Licenses for Permanent Installation The contractor must comply with all State mandatory licensing requirements prior to installation. Questions on licensing requirements should be directed to the State Licensing Board. Contractor must furnish and install all furniture and materials in compliance with all applicable codes, whether local, state, or federal; and that all permits or licenses required for installation will be obtained without cost to the State.
Unbundled Loop Modifications (Line Conditioning 2.5.1 Line Conditioning is defined as routine network modification that BellSouth regularly undertakes to provide xDSL services to its own customers. This may include the removal of any device, from a copper Loop or copper Subloop that may diminish the capability of the Loop or Subloop to deliver high-speed switched wireline telecommunications capability, including xDSL service. Such devices include, load coils, excessive bridged taps, low pass filters, and range extenders. Excessive bridged taps are bridged taps that serves no network design purpose and that are beyond the limits set according to industry standards and/or the BellSouth’s TR 73600 Unbundled Local Loop Technical Specification. 2.5.2 BellSouth will remove load coils only on copper Loops and Subloops that are less than eighteen thousand (18,000) feet in length. 2.5.3 For any copper loop being ordered by NewPhone which has over six thousand (6,000) feet of combined bridged tap will be modified, upon request from NewPhone, so that the loop will have a maximum of six thousand (6,000) feet of bridged tap. This modification will be performed at no additional charge to NewPhone. Loop conditioning orders that require the removal of bridged tap that serves no network design purpose on a copper Loop that will result in a combined total of bridged tap between two thousand five hundred (2,500) and six thousand (6,000) feet will be performed at the rates set forth in Exhibit A. 2.5.4 NewPhone may request removal of any unnecessary and non-excessive bridged tap (bridged tap between zero (0) and two thousand five hundred (2,500) feet which serves no network design purpose), at rates pursuant to BellSouth’s SC Process as mutually agreed to by the Parties. 2.5.5 Rates for ULM are as set forth in Exhibit A. 2.5.6 BellSouth will not modify a Loop in such a way that it no longer meets the technical parameters of the original Loop type (e.g., voice grade, ADSL, etc.) being ordered. 2.5.7 If NewPhone requests ULM on a reserved facility for a new Loop order, BellSouth may perform a pair change and provision a different Loop facility in lieu of the reserved facility with ULM if feasible. The Loop provisioned will meet or exceed specifications of the requested Loop facility as modified. NewPhone will not be charged for ULM if a different Loop is provisioned. For Loops that require a DLR or its equivalent, BellSouth will provide LMU detail of the Loop provisioned. 2.5.8 NewPhone shall request Loop make up information pursuant to this Attachment prior to submitting a service inquiry and/or a LSR for the Loop type that NewPhone desires BellSouth to condition. 2.5.9 When requesting ULM for a Loop that BellSouth has previously provisioned for NewPhone, NewPhone will submit a SI to BellSouth. If a spare Loop facility that meets the Loop modification specifications requested by NewPhone is available at the location for which the ULM was requested, NewPhone will have the option to change the Loop facility to the qualifying spare facility rather than to provide ULM. In the event that BellSouth changes the Loop facility in lieu of providing ULM, NewPhone will not be charged for ULM but will only be charged the service order charges for submitting an order.
Extension of Facility Termination Date The Seller may advise any Managing Agent in writing of its desire to extend the Facility Termination Date for an additional period not exceeding 364 days, provided such request is made not more than 90 days prior to, and not less than 60 days prior to, the then current Facility Termination Date. Each Managing Agent so advised by the Seller shall promptly notify each Committed Purchaser in its related Purchaser Group of any such request and each such Committed Purchaser shall notify its related Managing Agent, the Collateral Agent and the Seller of its decision to accept or decline the request for such extension no later than 30 days prior to the then current Facility Termination Date (it being understood that each Committed Purchaser may accept or decline such request in its sole discretion and on such terms as it may elect, and the failure to so notify its Managing Agent, the Collateral Agent and the Seller shall be deemed an election not to extend by such Committed Purchaser). In the event that at least one Committed Purchaser agrees to extend the Facility Termination Date, the Seller Parties, the Collateral Agent, the extending Committed Purchasers and the applicable Managing Agent or Managing Agents shall enter into such documents as such extending Committed Purchasers may deem necessary or appropriate to reflect such extension, and all reasonable costs and expenses incurred by such Committed Purchasers, the Managing Agents and the Collateral Agent (including reasonable attorneys’ fees) shall be paid by the Seller. In the event that any Committed Purchaser (a) declines the request to extend the Facility Termination Date or (b) is in a Purchaser Group with respect to which the Seller did not seek an extension of the Facility Termination Date (each such Committed Purchaser being referred to herein as a “Non-Renewing Committed Purchaser”), and, in the case of a Non-Renewing Committed Purchaser described in clause (a), the Commitment of such Non-Renewing Committed Purchaser is not assigned to another Person in accordance with the terms of this Article XI prior to the then current Facility Termination Date, the Purchase Limit shall be reduced by an amount equal to each such Non-Renewing Committed Purchaser’s Commitment on the then current Facility Termination Date.
Replacement of the L/C Issuer The L/C Issuer may be replaced at any time by written agreement between the Borrower, the Administrative Agent, the replaced L/C Issuer and the successor L/C Issuer. The Administrative Agent shall notify the Lenders of any such replacement of the L/C Issuer. At the time any such replacement shall become effective, the Borrower shall pay all unpaid fees accrued for the account of the replaced L/C Issuer pursuant to Section 2.03(m). From and after the effective date of any such replacement, (i) the successor L/C Issuer shall have all the rights and obligations of an L/C Issuer under this Agreement with respect to Letters of Credit to be issued by it thereafter and (ii) references herein to the term “L/C Issuer” shall be deemed to include such successor or any previous L/C Issuer, or such successor and all previous L/C Issuer, as the context shall require. After the replacement of the L/C Issuer hereunder, the replaced L/C Issuer shall remain a party hereto and shall continue to have all the rights and obligations of an L/C Issuer under this Agreement with respect to Letters of Credit issued by it prior to such replacement, but shall not be required to issue additional Letters of Credit.
Equipment Installation In order to meet its obligations under this Agreement, a Party that owns, rents, or leases equipment (the equipment owner) may require installation of such equipment on property owned by another Party (the property owner), provided that the property is being used for an electric utility purpose and that the property owner shall not be required to do so if it would thereby be prevented from performing its own obligations or exercising its rights under this Agreement.
Maintenance Repairs Utility Installations Trade Fixtures and Alterations (a) Section 8.1(a) is amended in its entirety to read as follows: Subject to the provisions of Sections 8.2, 10, and 15, Tenant shall, at Tenant's sole cost and expense and at all times, keep the Building Complex and every part thereof in good order, condition and repair (whether or not the need for such repairs occurs as a result of Tenant's use, any prior use, the elements or the age of such portion of the Building Complex), including, without limiting the generality of the foregoing, plumbing, electrical lighting facilities, boilers, fired or unfired pressure vessels, fire hose connections, fixtures, interior walls, exterior walls, roof, ceilings, floors, windows, doors, plate glass, and skylights, parking areas and lighting, driveways, sidewalks, landscaping, irrigation systems, and subject to Section 8.1(b) below, heating, air conditioning and ventilating systems, but excluding any items which are the responsibility of Landlord pursuant to Section 8.2 below. Tenant, in keeping the Building Complex in good order, condition and repair, shall exercise and perform good maintenance practices, including, without limitation, providing janitorial services to the Building Complex substantially equivalent to those attached hereto as Exhibit I and, snow, ice and trash removal service. Tenant's obligations shall include restorations, replacements or renewals when necessary to keep the Building Complex and all improvements thereon or a part thereof in good order, condition and state of repair. (b) Section 8.1(b) is amended in its entirety to read as follows: Tenant shall procure and pay the cost of a contract for maintenance of the heating, air conditioning and ventilating systems for the Building Complex with a reputable contractor licensed in the State of Colorado and reasonably satisfactory to Landlord. (c) Section 8.1(c) is amended to replace, in both places where it is used, the word "Premises" with the words "Building Complex" and to add the words "including, without limitation, the Premises," before the words "after twenty". (d) Section 8.2 is amended in its entirety to read as follows:
Provisioning Line Splitting and Splitter Space 3.8.1 The Data LEC, Voice CLEC or BellSouth may provide the splitter. When Southern Telecom or its authorized agent owns the splitter, Line Splitting requires the following: a non-designed analog Loop from the serving wire center to the NID at the End User’s location; a collocation cross connection connecting the Loop to the collocation space; a second collocation cross connection from the collocation space connected to a voice port; the high frequency spectrum line activation, and a splitter. The Loop and port cannot be a Loop and port combination (i.e. UNE-P), but must be individual stand-alone Network Elements. When BellSouth owns the splitter, Line Splitting requires the following: a non designed analog Loop from the serving wire center to the NID at the End User’s location with CFA and splitter port assignments, and a collocation cross connection from the collocation space connected to a voice port. 3.8.2 An unloaded 2-wire copper Loop must serve the End User. The meet point for the Voice CLEC and the Data LEC is the point of termination on the MDF for the Data LEC's cable and pairs. 3.8.3 The foregoing procedures are applicable to migration to Line Splitting Service from a UNE-P arrangement, BellSouth Retail Voice Service, BellSouth High Frequency Spectrum (CO Based) Line Sharing. 3.8.4 For other migration scenarios to line splitting, BellSouth will work cooperatively with CLECs to develop methods and procedures to develop a process whereby a Voice CLEC and a Data LEC may provide services over the same Loop.
Termination of Revolving Credit Facility The Revolving Credit Facility and the Revolving Credit Commitments shall terminate on the Revolving Credit Maturity Date.
System Upgrade Facilities and System Deliverability Upgrades Connecting Transmission Owner shall design, procure, construct, install, and own the System Upgrade Facilities and System Deliverability Upgrades described in Appendix A hereto. The responsibility of the Developer for costs related to System Upgrade Facilities and System Deliverability Upgrades shall be determined in accordance with the provisions of Attachment S to the NYISO OATT.
Termination or Reduction of Revolving Commitments The Borrower shall have the right, upon not less than three Business Days’ notice to the Administrative Agent, to terminate the Revolving Commitments or, from time to time, to reduce the amount of the Revolving Commitments; provided that no such termination or reduction of Revolving Commitments shall be permitted if, after giving effect thereto and to any prepayments of the Revolving Loans and Swingline Loans made on the effective date thereof, the Total Revolving Extensions of Credit would exceed the Total Revolving Commitments. Any such reduction shall be in an amount equal to $1,000,000, or a whole multiple thereof, and shall reduce permanently the Revolving Commitments then in effect.