Item Description Qnty Clause Samples

The 'Item Description Qnty' clause serves to clearly list and define the specific goods or services being provided, along with their respective quantities. In practice, this clause typically appears as a table or list within a contract or purchase order, detailing each item by name or description and specifying the number of units for each. This ensures both parties have a mutual understanding of what is being supplied and in what amounts, thereby reducing the risk of disputes over delivery or fulfillment.
Item Description Qnty. Dead End Mono pole steel 10 Tangent Mono pole steel 35 Dead End Three pole steel 10 Substation 345 kV breaker 362kV, 3000A, 50kA, Gas Filled, w/Pre-insertion Resistors 13 322, 327, 328, 342, 343, 346, 347, 348, 362, 363, 366, 367, 368 345 kV breaker 362kV, 2000A, 50kA, Gas Filled, for shunt reactor 2 R393, R392 345 kV breaker 362kV, 3000A, 50kA, Gas Filled, for Capacitor Bank 1 C329 345 kV switch 362kV, 3000A, Vertical Break, W/Ground Switch (Line) 8 345 kV Switch 362kV, 3000A, Vertical Break (Breaker Isolation) 20 345 kV Switch 362kV, 2000A, Vertical Break (Capacitor & Reactor) 3 345 kV Switch 362kV, 3000A, Vertical Break, W/Ground Switch 4 382G, 352G, 383G, 353G 345 kV CCVT 1550KV BIL, 1800/3000:1, No Carrier Accessories 6 345 kV CCVT 1550KV BIL, 1800/3000:1, With Carrier Accessories 5 345 kV CT/VT CT/VT Metering Units, 345kV 15 345 kV Capacitor Bank 362kV, 220/F275 MVar 1 345 kV Series Capacitor 347-262 kV, 1550 kV BIL 2 345 kV Reactors 362kV, 100MVA 2 Insulator Station Post, 345kV 738 Insulator Suspension, 345kV 48 Bus Rigid and Wire Bus, Assemblies, and Connectors 1 Bus Rigid & Wire Bus, Ass. & Connectors – 345kV Series Capacitor 2 Security Security System, Conduit Installation 1 Communications Power Line Carrier, With All Additional Equipment 5 Line Traps 345kV, 3000A 5 Lightning Arresters 345 kV, 212kV MCOV 24 Oil Containment System and Foundation 1 Foundations Concrete - Drilled Piers 5685 Yds Steel Structural Steel Supports 2374881 lbs. A parcel of land situate in the East Half and the East Half of the Northwest Quarter of Section 32, Township 11 South, Range 37 East and the Northeast Quarter of the Northeast Quarter of Section 5, ▇▇▇▇▇▇▇▇ ▇▇ ▇▇▇▇▇, ▇▇▇▇▇ 37 East, Boise Meridian, Bannock County, Idaho. The boundaries of said parcel are described as follows, to wit: Beginning at a point which is 1676.62 feet S.00°51’01”W along the section line from the Northeast Corner of said Section 32 and running thence S.00°51’01”W 968.72 feet to the East Quarter Corner of said Section 32; thence S.00°13’36”E 2645.12 feet to the Southeast Corner of said Section 32; thence S.00°11’13”W 1303.25 feet along the section line to the Southeast corner of the Northeast Quarter of the Northeast Quarter of said Section 5; thence N.89°32’18”W 353.00 feet along the south line of said Northeast Quarter of the Northeast Quarter of Section 5; thence N.00°28’56”E 4336.61 feet; thence N.89°29’04”W 1090.62 feet; thence S.00°30’56”W 219.04 feet; thence N.89°29’04”W 678.13 feet; th...
Item Description Qnty. Dead End Mono pole steel 10 Tangent Mono pole steel 35 Dead End Three pole steel 10 Substation 345 kV breaker 362kV, 3000A, 50kA, Gas Filled, w/Pre-insertion Resistors 13 322, 327, 328, 342, 343, 346, 347, 348, 362, 363, 366, 367, 368 345 kV breaker 362kV, 2000A, 50kA, Gas Filled, for shunt reactor 2 R393, R392 345 kV breaker 362kV, 3000A, 50kA, Gas Filled, for Capacitor Bank 1 C329 345 kV switch 362kV, 3000A, Vertical Break, W/Ground Switch (Line) 8 345 kV Switch 362kV, 3000A, Vertical Break (Breaker Isolation) 20 345 kV Switch 362kV, 2000A, Vertical Break (Capacitor & Reactor) 3 1For asset accounting purposes, Idaho Power may request unit of property breakdown information with greater detail than shown in this Exhibit A at the conclusion of construction. PacifiCorp will make reasonable and timely accommodation to such a request, not to exceed the level of detail produced for its own internal asset accounting purposes. 345 kV Switch 362kV, 3000A, Vertical Break, W/Ground Switch 4 382G, 352G, 383G, 353G 345 kV CCVT 1550KV BIL, 1800/3000:1, No Carrier Accessories 6 345 kV CCVT 1550KV BIL, 1800/3000:1, With Carrier Accessories 5 345 kV CT/VT CT/VT Metering Units, 345kV 15 345 kV Capacitor Bank 362kV, 220/F275 MVar 1 345 kV Series Capacitor 347-262 kV, 1550 kV BIL 2 345 kV Reactors 362kV, 100MVA 2 Insulator Station Post, 345kV 738 Insulator Suspension, 345kV 48 Bus Rigid and Wire Bus, Assemblies, and Connectors 1 Bus Rigid & Wire Bus, Ass. & Connectors – 345kV Series Capacitor 2 Security Security System, Conduit Installation 1 Communications Power Line Carrier, With All Additional Equipment 5 Line Traps 345kV, 3000A 5 Lightning Arresters 345 kV, 212kV MCOV 24 Oil Containment System and Foundation 1 Foundations Concrete - Drilled Piers 5685 Yds Steel Structural Steel Supports 2374881 lbs.

Related to Item Description Qnty

  • ITEM DESCRIPTION Equipment (include VIN, make, model, year, serial no., accessories, or other identifying features): 12. NO. OF OPERATORS PER SHIFT 13. HRLY/ DAILY/ MILEAGE SHIFT BASIS 14. SPECIAL 15. GUARANTEE (8 HOURS) Portable Toilet Rental – Serviced(Includes first day delivery/last day pickup and daily rental rate per unit) 1 $75 Daily Ea. Portable Toilet Rental – Unserviced(Rental only, no daily service call) 1 $45 Daily Ea. Accessible Portable Toilet Rental – Serviced(Includes first day delivery/last day pickup and daily rental rate per unit) 1 $95 Daily Ea. Accessible Portable Toilet Rental – Unserviced(Rental only, no daily service call) 1 $65 Daily Ea.

  • System Description The wet detention basin is designed to trap 80% of sediment in runoff and maintain pre-development downstream peak flows. The basin has two forebays (smaller ponds) located at the low end of two grass ▇▇▇▇▇▇. In addition to runoff conveyance, the grass ▇▇▇▇▇▇ also allow infiltration and filtering of pollutants, especially from smaller storms. The forebays are each 4 feet deep. They are connected to the main pool by 18 and 24-inch metal pipes that outlet onto a rock chute. The forebays will trap coarse sediments in runoff, such as road sands, thus reducing maintenance of the main basin. The main pool will trap the finer suspended sediment. To do this, the pond size, water level and outlet structures must be maintained as specified in this Agreement (see Figures 1, 2 and 3). The main basin receives runoff from a 67.1 acre drainage area (41.2 acres within the subdivision and 25.9 acres off- site drainage coming from the east). During high rainfall or snow melt events, the water level will temporarily rise and slowly drain down to the elevation of the control structure. The water level is controlled by a 12-inch concrete pipe extending through the berm in the northwest corner of the basin (see Figures 1 and 3). On the face of the 12- inch pipe, there is metal plate with a 3-inch drilled hole (orifice) with stone in front of it. This orifice controls the water level and causes the pond to temporarily rise during runoff events. Washed stone (1-2” diameter) is placed in front of the orifice to prevent clogging. High flows may enter the grated concrete riser or flow over the rock lined emergency spillway. “As-built” construction drawings of the basin, showing actual dimensions, elevations, outlet structures, etc. will be recorded as an addendum(s) to this agreement within 60 days after Waukesha County accepts verification of construction from the project engineer.

  • Task Description This task includes activities associated with permit-required monitoring conducted in accordance with the conditions specified by state or federal regulatory agencies. All monitoring tasks must be located within or adjacent to the Project area and follow the Department’s Regional Coastal Monitoring Program and FWC's marine turtle and shorebird monitoring programs. Guidance for monitoring of nearshore resources is available in the Department's Standard Operation Procedures For Nearshore Hardbottom Monitoring Of Beach Nourishment Projects. The Local Sponsor must submit work products directly to the appropriate state or federal regulatory agencies in accordance with permit conditions to be eligible for reimbursement under this task, unless otherwise directed.

  • Program Description The employer agrees to provide a vision benefit to eligible employees and dependents. The vision benefit provided by the State shall have an employee co-payment of $10 for the comprehensive annual eye examination and $25 for materials.

  • Work Description T-804 Opening Roads - Removal of closure devices, cleaning ditches, removing berms, and blading the traveled-way T-811 Closing Roads - Entrance treatment for 150' cross-rip; debris block (slash, earth, berm, rocks, etc.) + seed + water bar T-811 Closing Roads - Water bar frequency per BMPs for remainder of road T-811 Closing Roads - Engineering Rep. or Construction Inspector must be notified prior to performing closeout 9314A Single Lane / Level 1 NFSR 9314 0.00 END 0.20