Hypothetical Futures Generation Sample Clauses

Hypothetical Futures Generation. Now I discuss in more detail the steps taken to derive the term structure of the t t hypothetical futures. First I define a relationship between  H and  E . This relationship is given by: t t  H = f ( E ) . (3.3.5) t Second, I assume that the seasonal component of the hypothetical futures, ( H ) , t is equivalent to the seasonal component of the existing futures, ( E ) . This is given by:  H =  E Now t t  t t H can be calculated using SH . Rearranging equation (3.3.3) and  substituting equations (3.3.5) and (3.3.6), H is given by:
AutoNDA by SimpleDocs

Related to Hypothetical Futures Generation

  • Synchronous Generation The Interconnection Customer shall design its Small Generating Facility to maintain a composite power delivery at continuous rated power output at the Point of Interconnection at a power factor within the range of 0.95 leading to 0.95 lagging, unless the NYISO or the Transmission Owner in whose Transmission District the Small Generating Facility interconnects has established different requirements that apply to all similarly situated generators in the New York Control Area or Transmission District (as applicable) on a comparable basis, in accordance with Good Utility Practice.

  • Distribution of UDP and TCP queries DNS probes will send UDP or TCP “DNS test” approximating the distribution of these queries.

  • Unbundled Sub-Loop Distribution Intrabuilding Network Cable (USLD-INC) is the distribution facility owned or controlled by BellSouth inside a building or between buildings on the same property that is not separated by a public street or road. USLD-INC includes the facility from the cross connect device in the building equipment room up to and including the point of demarcation at the End User’s premises.

  • Non-Synchronous Generation The Interconnection Customer shall design its Small Generating Facility to maintain a composite power delivery at continuous rated power output at the high-side of the generator substation at a power factor within the range of 0.95 leading to 0.95 lagging, unless the NYISO or the Transmission Owner in whose Transmission District the Small Generating Facility interconnects has established a different power factor range that applies to all similarly situated non-synchronous generators in the control area or Transmission District (as applicable) on a comparable basis, in accordance with Good Utility Practice. This power factor range standard shall be dynamic and can be met using, for example, power electronics designed to supply this level of reactive capability (taking into account any limitations due to voltage level, real power output, etc.) or fixed and switched capacitors, or a combination of the two. This requirement shall only apply to newly interconnecting non-synchronous generators that have not yet executed a Facilities Study Agreement as of September 21, 2016.

  • Commingling of Resold Services with Unbundled Network Elements and Combinations of Unbundled Network Elements 6.7.1 To the extent it is Technically Feasible and pursuant to the terms of Section 9.1, CLEC may Commingle Telecommunications Services purchased on a resale basis with an Unbundled Network Element or combination of Unbundled Network Elements.

  • Allocation of Profits and Losses Distributions Profits/Losses. For financial accounting and tax purposes, the Company's net profits or net losses shall be determined on an annual basis and shall be allocated to the Members in proportion to each Member's relative capital interest in the Company as set forth in Schedule 2 as amended from time to time in accordance with U.S. Department of the Treasury Regulation 1.704-1.

  • Unbundled Loop Concentration 2.8.5.1 Upon the Effective Date of this Amendment, the Unbundled Loop Concentration (ULC) element will no longer be offered by BellSouth and no new orders for ULC will be accepted. Any existing ULCs that were provisioned prior to the Effective Date of this Amendment will be grandfathered at the rates set forth in the Parties’ interconnection agreement that was in effect immediately prior to this Amendment and may remain connected, maintained and repaired according to BellSouth’s TR73600 until such time as they are disconnected by MyLineToo, or BellSouth provides ninety (90) calendar days notice that such ULC must be terminated.

  • Unbundled Subloop Distribution (USLD) 2.8.2.1 The USLD facility is a dedicated transmission facility that BellSouth provides from an End User’s point of demarcation to a BellSouth cross-connect device. The BellSouth cross-connect device may be located within a remote terminal (RT) or a stand-alone cross-box in the field or in the equipment room of a building. The USLD media is a copper twisted pair that can be provisioned as a 2-wire or 4-wire facility. BellSouth will make available the following subloop distribution offerings where facilities exist: USLD – Voice Grade (USLD-VG) Unbundled Copper Subloop (UCSL) USLD – Intrabuilding Network Cable (USLD-INC (aka riser cable))

  • Accounts Distributions (a) On or prior to the Closing Date, the Indenture Trustee shall establish and maintain or cause to be established and maintained, in the name of the Indenture Trustee for the benefit of the Noteholders, the Transferor and the Insurer, the Distribution Account as provided in Article V of the Sale and Servicing Agreement into which amounts shall be deposited in accordance with the terms of the Sale and Servicing Agreement.

  • Services Generally Throughout the Term of this Agreement, the Contractor shall provide the Services in the Service Areas in accordance with the terms and conditions of this Agreement.

Time is Money Join Law Insider Premium to draft better contracts faster.