High-Resolution Geophysical (HRG) Surveys Sample Clauses

High-Resolution Geophysical (HRG) Surveys. The following stipulations are specific to HRG surveys conducted in support of plan submittal where one or more acoustic sound source is operating at frequencies below 200 kilohertz (kHz):
AutoNDA by SimpleDocs
High-Resolution Geophysical (HRG) Surveys. Stipulations specific to HRG surveys conducted in support of plan (i.e., SAP and/or COP) submittal are provided in 4.3.4.1 through 0.0.0.0:

Related to High-Resolution Geophysical (HRG) Surveys

  • Geotechnical Engineer « »« » « » « » « » « »

  • TCP DNS resolution RTT Refers to the RTT of the sequence of packets from the start of the TCP connection to its end, including the reception of the DNS response for only one DNS query. If the RTT is 5 times greater than the time specified in the relevant SLR, the RTT will be considered undefined.

  • UDP DNS resolution RTT Refers to the RTT of the sequence of two packets, the UDP DNS query and the corresponding UDP DNS response. If the RTT is 5 times greater than the time specified in the relevant SLR, the RTT will be considered undefined.

  • Engineer Resources The Engineer shall furnish and maintain quarters for the performance of all services, in addition to providing adequate and sufficient personnel and equipment to perform the services required under the contract. The Engineer certifies that it presently has adequate qualified personnel in its employment for performance of the services required under this contract, or it will be able to obtain such personnel from sources other than the State.

  • DNSSEC proper resolution There is a valid DNSSEC chain of trust from the root trust anchor to a particular domain name, e.g., a TLD, a domain name registered under a TLD, etc.

  • DNS resolution RTT Refers to either “UDP DNS resolution RTT” or “TCP DNS resolution RTT”.

  • Informal Resolution Outcomes a. When a complainant approaches an administrative officer and alleges harassment by another BCTF member, the following shall apply:

  • Geotechnical 19 The A/E as required shall review past pavement, soil 20 and geology investigations, discuss past findings as 21 impacting the subject roadway project, and independently 22 perform design-needed geotechnical services including 23 development and implementation of a field investigation plan 24 involving any field data collection as deemed necessary, 25 development of a laboratory testing program to conduct soils 26 surface and subsurface characterization tests as applicable 1 to the needs of the project, development of seismic analysis 2 and design criteria in accordance with code requirements, 3 development of pavement condition studies to provide 4 recommendations concerning life cycle costs and 5 rehabilitation/reconstruction methods, and recommendations 6 for the design of foundations, embankment and excavation 7 procedures, settlement analysis, lateral, active, and passive 8 earth pressures, de-watering, landslide mapping, slope 9 stabilization, soil corrosion, erosion, sedimentation control 10 and other applicable design criteria as deemed necessary.

  • Design Development Documents See Section 2, Part 1, Article 2.1.5.

  • Environmental Inspection at End of Agreement Term A. At Authority’s discretion, at least one hundred and twenty (120) days before the expiration or early termination of the Term as provided herein, Company will conduct an environmental inspection and examination of the Company Premises. At its discretion, Authority may complete environmental reviews to determine if recognized environmental conditions exist that could warrant soil and groundwater sampling. If warranted by the findings of Company or Authority’s inspection or if requested by Authority, a compliance audit or site assessment will be performed within the aforementioned time period by a qualified professional acceptable to Authority who will report the findings to Authority. The cost for professional consulting or engineering services required for such audit will be at the expense of Company. If a site assessment is conducted, Company agrees to pay all associated laboratory and testing fees incurred to test and analyze samples collected during the site assessment process. The Authority may also choose to conduct the compliance audit or site assessment. If the results of the assessment indicate that the Company Premises have been impacted by the release of Hazardous Substances, Company will immediately take such action as is necessary and will provide a substantial guaranty in a form and content acceptable to Authority that Company will clean up the contamination at its own expense, at no expense to Authority, and in accordance with Applicable Laws to the extent that it is obligated to do so by virtue of the foregoing provisions of this Article.

Time is Money Join Law Insider Premium to draft better contracts faster.