Liquidated Damages Letter of Credit Sample Clauses

Liquidated Damages Letter of Credit. In the event of a dispute over the amount of Liquidated Damages owed at Substantial Completion, Contractor shall have the right to furnish an irrevocable letter of credit in lieu of cash for all or any portion of such amount of Liquidated Damages in dispute, provided however that the letter of credit shall: (i) be a direct pay letter of credit payable immediately upon presentation by Owner, issued by a financial institution, and on a form, approved by Owner in its sole discretion; (ii) permit partial draws; and
AutoNDA by SimpleDocs

Related to Liquidated Damages Letter of Credit

  • The Letter of Credit Commitment (i) Subject to the terms and conditions set forth herein, (A) each L/C Issuer agrees, in reliance upon the agreements of the Lenders set forth in this Section 2.03, (1) from time to time on any Business Day during the period from the Closing Date until the Letter of Credit Expiration Date, to issue Letters of Credit denominated in Dollars for the account of the Borrower or any of its Subsidiaries, and to amend or extend Letters of Credit previously issued by it, in accordance with subsection (b) below, and (2) to honor drawings under the Letters of Credit; and (B) the Lenders severally agree to participate in Letters of Credit issued for the account of the Borrower or its Subsidiaries and any drawings thereunder; provided that after giving effect to any L/C Credit Extension with respect to any Letter of Credit, (w) the Total Revolving Outstandings shall not exceed the Aggregate Revolving Commitments, (x) the Revolving Credit Exposure of any Lender shall not exceed such Lender’s Revolving Commitment, (y) the Outstanding Revolving Amount of the L/C Obligations of any L/C Issuer shall not exceed such L/C Issuer’s L/C Commitment and (z) the Outstanding Revolver Amount of all L/C Obligations shall not exceed the Letter of Credit Sublimit. Each request by the Borrower for the issuance or amendment of a Letter of Credit shall be deemed to be a representation by the Borrower that the L/C Credit Extension so requested complies with the conditions set forth in the proviso to the preceding sentence. Within the foregoing limits, and subject to the terms and conditions hereof, the Borrower’s ability to obtain Letters of Credit shall be fully revolving, and accordingly the Borrower may, during the foregoing period, obtain Letters of Credit to replace Letters of Credit that have expired or that have been drawn upon and reimbursed. (ii) A L/C Issuer shall not issue any Letter of Credit if: (A) subject to Section 2.03(b)(iii), the expiry date of such requested Letter of Credit would occur more than twelve months after the date of issuance or last extension, unless the Required Lenders have approved such expiry date; or (B) subject to clause (vii) below, the expiry date of such requested Letter of Credit would occur after the Letter of Credit Expiration Date. (iii) A L/C Issuer shall not be under any obligation to issue any Letter of Credit if: (A) any order, judgment or decree of any Governmental Authority or arbitrator shall by its terms purport to enjoin or restrain a L/C Issuer from issuing such Letter of Credit, or any Law applicable to a L/C Issuer or any request or directive (whether or not having the force of law) from any Governmental Authority with jurisdiction over a L/C Issuer shall prohibit, or request that a L/C Issuer refrain from, the issuance of letters of credit generally or such Letter of Credit in particular or shall impose upon a L/C Issuer with respect to such Letter of Credit any restriction, reserve or capital requirement (for which a L/C Issuer is not otherwise compensated hereunder) not in effect on the Closing Date, or shall impose upon a L/C Issuer any unreimbursed loss, cost or expense which was not applicable on the Closing Date and which a L/C Issuer in good xxxxx xxxxx material to it; (B) the issuance of such Letter of Credit would violate one or more policies of a L/C Issuer applicable to letters of credit generally; (C) except as otherwise agreed by the Administrative Agent and a L/C Issuer, such Letter of Credit is in an initial stated amount less than $50,000; (D) such Letter of Credit is to be denominated in a currency other than Dollars; or (E) any Lender is at that time a Defaulting Lender, unless a L/C Issuer has entered into arrangements, including the delivery of Cash Collateral, reasonably satisfactory to a L/C Issuer (in its sole discretion) with the Borrower or such Lender to eliminate a L/C Issuer’s actual or potential Fronting Exposure (after giving effect to Section 2.15(a)(iv)) with respect to the Defaulting Lender arising from either the Letter of Credit then proposed to be issued or that Letter of Credit and all other L/C Obligations as to which a L/C Issuer has actual or potential Fronting Exposure, as it may elect in its sole discretion. (iv) A L/C Issuer shall not amend any Letter of Credit if such L/C Issuer would not be permitted at such time to issue the Letter of Credit in its amended form under the terms hereof. (v) A L/C Issuer shall be under no obligation to amend any Letter of Credit if (A) such L/C Issuer would have no obligation at such time to issue such Letter of Credit in its amended form under the terms hereof, or (B) the beneficiary of such Letter of Credit does not accept the proposed amendment to such Letter of Credit. (vi) A L/C Issuer shall act on behalf of the Lenders with respect to any Letters of Credit issued by it and the documents associated therewith, and such L/C Issuer shall have all of the benefits and immunities (A) provided to the Administrative Agent in Article X with respect to any acts taken or omissions suffered by such L/C Issuer in connection with Letters of Credit issued by it or proposed to be issued by it and Issuer Documents pertaining to such Letters of Credit as fully as if the term “Administrative Agent” as used in Article X included such L/C Issuer with respect to such acts or omissions, and (B) as additionally provided herein with respect to such L/C Issuer. (vii) Notwithstanding the foregoing, a L/C Issuer, will, if requested by the Borrower, issue one or more Letters of Credit hereunder, with expiry dates no later than twelve months after the Letter of Credit Expiration Date, based upon the Borrower’s agreement to provide Cash Collateral (in the full amount of such Letters of Credit and all obligations related thereto) to such L/C Issuer (or, if agreed upon, the Administrative Agent) relating to such Letters of Credit on or before the Letter of Credit Expiration Date in accordance with the terms of Section 2.14 and subject to documentation satisfactory to such L/C Issuer or the Administrative Agent, as applicable (and, upon receipt of such Cash Collateral by a L/C Issuer or the Administrative Agent, as applicable, the Lenders’ participation interests in such Letters of Credit shall terminate on the Revolving Maturity Date). In the event the Borrower fails to Cash Collateralize the outstanding Letter of Credit exposure on the Letter of Credit Expiration Date, each outstanding Letter of Credit shall automatically be deemed to be drawn in full, and the Borrower shall be deemed to have requested a Base Rate Loan to be funded by the Lenders on the Letter of Credit Expiration Date to reimburse such drawing (with the proceeds of such Base Rate Loan being used to Cash Collateralize outstanding Letter of Credit exposure as set forth in Section 2.14) in accordance with the provisions of Section 2.03(c). The funding by a Lender of its Applicable Percentage of such Base Rate Loan, to Cash Collateralize the outstanding Letter of Credit exposure on the Letter of Credit Expiration Date shall be deemed payment by such Lender in respect of its participation interest in such Letters of Credit.

  • Issuance of Letter of Credit Upon satisfaction or waiver (in accordance with subsection 10.6) of the conditions set forth in subsection 4.3, the Issuing Lender shall issue the requested Letter of Credit in accordance with the Issuing Lender's standard operating procedures.

  • The Letter of Credit Facility (i) Subject to the terms and conditions hereinafter set forth (A) Issuing Bank agrees, in reliance on the Agreements of the Lenders set forth in this Section (1) to issue Letters of Credit for the account of any Borrower from time to time on any Business Day during the period from the Effective Date hereof until 10 days before the Termination Date in an aggregate Available Amount for all Letters of Credit not to exceed at any time the lesser of (x) the Letter of Credit Facility at such time and (y) the Unused Revolving Credit Commitments of the Lenders at such time (provided that in no event shall the Issuing Bank be required to issue a Letter of Credit if, after giving effect to such issuance, the aggregate amount of the Revolving Credit Exposures of all Lenders shall exceed the Revolving Credit Availability at such time) and to amend or extend Letters of Credit previously issued by it in accordance with the terms of this Section 2.16, and (2) to honor drawings under the Letters of Credit, and (B) the Lenders severally agree to participate in Letters of Credit issued for the account of any Borrower and any drawings thereunder. Each request by a Borrower for the issuance or amendment of a Letter of Credit shall be deemed to be a representation by the Borrowers that the issuance, extension or amendment of the Letter of Credit so requested complies with the conditions set forth in the preceding sentence. Within the foregoing limits, and subject to the terms and conditions hereof, each Borrower’s ability to obtain Letters of Credit shall be fully revolving, and accordingly such Borrower may, during the foregoing period, obtain Letters of Credit to replace Letters of Credit that have expired or that have been drawn upon and reimbursed. (ii) No Letter of Credit shall have an expiration date (including all rights of the applicable Borrower or the beneficiary to require renewal) later than the earlier of (A) 10 days before the Termination Date and (B) one year after the date of issuance thereof (but such Letter of Credit may by its terms be automatically renewable (each, an “Auto-Extension Letter of Credit”); provided that any such Auto-Extension Letter of Credit must permit the Issuing Bank to prevent any such extension at least once in each twelve (12) month period (commencing with the date of issuance of such Letter of Credit) by giving prior notice to the beneficiary thereof not later than a day (the “Non-Extension Notice Date”) in each such twelve (12) month period to be agreed upon at the time such Letter of Credit is issued. Unless otherwise directed by the Issuing Bank, the applicable Borrower shall not be required to make a specific request to the Issuing Bank for any such extension. Once an Auto-Extension Letter of Credit has been issued, the Lenders shall be deemed to have authorized (but may not require) the Issuing Bank to permit the extension of such Letter of Credit at any time to an expiry date not later than the date 10 days before the Termination Date; provided that the Issuing Bank shall not permit any such extension if (A) the Issuing Bank has determined that it would not be permitted, or would have no obligation at such time to issue such Letter of Credit in its revised form (as extended) under the terms hereof (by reason of the provisions of this Section 2.16 or otherwise), or (B) it has received notice (which may be by telephone or in writing) on or before the day that is seven (7) Business Days before the Non-Extension Notice Date (1) from the Agent that the Required Lenders have elected not to permit such extension or (2) from the Agent, any Lender or a Borrower that one or more of the applicable conditions specified in Section 3.02 is not then satisfied, and in each such case directing the Issuing Bank not to permit such extension. (iii) The Issuing Bank shall not be under any obligation to issue any Letter of Credit if: (A) any order, judgment or decree of any Governmental Authority or arbitrator shall by its terms purport to enjoin or restrain the Issuing Bank from issuing the Letter of Credit, or any law applicable to the Issuing Bank or any request or directive (whether or not having the force of law) from any Governmental Authority with jurisdiction over the Issuing Bank shall prohibit, or request that the Issuing Bank refrain from, the issuance of letters of credit generally or the Letter of Credit in particular or shall impose upon the Issuing Bank with respect to the Letter of Credit any restriction, reserve or capital requirement (for which the Issuing Bank is not otherwise compensated hereunder) not in effect on the Effective Date, or shall impose upon the Issuing Bank any unreimbursed loss, cost or expense which was not applicable on the Effective Date and which the Issuing Bank in good xxxxx xxxxx material to it; (B) the issuance of the Letter of Credit would violate one or more policies of the Issuing Bank applicable to letters of credit generally; (C) except as otherwise agreed by the Agent and the Issuing Bank, the Letter of Credit is in an initial stated amount of less than $100,000; (D) the Letter of Credit is to be denominated in a currency other than Dollars; (E) any Lender is at that time a Defaulting Lender, unless the Issuing Bank has entered into arrangements, including the delivery of Cash Collateral, satisfactory to the Issuing Bank (in its sole discretion) with the Borrowers or such Lender to eliminate the Issuing Bank’s actual or potential Fronting Exposure (after giving effect to Section 2.23(a)(iv)) with respect to the Defaulting Lender arising from either the Letter of Credit then proposed to be issued or that Letter of Credit and all other L/C Exposure as to which the Issuing Bank has actual or potential Fronting Exposure, as it may elect in its sole discretion; or (F) the Letter of Credit contains any provisions for automatic reinstatement of the stated amount after any drawing thereunder. (iv) The Issuing Bank shall not amend any Letter of Credit if the Issuing Bank would not be permitted at such time to issue the Letter of Credit in its amended form under the terms hereof. (v) The Issuing Bank shall be under no obligation to amend any Letter of Credit if (A) the Issuing Bank would have no obligation at such time to issue such Letter of Credit in its amended form under the terms hereof, or (B) the beneficiary of such Letter of Credit does not accept the proposed amendment to the Letter of Credit. (vi) The Issuing Bank shall act on behalf of the Lenders with respect to any Letters of Credit issued by it and the documents associated therewith, and the Issuing Bank shall have all of the benefits and immunities (A) provided to the Agent in Article VII with respect to any acts taken or omissions suffered by the Issuing Bank in connection with Letters of Credit issued by it or proposed to be issued by it and L/C Related Documents pertaining to such Letters of Credit as fully as if the term “Agent” as used in Article VII included the Issuing Bank with respect to such acts or omissions, and (B) as additionally provided herein with respect to the Issuing Bank.

  • Letter of Credit Amounts Unless otherwise specified herein, the amount of a Letter of Credit at any time shall be deemed to be the stated amount of such Letter of Credit in effect at such time; provided, however, that with respect to any Letter of Credit that, by its terms or the terms of any Issuer Document related thereto, provides for one or more automatic increases in the stated amount thereof, the amount of such Letter of Credit shall be deemed to be the maximum stated amount of such Letter of Credit after giving effect to all such increases, whether or not such maximum stated amount is in effect at such time.

  • The Letter of Credit Subfacility (a) On the terms and conditions set forth herein (i) the Issuer agrees (and each Revolving Lender acknowledges that such agreement is made in reliance upon the agreements of the Revolving Lenders set forth in this Article III), (A) from time to time on any Business Day, during the period from the Effective Date to the day which is five days prior to the Revolving Termination Date, to Issue Letters of Credit for the account of the Borrower (or jointly for the account of the Borrower and any of its Subsidiaries) in an aggregate Outstanding Amount at any one time that, together with the aggregate Outstanding Amount of all other outstanding Letters of Credit issued pursuant hereto (including the Existing Letters of Credit), does not exceed the L/C Commitment, and to amend or renew Letters of Credit previously issued by it, in accordance with Sections 3.02(c) and 3.02(d), and (B) to honor drafts under the Letters of Credit; and (ii) the Revolving Lenders severally agree to participate in Letters of Credit (including the Existing Letters of Credit); provided that no Issuer shall be obligated to Issue, and no Revolving Lender shall be obligated to participate in, any Letter of Credit if as of the date of Issuance of such Letter of Credit (the “Issuance Date”) (1) the Outstanding Amount of all L/C Obligations, plus the Outstanding Amount of all Revolving Loans and Swing Line Loans exceeds the Aggregate Revolving Commitment or (2) the participation of any Revolving Lender in the Outstanding Amount of all L/C Obligations plus the principal amount of the Revolving Loans of such Revolving Lender and such Revolving Lender’s Revolving Percentage of the Outstanding Amount of Swing Line Loans exceeds such Lender’s Revolving Commitment. Within the foregoing limits, and subject to the other terms and conditions hereof, the Borrower’s ability to obtain Letters of Credit shall be fully revolving, and, accordingly, the Borrower may, during the foregoing period, obtain Letters of Credit to replace Letters of Credit which have expired or which have been drawn upon and reimbursed. Each of the Existing Letters of Credit shall be deemed to be Letters of Credit Issued hereunder on the Effective Date. (b) No Issuer shall issue any Letter of Credit if: (i) subject to Section 3.02(d), the expiry date of the requested Letter of Credit would occur more than twelve months after the date of issuance or last extension, unless the Required Revolving Lenders have approved such expiry date; or (ii) the expiry date of the requested Letter of Credit would occur after the Revolving Maturity Date, unless (x) all the Revolving Lenders and the Issuer have approved such expiry date or (y) such Letter of Credit is cash collateralized or becomes a Supported Letter of Credit on terms and pursuant to arrangements satisfactory to the Issuer. (c) No Issuer shall be under any obligation to Issue any Letter of Credit if: (i) any order, judgment or decree of any Governmental Authority or arbitrator shall by its terms purport to enjoin or restrain such Issuer from Issuing such Letter of Credit, or any Requirement of Law applicable to such Issuer or any request or directive (whether or not having the force of law) from any Governmental Authority with jurisdiction over such Issuer shall prohibit, or request that such Issuer refrain from, the Issuance of letters of credit generally or such Letter of Credit in particular or shall impose upon such Issuer with respect to such Letter of Credit any restriction, reserve or capital requirement (for which such Issuer is not otherwise compensated hereunder) not in effect on the Effective Date, or shall impose upon such Issuer any unreimbursed loss, cost or expense which was not applicable on the Effective Date and which such Issuer in good xxxxx xxxxx material to it; (ii) such Issuer has received written notice from any Revolving Lender, the Agent or the Borrower, on or prior to the Business Day prior to the requested date of Issuance of such Letter of Credit, that one or more of the applicable conditions contained in Article V is not then satisfied; (iii) any requested Letter of Credit does not provide for drafts, or is not otherwise in form and substance acceptable to such Issuer, or the Issuance of a Letter of Credit shall violate any applicable policies of such Issuer; (iv) such Letter of Credit is to be denominated in a currency other than Dollars; or (v) any Revolving Lender is at that time a Defaulting Lender, unless the Issuer has entered into arrangements, including the delivery of Cash Collateral, with the Borrower or such Revolving Lender to eliminate the Issuer’s actual or potential Fronting Exposure (after giving effect to Section 3.11(a)(iv)) with respect to the Defaulting Lender arising from either the Letter of Credit then proposed to be issued or that Letter of Credit and all other L/C Obligations as to which the Issuer has actual or potential Fronting Exposure, as it may elect in its sole discretion. (d) Each Issuer shall act on behalf of the Revolving Lenders with respect to any Letters of Credit Issued by it and the documents associated therewith, and the Issuer shall have all of the benefits and immunities (A) provided to the Agent in Article X with respect to any acts taken or omissions suffered by the Issuer in connection with Letters of Credit Issued by it or proposed to be Issued by it and Issuer Documents pertaining to such Letters of Credit as fully as if the term “Agent” as used in Article X included the Issuer with respect to such acts or omissions, and (B) as additionally provided herein with respect to the Issuer.

  • Agreement to Repay Letter of Credit Drawings (a) The Borrower agrees to reimburse each Issuing Lender, by making payment to the Administrative Agent in immediately available funds at the Payment Office, for any payment or disbursement made by such Issuing Lender under any Letter of Credit issued by it (each such amount, so paid until reimbursed by the Borrower, an “Unpaid Drawing”), not later than one Business Day following receipt by the Borrower of notice of such payment or disbursement (provided that no such notice shall be required to be given if a Default or an Event of Default under Section 11.05 shall have occurred and be continuing, in which case the Unpaid Drawing shall be due and payable immediately without presentment, demand, protest or notice of any kind (all of which are hereby waived by the Borrower)), with interest on the amount so paid or disbursed by such Issuing Lender, to the extent not reimbursed prior to 12:00 Noon (New York time) on the date of such payment or disbursement, from and including the date paid or disbursed to but excluding the date such Issuing Lender was reimbursed by the Borrower therefor at a rate per annum equal to the Base Rate as in effect from time to time plus the Applicable Margin as in effect from time to time for Revolving Loans that are maintained as Base Rate Loans; provided, however, to the extent such amounts are not reimbursed prior to 12:00 Noon (New York time) on the third Business Day following the receipt by the Borrower of notice of such payment or disbursement or following the occurrence of a Default or an Event of Default under Section 11.05, interest shall thereafter accrue on the amounts so paid or disbursed by such Issuing Lender (and until reimbursed by the Borrower) at a rate per annum equal to the Base Rate as in effect from time to time plus the Applicable Margin for Revolving Loans that are maintained as Base Rate Loans as in effect from time to time plus 2%, with such interest to be payable on demand. Each Issuing Lender shall give the Borrower prompt written notice of each Drawing under any Letter of Credit issued by it, provided that the failure to give any such notice shall in no way affect, impair or diminish the Borrower’s obligations hereunder. (b) The obligations of the Borrower under this Section 3.05 to reimburse each Issuing Lender with respect to drafts, demands and other presentations for payment under Letters of Credit issued by it (each, a “Drawing”) (including, in each case, interest thereon) shall be absolute and unconditional under any and all circumstances and irrespective of any setoff, counterclaim or defense to payment which the Borrower or any Subsidiary of the Borrower may have or have had against any Lender (including in its capacity as an Issuing Lender or as a Participant), including, without limitation, any defense based upon the failure of any drawing under a Letter of Credit to conform to the terms of the Letter of Credit or any nonapplication or misapplication by the beneficiary of the proceeds of such Drawing; provided, however, that the Borrower shall not be obligated to reimburse any Issuing Lender for any wrongful payment made by such Issuing Lender under a Letter of Credit issued by it as a result of acts or omissions constituting willful misconduct or gross negligence on the part of such Issuing Lender (as determined by a court of competent jurisdiction in a final and non-appealable decision).

  • Letter of Credit Fees The Borrower shall pay to the Administrative Agent for the account of each Revolving Credit Lender in accordance, subject to Section 2.16 with its Applicable Revolving Credit Percentage a Letter of Credit fee (the “Letter of Credit Fee”) for each Letter of Credit equal to the Applicable Rate times the daily amount available to be drawn under such Letter of Credit. For purposes of computing the daily amount available to be drawn under any Letter of Credit, the amount of such Letter of Credit shall be determined in accordance with Section 1.06. Letter of Credit Fees shall be (i) due and payable on the first Business Day after the end of each March, June, September and December, commencing with the first such date to occur after the issuance of such Letter of Credit, on the Letter of Credit Expiration Date and thereafter on demand and (ii) computed on a quarterly basis in arrears. If there is any change in the Applicable Rate during any quarter, the daily amount available to be drawn under each Letter of Credit shall be computed and multiplied by the Applicable Rate separately for each period during such quarter that such Applicable Rate was in effect. Notwithstanding anything to the contrary contained herein, upon the request of the Required Revolving Lenders, while any Event of Default exists, all past due Letter of Credit Fees shall accrue at the Default Rate.

  • The Letter of Credit Commitments (a) Subject to the terms and conditions set forth herein, (i) each Issuing Bank agrees, in reliance upon the agreements of the other Revolving Lenders set forth in this Section 2.03, (A) from time to time on any Business Day during the period from the Closing Date until the L/C Expiration Date, to issue Letters of Credit denominated in Dollars for the account of Holdings (to the extent not prohibited under Section 7.09), the Borrower or any of the Borrower’s Restricted Subsidiaries (so long as the Borrower is a co-applicant and jointly and severally liable thereunder) (provided that any such Letter of Credit may be for the benefit of Holdings or any Subsidiary of the Borrower) and to amend or extend Letters of Credit previously issued by it, in accordance with Section 2.03(2), and (B) to honor drawings under the Letters of Credit and (ii) the Revolving Lenders severally agree to participate in Letters of Credit issued pursuant to this Section 2.03; provided that no Issuing Bank shall be obligated to make any L/C Credit Extension with respect to any Letter of Credit, and no Lender shall be obligated to participate in any Letter of Credit if as of the date of such L/C Credit Extension, (x) the Revolving Exposure of any Revolving Lender would exceed such Lender’s Revolving Commitment or (y) the Outstanding Amount of the L/C Obligations would exceed the L/C Sublimit. The Existing Letters of Credit shall be deemed to be “Letters of Credit” issued on the Closing Date for all purposes of the Loan Documents. Within the foregoing limits, and subject to the terms and conditions hereof, the Borrower’s ability to obtain Letters of Credit shall be fully revolving, and accordingly the Borrower may, during the foregoing period, obtain Letters of Credit to replace Letters of Credit that have expired or that have been drawn upon and reimbursed. (b) An Issuing Bank shall be under no obligation to issue any Letter of Credit (other than, for the avoidance of doubt, the Existing Letters of Credit) if: (i) any order, judgment or decree of any Governmental Authority or arbitrator shall by its terms purport to enjoin or restrain such Issuing Bank from issuing such Letter of Credit, or any Law applicable to such Issuing Bank or any directive (whether or not having the force of law) from any Governmental Authority with jurisdiction over such Issuing Bank shall prohibit, or direct that such Issuing Bank refrain from, the issuance of letters of credit generally or such Letter of Credit in particular or shall impose upon such Issuing Bank with respect to such Letter of Credit any restriction, reserve or capital requirement (for which such Issuing Bank is not otherwise compensated hereunder) not in effect on the Closing Date, or shall impose upon such Issuing Bank any unreimbursed loss, cost or expense which was not applicable on the Closing Date (for which such Issuing Bank is not otherwise compensated hereunder); (ii) subject to Section 2.03(2)(c), the expiry date of such requested Letter of Credit would occur more than twelve months after the date of issuance or last extension, unless (A) each Appropriate Lender has approved of such expiration date or (B) the Outstanding Amount of L/C Obligations in respect of such requested Letter of Credit has been Cash Collateralized or back-stopped by a letter of credit reasonably satisfactory to the applicable Issuing Bank prior to the date that is twelve months after the date of issuance thereof; (iii) subject to Section 2.03(2)(c), the expiry date of such requested Letter of Credit would occur after the L/C Expiration Date, unless (I) each Appropriate Lender has approved of such expiration date or (II) the Outstanding Amount of L/C Obligations in respect of such requested Letter of Credit has been Cash Collateralized or back-stopped by a letter of credit reasonably satisfactory to the applicable Issuing Bank prior to the L/C Expiration Date; (iv) the issuance of such Letter of Credit would violate any policies of such Issuing Bank applicable to letters of credit generally; provided that no Issuing Bank shall be required to issue either (A) letters of guarantee or bankers’ acceptances or (B) commercial letters of credit, in each case without its consent; or (v) any Revolving Lender is at that time a Defaulting Lender, unless such Issuing Bank has entered into arrangements, including the delivery of Cash Collateral, satisfactory to such Issuing Bank (in its sole discretion) with the Borrower or such Lender to eliminate such Issuing Bank’s actual or potential Fronting Exposure (after giving effect to Section 2.17(1)(d)) with respect to the Defaulting Lender arising from either the Letter of Credit then proposed to be issued or that Letter of Credit and all other L/C Obligations as to which such Issuing Bank has actual or potential Fronting Exposure, as it may elect in its sole discretion. (c) An Issuing Bank shall be under no obligation to amend any Letter of Credit if (i) such Issuing Bank would have no obligation at such time to issue such Letter of Credit in its amended form under the terms hereof or (ii) the beneficiary of such Letter of Credit does not accept the proposed amendment to such Letter of Credit.

  • Issuance of and Drawings and Reimbursement Under Letters of Credit (a) Request for Issuance. Each Letter of Credit shall be issued upon notice, given not later than 2:00 P.M. (New York, New York time) on the fifth Business Day prior to the date of the proposed issuance of such Letter of Credit (or such later day as the Issuing Bank in its sole discretion shall agree), by the Borrower to the Issuing Bank, which shall give to the Administrative Agent and each Revolving Credit Lender prompt notice thereof. Each notice of issuance of a Letter of Credit (a "Notice of Issuance") shall be by telephone, confirmed immediately in writing, or by telecopier, shall be duly executed by a Responsible Officer of the Borrower, and shall specify therein: (i) the requested date of such issuance (which shall be a Business Day); (ii) the requested Available Amount of such Letter of Credit; (iii) the requested expiration date of such Letter of Credit (which shall comply with the requirements of Section 2.01(e)); (iv) the name and address of the proposed beneficiary of such Letter of Credit; and (v) the proposed form of such Letter of Credit, and shall be accompanied by such application and agreement for letters of credit as the Issuing Bank may specify to the Borrower for use in connection with such requested Letter of Credit (such applications and agreements, and all similar agreements entered into in connection with an Existing Letter of Credit, a "Letter of Credit Agreement"). If the requested form of such Letter of Credit is acceptable to the Issuing Bank in its sole discretion, the Issuing Bank will, upon fulfillment of the applicable conditions set forth in Article III, make such Letter of Credit available to the Borrower at its office referred to in Section 8.02 or as otherwise agreed with the Borrower in connection with the issuance of such Letter of Credit. If and to the extent that the provisions of any Letter of Credit Agreement shall conflict with this Agreement, the provisions of this Agreement shall govern.

  • Delivery of Letter of Credit Tenant shall deliver to Landlord, concurrently with Tenant’s execution of this Lease, an unconditional, clean, irrevocable letter of credit (the “L-C”) in the amount set forth in Section 21.3 below (the “L-C Amount”), which L-C shall be issued by a money-center, solvent and nationally recognized bank (a bank which accepts deposits, maintains accounts, has a California office which will negotiate a letter of credit, and whose deposits are insured by the FDIC) reasonably acceptable to Landlord (such approved, issuing bank being referred to herein as the “Bank”), which Bank must have a short term Fitch Rating which is not less than “F1”, and a long term Fitch Rating which is not less than “A” (or in the event such Fitch Ratings are no longer available, a comparable rating from Standard and Poor’s Professional Rating Service or Xxxxx’x Professional Rating Service) (collectively, the “Bank’s Credit Rating Threshold”), and which L-C shall be in substantially the form of Exhibit G, attached hereto. Tenant shall pay all expenses, points and/or fees incurred by Tenant in obtaining the L-C. The L-C shall (i) be “callable” at sight, irrevocable and unconditional, (ii) be maintained in effect, whether through renewal or extension, for the period commencing on the date of this Lease and continuing until the date (the “L-C Expiration Date”) that is no less than one hundred twenty (120) days after the expiration of the Lease Term as the same may be extended, and Tenant shall deliver a new L-C or certificate of renewal or extension to Landlord at least sixty (60) days prior to the expiration of the L-C then held by Landlord, without any action whatsoever on the part of Landlord, (iii) be fully assignable by Landlord, its successors and assigns, (iv) permit partial draws and multiple presentations and drawings, and (v) be otherwise subject to the Uniform Customs and Practices for Documentary Credits (1993-Rev), International Chamber of Commerce Publication #500, or the International Standby Practices-ISP 98, International Chamber of Commerce Publication #590. Landlord, or its then managing agent, shall have the right to draw down an amount up to the face amount of the L-C if any of the following shall have occurred or be applicable: (A) such amount is due to Landlord under the terms and conditions of this Lease, or (B) Tenant has filed a voluntary petition under the U. S. Bankruptcy Code or any state bankruptcy code (collectively, “Bankruptcy Code”), or (C) an involuntary petition has been filed against Tenant under the Bankruptcy Code, or (D) the Lease has been rejected, or is deemed rejected, under Section 365 of the U.S. Bankruptcy Code, following the filing of a voluntary petition by Tenant under the Bankruptcy Code, or the filing of an involuntary petition against Tenant under the Bankruptcy Code, or (E) the Bank has notified Landlord that the L-C will not be renewed or extended through the L-C Expiration Date, or (F) Tenant is placed into receivership or conservatorship, or becomes subject to similar proceedings under Federal or State law, or (G) Tenant executes an assignment for the benefit of creditors, or (H) if (1) any of the Bank’s Fitch Ratings (or other comparable ratings to the extent the Fitch Ratings are no longer available) have been reduced below the Bank’s Credit Rating Threshold, or (2) there is otherwise a material adverse change in the financial condition of the Bank, and Tenant has failed to provide Landlord with a replacement letter of credit, conforming in all respects to the requirements of this Article 21 (including, but not limited to, the requirements placed on the issuing Bank more particularly set forth in this Section 21.1 above), in the amount of the applicable L-C Amount, within ten (10) days following Landlord’s written demand therefor (with no other notice or cure or grace period being applicable thereto, notwithstanding anything in this Lease to the contrary) (each of the foregoing being an “L-C Draw Event”). The L-C shall be honored by the Bank regardless of whether Tenant disputes Landlord’s right to draw upon the L-C. In addition, in the event the Bank is placed into receivership or conservatorship by the Federal Deposit Insurance Corporation or any successor or similar entity, then, effective as of the date such receivership or conservatorship occurs, said L-C shall be deemed to fail to meet the requirements of this Article 21, and, within ten (10) days following Landlord’s notice to Tenant of such receivership or conservatorship (the “L-C FDIC Replacement Notice”), Tenant shall replace such L-C with a substitute letter of credit from a different issuer (which issuer shall meet or exceed the Bank’s Credit Rating Threshold and shall otherwise be acceptable to Landlord in its reasonable discretion) and that complies in all respects with the requirements of this Article 21. If Tenant fails to replace such L-C with such conforming, substitute letter of credit pursuant to the terms and conditions of this Section 21.1, then, notwithstanding anything in this Lease to the contrary, Landlord shall have the right to declare Tenant in default of this Lease for which there shall be no notice or grace or cure periods being applicable thereto (other than the aforesaid ten (10) day period). Tenant shall be responsible for the payment of any and all costs incurred with the review of any replacement L-C (including without limitation Landlord’s reasonable attorneys’ fees), which replacement is required pursuant to this Section or is otherwise requested by Tenant. In the event of an assignment by Tenant of its interest in the Lease (and irrespective of whether Landlord’s consent is required for such assignment), the acceptance of any replacement or substitute letter of credit by Landlord from the assignee shall be subject to Landlord’s prior written approval, in Landlord’s sole and absolute discretion, and the attorney’s fees incurred by Landlord in connection with such determination shall be payable by Tenant to Landlord within ten (10) days of billing.