Common use of Instructions to Bidders Clause in Contracts

Instructions to Bidders. The stipulated bid security amount shall be a minimum of $12,000.00. Upon award, the successful Contractor shall replace the Bid Security with the Performance Security. A mandatory preconstruction meeting between the successful Contractor and the Department shall be held in advance of construction startup, location to be determined. The Department may require a levelling course of hot mix be placed prior to placement of the seal coat. No additional compensation shall be provided for this work.

Appears in 3 contracts

Samples: www.princeedwardisland.ca, www.princeedwardisland.ca, www.princeedwardisland.ca

AutoNDA by SimpleDocs

Instructions to Bidders. The stipulated bid security amount shall be a minimum of $12,000.0033,000.00. Upon award, the successful Contractor shall replace the Bid Security with the Performance Security. A mandatory preconstruction meeting between the successful Contractor and the Department shall be held in advance of construction startup, location to be determined. The Department may require a levelling course of hot mix be placed prior to placement of the seal coat. No additional compensation shall be provided for this work. Tender will not be awarded until funding for the project has been approved. There shall be no compensation due to delays in awarding tender.

Appears in 2 contracts

Samples: Tender Form and Agreement, Tender Form and Agreement

Instructions to Bidders. The stipulated bid security amount shall be a minimum of $12,000.0080,000.00. Upon award, the successful Contractor shall replace the Bid Security with the Performance Security. A mandatory preconstruction meeting between the successful Contractor and the Department shall be held in advance of construction startup, location to be determined. The Department may require a levelling course of hot mix be placed prior to placement of the seal coat. No additional compensation shall be provided for this work.

Appears in 2 contracts

Samples: And Agreement, And Agreement

Instructions to Bidders. The stipulated bid security amount shall be a minimum of $12,000.0045,000.00. Upon award, the successful Contractor shall replace the Bid Security with the Performance Security. A mandatory preconstruction meeting between the successful Contractor and the Department shall be held in advance of construction startup, location to be determined. The Department may require a levelling course of hot mix be placed prior to placement of the seal coat. No additional compensation shall be provided for this work.

Appears in 2 contracts

Samples: www.princeedwardisland.ca, www.princeedwardisland.ca

Instructions to Bidders. The stipulated bid security amount shall be a minimum of $12,000.0023,000.00. Upon award, the successful Contractor shall replace the Bid Security with the Performance Security. A mandatory preconstruction meeting between the successful Contractor and the Department shall be held in advance of construction startup, location to be determined. The Department may require a levelling course of hot mix be placed prior to placement of the seal coat. No additional compensation shall be provided for this work.

Appears in 2 contracts

Samples: www.princeedwardisland.ca, www.princeedwardisland.ca

Instructions to Bidders. The stipulated bid security amount shall be a minimum of $12,000.0050,000.00. Upon award, the successful Contractor shall replace the Bid Security with the Performance Security. A mandatory preconstruction meeting between the successful Contractor and the Department shall be held in advance of construction startup, location to be determined. The Department may require a levelling course of hot mix be placed prior to placement of the seal coat. No additional compensation shall be provided for this work.

Appears in 2 contracts

Samples: www.princeedwardisland.ca, www.princeedwardisland.ca

Instructions to Bidders. The stipulated bid security amount shall be a minimum of $12,000.0022,000.00. Upon award, the successful Contractor shall replace the Bid Security with the Performance Security. A mandatory preconstruction meeting between the successful Contractor and the Department shall be held in advance of construction startup, location . Work shall have to be determined. The Department may require completed by a levelling course of hot mix be placed third party prior to placement of commencing the seal coatwork in this contract. No additional compensation shall be provided for this workany delays.

Appears in 2 contracts

Samples: www.princeedwardisland.ca, www.princeedwardisland.ca

Instructions to Bidders. The stipulated bid security amount shall be a minimum of $12,000.0018,000.00. Upon award, the successful Contractor shall replace the Bid Security with the Performance Security. A mandatory preconstruction meeting between the successful Contractor and the Department shall be held in advance of construction startup, location to be determined. The Department may require a levelling course of hot mix be placed prior to placement of the seal coat. No additional compensation shall be provided for this work.

Appears in 2 contracts

Samples: And Agreement, And Agreement

Instructions to Bidders. The stipulated bid security amount shall be a minimum of $12,000.009,000.00. Upon award, the successful Contractor shall replace the Bid Security with the Performance Security. A mandatory preconstruction meeting between the successful Contractor and the Department shall be held in advance of construction startup, location to be determined. The Department may require a levelling course of hot mix be placed prior to placement of the seal coat. No additional compensation shall be provided for this work.

Appears in 2 contracts

Samples: Tender Form and Agreement, And Agreement

Instructions to Bidders. The stipulated bid security amount shall be a minimum of $12,000.0048,000.00. Upon award, the successful Contractor shall replace the Bid Security with the Performance Security. A mandatory preconstruction meeting between the successful Contractor and the Department shall be held in advance of construction startup, location to be determined. The Department may require a levelling course of hot mix be placed prior to placement of the seal coat. No additional compensation shall be provided for this work.

Appears in 1 contract

Samples: www.princeedwardisland.ca

Instructions to Bidders. The stipulated bid security amount shall be a minimum of $12,000.0026,000.00. Upon award, the successful Contractor shall replace the Bid Security with the Performance Security. A mandatory preconstruction meeting between the successful Contractor and the Department shall be held in advance of construction startup, location . Work shall have to be determined. The Department may require completed by a levelling course of hot mix be placed third party prior to placement of commencing the seal coatwork in this contract. No additional compensation shall be provided for this workany delays.

Appears in 1 contract

Samples: www.princeedwardisland.ca

Instructions to Bidders. The stipulated bid security amount shall be a minimum of $12,000.0029,000.00. Upon award, the successful Contractor shall replace the Bid Security with the Performance Security. A mandatory preconstruction meeting between the successful Contractor and the Department shall be held in advance of construction startup, location to be determined. The Department may require a levelling course of hot mix be placed prior to placement of the seal coat. No additional compensation shall be provided for this work. Tender will not be awarded until funding for the project has been approved. There shall be no compensation due to delays in awarding tender.

Appears in 1 contract

Samples: Tender Form and Agreement

Instructions to Bidders. The stipulated bid security amount shall be a minimum of $12,000.0018,000.00. Upon award, the successful Contractor shall replace the Bid Security with the Performance Security. A mandatory preconstruction meeting between the successful Contractor and the Department shall be held in advance of construction startup, location to be determined. The Department may require a levelling course of hot mix be placed prior to placement of the seal coat. No additional compensation shall be provided for this work.

Appears in 1 contract

Samples: www.princeedwardisland.ca

Instructions to Bidders. The stipulated bid security amount shall be a minimum of $12,000.0041,000.00. Upon award, the successful Contractor shall replace the Bid Security with the Performance Security. A mandatory preconstruction meeting between the successful Contractor and the Department shall be held in advance of construction startup, location to be determined. The Department may require a levelling course of hot mix be placed prior to placement of the seal coat. No additional compensation shall be provided for this work.

Appears in 1 contract

Samples: And Agreement

Instructions to Bidders. The stipulated bid security amount shall be a minimum of $12,000.0016,000.00. Upon award, the successful Contractor shall replace the Bid Security with the Performance Security. A mandatory preconstruction meeting between the successful Contractor and the Department shall be held in advance of construction startup, location . Location to be determined. The Department may require a levelling course of hot mix be placed prior to placement of the seal coat. No additional compensation shall be provided for this work.

Appears in 1 contract

Samples: www.princeedwardisland.ca

Instructions to Bidders. The stipulated bid security amount shall be a minimum of $12,000.0015,000.00. Upon award, the successful Contractor shall replace the Bid Security with the Performance Security. A mandatory preconstruction meeting between the successful Contractor and the Department shall be held in advance of construction startup, location to be determined. The Department may require a levelling course of hot mix be placed prior to placement of the seal coat. No additional compensation shall be provided for this work.

Appears in 1 contract

Samples: Tender Form and Agreement

Instructions to Bidders. The stipulated bid security amount shall be a minimum of $12,000.0011,000.00. Upon award, the successful Contractor shall replace the Bid Security with the Performance Security. A mandatory preconstruction meeting between the successful Contractor and the Department shall be held in advance of construction startup, location to be determined. The Department may require a levelling course of hot mix be placed prior to placement of the seal coat. No additional compensation shall be provided for this work.

Appears in 1 contract

Samples: www.princeedwardisland.ca

Instructions to Bidders. The stipulated bid security amount shall be a minimum of $12,000.0040,000.00. Upon award, the successful Contractor shall replace the Bid Security with the Performance Security. A mandatory preconstruction meeting between the successful Contractor and the Department shall be held in advance of construction startup, location to be determined. The Department may require a levelling course of hot mix be placed prior to placement of the seal coat. No additional compensation shall be provided for this work.

Appears in 1 contract

Samples: And Agreement

Instructions to Bidders. The stipulated bid security amount shall be a minimum of $12,000.0043,000.00. Upon award, the successful Contractor shall replace the Bid Security with the Performance Security. A mandatory preconstruction meeting between the successful Contractor and the Department shall be held in advance of construction startup, location to be determined. The Department may require a levelling course of hot mix be placed prior to placement of the seal coat. No additional compensation shall be provided for this work. Tender will not be awarded until funding for the project has been approved. There shall be no compensation due to delays in awarding tender.

Appears in 1 contract

Samples: And Agreement

Instructions to Bidders. The stipulated bid security amount shall be a minimum of $12,000.0013,000.00. Upon award, the successful Contractor shall replace the Bid Security with the Performance Security. A mandatory preconstruction meeting between the successful Contractor and the Department shall be held in advance of construction startup, location . Location to be determined. The Department may require a levelling course of hot mix be placed prior to placement of the seal coat. No additional compensation shall be provided for this work.

Appears in 1 contract

Samples: www.princeedwardisland.ca

Instructions to Bidders. The stipulated bid security amount shall be a minimum of $12,000.0016,000.00. Upon award, the successful Contractor shall replace the Bid Security with the Performance Security. A mandatory preconstruction meeting between the successful Contractor and the Department shall be held in advance of construction startup, location to be determined. The Department may require a levelling course of hot mix be placed prior to placement of the seal coat. No additional compensation shall be provided for this work.

Appears in 1 contract

Samples: www.princeedwardisland.ca

Instructions to Bidders. The stipulated bid security amount shall be a minimum of $12,000.0039,000.00. Upon award, the successful Contractor shall replace the Bid Security with the Performance Security. A mandatory preconstruction meeting between the successful Contractor and the Department shall be held in advance of construction startup, location to be determined. The Department may require a levelling course of hot mix be placed prior to placement of the seal coat. No additional compensation shall be provided for this work. Tender will not be awarded until funding for the project has been approved. There shall be no compensation due to delays in awarding tender.

Appears in 1 contract

Samples: Tender Form and Agreement

Instructions to Bidders. The stipulated bid security amount shall be a minimum of $12,000.0014,000.00. Upon award, the successful Contractor shall replace the Bid Security with the Performance Security. A mandatory preconstruction meeting between the successful Contractor and the Department shall be held in advance of construction startup, location to be determined. The Department may require a levelling course of hot mix be placed prior to placement of the seal coat. No additional compensation shall be provided for this work.

Appears in 1 contract

Samples: And Agreement

Instructions to Bidders. The stipulated bid security amount shall be a minimum of $12,000.0025,000.00. Upon award, the successful Contractor shall replace the Bid Security with the Performance Security. A mandatory preconstruction meeting between the successful Contractor and the Department shall be held in advance of construction startup, location to be determined. The Department may require a levelling course of hot mix be placed prior to placement of the seal coat. No additional compensation shall be provided for this work. Tender will not be awarded until funding for the project has been approved. There shall be no compensation due to delays in awarding tender.

Appears in 1 contract

Samples: Tender Form and Agreement

Instructions to Bidders. The stipulated bid security amount shall be a minimum of $12,000.0071,000.00. Upon award, the successful Contractor shall replace the Bid Security with the Performance Security. A mandatory preconstruction meeting between the successful Contractor and the Department shall be held in advance of construction startup, location to be determined. The Department may require a levelling course of hot mix be placed prior to placement of the seal coat. No additional compensation shall be provided for this work. Tender will not be awarded until funding for the project has been approved. There shall be no compensation due to delays in awarding tender.

Appears in 1 contract

Samples: www.princeedwardisland.ca

Instructions to Bidders. The stipulated bid security amount shall be a minimum of $12,000.0011,000.00. Upon award, the successful Contractor shall replace the Bid Security with the Performance Security. A mandatory preconstruction meeting between the successful Contractor and the Department shall be held in advance of construction startup, location to be determined. The Department may require a levelling course of hot mix be placed prior to placement of the seal coat. No additional compensation shall be provided for this work.

Appears in 1 contract

Samples: www.princeedwardisland.ca

Instructions to Bidders. The stipulated bid security amount shall be a minimum of $12,000.0030,000.00. Upon award, the successful Contractor shall replace the Bid Security with the Performance Security. A mandatory preconstruction meeting between the successful Contractor and the Department shall be held in advance of construction startup, location to be determined. The Department may require a levelling course of hot mix be placed prior to placement of the seal coat. No additional compensation shall be provided for this work.

Appears in 1 contract

Samples: And Agreement

Instructions to Bidders. The stipulated bid security amount shall be a minimum of $12,000.0010,000.00. Upon award, the successful Contractor shall replace the Bid Security with the Performance Security. A mandatory preconstruction meeting between the successful Contractor and the Department shall be held in advance of construction startup, location start-up. Location to be determined. The Department may require a levelling course of hot mix be placed prior to placement of the seal coat. No additional compensation shall be provided for this work.

Appears in 1 contract

Samples: And Agreement

Instructions to Bidders. The stipulated bid security amount shall be a minimum of $12,000.0070,000.00. Upon award, the successful Contractor shall replace the Bid Security with the Performance Security. A mandatory preconstruction meeting between the successful Contractor and the Department shall be held in advance of construction startup, location to be determined. The Department may require a levelling course of hot mix be placed prior to placement of the seal coat. No additional compensation shall be provided for this workstart-up.

Appears in 1 contract

Samples: And Agreement

Instructions to Bidders. The stipulated bid security amount shall be a minimum of $12,000.0055,000.00. Upon award, the successful Contractor shall replace the Bid Security with the Performance Security. A mandatory preconstruction meeting between the successful Contractor and the Department shall be held in advance of construction startup, location to be determined. The Department may require a levelling course of hot mix be placed prior to placement of the seal coat. No additional compensation shall be provided for this work.

Appears in 1 contract

Samples: www.princeedwardisland.ca

Instructions to Bidders. The stipulated bid security amount shall be a minimum of $12,000.0045,000.00. Upon award, the successful Contractor shall replace the Bid Security with the Performance Security. A mandatory preconstruction meeting between the successful Contractor and the Department shall be held in advance of construction startup, location to be determined. The Department may require a levelling course of hot mix be placed prior to placement of the seal coat. No additional compensation shall be provided for this work.

Appears in 1 contract

Samples: And Agreement

AutoNDA by SimpleDocs

Instructions to Bidders. The stipulated bid security amount shall be a minimum of $12,000.0042,000.00. Upon award, the successful Contractor shall replace the Bid Security with the Performance Security. A mandatory preconstruction meeting between the successful Contractor and the Department shall be held in advance of construction startup, location to be determined. The Department may require a levelling course of hot mix be placed prior to placement of the seal coat. No additional compensation shall be provided for this work.

Appears in 1 contract

Samples: www.princeedwardisland.ca

Instructions to Bidders. The stipulated bid security amount shall be a minimum of $12,000.0081,000.00. Upon award, the successful Contractor shall replace the Bid Security with the Performance Security. A mandatory preconstruction meeting between the successful Contractor and the Department shall be held in advance of construction startup, location to be determined. The Department may require a levelling course of hot mix be placed prior to placement of the seal coat. No additional compensation shall be provided for this work.

Appears in 1 contract

Samples: www.princeedwardisland.ca

Instructions to Bidders. The stipulated bid security amount shall be a minimum of $12,000.0051,000.00. Upon award, the successful Contractor shall replace the Bid Security with the Performance Security. A mandatory preconstruction meeting between the successful Contractor and the Department shall be held in advance of construction startup, location to be determined. The Department may require a levelling course of hot mix be placed prior to placement of the seal coat. No additional compensation shall be provided for this work.

Appears in 1 contract

Samples: And Agreement

Instructions to Bidders. The stipulated bid security amount shall be a minimum of $12,000.0048,000.00. Upon award, the successful Contractor shall replace the Bid Security with the Performance Security. A mandatory preconstruction meeting between the successful Contractor and the Department shall be held in advance of construction startup, location to be determined. The Department may require a levelling course of hot mix be placed prior to placement of the seal coat. No additional compensation shall be provided for this work.

Appears in 1 contract

Samples: And Agreement

Instructions to Bidders. The stipulated bid security amount shall be a minimum of $12,000.0056,000.00. Upon award, the successful Contractor shall replace the Bid Security with the Performance Security. A mandatory preconstruction meeting between the successful Contractor and the Department shall be held in advance of construction startup, location to be determined. The Department may require a levelling course of hot mix be placed prior to placement of the seal coat. No additional compensation shall be provided for this work. Tender will not be awarded until funding for the project has been approved. There shall be no compensation due to delays in awarding tender.

Appears in 1 contract

Samples: www.princeedwardisland.ca

Instructions to Bidders. The stipulated bid security amount shall be a minimum of $12,000.0046,000.00. Upon award, the successful Contractor shall replace the Bid Security with the Performance Security. A mandatory preconstruction meeting between the successful Contractor and the Department shall be held at the Xxxxx Building in advance of construction startup, location to be determined. The Department may require a levelling course of hot mix be placed prior to placement of the seal coat. No additional compensation shall be provided for this work.

Appears in 1 contract

Samples: www.princeedwardisland.ca

Instructions to Bidders. The stipulated bid security amount shall be a minimum of $12,000.0022,000.00. Upon award, the successful Contractor shall replace the Bid Security with the Performance Security. A mandatory preconstruction meeting between the successful Contractor and the Department shall be held in advance of construction startup, location to be determined. The Department may require a levelling course of hot mix be placed prior to placement of the seal coat. No additional compensation shall be provided for this work.

Appears in 1 contract

Samples: www.princeedwardisland.ca

Instructions to Bidders. The stipulated bid security amount shall be a minimum of $12,000.0031,000.00. Upon award, the successful Contractor shall replace the Bid Security with the Performance Security. A mandatory preconstruction meeting between the successful Contractor and the Department shall be held in advance of construction startup, location . Work shall have to be determined. The Department may require completed by a levelling course of hot mix be placed third party prior to placement of commencing the seal coatwork in this contract. No additional compensation shall be provided for this workany delays.

Appears in 1 contract

Samples: www.princeedwardisland.ca

Instructions to Bidders. The stipulated bid security amount shall be a minimum of $12,000.0037,000.00. Upon award, the successful Contractor shall replace the Bid Security with the Performance Security. A mandatory preconstruction meeting between the successful Contractor and the Department shall be held in advance of construction startup, location to be determined. The Department may require a levelling course of hot mix be placed prior to placement of the seal coat. No additional compensation shall be provided for this work. Tender will not be awarded until funding for the project has been approved. There shall be no compensation due to delays in awarding tender.

Appears in 1 contract

Samples: Tender Form and Agreement

Instructions to Bidders. The stipulated bid security amount shall be a minimum of $12,000.0052,000.00. Upon award, the successful Contractor shall replace the Bid Security with the Performance Security. A mandatory preconstruction meeting between the successful Contractor and the Department shall be held in advance of construction startup, location to be determined. The Department may require a levelling course of hot mix be placed prior to placement of the seal coat. No additional compensation shall be provided for this work.

Appears in 1 contract

Samples: www.princeedwardisland.ca

Instructions to Bidders. The stipulated bid security amount shall be a minimum of $12,000.0027,000.00. Upon award, the successful Contractor shall replace the Bid Security with the Performance Security. A mandatory preconstruction meeting between the successful Contractor and the Department shall be held in advance of construction startup, location . Work shall have to be determined. The Department may require completed by a levelling course of hot mix be placed third party prior to placement of commencing the seal coatwork in this contract. No additional compensation shall be provided for this workany delays.

Appears in 1 contract

Samples: www.princeedwardisland.ca

Instructions to Bidders. The stipulated bid security amount shall be a minimum of $12,000.007,000.00. Upon award, the successful Contractor shall replace the Bid Security with the Performance Security. A mandatory preconstruction meeting between the successful Contractor and the Department shall be held in advance of construction startup, location to be determined. The Department may require a levelling course of hot mix be placed prior to placement of the seal coat. No additional compensation shall be provided for this work.

Appears in 1 contract

Samples: www.princeedwardisland.ca

Instructions to Bidders. The stipulated bid security amount shall be a minimum of $12,000.0042,000.00. Upon award, the successful Contractor shall replace the Bid Security with the Performance Security. A mandatory preconstruction meeting between the successful Contractor and the Department shall be held in advance of construction startup, location to be determined. The Department may require a levelling course of hot mix be placed prior to placement of the seal coat. No additional compensation shall be provided for this work. Work shall have to be completed by a third party prior to commencing the work in this contract. No additional compensation shall be provided for any delays.

Appears in 1 contract

Samples: Tender Form and Agreement

Instructions to Bidders. The stipulated bid security amount shall be a minimum of $12,000.0019,000.00. Upon award, the successful Contractor shall replace the Bid Security with the Performance Security. A mandatory preconstruction meeting between the successful Contractor and the Department shall be held in advance of construction startup, location to be determined. The Department may require a levelling course of hot mix be placed prior to placement of the seal coat. No additional compensation shall be provided for this work. Tender will not be awarded until funding for the project has been approved. There shall be no compensation due to delays in awarding tender.

Appears in 1 contract

Samples: Tender Form and Agreement

Instructions to Bidders. The stipulated bid security amount shall be a minimum of $12,000.0075,000.00. Upon award, the successful Contractor shall replace the Bid Security with the Performance Security. A mandatory preconstruction meeting between the successful Contractor and the Department shall be held in advance of construction startup, location to be determined. The Department may require a levelling course of hot mix be placed prior to placement of the seal coat. No additional compensation shall be provided for this work.

Appears in 1 contract

Samples: Tender Form and Agreement

Instructions to Bidders. The stipulated bid security amount shall be a minimum of $12,000.0060,000.00. Upon award, the successful Contractor shall replace the Bid Security with the Performance Security. A mandatory preconstruction meeting between the successful Contractor and the Department shall be held in advance of construction startup, location to be determined. The Department may require a levelling course of hot mix be placed prior to placement of the seal coat. No additional compensation shall be provided for this work.

Appears in 1 contract

Samples: And Agreement

Instructions to Bidders. The stipulated bid security amount shall be a minimum of $12,000.0022,000.00. Upon award, the successful Contractor shall replace the Bid Security with the Performance Security. A mandatory preconstruction meeting between the successful Contractor and the Department shall be held in advance of construction startup, location to be determined. The Department may require Work shall have to be completed by a levelling course of hot mix be placed third party prior to placement of commencing the seal coatwork in this contract. No additional compensation shall be provided for this workany delays.

Appears in 1 contract

Samples: www.princeedwardisland.ca

Instructions to Bidders. The stipulated bid security amount shall be a minimum of $12,000.0010,000.00. Upon award, the successful Contractor shall replace the Bid Security with the Performance Security. A mandatory preconstruction meeting between the successful Contractor and the Department shall be held in advance of construction startup, location to be determined. The Department may require a levelling course of hot mix be placed prior to placement of the seal coat. No additional compensation shall be provided for this work.

Appears in 1 contract

Samples: www.princeedwardisland.ca

Instructions to Bidders. The stipulated bid security amount shall be a minimum of $12,000.0035,000.00. Upon award, the successful Contractor shall replace the Bid Security with the Performance Security. A mandatory preconstruction meeting between the successful Contractor and the Department shall be held in advance of construction startup, location to be determined. The Department may require a levelling course of hot mix be placed prior to placement of the seal coat. No additional compensation shall be provided for this work.

Appears in 1 contract

Samples: www.princeedwardisland.ca