Integrated Project Delivery / LEAN Methods Sample Clauses

The Integrated Project Delivery (IPD) / LEAN Methods clause establishes a collaborative project management approach that emphasizes teamwork, shared responsibilities, and efficiency throughout the design and construction process. Under this clause, all key stakeholders—such as the owner, architect, contractors, and consultants—work together from the project's inception, often using tools like joint planning sessions, transparent communication, and continuous process improvement techniques to minimize waste and maximize value. The core function of this clause is to foster a cooperative environment that streamlines project delivery, reduces inefficiencies, and aligns the interests of all parties to achieve better project outcomes.
Integrated Project Delivery / LEAN Methods. The Design-Builder shall exercise the appropriate standards of the industry for Integrated Project Delivery to guide its relationships to the other members of the team, and for LEAN methods in the preconstruction and construction process. Direct Construction Cost Budget per RFP 3.02: $xx,xxx,xxx Fees as Proposed Fee Percentage (Fee as % of the DCCB) Fee in $ (Fee % * DCCB)
Integrated Project Delivery / LEAN Methods. The Design-Builder shall exercise the appropriate standards of the industry for Integrated Project Delivery to guide its relationships to the other members of the team, and for LEAN methods in the preconstruction and construction process. Direct Construction Cost Budget per RFP 3.02: $xx,xxx,xxx Fees as Proposed Fee Percentage (Fee as % of the DCCB) Fee in $ (Fee % * DCCB) 1 Total Design Fees for Design Phase and Design-Build Phase (percentage includes Overhead & Profit) % $ Phase 1 Design Fees (included in above line 1 total; 60% of design fees) Phase 2 Design-Build Fees (included in above line 1 total; 40% of design fees)