Inlet and Outlet Connections Sample Clauses

Inlet and Outlet Connections. All hot dip galvanised inlet, outlet and overflow connections shall conform to the sizes specified on the submittal drawings and shall be located so as to avoid vertical and horizontal bolt seams. Positions shall be agreed between the Engineer and the Authorised Tank Distributor. • Connection sizes shall be as follows: i. Inlet flange : 200mm ii. Outlet flange : 200mm iii. Overflow flange : 200mm iv. Drain Pipe : 200mm ▪ Where connections are shown to pass through tank sheets, these shall be pre-cut by the tank Manufacturer during manufacture. ▪ When necessary openings may be field located, saw cut opening shall only be done by trained personnel by Tank distributor and shall utilise an interior and exterior flange assembly. ▪ Acetylene torch cutting, grinding or welding is not permitted. ▪ Polyurethane sealant shall be applied on any cut sheet edges or bolt connections.

Related to Inlet and Outlet Connections

  • Interconnection Customer’s Interconnection Facilities The Interconnection Customer shall design, procure, construct, install, own and/or control the Interconnection Customer’s Interconnection Facilities described in Appendix A at its sole expense.

  • Interconnection Facilities 4.1.1 The Interconnection Customer shall pay for the cost of the Interconnection Facilities itemized in Attachment 2 of this Agreement. The NYISO, in consultation with the Connecting Transmission Owner, shall provide a best estimate cost, including overheads, for the purchase and construction of its Interconnection Facilities and provide a detailed itemization of such costs. Costs associated with Interconnection Facilities may be shared with other entities that may benefit from such facilities by agreement of the Interconnection Customer, such other entities, the NYISO, and the Connecting Transmission Owner. 4.1.2 The Interconnection Customer shall be responsible for its share of all reasonable expenses, including overheads, associated with (1) owning, operating, maintaining, repairing, and replacing its own Interconnection Facilities, and

  • Interconnection Facilities Engineering Procurement and Construction Interconnection Facilities, Network Upgrades, and Distribution Upgrades shall be studied, designed, and constructed pursuant to Good Utility Practice. Such studies, design and construction shall be based on the assumed accuracy and completeness of all technical information received by the Participating TO and the CAISO from the Interconnection Customer associated with interconnecting the Large Generating Facility.

  • CONNECTING TRANSMISSION OWNER’S INTERCONNECTION FACILITIES As depicted on the one-line diagram in Attachment 3, the Connecting Transmission Owner’s Interconnection Facilities consist of the following constructed or installed between the POI and PCO, as well as metering and telecommunications located at the Bakerstand Solar Collector Substation.