Geothermal Fluid Clause Samples

Geothermal Fluid. The control system shall maximise electricity generation for all flow conditions of Geothermal Fluid. The design temperature of the Geothermal Fluid at the discharge terminal point shall be 87(degree)C +/- 2(degree)C and with a minimum brine return temperature of 85(degree)C. The Geothermal Fluid can be discharged at 4 locations depending on Binary Plant operating status: o Existing reinjection header, with a capacity of up to 3000 tonnes/hr o Existing prawn farm supply, of up to 1000 tonnes/hr. Intermittent flow is possible. o Emergency overflow to the Wairakei Stream, being the balance of the Geothermal Fluid flow up to a maximum permitted flow of 3,000 tonnes/hr. o Existing spilling systems at 60 series ▇▇▇▇▇ and Flash Plants.
Geothermal Fluid. Distribution System ------------------------------------ Geothermal two-phase fluid will be supplied from the three production ▇▇▇▇▇ (named MK-A, MK- B and MK-C) to the common separation system located at the Power Plant. The two-phase lines are protected against overpressure conditions. The steam lines will be equipped with steam traps along the lines.

Related to Geothermal Fluid

  • Gas If Customer has selected a Gas Fixed Rate, Customer’s Price will be based on the Fixed Rate(s), plus the Administration Charge, set forth in the Application, which includes RITERATE ENERGY’s compressor fuel and transportation charges, administrative and transaction costs and the Gas Balancing Amount and any Regulatory Charges (defined below).

  • Fuel The Vehicle must be returned with the amount of fuel equal to that at the time of the commencement of the rental. If the Vehicle is returned with less fuel, the difference will be charged to You at a rate of $5.00 per litre (which includes a service component).

  • Plant The expression ‘Plant’ as used in the tender papers shall mean every temporary accessory necessary or considered necessary by the Engineer to execute, construct, complete and maintain the work and all altered, modified, substituted and additional works ordered in the time and the manner herein provided and all temporary materials and special and other articles and appliance of every sort kind and description whatsoever intended or used therefore.

  • Pipelines Developer shall have no interest in the pipeline gathering system, which gathering system shall remain the sole property of Operator or its Affiliates and shall be maintained at their sole cost and expense.

  • Generators Temporary installation of generators, and permanent installation of generators that are placed inside existing non-residential buildings or that occupy an area under 50 square feet behind the building they serve.