HARD CORE Sample Clauses

HARD CORE. 3.3.1 Hard core shall be of hard broken stone or boulders broken to gauge not exceeding 8mm. The material of hard core shall be well graded for providing dense and compact sub grade Hard core shall be deposited, spread and levelled in layers not exceeding 15cm thick and watered and well rammed to a true surface and compacted with sufficient fine material. The thickness of hard core specified or indicated in the relevant item of Sch ‘A’ shall be the thickness after consolidation.
AutoNDA by SimpleDocs
HARD CORE. 3.3.1. Hard core shall be crushed granite / trap stone aggregate of gauge not exceeding 63 mm and shall be as specified in Para 3.27.1 to 3.27.6

Related to HARD CORE

  • Unbundled Copper Loop Designed (UCL-D)

  • Unbundled Loops 2.1.1 BellSouth agrees to offer access to unbundled loops pursuant to the following terms and conditions and at the rates set forth in Attachment 11.

  • wire HDSL-Compatible Loop This is a designed Loop that meets Carrier Serving Area (CSA) specifications, may be up to 12,000 feet long and may have up to 2,500 feet of bridged tap (inclusive of Loop length). It may be a 2-wire or 4-wire circuit and will come standard with a test point, OC, and a DLR.

  • Unbundled Copper Loops (UCL) 2.4.1 BellSouth shall make available Unbundled Copper Loops (UCLs). The UCL is a copper twisted pair Loop that is unencumbered by any intervening equipment (e.g., filters, load coils, range extenders, digital loop carrier, or repeaters) and is not intended to support any particular telecommunications service. The UCL will be offered in two types – Designed and Non-Designed.

  • Digital Outputs 24.1.1. For avoidance of doubt, HD content may only be output in accordance with section “Digital Outputs” above unless stated explicitly otherwise below.

  • ROAD DIMENSIONS Purchaser shall perform road work in accordance with the dimensions shown on the TYPICAL SECTION SHEET and the specifications within this road plan.

  • Unbundled Copper Loop – Designed (UCL-D) 2.4.2.1 The UCL-D will be provisioned as a dry copper twisted pair (2- or 4-wire) Loop that is unencumbered by any intervening equipment (e.g., filters, load coils, range extenders, digital loop carrier, or repeaters).

  • Unbundled Network Elements 35.4.1. The charges that CLEC shall pay to Sprint for Unbundled Network Elements are set forth in Table One of this Agreement. 35.5. Collocation

  • Unbundled Network Element Combinations 4.1 For purposes of this Section, references to “Currently Combined” Network Elements shall mean that the particular Network Elements requested by NewPhone are in fact already combined by BellSouth in the BellSouth network. References to “

  • Copper Subloops Sprint will make available access to copper subloops on an unbundled basis. A copper subloop is a portion of a Copper Loop, or Hybrid Loop, and is comprised entirely of copper wire or copper cable that acts as a transmission facility between any accessible terminal in Sprint’s outside plant, including inside wire owned or controlled by Sprint, and the end-user customer premises. A copper subloop can also include intermediate devices, such as repeaters, used to establish the transmission path. Copper subloops can be used by CLEC to provide voice-grade services as well as digital subscriber line services. Access to copper subloops is subject to the collocation provisions of this Agreement. Copper subloop consists of the distribution portion of the copper loop. Sprint is not obligated to offer feeder loop plant as a stand-alone UNE.

Time is Money Join Law Insider Premium to draft better contracts faster.