Common use of IN CONDUCTING THE FEASIBILITY STUDY Clause in Contracts

IN CONDUCTING THE FEASIBILITY STUDY. The Feasibility Study will be based upon the information set forth in the Interconnection Request and agreed upon in the Scoping Meeting held on : Designation of Point of Interconnection and configuration to be studied. Designation of alternative Point(s) of Interconnection and configuration. A Feasibility Study will consist of a power flow analysis and short-circuit analysis, each of which will be conducted and evaluated in accordance with the delivery provisions set forth in Appendix 2 of the GIP. Power Flow will be performed by using the General Electric (GE) PSLF 16.1 Short-Circuit Study will be conducted by using the Siemens PTI version 29 Article 1 One-line Diagram ( to be provided by the requestor) Article 2 Interconnection Transmission Line using 100 MVA base Article 3 Station Transformer Transformer Name MVA Base R1 on 100 MVA base X1 on 100 MVA base R0on 100 MVAbase X0 on 100 MVA base Vnorm (from) Vnorm (to) Tap (from) Tap (to) Variable Tap Tap (max) Tap (min) Tap Step Size Article 4 Transmission Component Ratings Transmission Component Normal Rating (MVA) Long-Term Emergency Rating (MVA) Short-Term Emergency Rating (MVA) Article 5 Generator Power Flow Data Unit Rate (MVA) X’’1/X”2/X”0 for Short-Circuit on GEN rated MVA base (in pu) Pmax MW Pmin MW Qmax MVars Qmin MVars Regulated Bus Unit X’’1/X”2/X”0 for Short-Circuit on 100 MVA base (in pu)

Appears in 3 contracts

Samples: Generator Interconnection Procedures, Generator Interconnection Procedures, Generator Interconnection Procedures

AutoNDA by SimpleDocs

IN CONDUCTING THE FEASIBILITY STUDY. The Feasibility Study will be based upon the information set forth in the Interconnection Request and agreed upon in the Scoping Meeting held on : Designation of Point of Interconnection and configuration to be studied. Designation of alternative Point(s) of Interconnection and configuration. A Feasibility Study will consist of a power flow analysis and short-circuit analysis, each of which will be conducted and evaluated in accordance with the delivery provisions set forth in Appendix 2 of the GIP. Power Flow will be performed by using the General Electric (GE) PSLF 16.1 Short-Circuit Study will be conducted by using the Siemens PTI version 29 Article 1 One-line Diagram ( to be provided by the requestor) Article 2 Interconnection Transmission Line using 100 MVA base Article 3 Station Transformer Transformer Name MVA Base R1 on 100 MVA base X1 on 100 MVA base R0on R0 on 100 MVAbase X0 on 100 MVA base Vnorm (from) Vnorm (to) Tap (from) Tap (to) Variable Tap Tap (max) Tap (min) Tap Step Size Article 4 Transmission Component Ratings Transmission Component Normal Rating (MVA) Long-Term Emergency Rating (MVA) Short-Term Emergency Rating (MVA) Article 5 Generator Power Flow Data Unit Rate (MVA) X’’1/X”2/X”0 for Short-Circuit on GEN rated MVA base (in pu) Pmax MW Pmin MW Qmax MVars Qmin MVars Regulated Bus Unit X’’1/X”2/X”0 for Short-Circuit on 100 MVA base (in pu)

Appears in 2 contracts

Samples: Generator Interconnection Agreement (Gia), Generator Interconnection Agreement (Gia)

AutoNDA by SimpleDocs
Draft better contracts in just 5 minutes Get the weekly Law Insider newsletter packed with expert videos, webinars, ebooks, and more!