INTERVENING LAW. 23.1 This Agreement is the result of negotiations between the Parties and may incorporate certain provisions that resulted from arbitration by the appropriate state Commission(s). The Parties acknowledge that the respective rights and obligations of each Party as set forth in this Agreement are based on the following, as of October 20, 2004: the Act, the applicable rules, regulations and Orders promulgated under the Act by the FCC, and applicable Oklahoma statutes, rules, regulations and Commission orders, and judicial decisions by courts of competent jurisdiction interpreting and applying said federal and Oklahoma statutes, rules, regulations and Orders. In entering into this Agreement and any Amendments to such Agreement and carrying out the provisions herein, neither Party waives, but instead expressly reserves, all of its rights, remedies and arguments with respect to any orders, decisions, legislation or proceedings and any remands thereof and any other federal or state regulatory, legislative or judicial action(s) that are issued, rendered, or adopted after October 20, 2004. Additionally, each Party expressly reserves its intervening law rights relating to the following actions: Verizon v. FCC, et al, 535 U.S. 467 (2002); USTA, et. al v. FCC, 290 F.3d 415 (D.C. Cir. 2002); the impairment proceedings that will be heard before the Commission and any pending appeals (and following xxxxxx and appeal, USTA v. FCC, 359 F.2d 554 (D.C. Cir. 2004), that relate to, or arise from, the FCC’s Triennial Review Order, CC Docket Nos. 01-338, 96-98, and 98-147 (FCC 03-36) (the “TRO”), including, without limitation, the FCC’s MDU Reconsideration Order (FCC 04-191) (rel. August 9, 2004) and the FCC’s Order on Reconsideration (FCC 04-248) (rel. Oct. 18, 2004), and the FCC’s Biennial Review Proceeding which the FCC announced, in its Triennial Review Order, is scheduled to commence in 2004; the FCC’s Supplemental Order Clarification (FCC 00-183) (rel. June 2, 2000), in CC Docket 96-98; and the FCC’s Order on Remand and Report and Order in CC Dockets No. 96-98 and 99-68, 16 FCC Rcd 9151 (2001), (rel. April 27, 2001), which was remanded in WorldCom, Inc. v. FCC, 288 F.3d 429 (D.C. Cir. 2002), and as to the FCC’s Notice of Proposed Rulemaking on the topic of Intercarrier Compensation generally, issued In the Matter of Developing a Unified Intercarrier Compensation Regime, in CC Docket 01-92 (Order No. 01-132), on April 27, 2001 and the FCC’s Order In the Matter of Petition of Core Communications, Inc. for Forbearance Under 47 U.S.C. §160(c) from Application of the ISP Remand Order, WC Docket No. 03-171 (Order No. FCC 04-241) (rel. October 18, 2004) (collectively “Government Actions”). Except to the extent that AT&T-13STATE has adopted the FCC ISP terminating compensation plan (“FCC Plan”) in an AT&T-13STATE state in which this Agreement is effective, and the Parties have incorporated rates, terms and conditions associated with the FCC Plan into this Agreement, these rights also include but are not limited to AT&T-13STATE’s right to exercise its option at any time to adopt on a date specified by AT&T-13STATE the FCC Plan, after which date ISP-bound traffic will be subject to the FCC Plan’s prescribed terminating compensation rates, and other terms and conditions, and seek conforming modifications to this Agreement. For purposes of this Agreement, "Change in Law" shall be defined as any legally binding judicial decision by a court of competent jurisdiction, amendment of the Act or applicable Oklahoma statute, or legislative, federal or state regulatory action, rule, regulation or other legal action that is issued, rendered or adopted after October 20, 2004 and that (i) materially revises, reverses, modifies or clarifies the meaning of the Act, an applicable Oklahoma statute or any of said rules, regulations, Orders, or judicial decisions, (ii) invalidates, modifies, or stays the enforcement of laws or regulations that were the basis or rationales for any rate(s), terms(s) and/or condition(s) of the Agreement, (iii) and/or otherwise affects the rights or obligations of either Party that are addressed by this Agreement specifically including but not limited to those arising with respect to the Government Actions.. For purposes of this section, "legally binding" means that the relevant legal action has not been stayed, no request for a stay is pending and if any deadline for requesting a stay is designated by statute or regulation, such deadline has passed. If either Party believes that a Change in Law within the meaning of this section has occurred, that Party may request renegotiation by written notice to the other Party. The Parties shall thereafter renegotiate the affected provisions in this Agreement in good faith and amend this Agreement to reflect such Change in Law. For avoidance of any doubt, this section shall also apply to situations where this Agreement defines the rights or obligations of either Party solely by reference to Applicable Law or similar reference. In the event that any renegotiation under this Section 23.0 is not concluded within sixty ninety (90) days after one Party gives the other notice that it demands renegotiation pursuant to this provision, or if at any time during such ninety
Appears in 3 contracts
Samples: Interconnection Agreement, Interconnection Agreement, Interconnection Agreement
INTERVENING LAW. 23.1 This Agreement is the result of negotiations between the Parties and may incorporate certain provisions that resulted from arbitration by the appropriate state Commission(s). The Parties acknowledge that the respective rights and obligations of each Party as set forth in this Agreement are based on the following, as of October 20, 2004: the Act, the applicable rules, regulations and Orders promulgated under the Act by the FCC, and applicable Oklahoma Arkansas statutes, rules, regulations and Commission orders, and judicial decisions by courts of competent jurisdiction interpreting and applying said federal and Oklahoma Arkansas statutes, rules, regulations and Orders. In entering into this Agreement and any Amendments to such Agreement and carrying out the provisions herein, neither Party waives, but instead expressly reserves, all of its rights, remedies and arguments with respect to any orders, decisions, legislation or proceedings and any remands thereof and any other federal or state regulatory, legislative or judicial action(s) that are issued, rendered, or adopted after October 20, 2004. Additionally, each Party expressly reserves its intervening law rights relating to the following actions: Verizon v. FCC, et al, 535 U.S. 467 (2002); USTA, et. al v. FCC, 290 F.3d 415 (D.C. Cir. 2002); the impairment proceedings that will be heard before the Commission and any pending appeals (and following xxxxxx and appeal, USTA v. FCC, 359 F.2d 554 (D.C. Cir. 2004), that relate to, or arise from, the FCC’s Triennial Review Order, CC Docket Nos. 01-338, 96-98, and 98-147 (FCC 03-36) (the “TRO”), including, without limitation, the FCC’s MDU Reconsideration Order (FCC 04-191) (rel. August 9, 2004) and the FCC’s Order on Reconsideration (FCC 04-248) (rel. Oct. 18, 2004), and the FCC’s Biennial Review Proceeding which the FCC announced, in its Triennial Review Order, is scheduled to commence in 2004; the FCC’s Supplemental Order Clarification (FCC 00-183) (rel. June 2, 2000), in CC Docket 96-98; and the FCC’s Order on Remand and Report and Order in CC Dockets No. 96-98 and 99-68, 16 FCC Rcd 9151 (2001), (rel. April 27, 2001), which was remanded in WorldCom, Inc. v. FCC, 288 F.3d 429 (D.C. Cir. 2002), and as to the FCC’s Notice of Proposed Rulemaking on the topic of Intercarrier Compensation generally, issued In the Matter of Developing a Unified Intercarrier Compensation Regime, in CC Docket 01-92 (Order No. 01-132), on April 27, 2001 and the FCC’s Order In the Matter of Petition of Core Communications, Inc. for Forbearance Under 47 U.S.C. §160(c) from Application of the ISP Remand Order, WC Docket No. 03-171 (Order No. FCC 04-241) (rel. October 18, 2004) (collectively “Government Actions”). Except to the extent that AT&T-13STATE has adopted the FCC ISP terminating compensation plan (“FCC Plan”) in an AT&T-13STATE state in which this Agreement is effective, and the Parties have incorporated rates, terms and conditions associated with the FCC Plan into this Agreement, these rights also include but are not limited to AT&T-13STATE’s right to exercise its option at any time to adopt on a date specified by AT&T-13STATE the FCC Plan, after which date ISP-bound traffic will be subject to the FCC Plan’s prescribed terminating compensation rates, and other terms and conditions, and seek conforming modifications to this Agreement. For purposes of this Agreement, "Change in Law" shall be defined as any legally binding judicial decision by a court of competent jurisdiction, amendment of the Act or applicable Oklahoma Arkansas statute, or legislative, federal or state regulatory action, rule, regulation or other legal action that is issued, rendered or adopted after October 20, 2004 and that (i) materially revises, reverses, modifies or clarifies the meaning of the Act, an applicable Oklahoma Arkansas statute or any of said rules, regulations, Orders, or judicial decisions, (ii) invalidates, modifies, or stays the enforcement of laws or regulations that were the basis or rationales for any rate(s), terms(s) and/or condition(s) of the Agreement, (iii) and/or otherwise affects the rights or obligations of either Party that are addressed by this Agreement specifically including but not limited to those arising with respect to the Government Actions.. . For purposes of this section, "legally binding" means that the relevant legal action has not been stayed, no request for a stay is pending and if any deadline for requesting a stay is designated by statute or regulation, such deadline has passed. If either Party believes that a Change in Law within the meaning of this section has occurred, that Party may request renegotiation by written notice to the other Party. The Parties shall thereafter renegotiate the affected provisions in this Agreement in good faith and amend this Agreement to reflect such Change in Law. For avoidance of any doubt, this section shall also apply to situations where this Agreement defines the rights or obligations of either Party solely by reference to Applicable Law or similar reference. In the event that any renegotiation under this Section 23.0 23 is not concluded within sixty ninety (90) days after one Party gives the other notice that it demands renegotiation pursuant to this provision, or if at any time during such ninetyninety (90) day period the Parties shall have ceased to negotiate such terms for a continuous period of fifteen
Appears in 2 contracts
Samples: Interconnection Agreement, Interconnection Agreement
INTERVENING LAW. 23.1 This Agreement is the result of negotiations between the Parties and may incorporate certain provisions that resulted from arbitration by the appropriate state Commission(s). The Parties acknowledge that the respective rights and obligations of each Party as set forth in this Agreement are based on the following, as of October 20, 2004: the Act, the applicable rules, regulations and Orders promulgated under the Act by the FCC, and applicable Oklahoma statutes, rules, regulations and Commission orders, and judicial decisions by courts of competent jurisdiction interpreting and applying said federal and Oklahoma statutes, rules, regulations and Orders. In entering into this Agreement and any Amendments to such Agreement and carrying out the provisions herein, neither Party waives, but instead expressly reserves, all of its rights, remedies and arguments with respect to any orders, decisions, legislation or proceedings and any remands thereof and any other federal or state regulatory, legislative or judicial action(s) that are issued, rendered, or adopted after October 20, 2004. Additionally, each Party expressly reserves its intervening law rights relating to the following actions: Verizon v. FCC, et al, 535 U.S. 467 (2002); USTA, et. al v. FCC, 290 F.3d 415 (D.C. Cir. 2002); the impairment proceedings that will be heard before the Commission and any pending appeals (and following xxxxxx remand and appeal, USTA v. FCC, 359 F.2d 554 (D.C. Cir. 2004), that relate to, or arise from, the FCC’s Triennial Review Order, CC Docket Nos. 01-338, 96-98, and 98-147 (FCC 03-36) (the “TRO”), including, without limitation, the FCC’s MDU Reconsideration Order (FCC 04-191) (rel. August 9, 2004) and the FCC’s Order on Reconsideration (FCC 04-248) (rel. Oct. 18, 2004), and the FCC’s Biennial Review Proceeding which the FCC announced, in its Triennial Review Order, is scheduled to commence in 2004; the FCC’s Supplemental Order Clarification (FCC 00-183) (rel. June 2, 2000), in CC Docket 96-98; and the FCC’s Order on Remand and Report and Order in CC Dockets No. 96-98 and 99-68, 16 FCC Rcd 9151 (2001), (rel. April 27, 2001), which was remanded in WorldCom, Inc. v. FCC, 288 F.3d 429 (D.C. Cir. 2002), and as to the FCC’s Notice of Proposed Rulemaking on the topic of Intercarrier Compensation generally, issued In the Matter of Developing a Unified Intercarrier Compensation Regime, in CC Docket 01-92 (Order No. 01-132), on April 27, 2001 and the FCC’s Order In the Matter of Petition of Core Communications, Inc. for Forbearance Under 47 U.S.C. §160(c) from Application of the ISP Remand Order, WC Docket No. 03-171 (Order No. FCC 04-241) (rel. October 18, 2004) (collectively “Government Actions”). Except to the extent that AT&T-13STATE has adopted the FCC ISP terminating compensation plan (“FCC Plan”) in an AT&T-13STATE state in which this Agreement is effective, and the Parties have incorporated rates, terms and conditions associated with the FCC Plan into this Agreement, these rights also include but are not limited to AT&T-13STATE’s right to exercise its option at any time to adopt on a date specified by AT&T-13STATE the FCC Plan, after which date ISP-bound traffic will be subject to the FCC Plan’s prescribed terminating compensation rates, and other terms and conditions, and seek conforming modifications to this Agreement. For purposes of this Agreement, "Change in Law" shall be defined as any legally binding judicial decision by a court of competent jurisdiction, amendment of the Act or applicable Oklahoma statute, or legislative, federal or state regulatory action, rule, regulation or other legal action that is issued, rendered or adopted after October 20, 2004 and that (i) materially revises, reverses, modifies or clarifies the meaning of the Act, an applicable Oklahoma statute or any of said rules, regulations, Orders, or judicial decisions, (ii) invalidates, modifies, or stays the enforcement of laws or regulations that were the basis or rationales for any rate(s), terms(s) and/or condition(s) of the Agreement, (iii) and/or otherwise affects the rights or obligations of either Party that are addressed by this Agreement specifically including but not limited to those arising with respect to the Government Actions.. For purposes of this section, "legally binding" means that the relevant legal action has not been stayed, no request for a stay is pending and if any deadline for requesting a stay is designated by statute or regulation, such deadline has passed. If either Party believes that a Change in Law within the meaning of this section has occurred, that Party may request renegotiation by written notice to the other Party. The Parties shall thereafter renegotiate the affected provisions in this Agreement in good faith and amend this Agreement to reflect such Change in Law. For avoidance of any doubt, this section shall also apply to situations where this Agreement defines the rights or obligations of either Party solely by reference to Applicable Law or similar reference. In the event that any renegotiation under this Section 23.0 is not concluded within sixty ninety (90) days after one Party gives the other notice that it demands renegotiation pursuant to this provision, or if at any time during such ninety
Appears in 2 contracts
Samples: Interconnection Agreement, Interconnection Agreement
INTERVENING LAW. 23.1 This Agreement is the result of negotiations between the Parties and may incorporate certain provisions that resulted from arbitration by the appropriate state Commission(s). The Parties acknowledge that the respective rights and obligations of each Party as set forth in this Agreement are based on the following, as of October 20, 2004: the Act, the applicable rules, regulations and Orders promulgated under the Act by the FCC, and applicable Oklahoma Arkansas statutes, rules, regulations and Commission orders, and judicial decisions by courts of competent jurisdiction interpreting and applying said federal and Oklahoma Arkansas statutes, rules, regulations and Orders. In entering into this Agreement and any Amendments to such Agreement and carrying out the provisions herein, neither Party waives, but instead expressly reserves, all of its rights, remedies and arguments with respect to any orders, decisions, legislation or proceedings and any remands thereof and any other federal or state regulatory, legislative or judicial action(s) that are issued, rendered, or adopted after October 20, 2004. Additionally, each Party expressly reserves its intervening law rights relating to the following actions: Verizon v. FCC, et al, 535 U.S. 467 (2002); USTA, et. al v. FCC, 290 F.3d 415 (D.C. Cir. 2002); the impairment proceedings that will be heard before the Commission and any pending appeals (and following xxxxxx and appeal, USTA v. FCC, 359 F.2d 554 (D.C. Cir. 2004), that relate to, or arise from, the FCC’s Triennial Review Order, CC Docket Nos. 01-338, 96-98, and 98-147 (FCC 03-36) (the “TRO”), including, without limitation, the FCC’s MDU Reconsideration Order (FCC 04-191) (rel. August 9, 2004) and the FCC’s Order on Reconsideration (FCC 04-248) (rel. Oct. 18, 2004), and the FCC’s Biennial Review Proceeding which the FCC announced, in its Triennial Review Order, is scheduled to commence in 2004; the FCC’s Supplemental Order Clarification (FCC 00-183) (rel. June 2, 2000), in CC Docket 96-98; and the FCC’s Order on Remand and Report and Order in CC Dockets No. 96-98 and 99-68, 16 FCC Rcd 9151 (2001), (rel. April 27, 2001), which was remanded in WorldCom, Inc. v. FCC, 288 F.3d 429 (D.C. Cir. 2002), and as to the FCC’s Notice of Proposed Rulemaking on the topic of Intercarrier Compensation generally, issued In the Matter of Developing a Unified Intercarrier Compensation Regime, in CC Docket 01-92 (Order No. 01-132), on April 27, 2001 and the FCC’s Order In the Matter of Petition of Core Communications, Inc. for Forbearance Under 47 U.S.C. §160(c) from Application of the ISP Remand Order, WC Docket No. 03-171 (Order No. FCC 04-241) (rel. October 18, 2004) (collectively “Government Actions”). Except to the extent that AT&T-13STATE has adopted the FCC ISP terminating compensation plan (“FCC Plan”) in an AT&T-13STATE state in which this Agreement is effective, and the Parties have incorporated rates, terms and conditions associated with the FCC Plan into this Agreement, these rights also include but are not limited to AT&T-13STATE’s right to exercise its option at any time to adopt on a date specified by AT&T-13STATE the FCC Plan, after which date ISP-bound traffic will be subject to the FCC Plan’s prescribed terminating compensation rates, and other terms and conditions, and seek conforming modifications to this Agreement. For purposes of this Agreement, "Change in Law" shall be defined as any legally binding judicial decision by a court of competent jurisdiction, amendment of the Act or applicable Oklahoma statute, or legislative, federal or state regulatory action, rule, regulation or other legal action that is issued, rendered or adopted after October 20, 2004 and that (i) materially revises, reverses, modifies or clarifies the meaning of the Act, an applicable Oklahoma statute or any of said rules, regulations, Orders, or judicial decisions, (ii) invalidates, modifies, or stays the enforcement of laws or regulations that were the basis or rationales for any rate(s), terms(s) and/or condition(s) of the Agreement, (iii) and/or otherwise affects the rights or obligations of either Party that are addressed by this Agreement specifically including but not limited to those arising with respect to the Government Actions.. For purposes of this section, "legally binding" means that the relevant legal action has not been stayed, no request for a stay is pending and if any deadline for requesting a stay is designated by statute or regulation, such deadline has passed. If either Party believes that a Change in Law within the meaning of this section has occurred, that Party may request renegotiation by written notice to the other Party. The Parties shall thereafter renegotiate the affected provisions in this Agreement in good faith and amend this Agreement to reflect such Change in Law. For avoidance of any doubt, this section shall also apply to situations where this Agreement defines the rights or obligations of either Party solely by reference to Applicable Law or similar reference. In the event that any renegotiation under this Section 23.0 23 is not concluded within sixty ninety (90) days after one Party gives the other notice that it demands renegotiation pursuant to this provision, or if at any time during such ninetyninety (90) day period the Parties shall have ceased to negotiate such terms for a continuous period of fifteen
Appears in 1 contract
Samples: Interconnection Agreement
INTERVENING LAW. 000032
23.1 This Agreement is the result of negotiations between the Parties and may incorporate certain provisions that resulted from arbitration by the appropriate state Commission(s). The Parties acknowledge that the respective rights and obligations of each Party as set forth in this Agreement are based on the following, as of October 20, 2004: the Act, the applicable rules, regulations and Orders promulgated under the Act by the FCC, and applicable Oklahoma Missouri statutes, rules, regulations and Commission orders, and judicial decisions by courts of competent jurisdiction interpreting and applying said federal and Oklahoma Missouri statutes, rules, regulations and Orders. In entering into this Agreement and any Amendments to such Agreement and carrying out the provisions herein, neither Party waives, but instead expressly reserves, all of its rights, remedies and arguments with respect to any orders, decisions, legislation or proceedings and any remands thereof and any other federal or state regulatory, legislative or judicial action(s) that are issued, rendered, or adopted after October 20, 2004. Additionally, each Party expressly reserves its intervening law rights relating to the following actions: Verizon v. FCC, et al, 535 U.S. 467 (2002); USTA, et. al v. FCC, 290 F.3d 415 (D.C. Cir. 2002); the impairment proceedings that will be heard before the Commission and any pending appeals (and following xxxxxx and appeal, USTA v. FCC, 359 F.2d 554 (D.C. Cir. 2004), that relate to, or arise from, the FCC’s Triennial Review Order, CC Docket Nos. 01-338, 96-98, and 98-147 (FCC 03-36) (the “TRO”), including, without limitation, the FCC’s MDU Reconsideration Order (FCC 04-04- 191) (rel. August 9, 2004) and the FCC’s Order on Reconsideration (FCC 04-248) (rel. Oct. 18, 2004), and the FCC’s Biennial Review Proceeding which the FCC announced, in its Triennial Review Order, is scheduled to commence in 2004; the FCC’s Supplemental Order Clarification (FCC 00-183) (rel. June 2, 2000), in CC Docket 96-98; and the FCC’s Order on Remand and Report and Order in CC Dockets No. 96-96- 98 and 99-68, 16 FCC Rcd 9151 (2001), (rel. April 27, 2001), which was remanded in WorldCom, Inc. v. FCC, 288 F.3d 429 (D.C. Cir. 2002), and as to the FCC’s Notice of Proposed Rulemaking on the topic of Intercarrier Compensation generally, issued In the Matter of Developing a Unified Intercarrier Compensation Regime, in CC Docket 01-92 (Order No. 01-132), on April 27, 2001 and the FCC’s Order In the Matter of Petition of Core Communications, Inc. for Forbearance Under 47 U.S.C. §160(c) from Application of the ISP Remand Order, WC Docket No. 03-171 (Order No. FCC 04-241) (rel. October 18, 2004) (collectively “Government Actions”). Except to the extent that AT&T-13STATE SBC-13STATE has adopted the FCC ISP terminating compensation plan (“FCC Plan”) in an AT&T-13STATE SBC-13STATE state in which this Agreement is effective, and the Parties have incorporated rates, terms and conditions associated with the FCC Plan into this Agreement, these rights also include but are not limited to AT&T-13STATESBC-13STATE’s right to exercise its option at any time to adopt on a date specified by AT&T-13STATE SBC-13STATE the FCC Plan, after which date ISP-bound traffic will be subject to the FCC Plan’s prescribed terminating compensation rates, and other terms and conditions, and seek conforming modifications to this Agreement. For purposes of this Agreement, "Change in Law" shall be defined as any legally binding judicial decision by a court of competent jurisdiction, amendment of the Act or applicable Oklahoma Missouri statute, or legislative, federal or state regulatory action, rule, regulation or other legal action that is issued, rendered or adopted after October 20, 2004 and that (i) materially revises, reverses, modifies or clarifies the meaning of the Act, an applicable Oklahoma Missouri statute or any of said rules, regulations, Orders, or judicial decisions, (ii) invalidates, modifies, or stays the enforcement of laws or regulations that were the basis or rationales for any rate(s), terms(s) and/or condition(s) of the Agreement, (iii) and/or otherwise affects the rights or obligations of either Party that are addressed by this Agreement specifically including but not limited to those arising with respect to the Government Actions.. . For purposes of this section, "legally binding" means that the relevant legal action has not been stayed, no request for a stay is pending and if any deadline for requesting a stay is designated by statute or regulation, such deadline has passed. If either Party believes that a Change in Law within the meaning of this section has occurred, that Party may request renegotiation by written notice to the other Party. The Parties shall thereafter renegotiate the affected provisions in this Agreement in good faith and amend this Agreement to reflect such Change in Law. For avoidance of any doubt, this section shall also apply to situations where this Agreement defines the rights or obligations of either Party solely by reference to Applicable Law or similar reference. In the event that any renegotiation under this Section 23.0 is not concluded within sixty ninety (90) days after one Party gives the other notice that it demands renegotiation pursuant to this provision, or if at any time during such ninetyninety (90) day period the Parties shall have ceased to negotiate such terms for a continuous period of fifteen (15) business days or if the non- requesting Party refuses to engage in such renegotiation on the ground that there has been no Change in Law sufficient to require renegotiation under this Section, the dispute shall be resolved as provided in Section 13 of this Agreement. During the negotiation or arbitration of any such Change in Law, the Parties shall remain obligated to perform under the terms set forth in this Agreement.
23.2 The Parties further acknowledge and agree that by executing this Agreement, neither Party waives any of its rights to participate in any proceedings regarding the proper interpretation and/or application of the Act, applicable rules and regulations nor does it waive any rights, remedies, or arguments with respect to any provisions of this Agreement or any rules, regulations, Orders or laws upon which it is based, including its right to seek legal review or a stay pending appeal.
Appears in 1 contract
Samples: Interconnection Agreement
INTERVENING LAW. 23.1 This Agreement is the result of negotiations between the Parties and may incorporate certain provisions that resulted from arbitration by the appropriate state Commission(s). The Parties acknowledge that the respective rights and obligations of each Party as set forth in this Agreement are based on the following, as of October 20, 2004: the Act, the applicable rules, regulations and Orders promulgated under the Act by the FCC, and applicable Oklahoma Kansas statutes, rules, regulations and Commission orders, and judicial decisions by courts of competent jurisdiction interpreting and applying said federal and Oklahoma Kansas statutes, rules, regulations and Orders. In entering into this Agreement and any Amendments to such Agreement and carrying out the provisions herein, neither Party waives, but instead expressly reserves, all of its rights, remedies and arguments with respect to any orders, decisions, legislation or proceedings and any remands thereof and any other federal or state regulatory, legislative or judicial action(s) that are issued, rendered, or adopted after October 20, 2004. Additionally, each Party expressly reserves its intervening law rights relating to the following actions: Verizon v. FCC, et al, 535 U.S. 467 (2002); USTA, et. al v. FCC, 290 F.3d 415 (D.C. Cir. 2002); the impairment proceedings that will be heard before the Commission and any pending appeals (and following xxxxxx and appeal, USTA v. FCC, 359 F.2d 554 (D.C. Cir. 2004), that relate to, or arise from, the FCC’s Triennial Review Order, CC Docket Nos. 01-338, 96-98, and 98-147 (FCC 03-36) (the “TRO”), including, without limitation, the FCC’s MDU Reconsideration Order (FCC 04-191) (rel. August 9, 2004) and the FCC’s Order on Reconsideration (FCC 04-248) (rel. Oct. 18, 2004), and the FCC’s Biennial Review Proceeding which the FCC announced, in its Triennial Review Order, is scheduled to commence in 2004; the FCC’s Supplemental Order Clarification (FCC 00-183) (rel. June 2, 2000), in CC Docket 96-98; and the FCC’s Order on Remand and Report and Order in CC Dockets No. 96-98 and 99-68, 16 FCC Rcd 9151 (2001), (rel. April 27, 2001), which was remanded in WorldCom, Inc. v. FCC, 288 F.3d 429 (D.C. Cir. 2002), and as to the FCC’s Notice of Proposed Rulemaking on the topic of Intercarrier Compensation generally, issued In the Matter of Developing a Unified Intercarrier Compensation Regime, in CC Docket 01-92 (Order No. 01-132), on April 27, 2001 and the FCC’s Order In the Matter of Petition of Core Communications, Inc. for Forbearance Under 47 U.S.C. §160(c) from Application of the ISP Remand Order, WC Docket No. 03-171 (Order No. FCC 04-241) (rel. October 18, 2004) (collectively “Government Actions”). Except to the extent that AT&T-13STATE AT&T has adopted the FCC ISP terminating compensation plan (“FCC Plan”) in an AT&T-13STATE state AT&Tstate in which this Agreement is effective, and the Parties have incorporated rates, terms and conditions associated with the FCC Plan into this Agreement, these rights also include but are not limited to AT&T-13STATEAT&T’s right to exercise its option at any time to adopt on a date specified by AT&T-13STATE AT&T the FCC Plan, after which date ISP-bound traffic will be subject to the FCC Plan’s prescribed terminating compensation rates, and other terms and conditions, and seek conforming modifications to this Agreement. For purposes of this Agreement, "Change in Law" shall be defined as any legally binding judicial decision by a court of competent jurisdiction, amendment of the Act or applicable Oklahoma Kansas statute, or legislative, federal or state regulatory action, rule, regulation or other legal action that is issued, rendered or adopted after October 20, 2004 and that (i) materially revises, reverses, modifies or clarifies the meaning of the Act, an applicable Oklahoma Kansas statute or any of said rules, regulations, Orders, or judicial decisions, (ii) invalidates, modifies, or stays the enforcement of laws or regulations that were the basis or rationales for any rate(s), terms(s) and/or condition(s) of the Agreement, (iii) and/or otherwise affects the rights or obligations of either Party that are addressed by this Agreement specifically including but not limited to those arising with respect to the Government Actions.. . For purposes of this section, "legally binding" means that the relevant legal action has not been stayed, no request for a stay is pending and if any deadline for requesting a stay is designated by statute or regulation, such deadline has passed. If either Party believes that a Change in Law within the meaning of this section has occurred, that Party may request renegotiation by written notice to the other Party. The Parties shall thereafter renegotiate the affected provisions in this Agreement in good faith and amend this Agreement to reflect such Change in Law. For avoidance of any doubt, this section shall also apply to situations where this Agreement defines the rights or obligations of either Party solely by reference to Applicable Law or similar reference. In the event that any renegotiation under this Section 23.0 is not concluded within sixty ninety (90) days after one Party gives the other notice that it demands renegotiation pursuant to this provision, or if at any time during such ninetyninety (90) days period the Parties shall have ceased to negotiate such terms for a continuous period of fifteen (15) business days or if the non-requesting Party refuses to engage in such renegotiation on the ground that there has been no Change in Law sufficient to require renegotiation under this Section, the dispute shall be resolved as provided in Section 13 of this Agreement. During the negotiation or arbitration of any such Change in Law, the Parties shall remain obligated to perform under the terms set forth in this Agreement.
23.2 The Parties further acknowledge and agree that by executing this Agreement, neither Party waives any of its rights to participate in any proceedings regarding the proper interpretation and/or application of the Act, applicable rules and regulations nor does it waive any rights, remedies, or arguments with respect to any provisions of this Agreement or any rules, regulations, Orders or laws upon which it is based, including its right to seek legal review or a stay pending appeal.
Appears in 1 contract
Samples: Interconnection Agreement
INTERVENING LAW. 23.1 This Agreement is the result of negotiations between the Parties and may incorporate certain provisions that resulted from arbitration by the appropriate state Commission(s). The Parties acknowledge that the respective rights and obligations of each Party as set forth in this Agreement are based on the following, as of October 20, 2004: the Act, the applicable rules, regulations and Orders promulgated under the Act by the FCC, and applicable Oklahoma Illinois statutes, rules, regulations and Commission orders, and judicial decisions by courts of competent jurisdiction interpreting and applying said federal and Oklahoma Illinois statutes, rules, regulations and Orders. In entering into this Agreement and any Amendments to such Agreement and carrying out the provisions herein, neither Party waives, but instead expressly reserves, all of its rights, remedies and arguments with respect to any orders, decisions, legislation or proceedings and any remands thereof and any other federal or state regulatory, legislative or judicial action(s) that are issued, rendered, or adopted after October 20, 2004. Additionally, each Party expressly reserves its intervening law rights relating to the following actions: Verizon v. FCC, et al, 535 U.S. 467 (2002); USTA, et. al v. FCC, 290 F.3d 415 (D.C. Cir. 2002); the impairment proceedings that will be heard before the Commission and any pending appeals (and following xxxxxx remand and appeal, USTA v. FCC, 359 F.2d 554 (D.C. Cir. 2004), that relate to, or arise from, the FCC’s Triennial Review Order, CC Docket Nos. 01-338, 96-98, and 98-147 (FCC 03-36) (the “TRO”), including, without limitation, the FCC’s MDU Reconsideration Order (FCC 04-191) (rel. August 9, 2004) and the FCC’s Order on Reconsideration (FCC 04-248) (rel. Oct. 18, 2004), and the FCC’s Biennial Review Proceeding which the FCC announced, in its Triennial Review Order, is scheduled to commence in 2004; the FCC’s Supplemental Order Clarification (FCC 00-183) (rel. June 2, 2000), in CC Docket 96-98; and the FCC’s Order on Remand and Report and Order in CC Dockets No. 96-98 and 99-68, 16 FCC Rcd 9151 (2001), (rel. April 27, 2001), which was remanded in WorldCom, Inc. v. FCC, 288 F.3d 429 (D.C. Cir. 2002), and as to the FCC’s Notice of Proposed Rulemaking on the topic of Intercarrier Compensation generally, issued In the Matter of Developing a Unified Intercarrier Compensation Regime, in CC Docket 01-92 (Order No. 01-132), on April 27, 2001 and the FCC’s Order In the Matter of Petition of Core Communications, Inc. for Forbearance Under 47 U.S.C. §160(c) from Application of the ISP Remand Order, WC Docket No. 03-171 (Order No. FCC 04-241) (rel. October 18, 2004) (collectively “Government Actions”). Except to the extent that AT&T-13STATE AT&T has adopted the FCC ISP terminating compensation plan (“FCC Plan”) in an AT&T-13STATE AT&T- state in which this Agreement is effective, and the Parties have incorporated rates, terms and conditions associated with the FCC Plan into this Agreement, these rights also include but are not limited to AT&T-13STATEAT&T’s right to exercise its option at any time to adopt on a date specified by AT&T-13STATE AT&T the FCC Plan, after which date ISP-bound traffic will be subject to the FCC Plan’s prescribed terminating compensation rates, and other terms and conditions, and seek conforming modifications to this Agreement. For purposes of this Agreement, "Change in Law" shall be defined as any legally binding judicial decision by a court of competent jurisdiction, amendment of the Act or applicable Oklahoma Illinois statute, or legislative, federal or state regulatory action, rule, regulation or other legal action that is issued, rendered or adopted after October 20, 2004 and that (i) materially revises, reverses, modifies or clarifies the meaning of the Act, an applicable Oklahoma Illinois statute or any of said rules, regulations, Orders, or judicial decisions, (ii) invalidates, modifies, or stays the enforcement of laws or regulations that were the basis or rationales for any rate(s), terms(s) and/or condition(s) of the Agreement, (iii) and/or otherwise affects the rights or obligations of either Party that are addressed by this Agreement specifically including but not limited to those arising with respect to the Government Actions.. For purposes of this section, "legally binding" means that the relevant legal action has not been stayed, no request for a stay is pending and if any deadline for requesting a stay is designated by statute or regulation, such deadline has passed. If either Party believes that a Change in Law within the meaning of this section has occurred, that Party may request renegotiation by written notice to the other Party. The Parties shall thereafter renegotiate the affected provisions in this Agreement in good faith and amend this Agreement to reflect such Change in Law. For avoidance of any doubt, this section shall also apply to situations where this Agreement defines the rights or obligations of either Party solely by reference to Applicable Law or similar reference. In the event that any renegotiation under this Section 23.0 is not concluded within sixty ninety (90) days after one Party gives the other notice that it demands renegotiation pursuant to this provision, or if at any time during such ninetyninety (90) days period the Parties shall have ceased to negotiate such terms for a continuous period of fifteen (15) business days or if the non- requesting Party refuses to engage in such renegotiation on the ground that there has been no Change in Law sufficient to require renegotiation under this Section, the dispute shall be resolved as provided in Section 13 of this Agreement. During the negotiation or arbitration of any such Change in Law, the Parties shall remain obligated to perform under the terms set forth in this Agreement.
23.2 The Parties further acknowledge and agree that by executing this Agreement, neither Party waives any of its rights to participate in any proceedings regarding the proper interpretation and/or application of the Act, applicable rules and regulations nor does it waive any rights, remedies, or arguments with respect to any provisions of this Agreement or any rules, regulations, Orders or laws upon which it is based, including its right to seek legal review or a stay pending appeal.
Appears in 1 contract
Samples: Interconnection Agreement
INTERVENING LAW.
23.1 This Agreement is the result of negotiations between the Parties and may incorporate certain provisions that resulted from arbitration by the appropriate state Commission(s). The Parties acknowledge that the respective rights and obligations of each Party as set forth in this Agreement are based on the following, as of October 20, 2004: the Act, the applicable rules, regulations and Orders promulgated under the Act by the FCC, and applicable Oklahoma statutes, rules, regulations and Commission orders, and judicial decisions by courts of competent jurisdiction interpreting and applying said federal and Oklahoma statutes, rules, regulations and Orders. In entering into this Agreement and any Amendments to such Agreement and carrying out the provisions herein, neither Party waives, but instead expressly reserves, all of its rights, remedies and arguments with respect to any orders, decisions, legislation or proceedings and any remands thereof and any other federal or state regulatory, legislative or judicial action(s) that are issued, rendered, or adopted after October 20, 2004. Additionally, each Party expressly reserves its intervening law rights relating to the following actions: Verizon v. FCC, et al, 535 U.S. 467 (2002); USTA, et. al v. FCC, 290 F.3d 415 (D.C. Cir. 2002); the impairment proceedings that will be heard before the Commission and any pending appeals (and following xxxxxx and appeal, USTA v. FCC, 359 F.2d 554 (D.C. Cir. 2004), that relate to, or arise from, the FCC’s Triennial Review Order, CC Docket Nos. 01-338, 96-98, and 98-147 (FCC 03-36) (the “TRO”), including, without limitation, the FCC’s MDU Reconsideration Order (FCC 04-191) (rel. August 9, 2004) and the FCC’s Order on Reconsideration (FCC 04-248) (rel. Oct. 18, 2004), and the FCC’s Biennial Review Proceeding which the FCC announced, in its Triennial Review Order, is scheduled to commence in 2004; the FCC’s Supplemental Order Clarification (FCC 00-183) (rel. June 2, 2000), in CC Docket 96-98; and the FCC’s Order on Remand and Report and Order in CC Dockets No. 96-98 and 99-68, 16 FCC Rcd 9151 (2001), (rel. April 27, 2001), which was remanded in WorldCom, Inc. v. FCC, 288 F.3d 429 (D.C. Cir. 2002), and as to the FCC’s Notice of Proposed Rulemaking on the topic of Intercarrier Compensation generally, issued In the Matter of Developing a Unified Intercarrier Compensation Regime, in CC Docket 01-92 (Order No. 01-132), on April 27, 2001 and the FCC’s Order In the Matter of Petition of Core Communications, Inc. for Forbearance Under 47 U.S.C. §160(c) from Application of the ISP Remand Order, WC Docket No. 03-171 (Order No. FCC 04-241) (rel. October 18, 2004) (collectively “Government Actions”). Except to the extent that AT&T-13STATE has adopted the FCC ISP terminating compensation plan (“FCC Plan”) in an AT&T-13STATE state in which this Agreement is effective, and the Parties have incorporated rates, terms and conditions associated with the FCC Plan into this Agreement, these rights also include but are not limited to AT&T-13STATE’s right to exercise its option at any time to adopt on a date specified by AT&T-13STATE the FCC Plan, after which date ISP-bound traffic will be subject to the FCC Plan’s prescribed terminating compensation rates, and other terms and conditions, and seek conforming modifications to this Agreement. For purposes of this Agreement, "Change in Law" shall be defined as any legally binding judicial decision by a court of competent jurisdiction, amendment of the Act or applicable Oklahoma statute, or legislative, federal or state regulatory action, rule, regulation or other legal action that is issued, rendered or adopted after October 20, 2004 and that (i) materially revises, reverses, modifies or clarifies the meaning of the Act, an applicable Oklahoma statute or any of said rules, regulations, Orders, or judicial decisions, (ii) invalidates, modifies, or stays the enforcement of laws or regulations that were the basis or rationales for any rate(s), terms(s) and/or condition(s) of the Agreement, (iii) and/or otherwise affects the rights or obligations of either Party that are addressed by this Agreement specifically including but not limited to those arising with respect to the Government Actions.. For purposes of this section, "legally binding" means that the relevant legal action has not been stayed, no request for a stay is pending and if any deadline for requesting a stay is designated by statute or regulation, such deadline has passed. If either Party believes that a Change in Law within the meaning of this section has occurred, that Party may request renegotiation by written notice to the other Party. The Parties shall thereafter renegotiate the affected provisions in this Agreement in good faith and amend this Agreement to reflect such Change in Law. For avoidance of any doubt, this section shall also apply to situations where this Agreement defines the rights or obligations of either Party solely by reference to Applicable Law or similar reference. In the event that any renegotiation under this Section 23.0 is not concluded within sixty ninety (90) days after one Party gives the other notice that it demands renegotiation pursuant to this provision, or if at any time during such ninety
Appears in 1 contract
Samples: Interconnection Agreement
INTERVENING LAW. 23.1 This Agreement is the result of negotiations between the Parties and may incorporate certain provisions that resulted from arbitration by the appropriate state Commission(s). The Parties acknowledge that the respective rights and obligations of each Party as set forth in this Agreement are based on the following, as of October 20, 2004: the Act, the applicable rules, regulations and Orders promulgated under the Act by the FCC, and applicable Oklahoma Georgia statutes, rules, regulations and Commission orders, and judicial decisions by courts of competent jurisdiction interpreting and applying said federal and Oklahoma Georgia statutes, rules, regulations and Orders. In entering into this Agreement and any Amendments to such Agreement and carrying out the provisions herein, neither Party waives, but instead expressly reserves, all of its rights, remedies and arguments with respect to any orders, decisions, legislation or proceedings and any remands thereof and any other federal or state regulatory, legislative or judicial action(s) that are issued, rendered, or adopted after October 20, 2004. Additionally, each Party expressly reserves its intervening law rights relating to the following actions: Verizon v. FCC, et al, 535 U.S. 467 (2002); USTA, et. al v. FCC, 290 F.3d 415 (D.C. Cir. 2002); the impairment proceedings that will be heard before the Commission and any pending appeals (and following xxxxxx and appeal, USTA v. FCC, 359 F.2d 554 (D.C. Cir. 2004), that relate to, or arise from, the FCC’s Triennial Review Order, CC Docket Nos. 01-338, 96-98, and 98-147 (FCC 03-36) (the “TRO”), including, without limitation, the FCC’s MDU Reconsideration Order (FCC 04-191) (rel. August 9, 2004) and the FCC’s Order on Reconsideration (FCC 04-248) (rel. Oct. 18, 2004), and the FCC’s Biennial Review Proceeding which the FCC announced, in its Triennial Review Order, is scheduled to commence in 2004; the FCC’s Supplemental Order Clarification (FCC 00-183) (rel. June 2, 2000), in CC Docket 96-98; and the FCC’s Order on Remand and Report and Order in CC Dockets No. 96-98 and 99-68, 16 FCC Rcd 9151 (2001), (rel. April 27, 2001), which was remanded in WorldCom, Inc. v. FCC, 288 F.3d 429 (D.C. Cir. 2002), and as to the FCC’s Notice of Proposed Rulemaking on the topic of Intercarrier Compensation generally, issued In the Matter of Developing a Unified Intercarrier Compensation Regime, in CC Docket 01-92 (Order No. 01-132), on April 27, 2001 and the FCC’s Order In the Matter of Petition of Core Communications, Inc. for Forbearance Under 47 U.S.C. §160(c) from Application of the ISP Remand Order, WC Docket No. 03-171 (Order No. FCC 04-241) (rel. October 18, 2004) (collectively “Government Actions”). Except to the extent that AT&T-13STATE AT&T has adopted the FCC ISP terminating compensation plan (“FCC Plan”) in an AT&T-13STATE AT&T state in which this Agreement is effective, and the Parties have incorporated rates, terms and conditions associated with the FCC Plan into this Agreement, these rights also include but are not limited to AT&T-13STATEAT&T’s right to exercise its option at any time to adopt on a date specified by AT&T-13STATE AT&T the FCC Plan, after which date ISP-bound traffic will be subject to the FCC Plan’s prescribed terminating compensation rates, and other terms and conditions, and seek conforming modifications to this Agreement. For purposes of this Agreement, "Change in Law" shall be defined as any legally binding judicial decision by a court of competent jurisdiction, amendment of the Act or applicable Oklahoma Georgia statute, or legislative, federal or state regulatory action, rule, regulation or other legal action that is issued, rendered or adopted after October 20, 2004 and that (i) materially revises, reverses, modifies or clarifies the meaning of the Act, an applicable Oklahoma Georgia statute or any of said rules, regulations, Orders, or judicial decisions, (ii) invalidates, modifies, or stays the enforcement of laws or regulations that were the basis or rationales for any rate(s), terms(s) and/or condition(s) of the Agreement, (iii) and/or otherwise affects the rights or obligations of either Party that are addressed by this Agreement specifically including but not limited to those arising with respect to the Government Actions.. For purposes of this section, "legally binding" means that the relevant legal action has not been stayed, no request for a stay is pending and if any deadline for requesting a stay is designated by statute or regulation, such deadline has passed. If either Party believes that a Change in Law within the meaning of this section has occurred, that Party may request renegotiation by written notice to the other Party. The Parties shall thereafter renegotiate the affected provisions in this Agreement in good faith and amend this Agreement to reflect such Change in Law. For avoidance of any doubt, this section shall also apply to situations where this Agreement defines the rights or obligations of either Party solely by reference to Applicable Law or similar reference. In the event that any renegotiation under this Section 23.0 is not concluded within sixty ninety (90) days after one Party gives the other notice that it demands renegotiation pursuant to this provision, or if at any time during such ninetyninety (90) days period the Parties shall have ceased to negotiate such terms for a continuous period of fifteen (15) business days or if the non-requesting Party refuses to engage in such renegotiation on the ground that there has been no Change in Law sufficient to require renegotiation under this Section, the dispute shall be resolved as provided in Section 13 of this Agreement. During the negotiation or arbitration of any such Change in Law, the Parties shall remain obligated to perform under the terms set forth in this Agreement.
23.2 The Parties further acknowledge and agree that by executing this Agreement, neither Party waives any of its rights to participate in any proceedings regarding the proper interpretation and/or application of the Act, applicable rules and regulations nor does it waive any rights, remedies, or arguments with respect to any provisions of this Agreement or any rules, regulations, Orders or laws upon which it is based, including its right to seek legal review or a stay pending appeal.
Appears in 1 contract
Samples: Interconnection Agreement
INTERVENING LAW. 23.1 This Agreement is the result of negotiations between the Parties and may incorporate certain provisions that resulted from arbitration by the appropriate state Commission(s). The Parties acknowledge that the respective rights and obligations of each Party as set forth in this Agreement are based on the following, as of October 20, 2004: the Act, the applicable rules, regulations and Orders promulgated under the Act by the FCC, and applicable Oklahoma Missouri statutes, rules, regulations and Commission orders, and judicial decisions by courts of competent jurisdiction interpreting and applying said federal and Oklahoma Missouri statutes, rules, regulations and Orders. In entering into this Agreement and any Amendments to such Agreement and carrying out the provisions herein, neither Party waives, but instead expressly reserves, all of its rights, remedies and arguments with respect to any orders, decisions, legislation or proceedings and any remands thereof and any other federal or state regulatory, legislative or judicial action(s) that are issued, rendered, or adopted after October 20, 2004. Additionally, each Party expressly reserves its intervening law rights relating to the following actions: Verizon v. FCC, et al, 535 U.S. 467 (2002); USTA, et. al v. FCC, 290 F.3d 415 (D.C. Cir. 2002); the impairment proceedings that will be heard before the Commission and any pending appeals (and following xxxxxx and appeal, USTA v. FCC, 359 F.2d 554 (D.C. Cir. 2004), that relate to, or arise from, the FCC’s Triennial Review Order, CC Docket Nos. 01-338, 96-98, and 98-147 (FCC 03-36) (the “TRO”), including, without limitation, the FCC’s MDU Reconsideration Order (FCC 04-04- 191) (rel. August 9, 2004) and the FCC’s Order on Reconsideration (FCC 04-248) (rel. Oct. 18, 2004), and the FCC’s Biennial Review Proceeding which the FCC announced, in its Triennial Review Order, is scheduled to commence in 2004; the FCC’s Supplemental Order Clarification (FCC 00-183) (rel. June 2, 2000), in CC Docket 96-98; and the FCC’s Order on Remand and Report and Order in CC Dockets No. 96-96- 98 and 99-68, 16 FCC Rcd 9151 (2001), (rel. April 27, 2001), which was remanded in WorldCom, Inc. v. FCC, 288 F.3d 429 (D.C. Cir. 2002), and as to the FCC’s Notice of Proposed Rulemaking on the topic of Intercarrier Compensation generally, issued In the Matter of Developing a Unified Intercarrier Compensation Regime, in CC Docket 01-92 (Order No. 01-132), on April 27, 2001 and the FCC’s Order In the Matter of Petition of Core Communications, Inc. for Forbearance Under 47 U.S.C. §160(c) from Application of the ISP Remand Order, WC Docket No. 03-171 (Order No. FCC 04-241) (rel. October 18, 2004) (collectively “Government Actions”). Except to the extent that AT&T-13STATE SBC-13STATE has adopted the FCC ISP terminating compensation plan (“FCC Plan”) in an AT&T-13STATE SBC-13STATE state in which this Agreement is effective, and the Parties have incorporated rates, terms and conditions associated with the FCC Plan into this Agreement, these rights also include but are not limited to AT&T-13STATESBC-13STATE’s right to exercise its option at any time to adopt on a date specified by AT&T-13STATE SBC-13STATE the FCC Plan, after which date ISP-bound traffic will be subject to the FCC Plan’s prescribed terminating compensation rates, and other terms and conditions, and seek conforming modifications to this Agreement. For purposes of this Agreement, "Change in Law" shall be defined as any legally binding judicial decision by a court of competent jurisdiction, amendment of the Act or applicable Oklahoma Missouri statute, or legislative, federal or state regulatory action, rule, regulation or other legal action that is issued, rendered or adopted after October 20, 2004 and that (i) materially revises, reverses, modifies or clarifies the meaning of the Act, an applicable Oklahoma Missouri statute or any of said rules, regulations, Orders, or judicial decisions, (ii) invalidates, modifies, or stays the enforcement of laws or regulations that were the basis or rationales for any rate(s), terms(s) and/or condition(s) of the Agreement, (iii) and/or otherwise affects the rights or obligations of either Party that are addressed by this Agreement specifically including but not limited to those arising with respect to the Government Actions.. . For purposes of this section, "legally binding" means that the relevant legal action has not been stayed, no request for a stay is pending and if any deadline for requesting a stay is designated by statute or regulation, such deadline has passed. If either Party believes that a Change in Law within the meaning of this section has occurred, that Party may request renegotiation by written notice to the other Party. The Parties shall thereafter renegotiate the affected provisions in this Agreement in good faith and amend this Agreement to reflect such Change in Law. For avoidance of any doubt, this section shall also apply to situations where this Agreement defines the rights or obligations of either Party solely by reference to Applicable Law or similar reference. In the event that any renegotiation under this Section 23.0 is not concluded within sixty ninety (90) days after one Party gives the other notice that it demands renegotiation pursuant to this provision, or if at any time during such ninetyninety (90) day period the Parties shall have ceased to negotiate such terms for a continuous period of fifteen (15) business days or if the non- requesting Party refuses to engage in such renegotiation on the ground that there has been no Change in Law sufficient to require renegotiation under this Section, the dispute shall be resolved as provided in Section 13 of this Agreement. During the negotiation or arbitration of any such Change in Law, the Parties shall remain obligated to perform under the terms set forth in this Agreement.
23.2 The Parties further acknowledge and agree that by executing this Agreement, neither Party waives any of its rights to participate in any proceedings regarding the proper interpretation and/or application of the Act, applicable rules and regulations nor does it waive any rights, remedies, or arguments with respect to any provisions of this Agreement or any rules, regulations, Orders or laws upon which it is based, including its right to seek legal review or a stay pending appeal.
Appears in 1 contract
Samples: Interconnection Agreement
INTERVENING LAW. 23.1 This Agreement is the result of negotiations between the Parties and may incorporate certain provisions that resulted from arbitration by the appropriate state Commission(s). The Parties acknowledge that the respective rights and obligations of each Party as set forth in this Agreement are based on the following, as of October 20, 2004: the Act, the applicable rules, regulations and Orders promulgated under the Act by the FCC, and applicable Oklahoma Missouri statutes, rules, regulations and Commission orders, and judicial decisions by courts of competent jurisdiction interpreting and applying said federal and Oklahoma Missouri statutes, rules, regulations and Orders. In entering into this Agreement and any Amendments to such Agreement and carrying out the provisions herein, neither Party waives, but instead expressly reserves, all of its rights, remedies and arguments with respect to any orders, decisions, legislation or proceedings and any remands thereof and any other federal or state regulatory, legislative or judicial action(s) that are issued, rendered, or adopted after October 20, 2004. Additionally, each Party expressly reserves its intervening law rights relating to the following actions: Verizon v. FCC, et al, 535 U.S. 467 000 X.X. 000 (2002); USTA, et. al v. FCCXXX, 290 F.3d 415 000 X.0x 000 (D.C. X.X. Cir. 2002); the impairment proceedings that will be heard before the Commission and any pending appeals (and following xxxxxx remand and appeal, USTA v. FCC, 359 F.2d 554 (D.C. Cir. 2004), that relate to, or arise from, the FCC’s Triennial Review Order, CC Docket Nos. 01-338, 96-98, and 98-147 (FCC 03-36) (the “TRO”), including, without limitation, the FCC’s MDU Reconsideration Order (FCC 04-04- 191) (rel. August 9, 2004) and the FCC’s Order on Reconsideration (FCC 04-248) (rel. Oct. 18, 2004), and the FCC’s Biennial Review Proceeding which the FCC announced, in its Triennial Review Order, is scheduled to commence in 2004; the FCC’s Supplemental Order Clarification (FCC 00-183) (rel. June 2, 2000), in CC Docket 96-98; and the FCC’s Order on Remand and Report and Order in CC Dockets No. 96-96- 98 and 99-68, 16 FCC Rcd 9151 (2001), (rel. April 27, 2001), which was remanded in WorldCom, Inc. v. FCC, 288 F.3d 429 (D.C. Cir. 2002), and as to the FCC’s Notice of Proposed Rulemaking on the topic of Intercarrier Compensation generally, issued In the Matter of Developing a Unified Intercarrier Compensation Regime, in CC Docket 01-92 (Order No. 01-132), on April 27, 2001 and the FCC’s Order In the Matter of Petition of Core Communications, Inc. for Forbearance Under 47 U.S.C. §160(c) from Application of the ISP Remand Order, WC Docket No. 03-171 (Order No. FCC 04-241) (rel. October 18, 2004) (collectively “Government Actions”). Except to the extent that AT&T-13STATE SBC-13STATE has adopted the FCC ISP terminating compensation plan (“FCC Plan”) in an AT&T-13STATE SBC-13STATE state in which this Agreement is effective, and the Parties have incorporated rates, terms and conditions associated with the FCC Plan into this Agreement, these rights also include but are not limited to AT&T-13STATESBC-13STATE’s right to exercise its option at any time to adopt on a date specified by AT&T-13STATE SBC-13STATE the FCC Plan, after which date ISP-bound traffic will be subject to the FCC Plan’s prescribed terminating compensation rates, and other terms and conditions, and seek conforming modifications to this Agreement. For purposes of this Agreement, "Change in Law" shall be defined as any legally binding judicial decision by a court of competent jurisdiction, amendment of the Act or applicable Oklahoma Missouri statute, or legislative, federal or state regulatory action, rule, regulation or other legal action that is issued, rendered or adopted after October 20, 2004 and that (i) materially revises, reverses, modifies or clarifies the meaning of the Act, an applicable Oklahoma Missouri statute or any of said rules, regulations, Orders, or judicial decisions, (ii) invalidates, modifies, or stays the enforcement of laws or regulations that were the basis or rationales for any rate(s), terms(s) and/or condition(s) of the Agreement, (iii) and/or otherwise affects the rights or obligations of either Party that are addressed by this Agreement specifically including but not limited to those arising with respect to the Government Actions.. . For purposes of this section, "legally binding" means that the relevant legal action has not been stayed, no request for a stay is pending and if any deadline for requesting a stay is designated by statute or regulation, such deadline has passed. If either Party believes that a Change in Law within the meaning of this section has occurred, that Party may request renegotiation by written notice to the other Party. The Parties shall thereafter renegotiate the affected provisions in this Agreement in good faith and amend this Agreement to reflect such Change in Law. For avoidance of any doubt, this section shall also apply to situations where this Agreement defines the rights or obligations of either Party solely by reference to Applicable Law or similar reference. In the event that any renegotiation under this Section 23.0 is not concluded within sixty ninety (90) days after one Party gives the other notice that it demands renegotiation pursuant to this provision, or if at any time during such ninetyninety (90) day period the Parties shall have ceased to negotiate such terms for a continuous period of fifteen (15) business days or if the non- requesting Party refuses to engage in such renegotiation on the ground that there has been no Change in Law sufficient to require renegotiation under this Section, the dispute shall be resolved as provided in Section 13 of this Agreement. During the negotiation or arbitration of any such Change in Law, the Parties shall remain obligated to perform under the terms set forth in this Agreement.
23.2 The Parties further acknowledge and agree that by executing this Agreement, neither Party waives any of its rights to participate in any proceedings regarding the proper interpretation and/or application of the Act, applicable rules and regulations nor does it waive any rights, remedies, or arguments with respect to any provisions of this Agreement or any rules, regulations, Orders or laws upon which it is based, including its right to seek legal review or a stay pending appeal.
Appears in 1 contract
Samples: Interconnection Agreement
INTERVENING LAW. 23.1 This Agreement is the result of negotiations between the Parties and may incorporate certain provisions that resulted from arbitration by the appropriate state Commission(s). The Parties acknowledge that the respective rights and obligations of each Party as set forth in this Agreement are based on the following, as of October 20, 2004: the Act, the applicable rules, regulations and Orders promulgated under the Act by the FCC, and applicable Oklahoma statutes, rules, regulations and Commission orders, and judicial decisions by courts of competent jurisdiction interpreting and applying said federal and Oklahoma statutes, rules, regulations and Orders. In entering into this Agreement and any Amendments to such Agreement and carrying out the provisions herein, neither Party waives, but instead expressly reserves, all of its rights, remedies and arguments with respect to any orders, decisions, legislation or proceedings and any remands thereof and any other federal or state regulatory, legislative or judicial action(s) that are issued, rendered, or adopted after October 20, 2004. Additionally, each Party expressly reserves its intervening law rights relating to the following actions: Verizon v. FCC, et al, 535 U.S. 467 (2002); USTA, et. al v. FCC, 290 F.3d 415 (D.C. Cir. 2002); the impairment proceedings that will be heard before the Commission and any pending appeals (and following xxxxxx and appeal, USTA v. FCC, 359 F.2d 554 (D.C. Cir. 2004), that relate to, or arise from, the FCC’s Triennial Review Order, CC Docket Nos. 01-338, 96-98, and 98-147 (FCC 03-36) (the “TRO”), including, without limitation, the FCC’s MDU Reconsideration Order (FCC 04-191) (rel. August 9, 2004) and the FCC’s Order on Reconsideration (FCC 04-248) (rel. Oct. 18, 2004), and the FCC’s Biennial Review Proceeding which the FCC announced, in its Triennial Review Order, is scheduled to commence in 2004; the FCC’s Supplemental Order Clarification (FCC 00-183) (rel. June 2, 2000), in CC Docket 96-98; and the FCC’s Order on Remand and Report and Order in CC Dockets No. 96-98 and 99-68, 16 FCC Rcd 9151 (2001), (rel. April 27, 2001), which was remanded in WorldCom, Inc. v. FCC, 288 F.3d 429 (D.C. Cir. 2002), and as to the FCC’s Notice of Proposed Rulemaking on the topic of Intercarrier Compensation generally, issued In the Matter of Developing a Unified Intercarrier Compensation Regime, in CC Docket 01-92 (Order No. 01-132), on April 27, 2001 and the FCC’s Order In the Matter of Petition of Core Communications, Inc. for Forbearance Under 47 U.S.C. §160(c) from Application of the ISP Remand Order, WC Docket No. 03-171 (Order No. FCC 04-241) (rel. October 18, 2004) (collectively “Government Actions”). Except to the extent that AT&T-13STATE has adopted the FCC ISP terminating compensation plan (“FCC Plan”) in an AT&T-13STATE state in which this Agreement is effective, and the Parties have incorporated rates, terms and conditions associated with the FCC Plan into this Agreement, these rights also include but are not limited to AT&T-13STATE’s right to exercise its option at any time to adopt on a date specified by AT&T-13STATE the FCC Plan, after which date ISP-bound traffic will be subject to the FCC Plan’s prescribed terminating compensation rates, and other terms and conditions, and seek conforming modifications to this Agreement. For purposes of this Agreement, "Change in Law" shall be defined as any legally binding judicial decision by a court of competent jurisdiction, amendment of the Act or applicable Oklahoma statute, or legislative, federal or state regulatory action, rule, regulation or other legal action that is issued, rendered or adopted after October 20, 2004 and that (i) materially revises, reverses, modifies or clarifies the meaning of the Act, an applicable Oklahoma statute or any of said rules, regulations, Orders, or judicial decisions, (ii) invalidates, modifies, or stays the enforcement of laws or regulations that were the basis or rationales for any rate(s), terms(s) and/or condition(s) of the Agreement, (iii) and/or otherwise affects the rights or obligations of either Party that are addressed by this Agreement specifically including but not limited to those arising with respect to the Government Actions.. For purposes of this section, "legally binding" means that the relevant legal action has not been stayed, no request for a stay is pending and if any deadline for requesting a stay is designated by statute or regulation, such deadline has passed. If either Party believes that a Change in Law within the meaning of this section has occurred, that Party may request renegotiation by written notice to the other Party. The Parties shall thereafter renegotiate the affected provisions in this Agreement in good faith and amend this Agreement to reflect such Change in Law. For avoidance of any doubt, this section shall also apply to situations where this Agreement defines the rights or obligations of either Party solely by reference to Applicable Law or similar reference. In the event that any renegotiation under this Section 23.0 is not concluded within sixty ninety (90) days after one Party gives the other notice that it demands renegotiation pursuant to this provision, or if at any time during such ninetyninety (90) days period the Parties shall have ceased to negotiate such terms for a continuous period of fifteen (15) business days or if the non- requesting Party refuses to engage in such renegotiation on the ground that there has been no Change in Law sufficient to require renegotiation under this Section, the dispute shall be resolved as provided in Section 13 of this Agreement. During the negotiation or arbitration of any such Change in Law, the Parties shall remain obligated to perform under the terms set forth in this Agreement.
23.2 The Parties further acknowledge and agree that by executing this Agreement, neither Party waives any of its rights to participate in any proceedings regarding the proper interpretation and/or application of the Act, applicable rules and regulations nor does it waive any rights, remedies, or arguments with respect to any provisions of this Agreement or any rules, regulations, Orders or laws upon which it is based, including its right to seek legal review or a stay pending appeal.
Appears in 1 contract
Samples: Interconnection Agreement
INTERVENING LAW. 23.1 This Agreement is the result of negotiations between the Parties and may incorporate certain provisions that resulted from arbitration by the appropriate state Commission(s). The Parties acknowledge that the respective rights and obligations of each Party as set forth in this Agreement are based on the following, as of October 20, 2004: the Act, the applicable rules, regulations and Orders promulgated under the Act by the FCC, and applicable Oklahoma statutes, rules, regulations and Commission orders, and judicial decisions by courts of competent jurisdiction interpreting and applying said federal and Oklahoma statutes, rules, regulations and Orders. In entering into this Agreement and any Amendments to such Agreement and carrying out the provisions herein, neither Party waives, but instead expressly reserves, all of its rights, remedies and arguments with respect to any orders, decisions, legislation or proceedings and any remands thereof and any other federal or state regulatory, legislative or judicial action(s) that are issued, rendered, or adopted after October 20, 2004. Additionally, each Party expressly reserves its intervening law rights relating to the following actions: Verizon v. FCC, et al, 535 U.S. 467 (2002); USTA, et. al v. FCC, 290 F.3d 415 (D.C. Cir. 2002); the impairment proceedings that will be heard before the Commission and any pending appeals (and following xxxxxx and appeal, USTA v. FCC, 359 F.2d 554 (D.C. Cir. 2004), that relate to, or arise from, the FCC’s Triennial Review Order, CC Docket Nos. 01-338, 96-98, and 98-147 (FCC 03-36) (the “TRO”), including, without limitation, the FCC’s MDU Reconsideration Order (FCC 04-191) (rel. August 9, 2004) and the FCC’s Order on Reconsideration (FCC 04-248) (rel. Oct. 18, 2004), and the FCC’s Biennial Review Proceeding which the FCC announced, in its Triennial Review Order, is scheduled to commence in 2004; the FCC’s Supplemental Order Clarification (FCC 00-183) (rel. June 2, 2000), in CC Docket 96-98; and the FCC’s Order on Remand and Report and Order in CC Dockets No. 96-98 and 99-68, 16 FCC Rcd 9151 (2001), (rel. April 27, 2001), which was remanded in WorldCom, Inc. v. FCC, 288 F.3d 429 (D.C. Cir. 2002), and as to the FCC’s Notice of Proposed Rulemaking on the topic of Intercarrier Compensation generally, issued In the Matter of Developing a Unified Intercarrier Compensation Regime, in CC Docket 01-92 (Order No. 01-132), on April 27, 2001 and the FCC’s Order In the Matter of Petition of Core Communications, Inc. for Forbearance Under 47 U.S.C. §160(c) from Application of the ISP Remand Order, WC Docket No. 03-171 (Order No. FCC 04-241) (rel. October 18, 2004) (collectively “Government Actions”). Except to the extent that AT&T-13STATE has adopted the FCC ISP terminating compensation plan (“FCC Plan”) in an AT&T-13STATE state in which this Agreement is effective, and the Parties have incorporated rates, terms and conditions associated with the FCC Plan into this Agreement, these rights also include but are not limited to AT&T-13STATE’s right to exercise its option at any time to adopt on a date specified by AT&T-13STATE the FCC Plan, after which date ISP-bound traffic will be subject to the FCC Plan’s prescribed terminating compensation rates, and other terms and conditions, and seek conforming modifications to this Agreement. For purposes of this Agreement, "Change in Law" shall be defined as any legally binding judicial decision by a court of competent jurisdiction, amendment of the Act or applicable Oklahoma statute, or legislative, federal or state regulatory action, rule, regulation or other legal action that is issued, rendered or adopted after October 20, 2004 and that (i) materially revises, reverses, modifies or clarifies the meaning of the Act, an applicable Oklahoma statute or any of said rules, regulations, Orders, or judicial decisions, (ii) invalidates, modifies, or stays the enforcement of laws or regulations that were the basis or rationales for any rate(s), terms(s) and/or condition(s) of the Agreement, (iii) and/or otherwise affects the rights or obligations of either Party that are addressed by this Agreement specifically including but not limited to those arising with respect to the Government Actions.. For purposes of this section, "legally binding" means that the relevant legal action has not been stayed, no request for a stay is pending and if any deadline for requesting a stay is designated by statute or regulation, such deadline has passed. If either Party believes that a Change in Law within the meaning of this section has occurred, that Party may request renegotiation by written notice to the other Party. The Parties shall thereafter renegotiate the affected provisions in this Agreement in good faith and amend this Agreement to reflect such Change in Law. For avoidance of any doubt, this section shall also apply to situations where this Agreement defines the rights or obligations of either Party solely by reference to Applicable Law or similar reference. In the event that any renegotiation under this Section 23.0 is not concluded within sixty ninety (90) days after one Party gives the other notice that it demands renegotiation pursuant to this provision, or if at any time during such ninetyninety (90) days period the Parties shall have ceased to negotiate such terms for a continuous period of fifteen (15) business days or if the non-requesting Party refuses to engage in such renegotiation on the ground that there has been no Change in Law sufficient to require renegotiation under this Section, the dispute shall be resolved as provided in Section 13 of this Agreement. During the negotiation or arbitration of any such Change in Law, the Parties shall remain obligated to perform under the terms set forth in this Agreement.
23.2 The Parties further acknowledge and agree that by executing this Agreement, neither Party waives any of its rights to participate in any proceedings regarding the proper interpretation and/or application of the Act, applicable rules and regulations nor does it waive any rights, remedies, or arguments with respect to any provisions of this Agreement or any rules, regulations, Orders or laws upon which it is based, including its right to seek legal review or a stay pending appeal.
Appears in 1 contract
Samples: Interconnection Agreement
INTERVENING LAW. 23.1 This Agreement is the result of negotiations between the Parties and may incorporate certain provisions that resulted from arbitration by the appropriate state Commission(s). The Parties acknowledge that the respective rights and obligations of each Party as set forth in this Agreement are based on the following, as of October 20, 2004: the Act, the applicable rules, regulations and Orders promulgated under the Act by the FCC, and applicable Oklahoma Missouri statutes, rules, regulations and Commission orders, and judicial decisions by courts of competent jurisdiction interpreting and applying said federal and Oklahoma Missouri statutes, rules, regulations and Orders. In entering into this Agreement and any Amendments to such Agreement and carrying out the provisions herein, neither Party waives, but instead expressly reserves, all of its rights, remedies and arguments with respect to any orders, decisions, legislation or proceedings and any remands thereof and any other federal or state regulatory, legislative or judicial action(s) that are issued, rendered, or adopted after October 20, 2004. Additionally, each Party expressly reserves its intervening law rights relating to the following actions: Verizon v. FCC, et al, 535 U.S. 467 000 X.X. 000 (2002); USTA, et. al v. FCCXXX, 290 F.3d 415 000 X.0x 000 (D.C. X.X. Cir. 2002); the impairment proceedings that will be heard before the Commission and any pending appeals (and following xxxxxx remand and appeal, USTA v. FCC, 359 F.2d 554 (D.C. Cir. 2004), that relate to, or arise from, the FCC’s Triennial Review Order, CC Docket Nos. 01-338, 96-98, and 98-147 (FCC 03-36) (the “TRO”), including, without limitation, the FCC’s MDU Reconsideration Order (FCC 04-191) (rel. August 9, 2004) and the FCC’s Order on Reconsideration (FCC 04-248) (rel. Oct. 18, 2004), and the FCC’s Biennial Review Proceeding which the FCC announced, in its Triennial Review Order, is scheduled to commence in 2004; the FCC’s Supplemental Order Clarification (FCC 00-183) (rel. June 2, 2000), in CC Docket 96-98; and the FCC’s Order on Remand and Report and Order in CC Dockets No. 96-98 and 99-68, 16 FCC Rcd 9151 (2001), (rel. April 27, 2001), which was remanded in WorldCom, Inc. v. FCC, 288 F.3d 429 (D.C. Cir. 2002), and as to the FCC’s Notice of Proposed Rulemaking on the topic of Intercarrier Compensation generally, issued In the Matter of Developing a Unified Intercarrier Compensation Regime, in CC Docket 01-92 (Order No. 01-132), on April 27, 2001 and the FCC’s Order In the Matter of Petition of Core Communications, Inc. for Forbearance Under 47 U.S.C. §160(c) from Application of the ISP Remand Order, WC Docket No. 03-171 (Order No. FCC 04-241) (rel. October 18, 2004) (collectively “Government Actions”). Except to the extent that AT&T-13STATE AT&T has adopted the FCC ISP terminating compensation plan (“FCC Plan”) in an AT&T-13STATE AT&T- state in which this Agreement is effective, and the Parties have incorporated rates, terms and conditions associated with the FCC Plan into this Agreement, these rights also include but are not limited to AT&T-13STATEAT&T’s right to exercise its option at any time to adopt on a date specified by AT&T-13STATE AT&T the FCC Plan, after which date ISP-bound traffic will be subject to the FCC Plan’s prescribed terminating compensation rates, and other terms and conditions, and seek conforming modifications to this Agreement. For purposes of this Agreement, "Change in Law" shall be defined as any legally binding judicial decision by a court of competent jurisdiction, amendment of the Act or applicable Oklahoma Missouri statute, or legislative, federal or state regulatory action, rule, regulation or other legal action that is issued, rendered or adopted after October 20, 2004 and that that
(i) materially revises, reverses, modifies or clarifies the meaning of the Act, an applicable Oklahoma statute or any of said rules, regulations, Orders, or judicial decisions, (ii) invalidates, modifies, or stays the enforcement of laws or regulations that were the basis or rationales for any rate(s), terms(s) and/or condition(s) of the Agreement, (iii) and/or otherwise affects the rights or obligations of either Party that are addressed by this Agreement specifically including but not limited to those arising with respect to the Government Actions.. For purposes of this section, "legally binding" means that the relevant legal action has not been stayed, no request for a stay is pending and if any deadline for requesting a stay is designated by statute or regulation, such deadline has passed. If either Party believes that a Change in Law within the meaning of this section has occurred, that Party may request renegotiation by written notice to the other Party. The Parties shall thereafter renegotiate the affected provisions in this Agreement in good faith and amend this Agreement to reflect such Change in Law. For avoidance of any doubt, this section shall also apply to situations where this Agreement defines the rights or obligations of either Party solely by reference to Applicable Law or similar reference. In the event that any renegotiation under this Section 23.0 is not concluded within sixty ninety (90) days after one Party gives the other notice that it demands renegotiation pursuant to this provision, or if at any time during such ninetyninety (90) days period the Parties shall have ceased to negotiate such terms for a continuous period of fifteen (15) business days or if the non-requesting Party refuses to engage in such renegotiation on the ground that there has been no Change in Law sufficient to require renegotiation under this Section, the dispute shall be resolved as provided in Section 13 of this Agreement. During the negotiation or arbitration of any such Change in Law, the Parties shall remain obligated to perform under the terms set forth in this Agreement.
23.2 The Parties further acknowledge and agree that by executing this Agreement, neither Party waives any of its rights to participate in any proceedings regarding the proper interpretation and/or application of the Act, applicable rules and regulations nor does it waive any rights, remedies, or arguments with respect to any provisions of this Agreement or any rules, regulations, Orders or laws upon which it is based, including its right to seek legal review or a stay pending appeal.
Appears in 1 contract
Samples: Interconnection Agreement