Generation of contextual resources Sample Clauses

Generation of contextual resources. Lots of identifiers present in library data are good candidates to create new contextual resources. However the source of these identifiers should be always described in the appropriate attributes. This practice would easier the process of disambiguation of the resources. For instance identifying a series of numbers as being a code from the Library of Congress Subject Headings17 would allow the identification of the resource as a potential concept. After the identification of the identifiers present in the data, the solution is to select key vocabularies to which data could be matched. The validation exercise as shown that an important number of libraries are using VIAF18 identifiers or GND19 identifiers in their data. These could be the first targets Europeana Libraries could link the data to.
AutoNDA by SimpleDocs

Related to Generation of contextual resources

  • Synchronous Generation The Interconnection Customer shall design its Small Generating Facility to maintain a composite power delivery at continuous rated power output at the Point of Interconnection at a power factor within the range of 0.95 leading to 0.95 lagging, unless the NYISO or the Transmission Owner in whose Transmission District the Small Generating Facility interconnects has established different requirements that apply to all similarly situated generators in the New York Control Area or Transmission District (as applicable) on a comparable basis, in accordance with Good Utility Practice.

  • Non-Synchronous Generation The Interconnection Customer shall design its Small Generating Facility to maintain a composite power delivery at continuous rated power output at the high-side of the generator substation at a power factor within the range of 0.95 leading to 0.95 lagging, unless the NYISO or the Transmission Owner in whose Transmission District the Small Generating Facility interconnects has established a different power factor range that applies to all similarly situated non-synchronous generators in the control area or Transmission District (as applicable) on a comparable basis, in accordance with Good Utility Practice. This power factor range standard shall be dynamic and can be met using, for example, power electronics designed to supply this level of reactive capability (taking into account any limitations due to voltage level, real power output, etc.) or fixed and switched capacitors, or a combination of the two. This requirement shall only apply to newly interconnecting non-synchronous generators that have not yet executed a Facilities Study Agreement as of September 21, 2016.

  • Certain Phrases, etc The words (i) “including”, “includes” and “include” mean “including (or includes or include) without limitation,” (ii) “the aggregate of”, “the total of”, “the sum of”, or a phrase of similar meaning means “the aggregate (or total or sum), without duplication, of,” and (iii) unless stated otherwise, “Article”, “Section”, and “Schedule” followed by a number or letter mean and refer to the specified Article or Section of or Schedule to this Plan of Arrangement.

  • Distribution of UDP and TCP queries DNS probes will send UDP or TCP “DNS test” approximating the distribution of these queries.

  • Secure Information Handling and Transfers 7.1 Physical and electronic handling, processing and transferring of DWP Data, including secure access to systems and the use of encryption where appropriate.

  • Geographic Area and Sector Specific Allowances, Conditions and Exceptions The following allowances and conditions shall apply where relevant. Where the Employer does work which falls under the following headings, the Employer agrees to pay and observe the relevant respective conditions and/or exceptions set out below in each case.

  • Switching System Hierarchy and Trunking Requirements For purposes of routing ECI traffic to Verizon, the subtending arrangements between Verizon Tandem Switches and Verizon End Office Switches shall be the same as the Tandem/End Office subtending arrangements Verizon maintains for the routing of its own or other carriers’ traffic (i.e., traffic will be routed to the appropriate Verizon Tandem subtended by the terminating End Office serving the Verizon Customer). For purposes of routing Verizon traffic to ECI, the subtending arrangements between ECI Tandem Switches and ECI End Office Switches shall be the same as the Tandem/End Office subtending arrangements that ECI maintains for the routing of its own or other carriers’ traffic.

  • COVID-19 Vaccine Passports Pursuant to Texas Health and Safety Code, Section 161.0085(c), Contractor certifies that it does not require its customers to provide any documentation certifying the customer’s COVID-19 vaccination or post-transmission recovery on entry to, to gain access to, or to receive service from the Contractor’s business. Contractor acknowledges that such a vaccine or recovery requirement would make Contractor ineligible for a state-funded contract.

  • ACCESS TO SECURITY LOGS AND REPORTS Upon request, the Contractor shall provide access to security logs and reports to the State or Authorized User in a format as specified in the Authorized User Agreement.

  • Access to Information Systems Access, if any, to DXC’s Information Systems is granted solely to perform the Services under this Order, and is limited to those specific DXC Information Systems, time periods and personnel as are separately agreed to by DXC and Supplier from time to time. DXC may require Supplier’s employees, subcontractors or agents to sign individual agreements prior to access to DXC’s Information Systems. Use of DXC Information Systems during other time periods or by individuals not authorized by DXC is expressly prohibited. Access is subject to DXC business control and information protection policies, standards and guidelines as may be modified from time to time. Use of any other DXC Information Systems is expressly prohibited. This prohibition applies even when an DXC Information System that Supplier is authorized to access, serves as a gateway to other Information Systems outside Supplier’s scope of authorization. Supplier agrees to access Information Systems only from specific locations approved for access by DXC. For access outside of DXC premises, DXC will designate the specific network connections to be used to access Information Systems.