Incentives Obligations and Change Order Profit Component. Subject to Section 6.3.2.3 through 6.3.2.6, Buyer shall be obligated to pay to Contractor the Incentives Obligation and any Change Order Profit Component (if applicable), as follows: Buyer shall pay Contractor equal monthly payments that, when summed on a net present value basis to the Commencement Date using the Incentives Interest Rate, equals the total amount of Incentives Obligations plus Change Order Profit Component due hereunder. For example, if the PAS 1R Spacecraft is a Successfully Injected Spacecraft and on the Commencement Date all Transponders on such Spacecraft are and continue to be Successfully Operating Transponders for fifteen (15) years, assuming the maximum [*****] for the entire period, the monthly Incentives Obligations payment would be [*****] for PAS 1R and [*****] for Galaxy IIIC (the "Nominal Payment"). If the Incentives Interest Rate is less than [*****] per annum for any given month, the Incentives Obligations payment will be less than Buyer _______ Contractor _______ the Nominal Payment. In such circumstances, the amount of each month's payment will be calculated on a net present value basis to the date of the last month's payment using the remaining unpaid principal as the new principal, the Incentives Interest Rate, and a term equal to the number of months remaining in the Incentives period. The Parties shall agree in writing upon an appropriate allocation of the portion of Incentive Obligations which shall be payable for each Payload on the Spacecraft. The Incentives Obligations, identified above, shall be payable in 180 equal and consecutive monthly installments over a fifteen (15) year life of the Spacecraft, except as may be adjusted as set forth herein. Except as provided in Paragraph 6.3.4, the first installment of each Incentives Obligations shall be paid on the Spacecraft's Commencement Date. The foregoing notwithstanding: (a) If the Spacecraft is not a Successfully Injected Spacecraft pursuant to Section 6.3.1.4 but is successfully placed into its on-station orbit by ▇▇▇▇▇▇ during the "Transfer Period" (defined as the period from separation of the Launch Vehicle through on-station acquisition) then, subject to Section 6.3.2.3, Buyer shall pay the Incentives Obligations for the Spacecraft in equal and consecutive monthly installments over a period of the Spacecraft's On Station Operational Lifetime (defined at Section 6.3.2. 1 (b)). Buyer _______ Contractor _______ (b) If the Spacecraft is Successfully Injected, but is not successfully placed into its on-station orbit by Contractor during the Transfer Period, then the total amount of the Incentives Obligations for the Spacecraft shall be multiplied by a percentile equal to (i) the On-Station Operational Lifetime divided by (ii) the Calculated Operational Lifetime, which percentile shall, in no event, be greater than one. Subject to Section 6.3.2.3, Buyer shall pay such Incentives Obligations for the Spacecraft in equal and consecutive monthly installments over a period of the Spacecraft's On Station Operational Lifetime. The "On Station Operational Lifetime" shall be mutually determined by Buyer and Contractor, based on standard engineering practices, measured actuals of the Spacecraft, existing at the end of the Transfer Period. However, should the Spacecraft continue to operate successfully beyond the On-Station Operational Lifetime, Contractor will continue to earn Incentives Obligations at the same monthly rate up to the Specified Operational Lifetime. (c) Finally, if the Spacecraft is not a Successfully Injected Spacecraft and, in addition, is not successfully placed into its on-station orbit during the Transfer Period, then the total amount of the Incentives Obligations shall be multiplied by the sum of (A)(i) the Specified Operational Lifetime, plus (ii) the On-Station Operational Lifetime, minus (iii) the Calculated Operational Lifetime, divided by (B) the Specified Operational Lifetime, which percentile shall, in no event, be greater than one. Subject to Section 6.3.2.3, Buyer shall pay such Incentives Obligations for the Buyer _______ Contractor _______ Spacecraft in equal and consecutive monthly installments over a period of the Spacecraft's On-Station Operational Lifetime. For purposes of any provision of this Contract, if the Incentives Obligations or related payment periods are to be recalculated, the monthly installments due shall be recalculated to reflect the imputed interest element that is reflected in the payment plans specified above.
Appears in 1 contract
Incentives Obligations and Change Order Profit Component. Subject to Section 6.3.2.3 through 6.3.2.6, Buyer shall be obligated to pay to Contractor the Incentives Obligation and any Change Order Profit Component (if applicable), as follows: Buyer shall pay Contractor equal monthly payments that, when summed on a net present value basis to the Commencement Date using the Incentives Interest Rate, equals the total amount of Incentives Obligations plus Change Order Profit Component due hereunder. For example, if the PAS 1R Galaxy VIII(i)R Spacecraft is a Successfully Injected Spacecraft and on the Commencement Date all Transponders on such Spacecraft are and continue to be Successfully Operating Transponders for fifteen (15) years, PanAmSat and Boeing Property Information Subject to restrictions on Contract title page 17 Buyer _____ Contractor _____ [***] Filed separately with the Commission pursuant to a request for confidential treatment. assuming the maximum [*****] for the entire period, the monthly Incentives Obligations payment would be [*****] for PAS 1R and [*****] for Galaxy IIIC (the "Nominal Payment"). If the Incentives Interest Rate is less than [*****] per annum for any given month, the Incentives Obligations payment will be less than Buyer _______ Contractor _______ the Nominal Payment. In such circumstances, the amount of each month's payment will be calculated on a net present value basis to the date of the last month's payment using the remaining unpaid principal as the new principal, the Incentives Interest Rate, and a term equal to the number of months remaining in the Incentives period. The Parties shall agree In the event that a Spacecraft has multiple Payloads, the Incentives Obligations will be allocated among such Payloads in writing upon an appropriate the same manner as the allocation of the portion of Incentive Obligations which shall be payable in Buyer's policy for each Payload launch and in-orbit insurance for such Spacecraft on the Spacecraftdate that is not less than 30 days prior to the Launch Date. The Incentives Obligations, identified above, shall be payable in 180 equal and consecutive monthly installments over a fifteen (15) year life the Specified Operation Lifetime of the Spacecraft, except as may be adjusted as set forth herein. Except as provided in Paragraph 6.3.4, the first installment of each Incentives Obligations shall be paid on the Spacecraft's Commencement Date. A sample schedule matrix showing Incentives Obligations payments for fifteen years, assuming fully successful operation, and with a hypothetical interest rate will be attached to this Contract as Exhibit G. The foregoing notwithstanding:: PanAmSat and Boeing Property Information Subject to restrictions on Contract title page 18 Buyer _____ Contractor _____ [***] Filed separately with the Commission pursuant to a request for confidential treatment.
(a) If the Spacecraft is not a Successfully Injected Spacecraft pursuant to Section 6.3.1.4 but is successfully placed into its on-station orbit by ▇▇▇▇▇▇ Contractor during the "Transfer Period" (defined as the period from separation of the Launch Vehicle through on-station acquisition) then, subject to Section 6.3.2.3, Buyer shall pay the Incentives Obligations for the Spacecraft in equal and consecutive monthly installments over a period of the Spacecraft's On Station Operational Lifetime (defined at Section 6.3.2. 1 (b6.3.2.1(b)). Buyer _______ Contractor _______.
(b) If the Spacecraft is Successfully Injected, but is not successfully placed into its on-station orbit by Contractor during the Transfer Period, then the total amount of the Incentives Obligations for the Spacecraft shall be multiplied by a percentile percentage equal to (i) the On-Station Operational Lifetime divided by (ii) the Calculated Operational Lifetime, which percentile percentage shall, in no event, be greater than one. Subject to Section 6.3.2.3, Buyer shall pay such Incentives Obligations for the Spacecraft in equal and consecutive monthly installments over a period of the Spacecraft's On On-Station Operational Lifetime. The "On Station Operational Lifetime" shall be mutually determined by Buyer and Contractor, based on standard engineering practices, using measured actuals of the Spacecraft, existing at the end of the Transfer Period. However, should the PanAmSat and Boeing Property Information Subject to restrictions on Contract title page 19 Buyer _____ Contractor _____ [***] Filed separately with the Commission pursuant to a request for confidential treatment. Spacecraft continue to operate successfully beyond the On-Station Operational Lifetime, Contractor will continue to earn Incentives Obligations at the same monthly rate up to the Specified Operational Lifetime.
(c) Finally, if the Spacecraft is not a Successfully Injected Spacecraft and, in addition, is not successfully placed into its on-station orbit during the Transfer Period, then the total amount of the Incentives Obligations shall be multiplied by the sum of (A)(i) the Specified Operational Lifetime, plus (ii) the On-Station Operational Lifetime, minus (iii) the Calculated Operational Lifetime, divided by (B) the Specified Operational Lifetime, which percentile shall, in no event, be greater than one. Subject to Section 6.3.2.3, Buyer shall pay such Incentives Obligations for the Buyer _______ Contractor _______ Spacecraft in equal and consecutive monthly installments over a period of the Spacecraft's On-On- Station Operational Lifetime. For purposes of any provision of this Contract, if the Incentives Obligations or related payment periods are to be recalculated, the monthly installments due shall be recalculated to reflect the imputed appropriate interest element that is reflected in amount based upon the payment plans specified aboveIncentive Interest Rate.
Appears in 1 contract
Incentives Obligations and Change Order Profit Component. Subject to Section 6.3.2.3 through 6.3.2.6, [***]FILED SEPARATELY WITH THE COMMISSION PURSUANT TO A REQUEST FOR CONFIDENTIAL TREATMENT. PANAMSAT AND ▇▇▇▇▇▇ PROPRIETARY INFORMATION SUBJECT TO RESTRICTIONS ON CONTRACT TITLE PAGE Buyer shall be obligated to pay to Contractor the Incentives Obligation and any Change Order Profit Component (if applicable), as follows: Buyer shall pay Contractor equal monthly payments that, when summed on a net present value basis to the Commencement Date using the Incentives Interest Rate, equals the total amount of Incentives Obligations plus Change Order Profit Component due hereunder. For example, if the PAS 1R Domestic 1 Spacecraft is a Successfully Injected Spacecraft and on the Commencement Date all Transponders on such Spacecraft are and continue to be Successfully Operating Transponders for fifteen (15) years, assuming the maximum [*****] [*********************] for the entire period, the monthly Incentives Obligations payment would be [*****] for PAS 1R and [******] for Galaxy IIIC (the "Nominal Payment"). If the Incentives Interest Rate is less than [**********************] per annum for any given month, the Incentives Obligations payment will be less than Buyer _______ Contractor _______ the Nominal Payment. In such circumstances, the amount of each month's payment will be calculated on a net present value basis to the date of the last month's payment using the remaining unpaid principal as the new principal, the Incentives Interest Rate, and a term equal to the number of months remaining in the Incentives period. The Parties shall agree in writing upon an appropriate allocation [*******************] of the portion of Incentive total Incentives Obligations which shall be payable for each Payload on the SpacecraftC-Band Payload, and [*******] [****] of the total Incentives Obligations shall be payable for the Ku-Band Payload. The Incentives [***]FILED SEPARATELY WITH THE COMMISSION PURSUANT TO A REQUEST FOR CONFIDENTIAL TREATMENT. PANAMSAT AND ▇▇▇▇▇▇ PROPRIETARY INFORMATION SUBJECT TO RESTRICTIONS ON CONTRACT TITLE PAGE Obligations, identified above, shall be payable in 180 equal and consecutive monthly installments over a fifteen (15) year life of the Spacecraft, except as may be adjusted as set forth herein. Except as provided in Paragraph 6.3.4, the first installment of each Incentives Obligations shall be paid on the Spacecraft's Commencement Date. A sample schedule matrix showing Incentives Obligations payments for fifteen years, assuming fully successful operation, and with a hypothetical interest rate will be attached to this Contract as Exhibit G. The foregoing notwithstanding:
(a) If the Spacecraft is not a Successfully Injected Spacecraft pursuant to Section 6.3.1.4 but is successfully placed into its on-station orbit by ▇▇▇▇▇▇ during the "Transfer Period" (defined as the period from separation of the Launch Vehicle through on-on- station acquisition) then, subject to Section 6.3.2.3, Buyer shall pay the Incentives Obligations for the Spacecraft in equal and consecutive monthly installments over a period of the Spacecraft's On Station Operational Lifetime (defined at Section 6.3.2. 1 (b6.3.2.1(b)). Buyer _______ Contractor _______.
(b) If the Spacecraft is Successfully Injected, but is not successfully placed into its on-station orbit by Contractor during the Transfer Period, then the total PANAMSAT AND ▇▇▇▇▇▇ PROPRIETARY INFORMATION SUBJECT TO RESTRICTIONS ON CONTRACT TITLE PAGE amount of the Incentives Obligations for the Spacecraft shall be multiplied by a percentile equal to (i) the On-Station Operational Lifetime divided by (ii) the Calculated Operational Lifetime, which percentile shall, in no event, be greater than one. Subject to Section 6.3.2.3, Buyer shall pay such Incentives Obligations for the Spacecraft in equal and consecutive monthly installments over a period of the Spacecraft's On On-Station Operational Lifetime. The "On Station Operational Lifetime" shall be mutually determined by Buyer and Contractor, based on standard engineering practices, using measured actuals of the Spacecraft, existing at the end of the Transfer Period. However, should the Spacecraft continue to operate successfully beyond the On-Station Operational Lifetime, Contractor will continue to earn Incentives Obligations at the same monthly rate up to the Specified Operational Lifetime.
(c) Finally, if the Spacecraft is not a Successfully Injected Spacecraft and, in addition, is not successfully placed into its on-station orbit during the Transfer Period, then the total amount of the Incentives Obligations shall be multiplied by the sum of (A)(i) the Specified Operational Lifetime, plus (ii) the On-Station Operational Lifetime, minus (iii) the Calculated Operational Lifetime, divided by (B) the Specified Operational Lifetime, which percentile shall, in no event, be greater than one. Subject to Section 6.3.2.3, Buyer shall pay such Incentives Obligations for the Buyer _______ Contractor _______ Spacecraft in equal and consecutive monthly installments over a period of the Spacecraft's On-Station Operational Lifetime. For purposes of any provision of this Contract, if the Incentives Obligations or related payment periods are to be recalculated, the monthly installments due shall be recalculated to reflect the imputed interest element that is reflected in the payment plans specified above.by
Appears in 1 contract
Incentives Obligations and Change Order Profit Component. Subject to Section 6.3.2.3 6.4.2.3 through 6.3.2.66.4.2.6, Buyer shall be obligated to pay to [***] Filed separately with the Commission pursuant to a request for confidential treatment. Contractor the Incentives Obligation and any Change Order Profit Component (if applicable), as follows: Buyer shall pay Contractor an equal monthly payments payment that, when summed calculated on a net present value basis to the Commencement Date using the Incentives Interest Rate, equals the total amount of Incentives Obligations plus Change Order Profit Component due hereunder. For example, if the PAS 1R Galaxy XIII Spacecraft is a Successfully Injected Spacecraft and on the Commencement Date all Transponders on such the Spacecraft are and continue to be Successfully Operating Transponders for fifteen (15) years, assuming the maximum [*****] for the entire period, the monthly Incentives Obligations payment would be [*****TBD] for PAS 1R and [*****] for Galaxy IIIC (the "Nominal Payment"). If the Incentives Interest Rate is less than [*****] per annum for any given month, the Incentives Obligations payment will be less than Buyer _______ Contractor _______ the Nominal Payment. In such circumstances, the amount of each month's payment will be calculated on a net present value basis to the date of the last month's payment using the remaining unpaid principal as the new principal, the Incentives Interest Rate, and a term equal to the number of months remaining in the Incentives period. The Parties shall agree in writing upon an appropriate allocation of the portion of the Incentive Obligations which shall be payable for each Payload on the Spacecraft. The Incentives Obligations, identified above, shall be payable in 180 equal and consecutive monthly installments over a fifteen (15) year life of the Spacecraft, except as may be adjusted as set forth herein. Except as provided in Paragraph 6.3.46.4.4, the first installment of each Incentives Obligations shall be paid on the Spacecraft's Commencement Date. The foregoing notwithstanding:
(a) If A sample schedule matrix showing Incentives [***] Filed separately with the Spacecraft is not a Successfully Injected Spacecraft Commission pursuant to Section 6.3.1.4 but is successfully placed into its on-station orbit by ▇▇▇▇▇▇ during the "Transfer Period" (defined as the period from separation of the Launch Vehicle through on-station acquisition) then, subject to Section 6.3.2.3, Buyer shall pay the Incentives Obligations a request for the Spacecraft in equal and consecutive monthly installments over a period of the Spacecraft's On Station Operational Lifetime (defined at Section 6.3.2. 1 (b)). Buyer _______ Contractor _______
(b) If the Spacecraft is Successfully Injected, but is not successfully placed into its on-station orbit by Contractor during the Transfer Period, then the total amount of the Incentives Obligations for the Spacecraft shall be multiplied by a percentile equal to (i) the On-Station Operational Lifetime divided by (ii) the Calculated Operational Lifetime, which percentile shall, in no event, be greater than one. Subject to Section 6.3.2.3, Buyer shall pay such Incentives Obligations for the Spacecraft in equal and consecutive monthly installments over a period of the Spacecraft's On Station Operational Lifetime. The "On Station Operational Lifetime" shall be mutually determined by Buyer and Contractor, based on standard engineering practices, measured actuals of the Spacecraft, existing at the end of the Transfer Period. However, should the Spacecraft continue to operate successfully beyond the On-Station Operational Lifetime, Contractor will continue to earn Incentives Obligations at the same monthly rate up to the Specified Operational Lifetimeconfidential treatment.
(c) Finally, if the Spacecraft is not a Successfully Injected Spacecraft and, in addition, is not successfully placed into its on-station orbit during the Transfer Period, then the total amount of the Incentives Obligations shall be multiplied by the sum of (A)(i) the Specified Operational Lifetime, plus (ii) the On-Station Operational Lifetime, minus (iii) the Calculated Operational Lifetime, divided by (B) the Specified Operational Lifetime, which percentile shall, in no event, be greater than one. Subject to Section 6.3.2.3, Buyer shall pay such Incentives Obligations for the Buyer _______ Contractor _______ Spacecraft in equal and consecutive monthly installments over a period of the Spacecraft's On-Station Operational Lifetime. For purposes of any provision of this Contract, if the Incentives Obligations or related payment periods are to be recalculated, the monthly installments due shall be recalculated to reflect the imputed interest element that is reflected in the payment plans specified above.
Appears in 1 contract
Incentives Obligations and Change Order Profit Component. Subject to Section 6.3.2.3 through 6.3.2.6, Buyer shall be obligated to pay to Contractor the Incentives Obligation and any Change Order Profit Component (if applicable), as follows: Buyer shall pay Contractor an equal monthly payments payment that, when summed calculated on a net present value basis to the Commencement Date using the Incentives Interest Rate, equals the total amount of Incentives Obligations plus Change Order Profit Component due hereunder. For example, if the PAS 1R Spacecraft is a Successfully Injected Spacecraft and on the Commencement Date all Transponders on such the Spacecraft are and continue to be Successfully Operating Transponders for fifteen (15) years, assuming the maximum [** ******************************] for the entire period, the monthly Incentives Obligations payment would be [*****] for PAS 1R and [*********] for Galaxy IIIC (the "Nominal Payment"). If the Incentives Interest Rate is less than [*** **********************] per annum for any given month, the Incentives Obligations payment will be less than Buyer _______ Contractor _______ the Nominal Payment. In such circumstances, the [***] Filed separately with the Commission pursuant to a request for confidential treatment. amount of each month's payment will be calculated on a net present value basis to the date of the last month's payment using the remaining unpaid principal as the new principal, the Incentives Interest Rate, and a term equal to the number of months remaining in the Incentives period. The Parties shall agree in writing upon an appropriate allocation of the portion of the Incentive Obligations which shall be payable for each Payload on the Spacecraft. The Incentives Obligations, identified above, shall be payable in 180 equal and consecutive monthly installments over a fifteen (15) year life of the Spacecraft, except as may be adjusted as set forth herein. Except as provided in Paragraph 6.3.4, the first installment of each Incentives Obligations shall be paid on the Spacecraft's Commencement Date. A sample schedule matrix showing Incentives Obligations payments for fifteen years, assuming fully successful operation, and with varying hypothetical interests rates will be attached to this Contract as Exhibit I. The foregoing notwithstanding:
(a) If the Spacecraft is not a Successfully Injected Spacecraft pursuant to Section 6.3.1.4 but is successfully placed into its on-station orbit by Hughes during the "Transfer Pe▇▇▇▇▇▇ during the "Transfer Period" (defined as the period from separation of the Launch Vehicle through on-station acquisition) then, subject to Section 6.3.2.3, Buyer shall pay the Incentives Obligations for the Spacecraft in equal and consecutive monthly installments over a period of the Spacecraft's On Station Operational Lifetime (defined at Section 6.3.2. 1 (b6.3.2.1(b)). Buyer _______ Contractor _______.
(b) If the Spacecraft is Successfully Injected, but is not successfully placed into its on-station orbit by Contractor during the Transfer Period, then the total amount of the Incentives Obligations for the Spacecraft shall be multiplied by a percentile equal to (i) the On-Station Operational Lifetime divided by (ii) the Calculated Operational Lifetime, which percentile shall, in no event, be greater than one. Subject to Section 6.3.2.3, Buyer shall pay such Incentives Obligations for the Spacecraft in equal and consecutive monthly installments over a period of the Spacecraft's On On-Station Operational Lifetime. The "On Station Operational Lifetime" shall be mutually determined by Buyer and Contractor, based on standard engineering practices, using measured actuals of the Spacecraft, existing at the end of the Transfer Period. However, should the Spacecraft continue to operate successfully beyond the On-Station Operational Lifetime, Contractor will continue to earn Incentives Obligations at the same monthly rate up to the Specified Operational Lifetime.
(c) Finally, if the Spacecraft is not a Successfully Injected Spacecraft and, in addition, is not successfully placed into its on-station orbit during the Transfer Period, then the total amount of the Incentives Obligations shall be multiplied by the sum of (A)(i) the Specified Operational Lifetime, plus (ii) the On-Station Operational Lifetime, minus (iii) the Calculated Operational Lifetime, divided by (B) the Specified Operational Lifetime, which percentile shall, in no event, be greater than one. Subject to Section 6.3.2.3, Buyer shall pay such Incentives Obligations for the Buyer _______ Contractor _______ Spacecraft in equal and consecutive monthly installments over a period of the Spacecraft's On-Station Operational Lifetime. For purposes of any provision of this Contract, if the Incentives Obligations or related payment periods are to be recalculated, the monthly installments due shall be recalculated to reflect the imputed interest element that is reflected in the payment plans specified above.