Information and Services Required of the Owner. § 7.2.1 The Owner shall furnish information or services required of the Owner by the Design-Build Documents with reasonable promptness. § 7.2.2 Upon written request of the Design-Builder, the Owner shall provide, to the extent under the Owner’s control and if not required by the Design-Build Documents to be provided by the Design-Builder, the results and reports of prior tests, inspections or investigations conducted for the Project involving structural or mechanical systems; chemical, air and water pollution; hazardous materials; or environmental and subsurface conditions and information regarding the presence of pollutants at the Project site. Upon receipt of a written request from the Design-Builder, the Owner shall also provide surveys describing physical characteristics, legal limitations and utility locations for the site of the Project, and a legal description of the site under the Owner’s control. § 7.2.3 The Owner shall promptly obtain easements, zoning variances, and legal authorizations or entitlements regarding site utilization where essential to the completed Project. The Design-Builder shall promptly obtain easements (including but not limited to swing-way easements) and other property rights required for construction of the Project. § 7.2.4 The Owner shall cooperate with the Design-Builder in securing building and other permits, licenses and inspections. § 7.2.5 The services, information, surveys and reports required to be provided by the Owner under this Agreement, shall be furnished at the Owner’s expense, and except as otherwise specifically provided in this Contract or elsewhere in the Design-Build Documents or to the extent the Owner advises the Design-Builder to the contrary in writing, the Design-Builder shall be entitled to reasonably rely upon the accuracy and completeness thereof. In no event shall the Design-Builder be relieved of its responsibility to exercise proper precautions relating to the safe performance of the Work. § 7.2.5.1 Notwithstanding the provisions of Section 7.2.5, the Design-Builder shall be responsible for determining, prior to commencement of the Work, the locations of all underground utility lines, cables, pipelines and similar such § 7.2.6 If the Owner observes or otherwise becomes aware of a fault or defect in the Work or non-conformity with the Design-Build Documents, the Owner shall give prompt written notice thereof to the Design-Builder. § 7.2.7 Prior to the execution of the GMP Amendment, the Design-Builder may request in writing that the Owner provide reasonable evidence that the Owner has made financial arrangements to fulfill the Owner’s obligations under the Design-Build Documents. Thereafter, the Design-Builder may only request such evidence if (1) the Owner fails to make payments to the Design-Builder as the Design-Build Documents require; (2) a change in the Work materially changes the Guaranteed Maximum Price; or (3) the Design-Builder identifies in writing a reasonable concern regarding the Owner’s ability to make payment when due. The Owner shall furnish such evidence as a condition precedent to commencement or continuation of the Work or the portion of the Work affected by a material change. After the Owner furnishes the evidence, the Owner shall not materially vary such financial arrangements without prior notice to the Design-Builder. § 7.2.8 Except as otherwise provided in the Design-Build Documents or when direct communications have been specially authorized, the Owner shall communicate through the Design-Builder with persons or entities employed or retained by the Design-Builder. § 7.2.9 Unless required by the Design-Build Documents to be provided by the Design-Builder, the Owner shall, upon request from the Design-Builder, furnish the services of geotechnical engineers or other consultants for investigation of subsurface, air and water conditions when such services are reasonably necessary to properly carry out the design services furnished by the Design-Builder. In such event, the Design-Builder shall specify the services required. Such services may include, but are not limited to, test borings, test pits, determinations of soil bearing values, percolation tests, evaluations of hazardous materials, ground corrosion and resistivity tests, and necessary operations for anticipating subsoil conditions. The services of geotechnical engineer(s) or other consultants shall include preparation and submission of all appropriate reports and professional recommendations. § 7.2.10 The Design-Builder agrees that the Owner shall have no obligation to deliver copies of notices of right to a lien received by the Owner from parties purporting to be performing or furnishing Work under the Contract or on the Project, and that the Owner’s failure to deliver copies of such notices to the Design-Builder shall have no effect on the obligations of the Design-Builder to hold harmless and indemnify the Owner for mechanics’, material suppliers’, design professionals’, construction or similar liens as required by the Contract or applicable law. However, the Owner shall make a good faith attempt to deliver promptly to the Design-Builder copies of notices of right to a lien received by the Owner from parties purporting to be performing or furnishing Work under the Contract.

Appears in 1 contract

Samples: Design Build Contract

Information and Services Required of the Owner. § 7.2.1 The Owner shall furnish information or services required of the Owner by the Design-Build Documents with reasonable promptness. The Owner makes no warranties or representations as to the accuracy, suitability, or completeness of any information provided to the Design-Builder and the Design-Builder assumes all risks associated with such information. § 7.2.2 Upon written request of the Design-Builder, the The Owner shall provide, to the extent under the Owner’s control and in its possession and if not required by the Design-Build Documents to be provided by the Design-Builder, the results and reports of prior tests, inspections or investigations conducted for the Project involving structural or mechanical systems; chemical, air and water pollution; hazardous materials; or environmental and subsurface conditions and information regarding the presence of pollutants at the Project site. Upon receipt of a written request from the Design-BuilderThe Owner, the Owner if in its possession, shall also provide surveys describing physical characteristics, legal limitations and utility locations for the site of the Project, and a legal description of the site under the Owner’s control.physical § 7.2.3 The Owner shall promptly obtain easements, zoning variances, and legal authorizations or entitlements regarding site utilization where essential to the completed Project. The Design-Builder shall promptly obtain easements (including but not limited to swing-way easements) and other property rights required for construction execution of the Project. § 7.2.4 The Owner shall cooperate with the Design-Builder in securing building and other permits, licenses and inspections. § 7.2.5 The services, information, surveys and reports to the extent required to be provided by the Owner under this AgreementArticle 7, shall be furnished at the Owner’s 's expense, and except as otherwise specifically provided in this Contract or elsewhere in the Design-Build Documents or to the extent the Owner advises the Design-Builder to the contrary in writing, the Design-Builder shall be entitled to reasonably rely upon the accuracy and completeness thereof. In no event shall the Design-Builder be relieved of its responsibility to exercise proper precautions relating to the safe performance of the Work. § 7.2.5.1 Notwithstanding the provisions of Section 7.2.5, the Design-Builder shall be responsible for determining, prior to commencement of the Work, the locations of all underground utility lines, cables, pipelines and similar such § 7.2.6 If the Owner observes or otherwise becomes aware of a fault or defect in the Work or non-conformity with the Design-Build Documents, the Owner shall give prompt written notice thereof to the Design-Builder; however, the Owner has no duty to discover any such fault, defect, or non-conformity. § 7.2.7 Prior to the execution of the GMP Amendment, the Design-Builder may request in writing that the Owner provide reasonable evidence that the Owner has made financial arrangements to fulfill the Owner’s obligations under the Design-Build Documents. Thereafter, the Design-Builder may only request such evidence if (1) the Owner fails to make payments to the Design-Builder as the Design-Build Documents require; (2) a change in the Work materially changes the Guaranteed Maximum Price; or (3) the Design-Builder identifies in writing a reasonable concern regarding the Owner’s ability to make payment when due. The Owner shall furnish such evidence as a condition precedent to commencement or continuation of the Work or the portion of the Work affected by a material change. After the Owner furnishes the evidence, the Owner shall not materially vary such financial arrangements without prior notice to the Design-Builder. § 7.2.8 Except as otherwise provided in the Design-Build Documents or when direct communications have been specially authorized, the Owner shall endeavor to communicate through the Design-Builder with persons or entities employed or retained by the Design-Builder. § 7.2.9 Unless required by the 7.2.8 The Design-Build Documents to be provided by the Design-Builder, the Owner shall, upon request from the Design-Builder, Builder shall furnish the services of geotechnical engineers or other consultants for investigation of subsurface, air and water conditions when such services are reasonably necessary to properly carry out the design services furnished by the Design-Builder. In such event, the Design-Builder shall specify the services requiredconditions. Such services may shall include, but are not limited to, test borings, test pits, determinations of soil bearing values, percolation tests, evaluations of hazardous materials, ground corrosion and resistivity tests, and necessary operations for anticipating subsoil conditions. The services of geotechnical engineer(s) or other consultants shall include preparation and submission of all appropriate reports and professional recommendations. § 7.2.10 The Design-Builder agrees that the Owner shall have no obligation to deliver copies of notices of right to a lien received by the Owner from parties purporting to be performing or furnishing Work under the Contract or on the Project, and that the Owner’s failure to deliver copies of such notices to the 7.2.9 Design-Builder shall have no effect on the obligations of the Design-Builder to hold harmless carefully examine and indemnify the Owner for mechanics’, material suppliers’, design professionals’, construction or similar liens as required by the Contract or applicable law. However, the Owner shall make a good faith attempt to deliver promptly to the Design-Builder copies of notices of right to a lien received study any information and services provided by the Owner from parties purporting to be performing (including, without limitation, the Owner’s Criteria and the like), compare such information with each other and physical conditions at the site and the other Design-Build Documents, and either confirm the accuracy and completeness of same or furnishing Work under the Contract.notify Owner immediately in writing of any inaccuracies, errors, inconsistencies, or

Appears in 1 contract

Samples: Standard Form of Agreement Between Owner and Design Builder

Information and Services Required of the Owner. § 7.2.1 The Owner shall furnish information or services required of the Owner by the Design-Build Documents with reasonable promptness. § 7.2.2 Upon written request of the Design-Builder, the The Owner shall provide, to the extent under the Owner’s control and if not required by the Design-Build Documents to be provided by the Design-Builder, the results and reports of prior tests, inspections or investigations conducted for the Project involving structural or mechanical systems; chemical, air and water pollution; hazardous materials; or environmental and subsurface conditions and information regarding the presence of pollutants at the Project site. Upon receipt of a written request from the Design-Builder, the Owner shall also provide surveys describing physical characteristics, legal limitations and utility locations for the site of the Project, and a legal description of the site under the Owner’s control. § 7.2.3 The Owner shall promptly obtain easements, zoning variances, and legal authorizations or entitlements regarding site utilization where essential to the completed Project. The Design-Builder shall promptly obtain easements (including but not limited to swing-way easements) and other property rights required for construction execution of the Project. § 7.2.4 The Owner shall cooperate with the Design-Builder in securing building and other permits, licenses and inspections. § 7.2.5 The services, information, surveys and reports required to be provided by the Owner under this Agreement, shall be furnished at the Owner’s 's expense, and except as otherwise specifically provided in this Contract Agreement or elsewhere in the Design-Build Documents or to the extent the Owner advises the Design-Builder to the contrary in writing, the Design-Builder shall be entitled to reasonably rely upon the accuracy and completeness thereof. In no event shall the Design-Builder be relieved of its responsibility to exercise proper precautions relating to the safe performance of the Work. § 7.2.5.1 Notwithstanding the provisions of Section 7.2.5, the Design-Builder shall be responsible for determining, prior to commencement of the Work, the locations of all underground utility lines, cables, pipelines and similar such § 7.2.6 If the Owner observes or otherwise becomes aware of a fault or defect in the Work or non-conformity with the Design-Build Documents, the Owner shall give prompt written notice thereof to the Design-Builder. § 7.2.7 Prior to the execution of the GMP Design-Build Amendment, the Design-Builder may request in writing that the Owner provide reasonable evidence that the Owner has made financial arrangements to fulfill the Owner’s obligations under the Design-Build DocumentsDocuments and the Design-Builder’s Proposal. Thereafter, the Design-Builder may only request such evidence if (1) the Owner fails to make payments to the Design-Builder as the Design-Build Documents require; (2) a change in the Work materially changes the Guaranteed Maximum PriceContract Sum; or (3) the Design-Builder identifies in writing a reasonable concern regarding the Owner’s ability to make payment when due. The Owner shall furnish such evidence as a condition precedent to commencement or continuation of the Work or the portion of the Work affected by a material change. After the Owner furnishes the evidence, the Owner shall not materially vary such financial arrangements without prior notice to the Design-Builder. § 7.2.8 Except as otherwise provided in the Design-Build Documents or when direct communications have been specially authorized, the Owner shall communicate through the Design-Builder with persons or entities employed or retained by the Design-Builder. § 7.2.9 Unless required by the Design-Build Documents to be provided by the Design-Builder, the Owner shall, upon request from the Design-Builder, furnish the services of geotechnical engineers or other consultants for investigation of subsurface, air and water conditions when such services are reasonably necessary to properly carry out the design services furnished by the Design-Builder. In such event, the Design-Builder shall specify the services required. Such services may include, but are not limited to, test borings, test pits, determinations of soil bearing values, percolation tests, evaluations of hazardous materials, ground corrosion and resistivity tests, and necessary operations for anticipating subsoil conditions. The services of geotechnical engineer(s) or other consultants shall include preparation and submission of all appropriate reports and professional recommendations. § 7.2.10 The Design-Builder agrees that the Owner shall have no obligation to deliver copies of notices of right to a lien received by the Owner from parties purporting to be performing or furnishing Work under the Contract or on the Project, purchase and that the Owner’s failure to deliver copies of such notices to the Design-Builder shall have no effect on the obligations of the Design-Builder to hold harmless and indemnify the Owner for mechanics’, material suppliers’, design professionals’, construction or similar liens maintain insurance as required by the Contract or applicable law. However, the Owner shall make a good faith attempt to deliver promptly to the Design-Builder copies of notices of right to a lien received by the Owner from parties purporting to be performing or furnishing Work under the Contract.set forth in Exhibit B.

Appears in 1 contract

Samples: Standard Form of Agreement Between Owner and Design Builder

Information and Services Required of the Owner. § 7.2.1 The Owner shall furnish information or services required of the Owner by the Design-Build Documents with reasonable promptness. § 7.2.2 Upon written request of the Design-Builder, the The Owner shall provide, to the extent under the Owner’s control and if not required by the Design-Build Documents to be provided by the Design-Builder, the results and reports of prior tests, inspections or investigations conducted for the Project involving structural or mechanical systems; chemical, air and water pollution; hazardous materials; or environmental and subsurface conditions and information regarding the presence of pollutants at the Project site. Upon receipt of a written request from the Design-Builder, the Owner shall also provide surveys describing physical characteristics, legal limitations and utility locations for the site of the Project, and a legal description of the site under the Owner’s control. § 7.2.3 The Owner shall promptly obtain easements, zoning variances, and legal authorizations or entitlements regarding site utilization where essential to the completed Project. The Design-Builder shall promptly obtain easements (including but not limited to swing-way easements) and other property rights required for construction execution of the Project. § 7.2.4 The Owner shall cooperate with the Design-Builder in securing building and other permits, licenses and inspections. § 7.2.5 The services, information, surveys and reports required to be provided by the Owner under this Agreement, shall be furnished at the Owner’s 's expense, and except as otherwise specifically provided in this Contract Agreement or elsewhere in the Design-Build Documents or to the extent the Owner advises the Design-Builder to the contrary in writing, the Design-Builder shall be entitled to reasonably rely upon the accuracy and completeness thereof. In no event shall the Design-Builder be relieved of its responsibility to exercise proper precautions relating to the safe performance of the Work. § 7.2.5.1 Notwithstanding the provisions of Section 7.2.5, the Design-Builder shall be responsible for determining, prior to commencement of the Work, the locations of all underground utility lines, cables, pipelines and similar such § 7.2.6 If the Owner observes or otherwise becomes aware of a fault or defect in the Work or non-conformity with the Design-Build Documents, the Owner shall give prompt written notice thereof to the Design-Builder. § 7.2.7 Prior to the execution of the GMP Amendment, the Design-Builder may request in writing that the Owner provide reasonable evidence that the Owner has made financial arrangements to fulfill the Owner’s obligations under the Design-Build Documents. Thereafter, the Design-Builder may only request such evidence if (1) the Owner fails to make payments to the Design-Builder as the Design-Build Documents require; (2) a change in the Work materially changes the Guaranteed Maximum Price; or (3) the Design-Builder identifies in writing a reasonable concern regarding the Owner’s ability to make payment when due. The Owner shall furnish such evidence as a condition precedent to commencement or continuation of the Work or the portion of the Work affected by a material change. After the Owner furnishes the evidence, the Owner shall not materially vary such financial arrangements without prior notice to the Design-Builder. § 7.2.8 Except as otherwise provided in the Design-Build Documents or when direct communications have been specially authorized, the Owner shall communicate through the Design-Builder with persons or entities employed or retained by the Design-Builder. § 7.2.9 Unless required by the Design-Build Documents to be provided by the Design-Builder, the Owner shall, upon request from the Design-Builder, furnish the services of geotechnical engineers or other consultants for investigation of subsurface, air and water conditions when such services are reasonably necessary to properly carry out the design services furnished by the Design-Builder. In such event, the Design-Builder shall specify the services required. Such services may include, but are not limited to, test borings, test pits, determinations of soil bearing values, percolation tests, evaluations of hazardous materials, ground corrosion and resistivity tests, and necessary operations for anticipating subsoil conditions. The services of geotechnical engineer(s) or other consultants shall include preparation and submission of all appropriate reports and professional recommendations. § 7.2.10 The Design-Builder agrees that the Owner shall have no obligation to deliver copies of notices of right to a lien received by the Owner from parties purporting to be performing or furnishing Work under the Contract or on the Project, and that the Owner’s failure to deliver copies of such notices to the Design-Builder shall have no effect on the obligations of the Design-Builder to hold harmless and indemnify the Owner for mechanics’, material suppliers’, design professionals’, construction or similar liens as required by the Contract or applicable law. However, the Owner shall make a good faith attempt to deliver promptly to the Design-Builder copies of notices of right to a lien received by the Owner from parties purporting to be performing or furnishing Work under the Contract.

Appears in 1 contract

Samples: Standard Form of Agreement Between Owner and Design Builder

Information and Services Required of the Owner. § 7.2.1 The Owner shall furnish information or services required of the Owner by the Design-Build Documents with reasonable promptness. § 7.2.2 Upon written request of the Design-Builder, the The Owner shall provide, to the extent under the Owner’s control and if not required by the Design-Build Documents to be provided by the Design-Builder, the results and reports of prior tests, inspections or investigations conducted for the Project involving structural or mechanical systems; chemical, air and water pollution; hazardous materials; or environmental and subsurface conditions and information regarding the presence of pollutants at the Project site. Upon receipt of a written request from the Design-Builder, the The Owner shall also provide surveys describing physical characteristics, legal limitations and utility locations for the site of the Project, and a legal description of the site under the Owner’s control. § 7.2.3 The Owner shall promptly obtain easements, zoning variances, and legal authorizations or entitlements regarding site utilization where essential to necessary for the completed Project. The Design-Builder shall promptly obtain easements (including but not limited to swing-way easements) and other property rights required for construction efficient execution of the Project. § 7.2.4 The Owner shall cooperate with the Design-Builder in securing building and other permits, licenses and inspections. § 7.2.5 The services, information, surveys and reports required to be provided by the Owner under this Agreement, shall be furnished at the Owner’s 's expense, and except as otherwise specifically provided in this Contract Agreement or elsewhere in the Design-Build Documents or to the extent the Owner advises the Design-Builder to the contrary in writingDocuments, the Design-Builder shall be entitled to reasonably rely upon the accuracy and completeness thereof. In no event shall the Design-Builder be relieved of its responsibility to exercise proper precautions relating to the safe performance of the Work. § 7.2.5.1 Notwithstanding the provisions of Section 7.2.5, the Design-Builder shall be responsible for determining, prior to commencement of the Work, the locations of all underground utility lines, cables, pipelines and similar such § 7.2.6 If the Owner observes or otherwise becomes aware of a fault or defect in the Work or non-conformity with the Design-Build Documents, the Owner shall give prompt written notice thereof to the Design-Builder. § 7.2.7 Prior to the execution of the GMP Design-Build Amendment, the Design-Builder may request in writing that the Owner provide reasonable evidence that the Owner has made financial arrangements to fulfill the Owner’s obligations under the Design-Build DocumentsDocuments and the Design-Builder’s Proposal. Thereafter, the Design-Builder may only request such evidence if (1) the Owner fails to make payments to the Design-Builder as the Design-Build Documents require; (2) require and the failure is not a change in the Work materially changes the Guaranteed Maximum Price; or (3) the Design-Builder identifies in writing a reasonable concern regarding the Owner’s ability to make payment when due. The Owner shall furnish such evidence as a condition precedent to commencement or continuation result of the Work or the portion fault of the Work affected by a material change. After the Owner furnishes the evidence, the Owner shall not materially vary such financial arrangements without prior notice to the Design-Builder. § 7.2.8 Except as otherwise provided in the Design-Build Documents or when direct communications have been specially authorized, the Owner shall communicate through the Design-Builder with persons or entities employed or retained by the Design-Builder. § 7.2.9 Unless required by the Design-Build Documents to be provided by the Design-Builder, the Owner shall, upon request from the Design-Builder, furnish the services of geotechnical engineers or other consultants for investigation of subsurface, air and water conditions when such services are reasonably necessary to properly carry out the design services furnished by the Design-Builder. In such event, the Design-Builder shall specify the services required. Such services may include, but are not limited to, test borings, test pits, determinations of soil bearing values, percolation tests, evaluations of hazardous materials, ground corrosion and resistivity tests, and necessary operations for anticipating subsoil conditions. The services of geotechnical engineer(s) or other consultants shall include preparation and submission of all appropriate reports and professional recommendations. § 7.2.10 The Design-Builder agrees that the Owner shall have no obligation to deliver copies of notices of right to a lien received by the Owner from parties purporting to be performing or furnishing Work under the Contract or on the Project, purchase and that the Owner’s failure to deliver copies of such notices to the Design-Builder shall have no effect on the obligations of the Design-Builder to hold harmless and indemnify the Owner for mechanics’, material suppliers’, design professionals’, construction or similar liens maintain insurance as required by the Contract or applicable law. However, the Owner shall make a good faith attempt to deliver promptly to the Design-Builder copies of notices of right to a lien received by the Owner from parties purporting to be performing or furnishing Work under the Contract.set forth in Exhibit B.

Appears in 1 contract

Samples: Standard Form of Agreement Between Owner and Design Builder (Fox Factory Holding Corp)

Information and Services Required of the Owner. § 7.2.1 The Owner shall furnish information or services required of the Owner by the Design-Build Documents with reasonable promptness. The Owner makes no warranties or representations as to the accuracy, suitability, or completeness of any information provided to the Design-Builder and the Design-Builder assumes all risks associated with such information. § 7.2.2 Upon written request of the Design-Builder, the The Owner shall provide, to the extent under the Owner’s control and in its possession and if not required by the Design-Build Documents to be provided by the Design-Builder, the results and reports of prior tests, inspections or investigations conducted for the Project involving structural or mechanical systems; chemical, air and water pollution; hazardous materials; or environmental and subsurface conditions and information regarding the presence of pollutants at the Project site. Upon receipt of a written request from the Design-BuilderThe Owner, the Owner if in its possession, shall also provide surveys describing physical characteristics, legal limitations and utility locations for the site of the Project, and a legal description of the site under the Owner’s control.physical § 7.2.3 The Owner shall promptly obtain easements, zoning variances, and legal authorizations or entitlements regarding site utilization where essential to the completed Project. The Design-Builder shall promptly obtain easements (including but not limited to swing-way easements) and other property rights required for construction execution of the Project. § 7.2.4 The Owner shall cooperate with the Design-Builder in securing building and other permits, licenses and inspections. § 7.2.5 The services, information, surveys and reports to the extent required to be provided by the Owner under this AgreementArticle 7, shall be furnished at the Owner’s 's expense, and except as otherwise specifically provided in this Contract or elsewhere in the Design-Build Documents or to the extent the Owner advises the Design-Builder to the contrary in writing, the Design-Builder shall be entitled to reasonably rely upon the accuracy and completeness thereof. In no event shall the Design-Builder be relieved of its responsibility to exercise proper precautions relating to the safe performance of the Work. § 7.2.5.1 Notwithstanding the provisions of Section 7.2.5, the Design-Builder shall be responsible for determining, prior to commencement of the Work, the locations of all underground utility lines, cables, pipelines and similar such § 7.2.6 If the Owner observes or otherwise becomes aware of a fault or defect in the Work or non-conformity with the Design-Build Documents, the Owner shall give prompt written notice thereof to the Design-Builder; however, the Owner has no duty to discover any such fault, defect, or non-conformity. § 7.2.7 Prior to the execution of the GMP Amendment, the Design-Builder may request in writing that the Owner provide reasonable evidence that the Owner has made financial arrangements to fulfill the Owner’s obligations under the Design-Build Documents. Thereafter, the Design-Builder may only request such evidence if (1) the Owner fails to make payments to the Design-Builder as the Design-Build Documents require; (2) a change in the Work materially changes the Guaranteed Maximum Price; or (3) the Design-Builder identifies in writing a reasonable concern regarding the Owner’s ability to make payment when due. The Owner shall furnish such evidence as a condition precedent to commencement or continuation of the Work or the portion of the Work affected by a material change. After the Owner furnishes the evidence, the Owner shall not materially vary such financial arrangements without prior notice to the Design-Builder. § 7.2.8 Except as otherwise provided in the Design-Build Documents or when direct communications have been specially authorized, the Owner shall endeavor to communicate through the Design-Builder with persons or entities employed or retained by the Design-Builder. § 7.2.9 Unless required by the 7.2.8 The Design-Build Documents to be provided by the Design-Builder, the Owner shall, upon request from the Design-Builder, Builder shall furnish the services of geotechnical engineers or other consultants for investigation of subsurface, air and water conditions when such services are reasonably necessary to properly carry out the design services furnished by the Design-Builder. In such event, the Design-Builder shall specify the services requiredconditions. Such services may shall include, but are not limited to, test borings, test pits, determinations of soil bearing values, percolation tests, evaluations of hazardous materials, ground corrosion and resistivity tests, and necessary operations for anticipating subsoil conditions. The services of geotechnical engineer(s) or other consultants shall include preparation and submission of all appropriate reports and professional recommendations. § 7.2.10 The Design-Builder agrees that the Owner shall have no obligation to deliver copies of notices of right to a lien received by the Owner from parties purporting to be performing or furnishing Work under the Contract or on the Project, and that the Owner’s failure to deliver copies of such notices to the 7.2.9 Design-Builder shall have no effect on carefully examine and study any information and services provided by the obligations Owner (including, without limitation, the Owner’s Criteria and the like), compare such information with each other and physical conditions at the site and the other Design-Build Documents, and either confirm the accuracy and completeness of same or notify Owner immediately in writing of any inaccuracies, errors, inconsistencies, or omissions before commencing any part of the Work. Design-Builder shall bear responsibility for, and shall not be entitled to hold harmless recover damages, costs, or losses relating to, any claim arising from any such inaccuracies, errors, inconsistencies, or omissions if it fails to provide such notice to Owner, and indemnify shall be responsible to the Owner for mechanics’all costs, material suppliers’damages, design professionals’, construction or similar liens as required by the Contract or applicable law. However, the Owner shall make a good faith attempt and losses related to deliver promptly to the Design-Builder copies of notices of right to a lien received by the Owner from parties purporting to be performing or furnishing Work under the Contractand necessary for correction.

Appears in 1 contract

Samples: Standard Form of Agreement Between Owner and Design Builder

Information and Services Required of the Owner. § 7.2.1 The Owner shall furnish information or services required of the Owner by the Design-Build Documents with reasonable promptness. § 7.2.2 Upon written request of the Design-Builder, the The Owner shall provide, to the extent under the Owner’s control and if not required by the Design-Build Documents to be provided by the Design-Builder, the results and reports of prior tests, inspections or investigations conducted for the Project involving structural or mechanical systems; chemical, air and water pollution; hazardous materials; or environmental and subsurface conditions and information regarding the presence of pollutants at the Project site. Upon receipt of a written request from the Design-Builder, the Owner shall also provide provide, if in Owner’s possession, surveys describing physical characteristics, legal limitations and utility locations for the site of the Project, and a legal description of the site under the Owner’s control. § 7.2.3 The Owner shall promptly cooperate with Design-Builder to obtain easements, zoning variances, and legal authorizations or entitlements regarding site utilization where essential to the completed Project. The Design-Builder shall promptly obtain easements (including but not limited to swing-way easements) and other property rights required for construction execution of the Project. § 7.2.4 The Owner shall cooperate with the Design-Builder in securing building and other permits, licenses and inspections. § 7.2.5 The services, information, surveys and reports required to be provided by the Owner under this Agreement, shall be furnished at the Owner’s 's expense, and except as otherwise specifically provided in this Contract Agreement or elsewhere in the Design-Build Documents or to the extent the Owner advises the Design-Builder to the contrary in writing, the Design-Builder shall be entitled to reasonably rely upon the accuracy and completeness thereof. In no event shall the Design-Builder be relieved of its responsibility to exercise proper precautions relating to the safe performance of the Work. § 7.2.5.1 Notwithstanding the provisions of Section 7.2.5, the Design-Builder shall be responsible for determining, prior to commencement of the Work, the locations of all underground utility lines, cables, pipelines and similar such § 7.2.6 If the Owner observes or otherwise becomes aware of a fault or defect in the Work or non-conformity with the Design-Build Documents, the Owner shall give prompt written notice thereof to the Design-Builder. § 7.2.7 Prior to the execution City Council Approval of the GMP AmendmentConstruction Documents, the Design-Builder may request in writing that the Owner provide reasonable evidence that the Owner has made financial arrangements to fulfill the Owner’s obligations under the Design-Build Documents. Thereafter, the Design-Builder may only request such evidence if if (1) the Owner fails to make payments to the Design-Builder as the Design-Build Documents require; (2) a change in the Work materially changes the Guaranteed Maximum PriceContract Sum; or (3) the Design-Builder identifies in writing a reasonable concern regarding the Owner’s ability to make payment when due. The Owner shall furnish such evidence as a condition precedent to commencement or continuation of the Work or the portion of the Work affected by a material change. After the Owner furnishes the evidence, the Owner shall not materially vary such financial arrangements without prior notice to the Design-Builder. § 7.2.8 Except as otherwise provided in the Design-Build Documents or when direct communications have been specially authorized, the Owner shall communicate through the Design-Builder with persons or entities employed or retained by the Design-Builder. § 7.2.9 Unless required by the Design-Build Documents to be provided by the Design-Builder, the Owner shall, upon request from the Design-Builder, furnish the services of geotechnical engineers or other consultants for investigation of subsurface, air and water conditions when such services are reasonably necessary to properly carry out the design services furnished by the Design-Builder. In such event, the Design-Builder shall specify the services required. Such services may include, but are not limited to, test borings, test pits, determinations of soil bearing values, percolation tests, evaluations of hazardous materials, ground corrosion and resistivity tests, and necessary operations for anticipating subsoil conditions. The services of geotechnical engineer(s) or other consultants shall include preparation and submission of all appropriate reports and professional recommendations[This provision intentionally left blank.] § 7.2.10 The Design-Builder agrees that the Owner shall have no obligation to deliver copies of notices of right to a lien received by the Owner from parties purporting to be performing or furnishing Work under the Contract or on the Project, and that the Owner’s failure to deliver copies of such notices to the Design-Builder shall have no effect on the obligations of the Design-Builder to hold harmless and indemnify the Owner for mechanics’, material suppliers’, design professionals’, construction or similar liens as required by the Contract or applicable law. HoweverIf applicable, the Owner shall make a good faith attempt to deliver promptly to the Design-Builder copies of notices of right to a lien received by the Owner from parties purporting to be performing or furnishing Work under the Contract.purchase and maintain insurance as set forth in Exhibit A.

Appears in 1 contract

Samples: Design Build Construction Agreement

Information and Services Required of the Owner. § 7.2.1 The Owner shall furnish information or services required of the Owner by the Design-Build Documents with reasonable promptness. § 7.2.2 Upon written request of the Design-Builder, the The Owner shall provide, to the extent under the Owner’s control and if not required by the Design-Build Documents to be provided by the Design-Builder, the results and reports of prior tests, inspections or investigations conducted for the Project involving structural or mechanical systems; chemical, air and water pollution; hazardous materials; or environmental and subsurface conditions and information regarding the presence of pollutants at the Project site. Upon receipt of a written request from the Design-Builder, the Owner shall also provide surveys describing physical characteristics, legal limitations and utility locations for the site of the Project, and a legal description of the site under the Owner’s control. § 7.2.3 The To the extent reasonably possible, Tthe Owner shall promptly obtain easements, zoning variances, and legal authorizations or entitlements regarding site utilization where essential to the completed Project. The Design-Builder shall promptly obtain easements (including but not limited to swing-way easements) and other property rights required for construction execution of the Project.Project.‌‌‌ § 7.2.4 The Owner shall cooperate with the Design-Builder in securing building and other permits, licenses and inspections. § 7.2.5 The services, information, surveys and reports required to be provided by the Owner under this Agreement, shall be furnished at the Owner’s 's expense., and except as otherwise specifically provided in this Contract Agreement or elsewhere in the Design-Build Documents or to the extent the Owner advises the Design-Builder to the contrary in writing, Although the Design-Builder shall generally be entitled to reasonably rely upon the accuracy and completeness thereof, if Owner did not prepare such documents, it cannot guarantee their accuracy or completeness. In no event shall the Design-Builder be relieved of its responsibility to exercise proper precautions relating to the safe performance of the Work. § 7.2.5.1 Notwithstanding the provisions of Section 7.2.5, the Design-Builder shall be responsible for determining, prior to commencement of the Work, the locations of all underground utility lines, cables, pipelines and similar such § 7.2.6 If the Owner observes or otherwise becomes aware of a fault or defect in the Work or non-conformity with the Design-Build Documents, the Owner shall give prompt written notice thereof to the Design-Builder. § 7.2.7 Prior to the execution of the GMP Amendment, the Design-Builder may request in writing that the Owner provide reasonable evidence that the Owner has made financial arrangements to fulfill the Owner’s obligations under the Design-Build Documents. Thereafter, the Design-Builder may only request such evidence if (1) the Owner fails to make payments to the Design-Builder as the Design-Build Documents require; (2) a change in the Work materially changes the Guaranteed Maximum Price; or (3) the Design-Builder identifies in writing a reasonable concern regarding the Owner’s ability to make payment when due. The Owner shall furnish such evidence as a condition precedent to commencement or continuation of the Work or the portion of the Work affected by a material change. After the Owner furnishes the evidence, the Owner shall not materially vary such financial arrangements without prior notice to the Design-Builder. § 7.2.8 Except as otherwise provided in the Design-Build Documents or when direct communications have been specially authorized, the Owner shall communicate through the Design-Builder with persons or entities employed or retained by the Design-Builder. § 7.2.9 Unless required by the Design-Build Documents to be provided by the Design-Builder, the Owner shall, upon request from the Design-Builder, furnish the services of geotechnical engineers or other consultants for investigation of subsurface, air and water conditions when such services are reasonably necessary to properly carry out the design services furnished by the Design-Builder. In such event, the Design-Builder shall specify the services required. Such services may include, but are not limited to, test borings, test pits, determinations of soil bearing values, percolation tests, evaluations of hazardous materials, ground corrosion and resistivity tests, and necessary operations for anticipating subsoil conditions. The services of geotechnical engineer(s) or other consultants shall include preparation and submission of all appropriate reports and professional recommendations. § 7.2.10 The Design-Builder agrees that the Owner shall have no obligation to deliver copies of notices of right to a lien received by the Owner from parties purporting to be performing or furnishing Work under the Contract or on the Project, and that the Owner’s failure to deliver copies of such notices to the Design-Builder shall have no effect on the obligations of the Design-Builder to hold harmless and indemnify the Owner for mechanics’, material suppliers’, design professionals’, construction or similar liens as required by the Contract or applicable law. However, the Owner shall make a good faith attempt to deliver promptly to the Design-Builder copies of notices of right to a lien received by the Owner from parties purporting to be performing or furnishing Work under the Contract.Work.‌‌‌‌‌

Appears in 1 contract

Samples: Standard Form of Agreement Between Owner and Design Builder

Information and Services Required of the Owner. § 7.2.1 The Owner shall furnish information or services required of the Owner by the Design-Build Documents with reasonable promptness. § 7.2.2 Upon written request of the Design-Builder, the The Owner shall provide, to the extent under the Owner’s control and if not required by the Design-Build Documents to be provided by the Design-Builder, the results and reports of prior tests, inspections or investigations conducted for the Project involving structural or mechanical systems; chemical, air and water pollution; hazardous materials; or environmental and subsurface conditions and information regarding the presence of pollutants at the Project site. Upon receipt of a written request from the Design-Builder, the Owner shall also provide surveys describing physical characteristics, legal limitations and utility locations for the site of the Project, and a legal description of the site under the Owner’s control. § 7.2.3 The To the extent reasonably possible, Tthe Owner shall promptly obtain easements, zoning variances, and legal authorizations or entitlements regarding site utilization where essential to the completed Project. The Design-Builder shall promptly obtain easements (including but not limited to swing-way easements) and other property rights required for construction execution of the Project. § 7.2.4 The Owner shall cooperate with the Design-Builder in securing building and other permits, licenses and inspections. § 7.2.5 The services, information, surveys and reports required to be provided by the Owner under this Agreement, shall be furnished at the Owner’s 's expense., and except as otherwise specifically provided in this Contract Agreement or elsewhere in the Design-Build Documents or to the extent the Owner advises the Design-Builder to the contrary in writing, Although the Design-Builder shall generally be entitled to reasonably rely upon the accuracy and completeness thereof, if Owner did not prepare such documents, it cannot guarantee their accuracy or completeness. In no event shall the Design-Builder be relieved of its responsibility to exercise proper precautions relating to the safe performance of the Work. § 7.2.5.1 Notwithstanding the provisions of Section 7.2.5, the Design-Builder shall be responsible for determining, prior to commencement of the Work, the locations of all underground utility lines, cables, pipelines and similar such § 7.2.6 If the Owner observes or otherwise becomes aware of a fault or defect in the Work or non-conformity with the Design-Build Documents, the Owner shall give prompt written notice thereof to the Design-Builder. However, the Design-Builder stipulates and agrees that the Owner has no duty to discover any design errors or omissions in the Drawings, Plans, Specifications, and other Construction Documents, and has no duty to notify Design-Builder of same. By entering into the Contract Documents or any Agreement with any Engineer, Owner does not warrant the adequacy and accuracy of any Drawings, Plans, Specifications, or other Construction Documents. § 7.2.7 Prior to the execution of the GMP Design-Build Amendment, the Design-Builder may request in writing that the Owner provide reasonable evidence that the Owner has made financial arrangements to fulfill the Owner’s obligations under the Design-Build DocumentsDocuments and the Design-Builder’s Proposal. Thereafter, the Design-Builder may only request such evidence if (1) the Owner fails to make payments to the Design-Builder as the Design-Build Documents require; (2) a change in the Work materially changes the Guaranteed Maximum PriceContract Sum; or (3) the Design-Builder identifies in writing a reasonable concern regarding the Owner’s ability to make payment when due. The Owner shall furnish such evidence as a condition precedent to commencement or continuation of the Work or the portion of the Work affected by a material change. After the Owner furnishes the evidence, the Owner shall not materially vary such financial arrangements without prior notice to the Design-Builder. § 7.2.8 Except as otherwise provided in the Design-Build Documents or when direct communications have been specially authorized, the Owner shall communicate through the Design-Builder with persons or entities employed or retained by the Design-Builder. § 7.2.9 Unless required by the Design-Build Documents to be provided by the Design-Builder, the Owner shall, upon request from the Design-Builder, furnish the services of geotechnical engineers or other consultants for investigation of subsurface, air and water conditions when such services are reasonably necessary to properly carry out the design services furnished by the Design-Builder. In such event, the Design-Builder shall specify the services required. Such services may include, but are not limited to, test borings, test pits, determinations of soil bearing values, percolation tests, evaluations of hazardous materials, ground corrosion and resistivity tests, and necessary operations for anticipating subsoil conditions. The services of geotechnical engineer(s) or other consultants shall include preparation and submission of all appropriate reports and professional recommendations. § 7.2.10 The Design-Builder agrees that the Owner BuilderOwner shall have no obligation to deliver copies of notices of right to a lien received by the Owner from parties purporting to be performing or furnishing Work under the Contract or on the Project, purchase and that the Owner’s failure to deliver copies of such notices to the Design-Builder shall have no effect on the obligations of the Design-Builder to hold harmless and indemnify the Owner for mechanics’, material suppliers’, design professionals’, construction or similar liens maintain insurance as required by the Contract or applicable law. However, the Owner shall make a good faith attempt to deliver promptly to the Design-Builder copies of notices of right to a lien received by the Owner from parties purporting to be performing or furnishing Work under the Contract.set forth in Exhibit B.

Appears in 1 contract

Samples: Standard Form of Agreement Between Owner and Design Builder

Information and Services Required of the Owner. § 7.2.1 The Owner shall furnish information or services required of the Owner by the Design-Build Documents with reasonable promptness. § 7.2.2 Upon written request of the Design-Builder, the The Owner shall provide, to the extent under the Owner’s control and if not required by the Design-Build Documents to be provided by the Design-Builder, the results and reports of prior tests, inspections or investigations conducted for the Project involving structural or mechanical systems; chemical, air and water pollution; hazardous materials; or environmental and subsurface conditions and information regarding the presence of pollutants at the Project site. Upon receipt of a written request from the Design-Builder, the Owner shall also provide surveys describing physical characteristics, legal limitations and utility locations for the site of the Project, and a legal description of the site under the Owner’s control. § 7.2.3 The Owner shall promptly obtain easements, zoning variances, and legal authorizations or entitlements regarding site utilization where essential to the completed Project. The Design-Builder shall promptly obtain easements (including but not limited to swing-way easements) and other property rights required for construction execution of the Project. § 7.2.4 The Owner shall cooperate with the Design-Builder in securing building and other permits, licenses and inspections. § 7.2.5 The services, information, surveys and reports required to be provided by the Owner under this Agreement, shall be furnished at the Owner’s 's expense, and except as otherwise specifically provided in this Contract Agreement or elsewhere in the Design-Build Documents or to the extent the Owner advises the Design-Builder to the contrary in writing, the Design-Builder shall be entitled to reasonably rely upon the accuracy and completeness thereof. In no event shall the Design-Builder be relieved of its responsibility to exercise proper precautions relating to the safe performance of the Work. § 7.2.5.1 Notwithstanding the provisions of Section 7.2.5, the Design-Builder shall be responsible for determining, prior to commencement of the Work, the locations of all underground utility lines, cables, pipelines and similar such § 7.2.6 If the Owner observes or otherwise becomes aware of a fault or defect in the Work or non-conformity with the Design-Build Documents, the Owner shall give prompt written notice thereof to the Design-Builder. § 7.2.7 Prior to the execution of the GMP Design-Build Amendment, the Design-Builder may request in writing that the Owner provide reasonable evidence that the Owner has made financial arrangements to fulfill the Owner’s obligations under the Design-Build DocumentsDocuments and the Design-Builder’s Proposal. Thereafter, the Design-Builder may only request such evidence if (1) the Owner fails to make payments to the Design-Builder as the Design-Build Documents require; (2) a change in the Work materially changes the Guaranteed Maximum PriceContract Sum; or (3) the Design-Builder identifies in writing a reasonable concern regarding the Owner’s ability to make payment when due. The Owner shall furnish such evidence as a condition precedent to commencement or continuation of the Work or the portion of the Work affected by a material change. After the Owner furnishes the evidence, the Owner shall not materially vary such financial arrangements without prior notice to the Design-Builder. § 7.2.8 Except as otherwise provided in the Design-Build Documents or when direct communications have been specially authorized, the Owner shall communicate through the Design-Builder with persons or entities employed or retained by the Design-Builder. § 7.2.9 Unless required by the Design-Build Documents to be provided by the Design-Builder, the Owner shall, upon request from the Design-Builder, furnish the services of geotechnical engineers or other consultants for investigation of subsurface, air and water conditions when such services are reasonably necessary to properly carry out the design services furnished by the Design-Builder. In such event, the Design-Builder shall specify the services required. Such services may include, but are not limited to, test borings, test pits, determinations of soil bearing values, percolation tests, evaluations of hazardous materials, ground corrosion and resistivity tests, and necessary operations for anticipating subsoil conditions. The services of geotechnical engineer(s) or other consultants shall include preparation and submission of all appropriate reports and professional recommendations.percolation § 7.2.10 The Design-Builder agrees that the Owner shall have no obligation to deliver copies of notices of right to a lien received by the Owner from parties purporting to be performing or furnishing Work under the Contract or on the Project, and that the Owner’s failure to deliver copies of such notices to the Design-Builder shall have no effect on the obligations of the Design-Builder to hold harmless and indemnify the Owner for mechanics’, material suppliers’, design professionals’, construction or similar liens as required by the Contract or applicable law. However, the Owner shall make a good faith attempt to deliver promptly to the Design-Builder copies of notices of right to a lien received by the Owner from parties purporting to be performing or furnishing Work under the Contract[Intentionally omitted].

Appears in 1 contract

Samples: Standard Form of Agreement Between Owner and Design Builder

Information and Services Required of the Owner. § 7.2.1 The Owner shall furnish information or services required of the Owner by the Design-Build Documents with reasonable promptness. § 7.2.2 Upon written request of the Design-Builder, the The Owner shall provide, to the extent under the Owner’s control and if not required by the Design-Build Documents to be provided by the Design-Builder, the results and reports of prior tests, inspections or investigations conducted for the Project involving structural or mechanical systems; chemical, air and water pollution; hazardous materials; or environmental and subsurface conditions and information regarding the presence of pollutants at the Project site. Upon receipt of a written request from the Design-Builder, the Owner shall also provide surveys describing physical characteristics, legal limitations and utility locations for the site of the Project, and a legal description of the site under the Owner’s control. § 7.2.3 The Owner shall promptly obtain easements, zoning variances, and legal authorizations or entitlements regarding site utilization where essential to the completed Project. The Design-Builder shall promptly obtain easements (including but not limited to swing-way easements) and other property rights required for construction execution of the Project. § 7.2.4 The Owner shall cooperate with the Design-Builder in securing building and other permits, licenses and inspections. § 7.2.5 The services, information, surveys and reports required to be provided by the Owner under this Agreement, shall be furnished at the Owner’s expense, and except as otherwise specifically provided in this Contract Agreement or elsewhere in the Design-Build Documents or to the extent the Owner advises the Design-Builder to the contrary in writing, the Design-Builder shall be entitled to reasonably rely upon the accuracy and completeness thereof. In no event shall the Design-Builder be relieved of its responsibility to exercise proper precautions relating to the safe performance of the Work. § 7.2.5.1 Notwithstanding the provisions of Section 7.2.5, the Design-Builder shall be responsible for determining, prior to commencement of the Work, the locations of all underground utility lines, cables, pipelines and similar such § 7.2.6 If the Owner observes or otherwise becomes aware of a fault or defect in the Work or non-conformity with the Design-Build Documents, the Owner shall give prompt written notice thereof to the Design-Builder. § 7.2.7 Prior to the execution of the GMP Design-Build Amendment, the Design-Builder may request in writing that the Owner provide reasonable evidence that the Owner has made financial arrangements to fulfill the Owner’s obligations under the Design-Build DocumentsDocuments and the Design-Builder’s Proposal. Thereafter, the Design-Builder may only request such evidence if (1) the Owner fails to make payments to the Design-Builder as the Design-Build Documents require; (2) a change in the Work materially changes the Guaranteed Maximum PriceContract Sum; or (3) the Design-Builder identifies in writing a reasonable concern regarding the Owner’s ability to make payment when due. The Owner shall furnish such evidence as a condition precedent to commencement or continuation of the Work or the portion of the Work affected by a material change. After the Owner furnishes the evidence, the Owner shall not materially vary such financial arrangements without prior notice to the Design-Builder. § 7.2.8 Except as otherwise provided in the Design-Build Documents or when direct communications have been specially authorized, the Owner shall communicate through the Design-Builder with persons or entities employed or retained by the Design-Builder. § 7.2.9 Unless required by the Design-Build Documents to be provided by the Design-Builder, the Owner shall, upon request from the Design-Builder, furnish the services of geotechnical engineers or other The Desig consultants for investigation of subsurface, air and water conditions when such services are reasonably necessary to in properly carry out the design services furnished by the Design-Builder. In such event, the Design-Builder shall specify the services required. Such services may include, but are not limited to, test borings, test pits, determinations of soil bearing values, percolation tests, evaluations of hazardous materials, ground corrosion and resistivity tests, and necessary operations for anticipating subsoil conditions. The services of geotechnical engineer(s) or other consultants shall include preparation and submission of all appropriate reports and professional recommendations.requi § 7.2.10 The Design-Builder agrees that the Owner shall have no obligation to deliver copies of notices of right to a lien received by the Owner from parties purporting to be performing or furnishing Work under the Contract or on the Project, purchase and that the Owner’s failure to deliver copies of such notices to the Design-Builder shall have no effect on the obligations of the Design-Builder to hold harmless and indemnify the Owner for mechanics’, material suppliers’, design professionals’, construction or similar liens maintain insurance as required by the Contract or applicable law. However, the Owner shall make a good faith attempt to deliver promptly to the Design-Builder copies of notices of right to a lien received by the Owner from parties purporting to be performing or furnishing Work under the Contract.set forth in Exhibit B.