Introduction to the Mumbai Area Traffic Sample Clauses

Introduction to the Mumbai Area Traffic. Control System In Mumbai, there are 653 signal junctions in all out of which 258 signal junctions are converted into Fully Adaptive Area Traffic Control Systems including VIP corridors and remaining are conventional type of Road Traffic Signal Systems.
AutoNDA by SimpleDocs
Introduction to the Mumbai Area Traffic. Control System In Mumbai, there are 653 signal junctions in all out of which 258 signal junctions are converted into Fully Adaptive Area Traffic Control Systems on VIP cor- ridors. There is a Main Control Centre at Traffic Police Head Quarters at Worli, Mum- bai-30 and Fault Management Systems at BMC Control Room, Engineering Hub, Worli, Mumbai-18. All the ATC signal junctions are connected through MTNL leased cable Network. The Area Traffic Control (ATC) is a system of centrally coordinating traffic signals using real time data collected through camera detectors on VIP Corridor in Greater Mumbai. This is an advanced tool in traffic management for efficient urban road network utilization. The components of the system that are procured/ installed and commis- sioned under the project are: • Fully Adaptive ATC System based on ITACA (Intelligent Traffic Adaptive Con- trol Area) at 258 signal junctions in Greater Mumbai. • Signal Controllers and Signal equipment • Vehicle Detector cameras • Central Control Room located at TPHQ • Fault Management Centre located at BMC ,Engineering Hub
Introduction to the Mumbai Area Traffic. Control System In Mumbai, there are 653 signal junctions in all out of which 258 signal junctions are converted into Fully Adaptive Area Traffic Control Systems on VIP corridors. There is a Main Control Centre at Traffic Police Head Quarters at Worli, Mumbai-30 and Fault Management Systems at BMC Control Room, Engineering Hub, Worli, Mumbai-18. All the ATC signal junctions are connected through MTNL leased cable Network. The Area Traffic Control (ATC) is a system of centrally co-ordinating traf- fic signals using real time data collected through camera detectors on VIP Corri- dor in Brihanmumbai. This is an advanced tool in traffic management for effi- cient urban road network utilization. The components of the system that are procured/ installed and commis- sioned under the project are: • Fully Adaptive ATC System based on ITACA (Intelligent Traffic Adaptive Control Area) at 258 signal junctions in Brihanmumbai. • Signal Controllers and Signal equipment • Vehicle Detector cameras • Central Control Room located at TPHQ • Fault Management Center located at BMC, Engineering Hub

Related to Introduction to the Mumbai Area Traffic

  • Built-up Area The built-up area for the Designated Apartment or any other Unit shall mean the Carpet Area of such Unit and Balcony area and 50% (fifty percent) of the area covered by those external walls which are common between such Unit/Balcony and any other Unit/Balcony and the area covered by all other external walls of the such Unit/Balcony.

  • Building Commissioning Services The Owner may provide as a part of its testing services the Building Commissioning services involving the project’s HVAC and exhaust systems, temperature control systems, fire detection and alarm systems, emergency power and lighting system, fire suppression system, security locks and security locking control systems, food service equipment (if applicable), and laundry equipment (if applicable). In the event the Using Agency’s Program specifies additional commissioning services, the Owner shall procure such services as well. The Owner, through its Executive Administrator, may engage an independent Commissioning Authority. It is the intent of this Article that the Commissioning Authority enforce the requirements mentioned herein and certify that the systems and equipment listed all function properly prior to the initiation of each final inspection.

  • Construction Phase Services 3.1.1 – Basic Construction Services

  • PREVAILING WAGE RATES - PUBLIC WORKS AND BUILDING SERVICES CONTRACTS If any portion of work being Bid is subject to the prevailing wage rate provisions of the Labor Law, the following shall apply:

  • Access Roads The Company is to construct a public access road from Xxxxx Avenue to the Town Centre together with all other roads shown on the Land Tenure Plan. All roads are to be paved and drained to the satisfaction of the City.

  • Provisioning of High Frequency Spectrum and Splitter Space 3.2.1 BellSouth will provide <<customer_name>> with access to the High Frequency Spectrum as follows:

  • Development Area 10.4. The Development Area shall encompass all Deposits to be produced.

  • Use of Basement and Service Areas The basement(s) and service areas, if any, as located within the (project name), shall be earmarked for purposes such as parking spaces and services including but not limited to electric sub-station, transformer, DG set rooms, underground water tanks, pump rooms, maintenance and service rooms, fire fighting pumps and equipment's etc. and other permitted uses as per sanctioned plans. The Allottee shall not be permitted to use the services areas and the basements in any manner whatsoever, other than those earmarked as parking spaces, and the same shall be reserved for use by the association of allottees formed by the Allottees for rendering maintenance services.

  • Project Location & Description The Project, for which the provision of financial assistance is the subject of this Agreement, is hereby described as follows:

  • Study Area The study area focused on the Bulk Power System in South-Eastern New York between Albany and New York City, and voltages underlying systems at 115 kV and above in the lower Xxxxxx Valley (Zones G, H & I). In the PSS™E power flow base case provided by NYISO, facilities rated at 115 kV and above in PSS™E designated areas 6 through 11 are monitored in the study. These areas are: • Capital District • Xxxxxx • Millwood • Xxxxxxxxx • Con Ed • Long Island

Time is Money Join Law Insider Premium to draft better contracts faster.