HOT MIX ASPHALTIC CONCRETE. SMOOTHNESS Section 603.15 shall not apply to this Contract.
HOT MIX ASPHALTIC CONCRETE. SMOOTHNESS Section 603.15 shall not apply to this Contract 5) SECTION 712 - COLD PLANE, STOCKPILE AND REPLACE RAP AS SHOULDER MATERIAL (Item 71201 - RAP: Shoulder Material) Cold planing of the 2.2m width widening for paved shoulders must be filled in with Asphalt Levelling A the same day. The transportation of the RAP to the temporary stockpile and from the temporary stockpile to the site (shoulders) shall be a closed haul. Once placement of the shoulder material is complete, the excess material (RAP) will be hauled to a location determined by the Department and stockpiled. The Contractor shall be required to load, transport and stockpile the excess RAP from the temporary stockpile onto the trucks and deliver to the designated site with no additional compensation being provided. The transportation of excess material from the temporary stockpile to any stockpile sites determined by the Department shall be an open haul, and open haul rates shall apply. A price adjustment shall apply based on the actual haul distance.