LEAD-TIME; REGULATORY STABILITY Sample Clauses

LEAD-TIME; REGULATORY STABILITY. The commercial medium- and heavy-duty on-high- way vehicle and work truck fuel economy standard adopted pursuant to this subsection shall provide not less than—
AutoNDA by SimpleDocs

Related to LEAD-TIME; REGULATORY STABILITY

  • REGULATORY FILINGS AND CAISO TARIFF COMPLIANCE 3.1 Filing

  • No response Regulatory Standing I certify to TIPS for the proposal attached that my company is in good standing with all governmental agencies Federal or state that regulate any part of our business operations. If not, please explain in the next attribute question. 4 7 Yes Regulatory Standing Regulatory Standing explanation of no answer on previous question. 4 8 No response

  • Product Changes Vocera shall have the right, in its absolute discretion, without liability to End User, to update to provide new functionality or otherwise change the design of any Product or to discontinue the manufacture or sale of any Product. Vocera shall notify End User at least 90 days prior to the delivery of any Product which incorporates a change that adversely affects form, fit or function (“Material Change”). Vocera shall also notify End User at least 90 days prior to the discontinuance of manufacture of any Product. Notification will be made as soon as reasonably practical for changes associated with regulatory or health and safety issues.

  • Technical Standards Applicable to a Wind Generating Plant i. Low Voltage Ride-Through (LVRT) Capability A wind generating plant shall be able to remain online during voltage disturbances up to the time periods and associated voltage levels set forth in the standard below. The LVRT standard provides for a transition period standard and a post-transition period standard.

  • Loop Testing/Trouble Reporting 2.1.6.1 Think 12 will be responsible for testing and isolating troubles on the Loops. Think 12 must test and isolate trouble to the BellSouth portion of a designed/non- designed unbundled Loop (e.g., UVL-SL2, UCL-D, UVL-SL1, UCL-ND, etc.) before reporting repair to the UNE Customer Wholesale Interconnection Network Services (CWINS) Center. Upon request from BellSouth at the time of the trouble report, Think 12 will be required to provide the results of the Think 12 test which indicate a problem on the BellSouth provided Loop.

  • Regulatory Status The Local Manager is authorised and regulated by the Financial Services Authority (the “FSA”), the UK supervisory authority whose registered office is at 25 The North Colonnade, Canary Xxxxx, Xxxxxx, Xxxxxx Xxxxxxx X00 0XX.

  • SINGLE-USE PRODUCTS The Board of County Commissioners has established a single-use products and plastic bags policy intended to reduce the use of products which have become globally recognized as having lasting negative impacts on the environment. Neither single-use products nor plastic bags may be sold or disbursed on County property by staff or contracted vendors, except as set forth in Orange County Administrative Regulation 9.01.03. Failure to comply with the Regulation may result in termination of the contract or other contractual remedies, and may affect future contracting with the County. The use of reusable, recyclable, biodegradable, or compostable materials is encouraged.

  • Random Drug Testing All employees covered by this Agreement shall be subject to random drug testing in accordance with Appendix D.

  • Voltage Regulators Whenever the Large Generating Facility is operated in parallel with the New York State Transmission System, the automatic voltage regulators shall be in automatic operation at all times. If the Large Generating Facility’s automatic voltage regulators are not capable of such automatic operation, the Developer shall immediately notify NYISO, or its designated representative, and ensure that such Large Generating Facility’s real and reactive power are within the design capability of the Large Generating Facility’s generating unit(s) and steady state stability limits and NYISO system operating (thermal, voltage and transient stability) limits. Developer shall not cause its Large Generating Facility to disconnect automatically or instantaneously from the New York State Transmission System or trip any generating unit comprising the Large Generating Facility for an under or over frequency condition unless the abnormal frequency condition persists for a time period beyond the limits set forth in ANSI/IEEE Standard C37.106, or such other standard as applied to other generators in the New York Control Area on a comparable basis.

  • Software compliance Unless explicitly agreed, software being used and developed to provide the service should: ● Be licensed under an open source and permissive license (like MIT, BSD, Apache 2.0,...). ● The license should provide unlimited access rights to the EGI community. ● Have source code publicly available via a public source code repository (if needed a mirror can be put in place under the EGI organisation in GitHub13.) All releases should be appropriately tagged. ● Adopt best practices: ○ Defining and enforcing code style guidelines. ○ Using Semantic Versioning. ○ Using a Configuration Management frameworks such as Ansible. ○ Taking security aspects into consideration through at every point in time. ○ Having automated testing in place. ○ Using code reviewing. 9 xxxxx://xxx.xxx.xx/about/policy/policies_procedures.html 10 xxxxx://xxxx.xxx.xx/wiki/OMB 11 xxxx://xxx.xxx.xx/ 12 xxxxx://xxx.xxx.xx/portal/index.php?Page_Type=NGI&id=4 13 xxxxx://xxxxxx.xxx/EGI-Foundation ○ Treating documentation as code. ○ Documentation should be available for Developers, administrators, and end users.

Time is Money Join Law Insider Premium to draft better contracts faster.