Common use of JURISDICTION AND ASSIGNMENT OF WORK Clause in Contracts

JURISDICTION AND ASSIGNMENT OF WORK. 11:01 The Employer will hold a pre-job conference and equipment xxxx-up attended by all interested Unions and will provide an overall description of the project, projected manpower requirements by craft, general information pertaining to hiring and recruiting procedures, transportation, on site work rules, safety and security regulations, safety meetings and any other pertinent information. The Employer will inform the Unions as to the projected scope of the contract, information pertaining to the Employer's intended supervisory staff and other relevant information including intended work assignments. Notification of the pre-job conference and hard copy documents to be presented shall be given to the Saskatchewan Provincial Building & Construction Trades Council and the office of the President of the Building Trades Department AFL-CIO with a minimum of fifteen (15) calendar days prior to the date set for the conference. The pre-job and equipment xxxx-up in all cases shall be held at least ten (10) calendar days before the work commences. The time limits set forth herein may be varied to suit unusual circumstances after consultation between the Employer and the Building Trades Council. The Employer will arrange to have available for meetings general descriptions of the work to be performed, equipment lists defining whether the equipment will be received broken down into component parts or as a complete package, drawings and any other relevant information which will assist the Unions in understanding their individual jurisdictional roles. The Employer who will be installing process equipment may have a process engineer attend the xxxx-up portion of the meeting to explain the function of the equipment to be installed. Before the close of the meeting, the Employer will read over the items in dispute. The Employer will then request that documentary evidence supporting the disputing Unions' claims be forwarded to him within a period of seven (7) calendar days. The Employer will make and circulate to the disputing trades final assignments, based on the evidence provided within a further three (3) calendar days or as may otherwise be agreed at the xxxx-up. All such assignments shall be made in accordance with the procedural rules of the National Joint Board. The Employer(s) recognizes the jurisdictional claims of Union(s) as set forth in the Charter Grants issued by the AFL-CIO subject to Trade Agreements and final decisions of the AFL- CIO as well as the decisions rendered by the Canadian Jurisdictional Disputes Plan. It is incumbent on all Employers to assign work in accordance with the Employers' responsibility set forth in the procedural rules and regulations of the Canadian Jurisdictional Disputes Plan. In the event a jurisdictional dispute arises, the representative(s) of the Union(s) shall first seek resolution of the dispute at the project level. In the event no resolution is found at the project level, the respective International Union(s) shall follow the procedures of the Canadian Jurisdictional Disputes Plan, or its successor. A xxxx-up conference for small projects may be conducted by facsimile when mutually agreed with the Saskatchewan Provincial Building and Construction Trades Council.

Appears in 5 contracts

Samples: Operating Engineers’ Agreement, ’ Agreement, ’ Agreement

AutoNDA by SimpleDocs

JURISDICTION AND ASSIGNMENT OF WORK. 11:01 19:01 The Employer will hold a pre-job conference and equipment xxxx-up attended by all interested Unions and will provide an overall description of the project, projected manpower requirements by craft, general information pertaining to hiring and recruiting procedures, transportation, on site work rules, safety and security regulations, safety meetings and any other pertinent information. The Employer will inform the Unions as to the projected scope of the contract, information pertaining to the Employer's intended supervisory staff and other relevant information including intended work assignments. Notification of the pre-job conference and hard copy documents to be presented shall be given to the Union, the Saskatchewan Provincial Building & Construction Trades Council and the office of the President of the Building Trades Department AFL-CIO with a minimum of fifteen (15) calendar days prior to the date set for the conference. The pre-job and equipment xxxx-up in all cases shall be held at least ten (10) calendar days before the work commences. The time limits set forth herein may be varied to suit unusual circumstances after consultation between the Employer Employer, the Union and the Building Trades Council. The Employer will arrange to have available for meetings general descriptions of the work to be performed, equipment lists defining whether the equipment will be received broken down into component parts or as a complete package, drawings and any other relevant information which will assist the Unions in understanding their individual jurisdictional roles. The Employer who will be installing process equipment may have a process engineer attend the xxxx-up portion of the meeting to explain the function of the equipment to be installed. Before the close of the meeting, the Employer will read over the items in dispute. The Employer will then request that documentary evidence supporting the disputing Unions' claims be forwarded to him within a period of seven (7) calendar days. The Employer will make and circulate to the disputing trades final assignments, based on the evidence provided within a further three (3) calendar days or as may otherwise be agreed at the xxxx-up. All such assignments shall be made in accordance with the procedural rules of the National Joint Board. The Employer(s) recognizes the jurisdictional claims of Union(s) as set forth in the Charter Grants issued by the AFL-CIO subject to Trade Agreements and final decisions of the AFL- AFL-CIO as well as the decisions rendered by the Canadian Jurisdictional Disputes Plan. It is incumbent on all Employers to assign work in accordance with the Employers' responsibility set forth in the procedural rules and regulations of the Canadian Jurisdictional Disputes PlanPlan or its successor. In the event a jurisdictional dispute arises, the representative(s) of the Union(s) shall first seek resolution of the dispute at the project level. In the event no resolution is found at the project level, the respective International Union(s) shall follow the procedures of the Canadian Jurisdictional Disputes Plan, or its successor. A xxxx-up conference for small projects may be conducted by facsimile when mutually agreed with the Saskatchewan Provincial Building and Construction Trades Councilelectronically.

Appears in 3 contracts

Samples: Provincial Labourers’ Agreement, Provincial Labourers’ Agreement, Provincial Labourers’ Agreement

JURISDICTION AND ASSIGNMENT OF WORK. 11:01 The Employer will hold a pre-job conference and equipment xxxx-up attended by all interested Unions and will provide an overall description of the project, projected manpower requirements by craft, general information pertaining to hiring and recruiting procedures, transportation, on site work rules, safety and security regulations, safety meetings and any other pertinent information. The Employer will inform the Unions Union as to the projected scope of the contract, information pertaining to the Employer's intended supervisory staff and other relevant information including intended work assignments. Notification of the pre-job conference and hard copy documents to be presented shall be given to the Saskatchewan Provincial Building & Construction Trades Council and the office of the President of the Building Trades Department AFL-CIO with a minimum of fifteen (15) calendar days prior to the date set for the conference. The pre-job and equipment xxxx-up in all cases shall be held at least ten (10) calendar days before the work commences. The time limits set forth herein may be varied to suit unusual circumstances after consultation between the Employer and the Building Trades Council. The Employer will arrange to have available for meetings general descriptions of the work to be performed, equipment lists defining whether the equipment will be received broken down into component parts or as a complete package, drawings and any other relevant information which will assist the Unions in understanding their individual jurisdictional roles. The Employer who will be installing process equipment may have a process engineer attend the xxxx-up portion of the meeting to explain the function of the equipment to be installed. Before the close of the meeting, the Employer will read over the items in dispute. The Employer will then request that documentary evidence supporting the disputing Unions' claims be forwarded to him within a period of seven (7) calendar days. The Employer will make and circulate to the disputing trades final assignments, based on the evidence provided within a further three (3) calendar days or as may otherwise be agreed at the xxxx-up. All such assignments shall be made in accordance with the procedural rules of the National Joint Board. The Employer(s) recognizes the jurisdictional claims of Union(s) as set forth in the Charter Grants issued by the AFL-CIO subject to Trade Agreements and final decisions of the AFL- CIO as well as the decisions rendered by the Canadian Jurisdictional Disputes Plan, or its successor. It is incumbent on all Employers to assign work in accordance with the Employers' responsibility set forth in the procedural rules and regulations of the Canadian Jurisdictional Disputes Plan. In the event a jurisdictional dispute arises, the representative(s) of the Union(s) shall first seek resolution of the dispute at the project level. In the event no resolution is found at the project level, the respective International Union(s) shall follow the procedures of the Canadian Jurisdictional Disputes Plan, or its successor. A xxxx-up conference for small projects may be conducted by facsimile when mutually agreed with the Saskatchewan Provincial Building and Construction Trades Council.

Appears in 3 contracts

Samples: Provincial Electrical Agreement, Provincial Electrical Agreement, Provincial Electrical Agreement

JURISDICTION AND ASSIGNMENT OF WORK. 11:01 7:01 The Employer will hold a pre-job conference and equipment xxxx-up attended by all interested Unions and will provide an overall description of the project, projected manpower requirements by craft, general information pertaining to hiring and recruiting procedures, transportation, on site work rules, safety and security regulations, safety meetings and any other pertinent information. The Employer will inform the Unions as to the projected scope of the contract, information pertaining to the Employer's intended supervisory staff and other relevant information including intended work assignments. Notification of the pre-job conference and hard copy documents to be presented shall be given to the Saskatchewan Provincial Building & Construction Trades Council Union and the office of the President of the Building Trades Department AFL-AFL- CIO with a minimum of fifteen (15) calendar days prior to the date set for the conference. The pre-job and equipment xxxx-up in all cases shall be held at least ten (10) calendar days before the work commences. The time limits set forth herein may be varied to suit unusual circumstances after consultation between the Employer and the Building Trades CouncilUnion. The Employer will arrange to have available for meetings general descriptions of the work to be performed, equipment lists defining whether the equipment will be received broken down into component parts or as a complete package, drawings and any other relevant information which will assist the Unions in understanding their individual jurisdictional roles. The Employer who will be installing process equipment may have a process engineer attend the xxxx-up portion of the meeting to explain the function of the equipment to be installed. Before the close of the meeting, the Employer will read over the items in dispute. The Employer will then request that documentary evidence supporting the disputing Unions' claims be forwarded to him within a period of seven (7) calendar days. The Employer will make and circulate to the disputing trades final assignments, based on the evidence provided within a further three (3) calendar days or as may otherwise be agreed at the xxxx-up. All such assignments shall be made in accordance with the procedural rules of the National Joint Board. The Employer(s) recognizes the jurisdictional claims of Union(s) as set forth in the Charter Grants issued by the AFL-CIO subject to Trade Agreements and final decisions of the AFL- CIO as well as the decisions rendered by the Canadian Jurisdictional Disputes Plan. It is incumbent on all Employers to assign work in accordance with the Employers' responsibility set forth in the procedural rules and regulations of the Canadian Jurisdictional Disputes Plan. In the event a jurisdictional dispute arises, the representative(s) of the Union(s) shall first seek resolution of the dispute at the project level. In the event no resolution is found at the project level, the respective International Union(s) shall follow the procedures of the Canadian Jurisdictional Disputes Plan, or its successor. A xxxx-up conference for small projects may be conducted by facsimile when mutually agreed with electronically. After completion of the Saskatchewan Provincial Building and Construction Trades Councilwork assignment, upon request from the Union, the Employer shall provide a letter confirming the assignment.

Appears in 3 contracts

Samples: Provincial Carpenters' Agreement, Provincial Carpenters' Agreement, Provincial Carpenters' Agreement

JURISDICTION AND ASSIGNMENT OF WORK. 11:01 The Employer will hold a pre-job conference and equipment xxxx-up attended by all interested Unions and will provide an overall description of the project, projected manpower requirements by craft, general information pertaining to hiring and recruiting procedures, transportation, on site work rules, safety and security regulations, safety meetings and any other pertinent information. The Employer will inform the Unions as to the projected scope of the contract, information pertaining to the Employer's intended supervisory staff and other relevant information including intended work assignments. Notification of the pre-job conference and hard copy documents to be presented shall be given to the Saskatchewan Provincial Building & Construction Trades Council and the office of the President of the Building Trades Department AFL-CIO with a minimum of fifteen (15) calendar days prior to the date set for the conference. The pre-job and equipment xxxx-up in all cases shall be held at least ten (10) calendar days before the work commences. The time limits set forth herein may be varied to suit unusual circumstances after consultation between the Employer and the Building Trades Council. The Employer will arrange to have available for meetings general descriptions of the work to be performed, equipment lists defining whether the equipment will be received broken down into component parts or as a complete package, drawings and any other relevant information which will assist the Unions in understanding their individual jurisdictional roles. The Employer who will be installing process equipment may have a process engineer attend the xxxx-up portion of the meeting to explain the function of the equipment to be installed. Before the close of the meeting, the Employer will read over the items in dispute. The Employer will then request that documentary evidence supporting the disputing Unions' claims be forwarded to him within a period of seven (7) calendar days. The Employer will make and circulate to the disputing trades final assignments, based on the evidence provided within a further three (3) calendar days or as may otherwise be agreed at the xxxx-up. All such assignments shall be made in accordance with the procedural rules of the National Joint Board. The Employer(s) recognizes the jurisdictional claims of Union(s) as set forth in the Charter Grants issued by the AFL-CIO subject to Trade Agreements and final decisions of the AFL- AFL-CIO as well as the decisions rendered by the Canadian Jurisdictional Disputes Plan. It is incumbent on all Employers to assign work in accordance with the Employers' responsibility set forth in the procedural rules and regulations of the Canadian Jurisdictional Disputes Plan. In the event a jurisdictional dispute arises, the representative(s) of the Union(s) shall first seek resolution of the dispute at the project level. In the event no resolution is found at the project level, the respective International Union(s) shall follow the procedures of the Canadian Jurisdictional Disputes Plan, or its successor. A xxxx-up conference for small projects may be conducted by facsimile when mutually agreed with the Saskatchewan Provincial Building and Construction Trades Council.

Appears in 3 contracts

Samples: Operating Engineers’ Agreement, Operating Engineers’ Agreement, Operating Engineers’ Agreement

JURISDICTION AND ASSIGNMENT OF WORK. 11:01 7:01 The Employer will hold a pre-job conference and equipment xxxx-up attended by all interested Unions and will provide an overall description of the project, projected manpower worker requirements by craft, general information pertaining to hiring and recruiting procedures, transportation, on site work rules, safety and security regulations, safety meetings and any other pertinent information. The Employer will inform the Unions as to the projected scope of the contract, information pertaining to the Employer's intended supervisory staff and other relevant information including intended work assignments. Notification of the pre-job conference and hard copy documents to be presented shall be given to the Saskatchewan Provincial Building & Construction Trades Council and the office of the President of the Building Trades Department AFL-CIO with a minimum of fifteen (15) calendar days prior to the date set for the conference. The pre-job and equipment xxxx-up in all cases shall be held at least ten (10) calendar days before the work commences. The time limits set forth herein may be varied to suit unusual circumstances after consultation between the Employer and the Building Trades Council. The Employer will arrange to have available for meetings general descriptions of the work to be performed, equipment lists defining whether the equipment will be received broken down into component parts or as a complete package, drawings and any other relevant information which will assist the Unions in understanding their individual jurisdictional roles. The Employer who will be installing process equipment may have a process engineer attend the xxxx-up portion of the meeting to explain the function of the equipment to be installed. Before the close of the meeting, the Employer will read over the items in dispute. The Employer will then request that documentary evidence supporting the disputing Unions' claims be forwarded to him them within a period of seven (7) calendar days. The Employer will make and circulate to the disputing trades final assignments, based on the evidence provided within a further three (3) calendar days or as may otherwise be agreed at the xxxx-up. All such assignments shall be made in accordance with the procedural rules of the National Joint Board. The Employer(s) recognizes the jurisdictional claims of Union(s) as set forth in the Charter Grants issued by the AFL-CIO subject to Trade Agreements and final decisions of the AFL- AFL-CIO as well as the decisions rendered by the Canadian Jurisdictional Disputes Plan. It is incumbent on all Employers to assign work in accordance with the Employers' responsibility set forth in the procedural rules and regulations of the Canadian Jurisdictional Disputes PlanPlan and Appeals Procedure. In the event a jurisdictional dispute arises, the representative(s) of the Union(s) shall first seek resolution of the dispute at the project level. In the event no resolution is found at the project level, the respective International Union(s) shall follow the procedures of the Canadian Jurisdictional Disputes Plan, or its successor. A xxxx-up conference for small projects may be conducted by facsimile e-mail when mutually agreed with the Saskatchewan Provincial Building and Construction Trades Council.

Appears in 2 contracts

Samples: Collective Bargaining Agreement, Collective Bargaining Agreement

JURISDICTION AND ASSIGNMENT OF WORK. 11:01 7:01 The Employer will hold a pre-job conference and equipment xxxx-up attended by all interested Unions and will provide an overall description of the project, projected manpower requirements by craft, general information pertaining to hiring and recruiting procedures, transportation, on site work rules, safety and security regulations, safety meetings and any other pertinent information. The Employer will inform the Unions as to the projected scope of the contract, information pertaining to the Employer's intended supervisory staff and other relevant information including intended work assignments. Notification of the pre-job conference and hard copy documents to be presented shall be given to the Saskatchewan Provincial Building & Construction Trades Council and the office of the President of the Building Trades Department AFL-CIO with a minimum of fifteen (15) calendar days prior to the date set for the conference. The pre-job and equipment xxxx-up in all cases shall be held at least ten (10) calendar days before the work commences. The time limits set forth herein may be varied to suit unusual circumstances after consultation between the Employer and the Building Trades Council. The Employer will arrange to have available for meetings general descriptions of the work to be performed, equipment lists defining whether the equipment will be received broken down into component parts or as a complete package, drawings and any other relevant information which will assist the Unions in understanding their individual jurisdictional roles. The Employer who will be installing process equipment may have a process engineer attend the xxxx-up portion of the meeting to explain the function of the equipment to be installed. Before the close of the meeting, the Employer will read over the items in dispute. The Employer will then request that documentary evidence supporting the disputing Unions' claims be forwarded to him within a period of seven (7) calendar days. The Employer will make and circulate to the disputing trades final assignments, based on the evidence provided within a further three (3) calendar days or as may otherwise be agreed at the xxxx-up. All such assignments shall be made in accordance with the procedural rules of the National Joint Board. The Employer(s) recognizes the jurisdictional claims of Union(s) as set forth in the Charter Grants issued by the AFL-CIO subject to Trade Agreements and final decisions of the AFL- CIO as well as the decisions rendered by the Canadian Jurisdictional Disputes Plan. It is incumbent on all Employers to assign work in accordance with the Employers' responsibility set forth in the procedural rules and regulations of the Canadian Jurisdictional Disputes PlanPlan and Appeals Procedure. In the event a jurisdictional dispute arises, the representative(s) of the Union(s) shall first seek resolution of the dispute at the project level. In the event no resolution is found at the project level, the respective International Union(s) shall follow the procedures of the Canadian Jurisdictional Disputes Plan, or its successor. A xxxx-up conference for small projects may be conducted by facsimile when mutually agreed with the Saskatchewan Provincial Building and Construction Trades Council.

Appears in 2 contracts

Samples: Collective Bargaining Agreement, Collective Bargaining Agreement

JURISDICTION AND ASSIGNMENT OF WORK. 11:01 19:01 The Employer will hold a pre-job conference and equipment xxxx-up attended by all interested Unions and will provide an overall description of the project, projected manpower requirements by craft, general information pertaining to hiring and recruiting procedures, transportation, on site work rules, safety and security regulations, safety meetings and any other pertinent information. The Employer will inform the Unions as to the projected scope of the contract, information pertaining to the Employer's intended supervisory staff and other relevant information including intended work assignments. Notification of the pre-job conference and hard copy documents to be presented shall be given to the Union, the Saskatchewan Provincial Building & Construction Trades Council and the office of the President of the Building Trades Department AFL-CIO with a minimum of fifteen (15) calendar days prior to the date set for the conference. The pre-job and equipment xxxx-up in all cases shall be held at least ten (10) calendar days before the work commences. The time limits set forth herein may be varied to suit unusual circumstances after consultation between the Employer Employer, the Union and the Building Trades Council. The Employer will arrange to have available for meetings general descriptions of the work to be performed, equipment lists defining whether the equipment will be received broken down into component parts or as a complete package, drawings and any other relevant information which will assist the Unions in understanding their individual jurisdictional roles. The Employer who will be installing process equipment may have a process engineer attend the xxxx-up portion of the meeting to explain the function of the equipment to be installed. Before the close of the meeting, the Employer will read over the items in dispute. The Employer will then request that documentary evidence supporting the disputing Unions' claims be forwarded to him within a period of seven (7) calendar days. The Employer will make and circulate to the disputing trades final assignments, based on the evidence provided within a further three (3) calendar days or as may otherwise be agreed at the xxxx-up. All such assignments shall be made in accordance with the procedural rules of the National Joint Board. The Employer(s) recognizes the jurisdictional claims of Union(s) as set forth in the Charter Grants issued by the AFL-CIO subject to Trade Agreements and final decisions of the AFL- CIO as well as the decisions rendered by the Canadian Jurisdictional Disputes Plan. It is incumbent on all Employers to assign work in accordance with the Employers' responsibility set forth in the procedural rules and regulations of the Canadian Jurisdictional Disputes PlanPlan or its successor. In the event a jurisdictional dispute arises, the representative(s) of the Union(s) shall first seek resolution of the dispute at the project level. In the event no resolution is found at the project level, the respective International Union(s) shall follow the procedures of the Canadian Jurisdictional Disputes Plan, or its successor. A xxxx-up conference for small projects may be conducted by facsimile when mutually agreed with the Saskatchewan Provincial Building and Construction Trades Councilelectronically.

Appears in 2 contracts

Samples: Provincial Labourers’ Agreement, Provincial Labourers’ Agreement

JURISDICTION AND ASSIGNMENT OF WORK. 11:01 16:01 The Employer will hold a pre-job conference and equipment xxxx-up attended by all interested Unions and will provide an overall description of the project, projected manpower requirements by craft, general information pertaining to hiring and recruiting procedures, transportation, on site work rules, safety and security regulations, safety meetings and any other pertinent information. The Employer will inform the Unions as to the projected scope of the contract, information pertaining to the Employer's intended supervisory staff and other relevant information including intended work assignments. Notification of the pre-job conference and hard copy documents to be presented shall be given to the Saskatchewan Provincial Building & Construction Trades Council and the office of the President of the Building Trades Department AFL-CIO with a minimum of fifteen (15) calendar days prior to the date set for the conference. The pre-job and equipment xxxx-up in all cases shall be held at least ten (10) calendar days before the work commences. The time limits set forth herein may be varied to suit unusual circumstances after consultation between the Employer and the Building Trades Council. The Employer will arrange to have available for meetings general descriptions of the work to be performed, equipment lists defining whether the equipment will be received broken down into component parts or as a complete package, drawings and any other relevant information which will assist the Unions in understanding their individual jurisdictional roles. The Employer who will be installing process equipment may have a process engineer attend the xxxx-up portion of the meeting to explain the function of the equipment to be installed. Before the close of the meeting, the Employer will read over the items in dispute. The Employer will then request that documentary evidence supporting the disputing Unions' claims be forwarded to him within a period of seven (7) calendar days. The Employer will make and circulate to the disputing trades final assignments, based on the evidence provided within a further three (3) calendar days or as may otherwise be agreed at the xxxx-up. All such assignments shall be made in accordance with the procedural rules of the National Joint Board. The Employer(s) recognizes the jurisdictional claims of Union(s) as set forth in the Charter Grants issued by the AFL-CIO subject to Trade Agreements and final decisions of the AFL- CIO as well as the decisions rendered by the Canadian Jurisdictional Disputes Plan. It is incumbent on all Employers to assign work in accordance with the Employers' responsibility set forth in the procedural rules and regulations of the Canadian Jurisdictional Disputes PlanPlan or its successor. In the event a jurisdictional dispute arises, the representative(s) of the Union(s) shall first seek resolution of the dispute at the project level. In the event no resolution is found at the project level, the respective International Union(s) shall follow the procedures of the Canadian Jurisdictional Disputes Plan, or its successor. A xxxx-up conference for small projects may be conducted by facsimile when mutually agreed with the Saskatchewan Provincial Building and Construction Trades Council. A xxxx-up conference may be conducted electronically where appropriate.

Appears in 2 contracts

Samples: Millwrights’ Agreement, Millwrights’ Agreement

JURISDICTION AND ASSIGNMENT OF WORK. 11:01 7:01 The Employer will hold a pre-job conference and equipment xxxxmark-up attended by all interested Unions and will provide an overall description of the project, projected manpower worker requirements by craft, general information pertaining to hiring and recruiting procedures, transportation, on site work rules, safety and security regulations, safety meetings and any other pertinent information. The Employer will inform the Unions as to the projected scope of the contract, information pertaining to the Employer's intended supervisory staff and other relevant information including intended work assignments. Notification of the pre-job conference and hard copy documents to be presented shall be given to the Saskatchewan Provincial Building & Construction Trades Council and the office of the President of the Building Trades Department AFL-CIO with a minimum of fifteen (15) calendar days prior to the date set for the conference. The pre-job and equipment xxxxmark-up in all cases shall be held at least ten (10) calendar days before the work commences. The time limits set forth herein may be varied to suit unusual circumstances after consultation between the Employer and the Building Trades Council. The Employer will arrange to have available for meetings general descriptions of the work to be performed, equipment lists defining whether the equipment will be received broken down into component parts or as a complete package, drawings and any other relevant information which will assist the Unions in understanding their individual jurisdictional roles. The Employer who will be installing process equipment may have a process engineer attend the xxxxmark-up portion of the meeting to explain the function of the equipment to be installed. Before the close of the meeting, the Employer will read over the items in dispute. The Employer will then request that documentary evidence supporting the disputing Unions' claims be forwarded to him them within a period of seven (7) calendar days. The Employer will make and circulate to the disputing trades final assignments, based on the evidence provided within a further three (3) calendar days or as may otherwise be agreed at the xxxxmark-up. All such assignments shall be made in accordance with the procedural rules of the National Joint Board. The Employer(s) recognizes the jurisdictional claims of Union(s) as set forth in the Charter Grants issued by the AFL-CIO subject to Trade Agreements and final decisions of the AFL- AFL-CIO as well as the decisions rendered by the Canadian Jurisdictional Disputes Plan. It is incumbent on all Employers to assign work in accordance with the Employers' responsibility set forth in the procedural rules and regulations of the Canadian Jurisdictional Disputes PlanPlan and Appeals Procedure. In the event a jurisdictional dispute arises, the representative(s) of the Union(s) shall first seek resolution of the dispute at the project level. In the event no resolution is found at the project level, the respective International Union(s) shall follow the procedures of the Canadian Jurisdictional Disputes Plan, or its successor. A xxxxmark-up conference for small projects may be conducted by facsimile e-mail when mutually agreed with the Saskatchewan Provincial Building and Construction Trades Council.

Appears in 2 contracts

Samples: Collective Bargaining Agreement, Collective Bargaining Agreement

JURISDICTION AND ASSIGNMENT OF WORK. 11:01 16:01 The Employer will hold a pre-job conference and equipment xxxx-up attended by all interested Unions and will provide an overall description of the project, projected manpower requirements by craft, general information pertaining to hiring and recruiting procedures, transportation, on site work rules, safety and security regulations, safety meetings and any other pertinent information. The Employer will inform the Unions as to the projected scope of the contract, information pertaining to the Employer's intended supervisory staff and other relevant information including intended work assignments. Notification of the pre-job conference and hard copy documents to be presented shall be given to the Saskatchewan Provincial Building & Construction Trades Council and the office of the President of the Building Trades Department AFL-CIO with a minimum of fifteen (15) calendar days prior to the date set for the conference. The pre-job and equipment xxxx-up in all cases shall be held at least ten (10) calendar days before the work commences. The time limits set forth herein may be varied to suit unusual circumstances after consultation between the Employer and the Building Trades Council. The Employer will arrange to have available for meetings general descriptions of the work to be performed, equipment lists defining whether the equipment will be received broken down into component parts or as a complete package, drawings and any other relevant information which will assist the Unions in understanding their individual jurisdictional roles. The Employer who will be installing process equipment may have a process engineer attend the xxxx-up portion of the meeting to explain the function of the equipment to be installed. Before the close of the meeting, the Employer will read over the items in dispute. The Employer will then request that documentary evidence supporting the disputing Unions' claims be forwarded to him within a period of seven (7) calendar days. The Employer will make and circulate to the disputing trades final assignments, based on the evidence provided within a further three (3) calendar days or as may otherwise be agreed at the xxxx-up. All such assignments shall be made in accordance with the procedural rules of the National Joint Board. The Employer(s) recognizes the jurisdictional claims of Union(s) as set forth in the Charter Grants issued by the AFL-CIO subject to Trade Agreements and final decisions of the AFL- AFL-CIO as well as the decisions rendered by the Canadian Jurisdictional Disputes Plan. It is incumbent on all Employers to assign work in accordance with the Employers' responsibility set forth in the procedural rules and regulations of the Canadian Jurisdictional Disputes PlanPlan or its successor. In the event a jurisdictional dispute arises, the representative(s) of the Union(s) shall first seek resolution of the dispute at the project level. In the event no resolution is found at the project level, the respective International Union(s) shall follow the procedures of the Canadian Jurisdictional Disputes Plan, or its successor. A xxxx-up conference for small projects may be conducted by facsimile when mutually agreed with the Saskatchewan Provincial Building and Construction Trades Council.

Appears in 1 contract

Samples: Millwrights' Agreement

JURISDICTION AND ASSIGNMENT OF WORK. 11:01 7:01 The Employer will hold a pre-job conference and equipment xxxxmark-up attended by all interested Unions and will provide an overall description of the project, projected manpower requirements by craft, general information pertaining to hiring and recruiting procedures, transportation, on site work rules, safety and security regulations, safety meetings and any other pertinent information. The Employer will inform the Unions as to the projected scope of the contract, information pertaining to the Employer's intended supervisory staff and other relevant information including intended work assignments. Notification of the pre-job conference and hard copy documents to be presented shall be given to the Saskatchewan Provincial Building & Construction Trades Council Union and the office of the President of the Building Trades Department AFL-AFL- CIO with a minimum of fifteen (15) calendar days prior to the date set for the conference. The pre-job and equipment xxxxmark-up in all cases shall be held at least ten (10) calendar days before the work commences. The time limits set forth herein may be varied to suit unusual circumstances after consultation between the Employer and the Building Trades CouncilUnion. The Employer will arrange to have available for meetings general descriptions of the work to be performed, equipment lists defining whether the equipment will be received broken down into component parts or as a complete package, drawings and any other relevant information which will assist the Unions in understanding their individual jurisdictional roles. The Employer who will be installing process equipment may have a process engineer attend the xxxxmark-up portion of the meeting to explain the function of the equipment to be installed. Before the close of the meeting, the Employer will read over the items in dispute. The Employer will then request that documentary evidence supporting the disputing Unions' claims be forwarded to him within a period of seven (7) calendar days. The Employer will make and circulate to the disputing trades final assignments, based on the evidence provided within a further three (3) calendar days or as may otherwise be agreed at the xxxxmark-up. All such assignments shall be made in accordance with the procedural rules of the National Joint Board. The Employer(s) recognizes the jurisdictional claims of Union(s) as set forth in the Charter Grants issued by the AFL-CIO subject to Trade Agreements and final decisions of the AFL- CIO as well as the decisions rendered by the Canadian Jurisdictional Disputes Plan. It is incumbent on all Employers to assign work in accordance with the Employers' responsibility set forth in the procedural rules and regulations of the Canadian Jurisdictional Disputes Plan. In the event a jurisdictional dispute arises, the representative(s) of the Union(s) shall first seek resolution of the dispute at the project level. In the event no resolution is found at the project level, the respective International Union(s) shall follow the procedures of the Canadian Jurisdictional Disputes Plan, or its successor. A xxxxmark-up conference for small projects may be conducted by facsimile when mutually agreed with electronically. After completion of the Saskatchewan Provincial Building and Construction Trades Councilwork assignment, upon request from the Union, the Employer shall provide a letter confirming the assignment.

Appears in 1 contract

Samples: Provincial Carpenters' Agreement

JURISDICTION AND ASSIGNMENT OF WORK. 11:01 The Employer will hold a pre-job conference and equipment xxxx-up attended by all interested Unions and will provide an overall description of the project, projected manpower requirements by craft, general information pertaining to hiring and recruiting procedures, transportation, on site work rules, safety and security regulations, safety meetings and any other pertinent information. The Employer will inform the Unions as to the projected scope of the contract, information pertaining to the Employer's ’s intended supervisory staff and other relevant information including intended work assignments. Notification of the pre-job conference and hard copy documents to be presented shall be given to the Saskatchewan Provincial Building & Construction Trades Council and the office of the President of the Building Trades Department AFL-CIO with a minimum of fifteen (15) calendar days prior to the date set for the conference. The pre-job and equipment xxxx-up in all cases shall be held at least ten (10) calendar days before the work commences. The time limits set forth herein may be varied to suit unusual circumstances after consultation between the Employer and the Building Trades Council. The Employer will arrange to have available for meetings general descriptions of the work to be performed, equipment lists defining whether the equipment will be received broken down into component parts or as a complete package, drawings and any other relevant information which will assist the Unions in understanding their individual jurisdictional roles. The Employer who will be installing process equipment may have a process engineer attend the xxxx-up portion of the meeting to explain the function of the equipment to be installed. Before the close of the meeting, the Employer will read over the items in dispute. The Employer will then request that documentary evidence supporting the disputing Unions' claims be forwarded to him within a period of seven (7) calendar days. The Employer will make and circulate to the disputing trades final assignments, based on the evidence provided within a further three (3) calendar days or as may otherwise be agreed at the xxxx-up. All such assignments shall be made in accordance with the procedural rules of the National Joint Board. The Employer(s) recognizes recognize the jurisdictional claims of Union(s) as set forth in the Charter Grants issued by the AFL-CIO subject to Trade Agreements and final decisions of the AFL- CIO as well as the decisions rendered by the Canadian Impartial Jurisdictional Disputes PlanBoard and Appeals Procedure. It is incumbent on all Employers to assign work in accordance with the Employers' responsibility set forth in the procedural rules and regulations of the Canadian Impartial Jurisdictional Disputes PlanBoard and Appeals Procedure. In the event a jurisdictional dispute arises, the representative(s) of the Union(s) shall first seek resolution of the dispute at the project level. In the event no resolution is found at the project level, the respective International Union(s) shall follow the procedures of the Canadian Impartial Jurisdictional Disputes PlanBoard, or its successor. A xxxx-up conference for small projects may be conducted by facsimile when mutually agreed with the Saskatchewan Provincial Building and Construction Trades Council. Single trade projects do not require pre-job and xxxx-up meetings.

Appears in 1 contract

Samples: Painters’ Agreement

JURISDICTION AND ASSIGNMENT OF WORK. 11:01 7:01 The Employer will hold a pre-job conference and equipment xxxx-up attended by all interested Unions and will provide an overall description of the project, projected manpower worker requirements by craft, general information pertaining to hiring and recruiting procedures, transportation, on site work rules, safety and security regulations, safety meetings and any other pertinent information. The Employer will inform the Unions as to the projected scope of the contract, information pertaining to the Employer's intended supervisory staff and other relevant information including intended work assignments. Notification of the pre-job conference and hard copy documents to be presented shall be given to the Saskatchewan Provincial Building & Construction Trades Council and the office of the President of the Building Trades Department AFL-CIO with a minimum of fifteen (15) calendar days prior to the date set for the conference. The pre-job and equipment xxxx-up in all cases shall be held at least ten (10) calendar days before the work commences. The time limits set forth herein may be varied to suit unusual circumstances after consultation between the Employer and the Building Trades Council. The Employer will arrange to have available for meetings general descriptions of the work to be performed, equipment lists defining whether the equipment will be received broken down into component parts or as a complete package, drawings and any other relevant information which will assist the Unions in understanding their individual jurisdictional roles. The Employer who will be installing process equipment may have a process engineer attend the xxxx-up portion of the meeting to explain the function of the equipment to be installed. Before the close of the meeting, the Employer will read over the items in dispute. The Employer will then request that documentary evidence supporting the disputing Unions' claims be forwarded to him them within a period of seven (7) calendar days. The Employer will make and circulate to the disputing trades final assignments, based on the evidence provided within a further three (3) calendar days or as may otherwise be agreed at the xxxx-up. All such assignments shall be made in accordance with the procedural rules of the National Joint Board. The Employer(s) recognizes the jurisdictional claims of Union(s) as set forth in the Charter Grants issued by the AFL-CIO subject to Trade Agreements and final decisions of the AFL- AFL-CIO as well as the decisions rendered by the Canadian Jurisdictional Disputes Plan. It is incumbent on all Employers to assign work in accordance with the Employers' responsibility set forth in the procedural rules and regulations of the Canadian Jurisdictional Disputes PlanPlan and Appeals Procedure. In the event a jurisdictional dispute arises, the representative(s) of the Union(s) shall first seek resolution of the dispute at the project level. In the event no resolution is found at the project level, the respective International Union(s) shall follow the procedures of the Canadian Jurisdictional Disputes Plan, or its successor. A xxxx-up conference for small projects may be conducted by facsimile e-mail when mutually agreed with the Saskatchewan Provincial Building and Construction Trades Council.

Appears in 1 contract

Samples: Collective Bargaining Agreement

AutoNDA by SimpleDocs

JURISDICTION AND ASSIGNMENT OF WORK. 11:01 19:01 The Employer will hold a pre-job conference and equipment xxxxmark-up attended by all interested Unions and will provide an overall description of the project, projected manpower requirements by craft, general information pertaining to hiring and recruiting procedures, transportation, on site work rules, safety and security regulations, safety meetings and any other pertinent information. The Employer will inform the Unions as to the projected scope of the contract, information pertaining to the Employer's intended supervisory staff and other relevant information including intended work assignments. Notification of the pre-job conference and hard copy documents to be presented shall be given to the Union, the Saskatchewan Provincial Building & Construction Trades Council and the office of the President of the Building Trades Department AFL-CIO with a minimum of fifteen (15) calendar days prior to the date set for the conference. The pre-job and equipment xxxxmark-up in all cases shall be held at least ten (10) calendar days before the work commences. The time limits set forth herein may be varied to suit unusual circumstances after consultation between the Employer Employer, the Union and the Building Trades Council. The Employer will arrange to have available for meetings general descriptions of the work to be performed, equipment lists defining whether the equipment will be received broken down into component parts or as a complete package, drawings and any other relevant information which will assist the Unions in understanding their individual jurisdictional roles. The Employer who will be installing process equipment may have a process engineer attend the xxxxmark-up portion of the meeting to explain the function of the equipment to be installed. Before the close of the meeting, the Employer will read over the items in dispute. The Employer will then request that documentary evidence supporting the disputing Unions' claims be forwarded to him within a period of seven (7) calendar days. The Employer will make and circulate to the disputing trades final assignments, based on the evidence provided within a further three (3) calendar days or as may otherwise be agreed at the xxxxmark-up. All such assignments shall be made in accordance with the procedural rules of the National Joint Board. The Employer(s) recognizes the jurisdictional claims of Union(s) as set forth in the Charter Grants issued by the AFL-CIO subject to Trade Agreements and final decisions of the AFL- AFL-CIO as well as the decisions rendered by the Canadian Jurisdictional Disputes Plan. It is incumbent on all Employers to assign work in accordance with the Employers' responsibility set forth in the procedural rules and regulations of the Canadian Jurisdictional Disputes PlanPlan or its successor. In the event a jurisdictional dispute arises, the representative(s) of the Union(s) shall first seek resolution of the dispute at the project level. In the event no resolution is found at the project level, the respective International Union(s) shall follow the procedures of the Canadian Jurisdictional Disputes Plan, or its successor. A xxxxmark-up conference for small projects may be conducted by facsimile when mutually agreed with the Saskatchewan Provincial Building and Construction Trades Councilelectronically.

Appears in 1 contract

Samples: Provincial Labourers’ Agreement

JURISDICTION AND ASSIGNMENT OF WORK. 11:01 The Employer will hold a pre-job conference and equipment xxxx-up attended by all interested Unions and will provide an overall description of the project, projected manpower requirements by craft, general information pertaining to hiring and recruiting procedures, transportation, on site work rules, safety and security regulations, safety meetings and any other pertinent information. The Employer will inform the Unions as to the projected scope of the contract, information pertaining to the Employer's ’s intended supervisory staff and other relevant information including intended work assignments. Notification of the pre-job conference and hard copy documents to be presented shall be given to the Saskatchewan Provincial Building & Construction Trades Council and the office of the President of the Building Trades Department AFL-CIO with a minimum of fifteen (15) calendar days prior to the date set for the conference. The pre-job and equipment xxxx-up in all cases shall be held at least ten (10) calendar days before the work commences. The time limits set forth herein may be varied to suit unusual circumstances after consultation between the Employer and the Building Trades Council. The Employer will arrange to have available for meetings general descriptions of the work to be performed, equipment lists defining whether the equipment will be received broken down into component parts or as a complete package, drawings and any other relevant information which will assist the Unions in understanding their individual jurisdictional roles. The Employer who will be installing process equipment may have a process engineer attend the xxxx-up portion of the meeting to explain the function of the equipment to be installed. Before the close of the meeting, the Employer will read over the items in dispute. The Employer will then request that documentary evidence supporting the disputing Unions' claims be forwarded to him within a period of seven (7) calendar days. The Employer will make and circulate to the disputing trades final assignments, based on the evidence provided within a further three (3) calendar days or as may otherwise be agreed at the xxxx-up. All such assignments shall be made in accordance with the procedural rules of the National Joint Board. The Employer(s) recognizes recognize the jurisdictional claims of Union(s) as set forth in the Charter Grants issued by the AFL-CIO subject to Trade Agreements and final decisions of the AFL- AFL-CIO as well as the decisions rendered by the Canadian Impartial Jurisdictional Disputes PlanBoard and Appeals Procedure. It is incumbent on all Employers to assign work in accordance with the Employers' responsibility set forth in the procedural rules and regulations of the Canadian Impartial Jurisdictional Disputes PlanBoard and Appeals Procedure. In the event a jurisdictional dispute arises, the representative(s) of the Union(s) shall first seek resolution of the dispute at the project level. In the event no resolution is found at the project level, the respective International Union(s) shall follow the procedures of the Canadian Impartial Jurisdictional Disputes PlanBoard, or its successor. A xxxx-up conference for small projects may be conducted by facsimile electronically when mutually agreed with the Saskatchewan Provincial Building agreed. Single trade projects do not require pre-job and Construction Trades Councilxxxx-up meetings.

Appears in 1 contract

Samples: Painters’ Agreement

JURISDICTION AND ASSIGNMENT OF WORK. 11:01 The Employer will hold a pre-job conference and equipment xxxx-up attended by all interested Unions and will provide an overall description of the project, projected manpower requirements by craft, general information pertaining to hiring and recruiting procedures, transportation, on site work rules, safety and security regulations, safety meetings and any other pertinent information. The Employer will inform the Unions as to the projected scope of the contract, information pertaining to the Employer's ’s intended supervisory staff and other relevant information including intended work assignments. Notification of the pre-job conference and hard copy documents to be presented shall be given to the Saskatchewan Provincial Building & Construction Trades Council and the office of the President of the Building Trades Department AFL-CIO with a minimum of fifteen (15) calendar days prior to the date set for the conference. The pre-job and equipment xxxx-up in all cases shall be held at least ten (10) calendar days before the work commences. The time limits set forth herein may be varied to suit unusual circumstances after consultation between the Employer and the Building Trades Council. The Employer will arrange to have available for meetings general descriptions of the work to be performed, equipment lists defining whether the equipment will be received broken down into component parts or as a complete package, drawings and any other relevant information which will assist the Unions in understanding their individual jurisdictional roles. The Employer who will be installing process equipment may have a process engineer attend the xxxx-up portion of the meeting to explain the function of the equipment to be installed. Before the close of the meeting, the Employer will read over the items in dispute. The Employer will then request that documentary evidence supporting the disputing Unions' claims be forwarded to him within a period of seven (7) calendar days. The Employer will make and circulate to the disputing trades final assignments, based on the evidence provided within a further three (3) calendar days or as may otherwise be agreed at the xxxx-up. All such assignments shall be made in accordance with the procedural rules of the National Joint Board. The Employer(s) recognizes recognize the jurisdictional claims of Union(s) as set forth in the Charter Grants issued by the AFL-CIO subject to Trade Agreements and final decisions of the AFL- AFL-CIO as well as the decisions rendered by the Canadian Impartial Jurisdictional Disputes PlanBoard and Appeals Procedure. It is incumbent on all Employers to assign work in accordance with the Employers' responsibility set forth in the procedural rules and regulations of the Canadian Impartial Jurisdictional Disputes PlanBoard and Appeals Procedure. In the event a jurisdictional dispute arises, the representative(s) of the Union(s) shall first seek resolution of the dispute at the project level. In the event no resolution is found at the project level, the respective International Union(s) shall follow the procedures of the Canadian Impartial Jurisdictional Disputes PlanBoard, or its successor. A xxxx-up conference for small projects may be conducted by facsimile when mutually agreed with the Saskatchewan Provincial Building and Construction Trades Council. Single trade projects do not require pre-job and xxxx-up meetings.

Appears in 1 contract

Samples: www.saskbuildingtrades.com

JURISDICTION AND ASSIGNMENT OF WORK. 11:01 The Employer will hold a pre-job conference and equipment xxxxmark-up attended by all interested Unions and will provide an overall description of the project, projected manpower requirements by craft, general information pertaining to hiring and recruiting procedures, transportation, on site work rules, safety and security regulations, safety meetings and any other pertinent information. The Employer will inform the Unions as to the projected scope of the contract, information pertaining to the Employer's ’s intended supervisory staff and other relevant information including intended work assignments. Notification of the pre-job conference and hard copy documents to be presented shall be given to the Saskatchewan Provincial Building & Construction Trades Council and the office of the President of the Building Trades Department AFL-CIO with a minimum of fifteen (15) calendar days prior to the date set for the conference. The pre-job and equipment xxxxmark-up in all cases shall be held at least ten (10) calendar days before the work commences. The time limits set forth herein may be varied to suit unusual circumstances after consultation between the Employer and the Building Trades Council. The Employer will arrange to have available for meetings general descriptions of the work to be performed, equipment lists defining whether the equipment will be received broken down into component parts or as a complete package, drawings and any other relevant information which will assist the Unions in understanding their individual jurisdictional roles. The Employer who will be installing process equipment may have a process engineer attend the xxxxmark-up portion of the meeting to explain the function of the equipment to be installed. Before the close of the meeting, the Employer will read over the items in dispute. The Employer will then request that documentary evidence supporting the disputing Unions' claims be forwarded to him within a period of seven (7) calendar days. The Employer will make and circulate to the disputing trades final assignments, based on the evidence provided within a further three (3) calendar days or as may otherwise be agreed at the xxxxmark-up. All such assignments shall be made in accordance with the procedural rules of the National Joint Board. The Employer(s) recognizes recognize the jurisdictional claims of Union(s) as set forth in the Charter Grants issued by the AFL-CIO subject to Trade Agreements and final decisions of the AFL- AFL-CIO as well as the decisions rendered by the Canadian Impartial Jurisdictional Disputes PlanBoard and Appeals Procedure. It is incumbent on all Employers to assign work in accordance with the Employers' responsibility set forth in the procedural rules and regulations of the Canadian Impartial Jurisdictional Disputes PlanBoard and Appeals Procedure. In the event a jurisdictional dispute arises, the representative(s) of the Union(s) shall first seek resolution of the dispute at the project level. In the event no resolution is found at the project level, the respective International Union(s) shall follow the procedures of the Canadian Impartial Jurisdictional Disputes PlanBoard, or its successor. A xxxxmark-up conference for small projects may be conducted by facsimile electronically when mutually agreed with the Saskatchewan Provincial Building agreed. Single trade projects do not require pre-job and Construction Trades Councilmark-up meetings.

Appears in 1 contract

Samples: Painters’ Agreement

JURISDICTION AND ASSIGNMENT OF WORK. 11:01 The Employer will hold a pre-job conference and equipment xxxxmark-up attended by all interested Unions and will provide an overall description of the project, projected manpower requirements by craft, general information pertaining to hiring and recruiting procedures, transportation, on site work rules, safety and security regulations, safety meetings and any other pertinent information. The Employer will inform the Unions as to the projected scope of the contract, information pertaining to the Employer's intended supervisory staff and other relevant information including intended work assignments. Notification of the pre-job conference and hard copy documents to be presented shall be given to the Saskatchewan Provincial Building & Construction Trades Council and the office of the President of the Building Trades Department AFL-CIO with a minimum of fifteen (15) calendar days prior to the date set for the conference. The pre-job and equipment xxxxmark-up in all cases shall be held at least ten (10) calendar days before the work commences. The time limits set forth herein may be varied to suit unusual circumstances after consultation between the Employer and the Building Trades Council. The Employer will arrange to have available for meetings general descriptions of the work to be performed, equipment lists defining whether the equipment will be received broken down into component parts or as a complete package, drawings and any other relevant information which will assist the Unions in understanding their individual jurisdictional roles. The Employer who will be installing process equipment may have a process engineer attend the xxxxmark-up portion of the meeting to explain the function of the equipment to be installed. Before the close of the meeting, the Employer will read over the items in dispute. The Employer will then request that documentary evidence supporting the disputing Unions' claims be forwarded to him within a period of seven (7) calendar days. The Employer will make and circulate to the disputing trades final assignments, based on the evidence provided within a further three (3) calendar days or as may otherwise be agreed at the xxxxmark-up. All such assignments shall be made in accordance with the procedural rules of the National Joint Board. The Employer(s) recognizes the jurisdictional claims of Union(s) as set forth in the Charter Grants issued by the AFL-CIO subject to Trade Agreements and final decisions of the AFL- AFL-CIO as well as the decisions rendered by the Canadian Jurisdictional Disputes Plan. It is incumbent on all Employers to assign work in accordance with the Employers' responsibility set forth in the procedural rules and regulations of the Canadian Jurisdictional Disputes Plan. In the event a jurisdictional dispute arises, the representative(s) of the Union(s) shall first seek resolution of the dispute at the project level. In the event no resolution is found at the project level, the respective International Union(s) shall follow the procedures of the Canadian Jurisdictional Disputes Plan, or its successor. A xxxxmark-up conference for small projects may be conducted by facsimile when mutually agreed with the Saskatchewan Provincial Building and Construction Trades Council.

Appears in 1 contract

Samples: Operating Engineers’ Agreement

JURISDICTION AND ASSIGNMENT OF WORK. 11:01 The Employer will hold a pre-job conference and equipment xxxxmark-up attended by all interested Unions and will provide an overall description of the project, projected manpower requirements by craft, general information pertaining to hiring and recruiting procedures, transportation, on site work rules, safety and security regulations, safety meetings and any other pertinent information. The Employer will inform the Unions Union as to the projected scope of the contract, information pertaining to the Employer's intended supervisory staff and other relevant information including intended work assignments. Notification of the pre-job conference and hard copy documents to be presented shall be given to the Saskatchewan Provincial Building & Construction Trades Council and the office of the President of the Building Trades Department AFL-CIO with a minimum of fifteen (15) calendar days prior to the date set for the conference. The pre-job and equipment xxxxmark-up in all cases shall be held at least ten (10) calendar days before the work commences. The time limits set forth herein may be varied to suit unusual circumstances after consultation between the Employer and the Building Trades Council. The Employer will arrange to have available for meetings general descriptions of the work to be performed, equipment lists defining whether the equipment will be received broken down into component parts or as a complete package, drawings and any other relevant information which will assist the Unions in understanding their individual jurisdictional roles. The Employer who will be installing process equipment may have a process engineer attend the xxxxmark-up portion of the meeting to explain the function of the equipment to be installed. Before the close of the meeting, the Employer will read over the items in dispute. The Employer will then request that documentary evidence supporting the disputing Unions' claims be forwarded to him within a period of seven (7) calendar days. The Employer will make and circulate to the disputing trades final assignments, based on the evidence provided within a further three (3) calendar days or as may otherwise be agreed at the xxxxmark-up. All such assignments shall be made in accordance with the procedural rules of the National Joint Board. The Employer(s) recognizes the jurisdictional claims of Union(s) as set forth in the Charter Grants issued by the AFL-CIO subject to Trade Agreements and final decisions of the AFL- CIO as well as the decisions rendered by the Canadian Jurisdictional Disputes Plan, or its successor. It is incumbent on all Employers to assign work in accordance with the Employers' responsibility set forth in the procedural rules and regulations of the Canadian Jurisdictional Disputes Plan. In the event a jurisdictional dispute arises, the representative(s) of the Union(s) shall first seek resolution of the dispute at the project level. In the event no resolution is found at the project level, the respective International Union(s) shall follow the procedures of the Canadian Jurisdictional Disputes Plan, or its successor. A xxxxmark-up conference for small projects may be conducted by facsimile when mutually agreed with the Saskatchewan Provincial Building and Construction Trades Council.

Appears in 1 contract

Samples: Provincial Electrical Agreement

JURISDICTION AND ASSIGNMENT OF WORK. 11:01 7:01 The Employer will hold a pre-job conference and equipment xxxx-up attended by all interested Unions and will provide an overall description of the project, projected manpower requirements by craft, general information pertaining to hiring and recruiting procedures, transportation, on site work rules, safety and security regulations, safety meetings and any other pertinent information. The Employer will inform the Unions as to the projected scope of the contract, information pertaining to the Employer's intended supervisory staff and other relevant information including intended work assignments. Notification of the pre-job conference and hard copy documents to be presented shall be given to the Saskatchewan Provincial Building & Construction Trades Council Union and the office of the President of the Building Trades Department AFL-CIO with a minimum of fifteen (15) calendar days prior to the date set for the conference. The pre-job and equipment xxxx-up in all cases shall be held at least ten (10) calendar days before the work commences. The time limits set forth herein may be varied to suit unusual circumstances after consultation between the Employer and the Building Trades CouncilUnion. The Employer will arrange to have available for meetings general descriptions of the work to be performed, equipment lists defining whether the equipment will be received broken down into component parts or as a complete package, drawings and any other relevant information which will assist the Unions in understanding their individual jurisdictional roles. The Employer who will be installing process equipment may have a process engineer attend the xxxx-up portion of the meeting to explain the function of the equipment to be installed. Before the close of the meeting, the Employer will read over the items in dispute. The Employer will then request that documentary evidence supporting the disputing Unions' claims be forwarded to him within a period of seven (7) calendar days. The Employer will make and circulate to the disputing trades final assignments, based on the evidence provided within a further three (3) calendar days or as may otherwise be agreed at the xxxx-up. All such assignments shall be made in accordance with the procedural rules of the National Joint Board. The Employer(s) recognizes the jurisdictional claims of Union(s) as set forth in the Charter Grants issued by the AFL-CIO subject to Trade Agreements and final decisions of the AFL- AFL-CIO as well as the decisions rendered by the Canadian Jurisdictional Disputes Plan. It is incumbent on all Employers to assign work in accordance with the Employers' responsibility set forth in the procedural rules and regulations of the Canadian Jurisdictional Disputes Plan. In the event a jurisdictional dispute arises, the representative(s) of the Union(s) shall first seek resolution of the dispute at the project level. In the event no resolution is found at the project level, the respective International Union(s) shall follow the procedures of the Canadian Jurisdictional Disputes Plan, or its successor. A xxxx-up conference for small projects may be conducted by facsimile when mutually agreed with electronically. After completion of the Saskatchewan Provincial Building and Construction Trades Councilwork assignment, upon request from the Union, the Employer shall provide a letter confirming the assignment.

Appears in 1 contract

Samples: Carpenters' Agreement

JURISDICTION AND ASSIGNMENT OF WORK. 11:01 7:01 The Employer will hold a pre-job conference and equipment xxxxmark-up attended by all interested Unions and will provide an overall description of the project, projected manpower requirements by craft, general information pertaining to hiring and recruiting procedures, transportation, on site work rules, safety and security regulations, safety meetings and any other pertinent information. The Employer will inform the Unions as to the projected scope of the contract, information pertaining to the Employer's intended supervisory staff and other relevant information including intended work assignments. Notification of the pre-job conference and hard copy documents to be presented shall be given to the Saskatchewan Provincial Building & Construction Trades Council and the office of the President of the Building Trades Department AFL-CIO with a minimum of fifteen (15) calendar days prior to the date set for the conference. The pre-job and equipment xxxxmark-up in all cases shall be held at least ten (10) calendar days before the work commences. The time limits set forth herein may be varied to suit unusual circumstances after consultation between the Employer and the Building Trades Council. The Employer will arrange to have available for meetings general descriptions of the work to be performed, equipment lists defining whether the equipment will be received broken down into component parts or as a complete package, drawings and any other relevant information which will assist the Unions in understanding their individual jurisdictional roles. The Employer who will be installing process equipment may have a process engineer attend the xxxxmark-up portion of the meeting to explain the function of the equipment to be installed. Before the close of the meeting, the Employer will read over the items in dispute. The Employer will then request that documentary evidence supporting the disputing Unions' claims be forwarded to him within a period of seven (7) calendar days. The Employer will make and circulate to the disputing trades final assignments, based on the evidence provided within a further three (3) calendar days or as may otherwise be agreed at the xxxxmark-up. All such assignments shall be made in accordance with the procedural rules of the National Joint Board. The Employer(s) recognizes the jurisdictional claims of Union(s) as set forth in the Charter Grants issued by the AFL-CIO subject to Trade Agreements and final decisions of the AFL- CIO as well as the decisions rendered by the Canadian Jurisdictional Disputes Plan. It is incumbent on all Employers to assign work in accordance with the Employers' responsibility set forth in the procedural rules and regulations of the Canadian Jurisdictional Disputes PlanPlan and Appeals Procedure. In the event a jurisdictional dispute arises, the representative(s) of the Union(s) shall first seek resolution of the dispute at the project level. In the event no resolution is found at the project level, the respective International Union(s) shall follow the procedures of the Canadian Jurisdictional Disputes Plan, or its successor. A xxxxmark-up conference for small projects may be conducted by facsimile when mutually agreed with the Saskatchewan Provincial Building and Construction Trades Council.

Appears in 1 contract

Samples: Collective Bargaining Agreement