frontier Verizon pursuant to this Attachment, over the next eight (8) quarters. 2.2.2 Ongoing forecast requirements. Where the Parties are already exchanging traffic through a Third Party Tandem Switch in a LATA, PBX MHT shall provide a new or revised traffic forecast when PBX MHT develops plans or becomes aware of information that will materially affect the Parties’ exchange of traffic through such Third Party Tandem Switch in that LATA. Instances that require a new or revised forecast include, but are not limited to: (i) PBX MHT plans to deploy a new switch; (ii) PBX MHT plans to implement interconnection in accordance with the Interconnection Attachment or a new network architecture; (iii) PBX MHT plans to rearrange its network; or (iv) PBX MHT expects a significant change in traffic volume.

Appears in 1 contract

Samples: Service Agreement

Forecasting Requirements. 2.2.1 Within ninety (90) days of executing the Agreement, PBX D-Max shall provide Frontier Verizon a two (2)-year traffic forecast. This initial forecast will provide the amount of traffic to be delivered to and from Frontier Verizon pursuant to this Attachment, over the next eight (8) quarters. 2.2.2 Ongoing forecast requirements. Where the Parties are already exchanging traffic through a Third Party Tandem Switch in a LATA, PBX D- Max shall provide a new or revised traffic forecast when PBX D-Max develops plans or becomes aware of information that will materially affect the Parties’ exchange of traffic through such Third Party Tandem Switch in that LATA. Instances that require a new or revised forecast include, but are not limited to: (i) PBX D-Max plans to deploy a new switch; (ii) PBX D-Max plans to implement interconnection in accordance with the Interconnection Attachment or a new network architecture; (iii) PBX D-Max plans to rearrange its network; or (iv) PBX D-Max expects a significant change in traffic volume.

Appears in 1 contract

Samples: Service Agreement

Forecasting Requirements. 2.2.1 Within ninety (90) days of executing the Agreement, PBX Ednetics shall provide Frontier a two (2)-year traffic forecast. This initial forecast will provide the amount of traffic to be delivered to and from Frontier pursuant to this Attachment, over the next eight (8) quarters. 2.2.2 Ongoing forecast requirements. Where the Parties are already exchanging traffic through a Third Party Tandem Switch in a LATA, PBX Ednetics shall provide a new or revised traffic forecast when PBX Ednetics develops plans or becomes aware of information that will materially affect the Parties’ exchange of traffic through such Third Party Tandem Switch in that LATA. Instances that require a new or revised forecast include, but are not limited to: (i) PBX Ednetics plans to deploy a new switch; (ii) PBX Ednetics plans to implement interconnection in accordance with the Interconnection Attachment or a new network architecture; (iii) PBX Ednetics plans to rearrange its network; or (iv) PBX Ednetics expects a significant change in traffic volume.

Appears in 1 contract

Samples: Interconnection Agreement

Forecasting Requirements. 2.2.1 Within ninety (90) days of executing the Agreement, PBX VNCI shall provide Frontier Verizon a two (2)-year traffic forecast. This initial forecast will provide the amount of traffic to be delivered to and from Frontier Verizon pursuant to this Attachment, over the next eight (8) quarters. 2.2.2 Ongoing forecast requirements. Where the Parties are already exchanging traffic through a Third Party Tandem Switch in a LATA, PBX VNCI shall provide a new or revised traffic forecast when PBX VNCI develops plans or becomes aware of information that will materially affect the Parties’ exchange of traffic through such Third Party Tandem Switch in that LATA. Instances that require a new or revised forecast include, but are not limited to: (i) PBX VNCI plans to deploy a new switch; (ii) PBX VNCI plans to implement interconnection in accordance with the Interconnection Attachment or a new network architecture; (iii) PBX VNCI plans to rearrange its network; or (iv) PBX VNCI expects a significant change in traffic volume.

Appears in 1 contract

Samples: Service Agreement

Forecasting Requirements. 2.2.1 Within ninety (90) days of executing the Agreement, PBX CTT shall provide Frontier Verizon a two (2)-year traffic forecast. This initial forecast will provide the amount of traffic to be delivered to and from Frontier Verizon pursuant to this Attachment, over the next eight (8) quarters. 2.2.2 Ongoing forecast requirements. Where the Parties are already exchanging traffic through a Third Party Tandem Switch in a LATA, PBX CTT shall provide a new or revised traffic forecast when PBX CTT develops plans or becomes aware of information that will materially affect the Parties’ exchange of traffic through such Third Party Tandem Switch in that LATA. Instances that require a new or revised forecast include, but are not limited to: (i) PBX CTT plans to deploy a new switch; (ii) PBX CTT plans to implement interconnection in accordance with the Interconnection Attachment or a new network architecture; (iii) PBX CTT plans to rearrange its network; or (iv) PBX CTT expects a significant change in traffic volume.

Appears in 1 contract

Samples: Telecommunications

Forecasting Requirements. 2.2.1 Within ninety (90) days of executing the Agreement, PBX Ymax shall provide Frontier Verizon a two (2)-year traffic forecast. This initial forecast will provide the amount of traffic to be delivered to and from Frontier Verizon pursuant to this Attachment, over the next eight (8) quarters. 2.2.2 Ongoing forecast requirements. Where the Parties are already exchanging traffic through a Third Party Tandem Switch in a LATA, PBX Ymax shall provide a new or revised traffic forecast when PBX Xxxx develops plans or becomes aware of information that will materially affect the Parties’ exchange of traffic through such Third Party Tandem Switch in that LATA. Instances that require a new or revised forecast include, but are not limited to: (i) PBX Ymax plans to deploy a new switch; (ii) PBX Ymax plans to implement interconnection in accordance with the Interconnection Attachment or a new network architecture; (iii) PBX Ymax plans to rearrange its network; or (iv) PBX Ymax expects a significant change in traffic volume.

Appears in 1 contract

Samples: Telecommunications