Lateral Firefighter Sample Clauses

Lateral Firefighter. The probationary period for a lateral firefighter shall be two (2) years from their start date. The same rules shall apply regarding the remainder of the probationary period as in 5.1.
AutoNDA by SimpleDocs

Related to Lateral Firefighter

  • Dark Fiber Loop 2.8.4.1 Dark Fiber Loop is an unused optical transmission facility, without attached signal regeneration, multiplexing, aggregation or other electronics, from the demarcation point at an End User’s premises to the End User’s serving wire center. Dark Fiber Loops may be strands of optical fiber existing in aerial or underground structure. BellSouth will not provide line terminating elements, regeneration or other electronics necessary for AFN to utilize Dark Fiber Loops.

  • Loop Provisioning Involving Integrated Digital Loop Carriers 2.6.1 Where Xxxx has requested an Unbundled Loop and BellSouth uses IDLC systems to provide the local service to the End User and BellSouth has a suitable alternate facility available, BellSouth will make such alternative facilities available to Xxxx. If a suitable alternative facility is not available, then to the extent it is technically feasible, BellSouth will implement one of the following alternative arrangements for Xxxx (e.g. hairpinning): 1. Roll the circuit(s) from the IDLC to any spare copper that exists to the customer premises. 2. Roll the circuit(s) from the IDLC to an existing DLC that is not integrated. 3. If capacity exists, provide "side-door" porting through the switch. 4. If capacity exists, provide "Digital Access Cross Connect System (DACS)- door" porting (if the IDLC routes through a DACS prior to integration into the switch). 2.6.2 Arrangements 3 and 4 above require the use of a designed circuit. Therefore, non- designed Loops such as the SL1 voice grade and UCL-ND may not be ordered in these cases. 2.6.3 If no alternate facility is available, and upon request from Xxxx, and if agreed to by both Parties, BellSouth may utilize its Special Construction (SC) process to determine the additional costs required to provision facilities. Xxxx will then have the option of paying the one-time SC rates to place the Loop.

  • Access Toll Connecting Trunk Group Architecture 9.2.1 If CSTC chooses to subtend a Verizon access Tandem, CSTC’s NPA/NXX must be assigned by CSTC to subtend the same Verizon access Tandem that a Verizon NPA/NXX serving the same Rate Center Area subtends as identified in the LERG. 9.2.2 CSTC shall establish Access Toll Connecting Trunks pursuant to applicable access Tariffs by which it will provide Switched Exchange Access Services to Interexchange Carriers to enable such Interexchange Carriers to originate and terminate traffic to and from CSTC’s Customers. 9.2.3 The Access Toll Connecting Trunks shall be two-way trunks. Such trunks shall connect the End Office CSTC utilizes to provide Telephone Exchange Service and Switched Exchange Access to its Customers in a given LATA to the access Tandem(s) Verizon utilizes to provide Exchange Access in such LATA. 9.2.4 Access Toll Connecting Trunks shall be used solely for the transmission and routing of Exchange Access to allow CSTC’s Customers to connect to or be connected to the interexchange trunks of any Interexchange Carrier which is connected to a Verizon access Tandem.

  • ADJACENT EXCAVATION-SHORING If an excavation shall be made upon land adjacent to the demised premises, or shall be authorized to be made, Tenant shall afford to the person causing or authorized to cause such excavation, license to enter upon the demised premises for the purpose of doing such work as said person shall deem necessary to preserve the wall or the building of which demised premises form a part from injury or damage and to support the same by proper foundations without any claim for damages or indemnity against Owner, or diminution or abatement of rent.

  • Compressed Work Week The Company and Union recognize the concept of the compressed work week. It is further understood that the compressed work week conditions will apply only to those departments that are on the compressed work week.

  • Television Equipment Recycling Program If this Contract is for the purchase or lease of covered television equipment, then Contractor certifies that it is compliance with Subchapter Z, Chapter 361 of the Texas Health and Safety Code related to the Television Equipment Recycling Program.

  • Dark Fiber Transport Dark Fiber Transport is defined as Dedicated Transport that consists of unactivated optical interoffice transmission facilities without attached signal regeneration, multiplexing, aggregation or other electronics. Except as set forth in Section 6.9.1 below, BellSouth shall not be required to provide access to Dark Fiber Transport Entrance Facilities pursuant to this Agreement.

  • Dark Fiber 8.1 Access to unbundled Dark Fiber will be provided by Verizon, where existing facilities are available at the requested availability date, in the loop, subloop and interoffice facilities (IOF) portions of the Company's network. Access to Dark Fiber will be provided in accordance with, but only to the extent required by, Applicable Law. Except as otherwise required by Applicable Law, the following terms and conditions apply to Verizon's Dark Fiber offering. 8.2 A “Dark Fiber Loop” consists of continuous fiber optic strand(s) in a Verizon fiber optic cable between the fiber distribution frame, or its functional equivalent, located within a Verizon Wire Center, and Verizon’s main termination point, such as the fiber patch panel located within a Customer premise, and that has not been activated through connection to the electronics that “light” it, and thereby render it capable of carrying Telecommunications Services. In addition to the other terms and conditions of this Agreement, the following terms and conditions also shall apply to Dark Fiber Loops: 8.2.1 Verizon shall be required to provide a Dark Fiber Loop only where (1) one end of the Dark Fiber Loop terminates at Z-Tel's collocation arrangement and (2) the other end terminates at the Customer premise. A CLEC demarcation point shall be established either in the main telco room of a building where a Customer is located or, if the building does not have a main telco room, then at a location to be determined by Verizon. Verizon shall connect a Dark Fiber Loop to the demarcation point by installing a fiber jumper. 8.2.2 Z-Tel may access a Dark Fiber Loop only at a pre-existing hard termination point of such Dark Fiber Loop, and Z-Tel may not access a Dark Fiber Loop at any other point, including, but not limited to, a splice point. Verizon will not introduce additional splice points or open existing splice points to accommodate a CLEC’s request. Unused fibers located in a cable vault or a controlled environment vault, manhole or other location outside the Verizon Wire Center, and not terminated to a fiber patch, are not available to Z-Tel. 8.2.3 A strand shall not be deemed to be continuous if splicing is required to provide fiber continuity between two locations. Dark Fiber will only be offered on a route-direct basis where facilities exist (i.e., no intermediate offices). 8.2.4 Verizon shall perform all work necessary to install a cross connection or a fiber jumper, including, but not limited to, the work necessary to connect a dark fiber to a demarcation point, a fiber distribution frame or a POT bay. 8.2.5 At the Customer premise, unused fibers are not available to Z-Tel pursuant to this Attachment unless such fibers terminate on a fiber patch panel. Unused fibers in a fiber splice point located outside the Customer premise are not available to Z-Tel. 8.2.6 Dark Fiber will be offered to Z-Tel in the condition that it is available in Verizon's network at the time that Z-Tel submits its request (i.e., "as is"). In addition, Verizon shall not be required to convert lit fiber to Dark Fiber for Z-Tel's use. 8.2.7 Spare wavelengths on fiber strands, where Wave Division Multiplexing (WDM) or Dense Wave Division Multiplexing (DWDM) equipment is deployed, are not considered to be spare Dark Fiber Loops and, therefore, will not be offered to Z-Tel as Dark Fiber. 8.2.8 Z-Tel shall be responsible for providing all transmission, terminating and regeneration equipment necessary to light and use Dark Fiber. 8.2.9 Z-Tel may not resell Dark Fiber purchased pursuant to this Attachment to third parties. 8.2.10 In order for Verizon to continue to satisfy its carrier of last resort (COLR) obligations under Applicable Law and/or to preserve the efficiency of its network, Verizon will limit Z-Tel to leasing a maximum of twenty-five percent (25%) of the Dark Fiber in any given segment of Verizon's network during any two-year period. In addition, except as otherwise required by Applicable Law, Verizon may take any of the following actions, notwithstanding anything to the contrary in this Agreement: 8.2.10.1 Revoke Dark Fiber leased to Z-Tel upon a showing of need to the Commission and twelve (12) months' advance written notice to Z-Tel; and 8.2.10.2 Revoke Dark Fiber leased to Z-Tel upon a showing to the Commission that Z-Tel underutilized fiber (less than OC-12) within any twelve (12) month period. 8.2.10.3 Verizon may reserve Dark Fiber for maintenance purposes, or to satisfy Customer orders for fiber related services or for future growth. Verizon reserves and shall not waive, Verizon’s right to claim before the Commission that Verizon should not have to fulfill a Z-Tel order for Dark Fiber because that request would strand an unreasonable amount of fiber capacity, disrupt or degrade service to Customers or carriers other than Z-Tel, or impair a Verizon obligation to serve as a carrier of last resort. 8.2.11 Z-Tel may not reserve Dark Fiber.

  • Signaling Link Transport 9.2.1 Signaling Link Transport is a set of two or four dedicated 56 kbps transmission paths between Global Connection-designated Signaling Points of Interconnection that provide appropriate physical diversity.

  • Originating Switched Access Detail Usage Data A category 1101XX record as defined in the EMI Telcordia Practice BR-010-200- 010.

Draft better contracts in just 5 minutes Get the weekly Law Insider newsletter packed with expert videos, webinars, ebooks, and more!