Common use of Line 167 Protection Packages Clause in Contracts

Line 167 Protection Packages. The existing Line 167 protection is a POTT for the A package and step distance for the B package. The existing relays, SEL-311C and B L-PRO 2100 will be reused and reset to accommodate interconnection of the Small Generating Facility. DTT transmit and receive to the Xxxxxx Road Collector Substation will be added. DTT will be sent to the Xxxxxx Road Collector Substation for a line relay operation, R715 or R718 breaker failure and if both R715 and R718 are open. DTT for breaker failure will be received from the Xxxxxx Road Collector Substation. A SEL-351-6 will be added for DTT receive supervision and will be used to trip and drive reclosing to lockout, and a GARD 8000 will be added for DTT to and from the Xxxxxx Road Collector Substation.

Appears in 2 contracts

Samples: Service Agreement, Service Agreement

AutoNDA by SimpleDocs

Line 167 Protection Packages. The existing Line 167 protection is a POTT for the A package and step distance for the B package. The existing relays, SEL-311C and B L-PRO 2100 will be reused and reset to accommodate interconnection of the Small Generating Facilitygeneration. DTT transmit and receive to the Xxxxxx Road Collector Substation will be added. DTT will be sent to the Xxxxxx Road Collector Substation for a line relay operation, R715 R402 or R718 R405 breaker failure and if both R715 R402 and R718 R405 are open. DTT for breaker failure will be received from the Xxxxxx Road Collector Substation. A SEL-351-6 will be added for DTT receive supervision and will be used to trip and drive reclosing to lockout, and a GARD 8000 will be added for DTT to and from the Xxxxxx Road Collector Substation.

Appears in 2 contracts

Samples: Service Agreement, Service Agreement

AutoNDA by SimpleDocs
Time is Money Join Law Insider Premium to draft better contracts faster.