INSPECTION OF CONSTRUCTION. A. The City Engineer, or his duly authorized representatives, shall make periodic inspection of the construction of improvements for subdivisions. Inspection of improvements by the City Engineer or his representative, is not intended to and does not relieve the subdivider, or his contractor, from ensuring that the improvements are constructed in accordance with approved plans and specifications. The subdivider, or his contractor, shall maintain contact with the City Engineer, or his representative, during construction of improvements. B. No sanitary sewer, water or storm sewer pipe shall be covered without approval of the City Engineer, or his representative. No flexible base material, subgrade material, or stabilization shall be applied to the street subgrade without said approval. No concrete shall be poured nor asphaltic surface applied to the base without said approval. C. The City Engineer, or his representative, may at any time cause any construction, installation, maintenance, or location of improvements to cease when, in his judgment, the requirements of this chapter or the standards and specifications as hereinbefore provided have been violated and may require such reconstruction or other work as may be necessary to correct any such violation. The cost of materials testing shall be borne by the developer. The cost of any work stoppage shall be borne by the developers.
Appears in 2 contracts