Common use of LIST OF ATTACHMENTS AND SCHEDULES Clause in Contracts

LIST OF ATTACHMENTS AND SCHEDULES. ATTACHMENT A Scope of Work and Basis of Design ATTACHMENT B Contractor Deliverables ATTACHMENT C Payment Schedule SCHEDULE C-1 Milestone Payment Schedule SCHEDULE C-2 Monthly Payment Schedule ATTACHMENT D Form of Change Order SCHEDULE D-1 Change Order Form SCHEDULE D-2 Unilateral Change Order Form SCHEDULE D-3 Contractor’s Change Order Request Form/Contractor’s Response to a Change Order Proposed by Owner SCHEDULE D-4 Unit Rates for Change Orders Performed on a Time and Material Basis SCHEDULE D-5 Existing Facility Labor Unit Rates ATTACHMENT E Project Schedule ATTACHMENT F Key Personnel and Contractor’s Organization ATTACHMENT G Approved Subcontractors and Sub-subcontractors and List of Major Equipment ATTACHMENT H Form of Limited Notice to Proceed and Notice to Proceed SCHEDULE H-1 Form of Limited Notice to Proceed SCHEDULE H-2 Form of Notice to Proceed ATTACHMENT I Form of Contractor’s Invoices SCHEDULE I-1 Form of Contractor’s Interim Invoice SCHEDULE I-2 Form of Contractor’s Final Invoice ATTACHMENT J HSE Plan Requirements ATTACHMENT K Form of Lien and Claim Waivers SCHEDULE K-1 Contractor’s Interim Conditional Lien Waiver SCHEDULE K-2 Contractor’s Interim Unconditional Lien Waiver SCHEDULE K-3 Subcontractor’s Interim Conditional Lien Waiver SCHEDULE K-4 Subcontractor’s Interim Unconditional Lien Waiver SCHEDULE K-5 Contractor’s Final Conditional Lien and Claim Waiver SCHEDULE K-6 Contractor’s Final Unconditional Lien and Claim Waiver SCHEDULE K-7 Subcontractor’s Final Conditional Lien and Claim Waiver SCHEDULE K-8 Subcontractor’s Final Unconditional Lien and Claim Waiver ATTACHMENT L Form of RFSU Completion Certificate ATTACHMENT M Form of Substantial Completion Certificate ATTACHMENT N Form of Final Completion Certificate ATTACHMENT O Insurance Requirements ATTACHMENT P Contractor Permits ATTACHMENT Q Owner Permits ATTACHMENT R Form of Irrevocable, Standby Letter of Credit ATTACHMENT S Performance Tests and Commissioning Tests ATTACHMENT T Performance Guarantee, Performance Liquidated Damages, Minimum Acceptance Criteria, and Delay Liquidated Damages ATTACHMENT U Owner Provided Items and Responsibility ATTACHMENT V Pre-Commissioning, Commissioning, Start-Up, and Training ATTACHMENT W Spare Parts SCHEDULE W-1 Form of Operating Spare Parts List SCHEDULE W-2 Capital Spare Parts List ATTACHMENT X Work in Existing Facility ATTACHMENT Y Site and Off-Site Rights of Way and Easements ATTACHMENT Z Landowner Access ATTACHMENT AA Form of Acknowledgement and Consent Agreement with Lender ATTACHMENT BB Form of Owner Confirmations SCHEDULE BB-1 Form of Owner Monthly Confirmation SCHEDULE BB-2 Form of Owner Quarterly Confirmation ATTACHMENT CC Independent Engineer Activities ATTACHMENT DD Form of Escrow Agreement ATTACHMENT EE Provisional Sums ATTACHMENT FF Form of Parent Guarantee SABINE PASS LNG LIQUEFACTION FACILITY ENGINEERING, PROCUREMENT AND CONSTRUCTION AGREEMENT THIS ENGINEERING, PROCUREMENT AND CONSTRUCTION AGREEMENT (this “Agreement”), dated as of the 11th Day of November, 2011 (the “Contract Date”), is entered into by and between SABINE PASS LIQUEFACTION, LLC, a Delaware limited liability company, having its principal place of business at 000 Xxxxx, Suite 800, Houston, Texas 77002 (“Owner”), and XXXXXXX OIL, GAS AND CHEMICALS, INC., a Delaware corporation, having an address at 0000 Xxxx Xxx Xxxxxxxxx, Xxxxxxx, Xxxxx 00000 (“Contractor” and, together with Owner, each a “Party” and together the “Parties”).

Appears in 4 contracts

Samples: Escrow Agreement (Sabine Pass Liquefaction, LLC), Escrow Agreement (Cheniere Energy Partners LP Holdings, LLC), Escrow Agreement (Cheniere Energy Partners LP Holdings, LLC)

AutoNDA by SimpleDocs

LIST OF ATTACHMENTS AND SCHEDULES. ATTACHMENT A 1 Scope of Work and Basis of Design SCHEDULE 1-1 Scope of Work SCHEDULE 1-2 FEED Documents ATTACHMENT B 2 Contractor Deliverables ATTACHMENT C 3 Payment Schedule SCHEDULE C-1 3-1 Milestone Payment Schedule SCHEDULE C-2 3-2 Monthly Payment Schedule ATTACHMENT D 4 Form of Change Order SCHEDULE D-1 4-1 Change Order Form SCHEDULE D-2 4-2 Unilateral Change Order Form SCHEDULE D-3 4-3 Contractor’s Change Order Request Form/Contractor’s Response to a Change Order Proposed by Owner SCHEDULE D-4 4-4 Unit Rates for Change Orders Performed on a Time and Material Basis SCHEDULE D-5 Existing Facility Labor Unit Rates ATTACHMENT E 5 Project Schedule ATTACHMENT F 6 Key Personnel and Contractor’s Organization ATTACHMENT G 7 Approved Subcontractors and Sub-subcontractors and List of Major Equipment ATTACHMENT H 8 Form of Limited Notice to Proceed and Notice to Proceed SCHEDULE H-1 8-1 Form of Limited Notice to Proceed SCHEDULE H-2 8-2 Form of Notice to Proceed ATTACHMENT I 9 Form of Contractor’s Invoices SCHEDULE I-1 9-1 Form of Contractor’s Interim Invoice SCHEDULE I-2 9-2 Form of Contractor’s Final Invoice ATTACHMENT J HSE 10 HS&E Plan Requirements ATTACHMENT K 11 Form of Lien and Claim Waivers SCHEDULE K-1 11-1 Contractor’s Interim Conditional Lien Waiver SCHEDULE K-2 11-2 Contractor’s Interim Unconditional Lien Waiver SCHEDULE K-3 11-3 Subcontractor’s Interim Conditional Lien Waiver SCHEDULE K-4 11-4 Subcontractor’s Interim Unconditional Lien Waiver SCHEDULE K-5 11-5 Contractor’s Final Conditional Lien and Claim Waiver SCHEDULE K-6 11-6 Contractor’s Final Unconditional Lien and Claim Waiver SCHEDULE K-7 11-7 Subcontractor’s Final Conditional Lien and Claim Waiver SCHEDULE K-8 11-8 Subcontractor’s Final Unconditional Lien and Claim Waiver ATTACHMENT L 12 Form of RFSU Completion Certificate ATTACHMENT M 13 Form of Substantial Completion Certificate ATTACHMENT N 14 Form of Final Completion Certificate ATTACHMENT O 15 Insurance Requirements ATTACHMENT P 16 Contractor Permits ATTACHMENT Q 17 Owner Permits ATTACHMENT R 18 Form of Irrevocable, Standby Letter of Credit ATTACHMENT S 19 Performance Tests and Commissioning Tests ATTACHMENT T 20 Performance Guarantee, Performance Liquidated Damages, Minimum Acceptance Criteria, and Delay Liquidated Damages ATTACHMENT U 21 Owner Provided Items and Responsibility ATTACHMENT V 22 Pre-Commissioning, Commissioning, Start-Up, and Training ATTACHMENT W Spare Parts SCHEDULE W-1 23 Form of Operating Spare Parts List SCHEDULE W-2 and Capital Spare Parts List ATTACHMENT X 24 Work in Existing Turned-Over Facility ATTACHMENT Y 25 Site and Off-Site Rights of Way and Easements ATTACHMENT Z 26 Landowner and Stakeholder Access ATTACHMENT AA 27 Form of Acknowledgement and Consent Agreement with Lender ATTACHMENT BB 28 Form of Owner Confirmations SCHEDULE BB-1 Form of Owner Monthly Confirmation SCHEDULE BB-2 28-1 Form of Owner Quarterly Confirmation ATTACHMENT CC 29 Independent Engineer Activities ATTACHMENT DD 30 Form of Escrow Agreement ATTACHMENT EE 31 Provisional Sums ATTACHMENT FF 32 Form of Parent Guarantee SABINE PASS LNG Xxxxxxxxx XXXXXXXXX XXX XXXXX 0 LIQUEFACTION FACILITY ENGINEERING, PROCUREMENT AND CONSTRUCTION AGREEMENT THIS ENGINEERING, PROCUREMENT AND CONSTRUCTION AGREEMENT (this “Agreement”), dated as of the 11th 10th Day of November, 2011 2017 (the “Contract Date”), is entered into by and between SABINE PASS LIQUEFACTION, DRIFTWOOD LNG LLC, a Delaware limited liability company, having its principal place of business at 000 Xxxxx0000 Xxxxxxxxx Xxxxxx, Suite 800Xxxxx 0000, HoustonXxxxxxx, Texas 77002 Xxxxx 00000 (“Owner”), and XXXXXXX OIL, GAS AND CHEMICALS, INC., a Delaware corporation, having an address at 0000 Xxxx Xxx Xxxxxxxxx, Xxxxxxx, Xxxxx 00000 (“Contractor” and, together with Owner, each a “Party” and together the “Parties”).

Appears in 4 contracts

Samples: Procurement and Construction Agreement (Tellurian Inc. /De/), Procurement and Construction Agreement (Tellurian Inc. /De/), Escrow Agreement (Tellurian Inc. /De/)

LIST OF ATTACHMENTS AND SCHEDULES. ATTACHMENT A Scope of Work and Basis of Design for Stage 2 SCHEDULE A-1 Scope of Work SCHEDULE A-2 FEED Documents ATTACHMENT B Contractor Deliverables for Stage 2 ATTACHMENT C Payment Schedule for Stage 2 SCHEDULE C-1 Aggregate Labor and Skills Price Milestone Payment Schedule SCHEDULE C-2 Aggregate Labor and Skills Price Monthly Payment Schedule SCHEDULE C-3 Aggregate Equipment Price Milestone Payment Schedule SCHEDULE C-4 Estimated Monthly Payments for Stage 2 ATTACHMENT D Form of Change Order SCHEDULE D-1 for Xxxxx 0 XXXXXXXX X-0 Change Order Form for Stage 2 SCHEDULE D-2 Unilateral Change Order Form SCHEDULE D-3 for Xxxxx 0 XXXXXXXX X-0 Contractor’s Change Order Request FormForm for Stage 2/Contractor’s Response to a Change Order Proposed by Owner for Stage 2 SCHEDULE D-4 Unit Rates for Change Orders Performed on a Time and Material Basis SCHEDULE D-5 Existing Facility Labor Unit Rates ATTACHMENT E Project Schedule for Stage 2 ATTACHMENT F Key Personnel and Contractor’s Organization for Stage 2 ATTACHMENT G Major Subcontracts, Major Sub-subcontracts, Bulk Subcontracts, Major Equipment, Approved Subcontractors and Sub-subcontractors and List of Major Equipment for Stage 2 ATTACHMENT H Form of Limited Notice to Proceed and Notice to Proceed for Stage 2 SCHEDULE H-1 Form of Limited Notice to Proceed for Stage 2 SCHEDULE H-2 Form of Limited Notice to Proceed No. 1 SCHEDULE H-3 Form of Limited Notice to Proceed No. 2 SCHEDULE H-4 Form of Limited Notice to Proceed No. 3 SCHEDULE H-5 Form of Notice to Proceed for Stage 2 ATTACHMENT I Form of Contractor’s Invoices for Stage 2 SCHEDULE I-1 Form of Contractor’s Interim Invoice SCHEDULE I-2 Form of Contractor’s Final Invoice ATTACHMENT J HSE Plan Requirements for Stage 2 ATTACHMENT K Form of Lien and Claim Waivers for Stage 2 SCHEDULE K-1 Contractor’s Interim Conditional Lien Waiver for Stage 2 SCHEDULE K-2 Contractor’s Interim Unconditional Lien Waiver for Stage 2 SCHEDULE K-3 Subcontractor’s Interim Conditional Lien Waiver for Stage 2 SCHEDULE K-4 Subcontractor’s Interim Unconditional Lien Waiver for Stage 2 SCHEDULE K-5 Contractor’s Final Conditional Lien and Claim Waiver for Stage 2 EXHIBIT K-5-1 Contractor’s Final Conditional Lien Waiver for Stage 2 EXHIBIT K-5-2 Contractor’s Final Conditional Claim Waiver for Stage 2 SCHEDULE K-6 Contractor’s Final Unconditional Lien and Claim Waiver for Stage 2 EXHIBIT K-6-1 Contractor’s Final Unconditional Lien Waiver for Stage 2 EXHIBIT K-6-2 Contractor’s Final Unconditional Claim Waiver for Stage 2 SCHEDULE K-7 Subcontractor’s Final Conditional Lien and Claim Waiver for Stage 2 EXHIBIT K-7-1 Subcontractor’s Final Conditional Lien Waiver for Stage 2 EXHIBIT K-7-2 Subcontractor’s Final Conditional Claim Waiver for Stage 2 SCHEDULE K-8 Subcontractor’s Final Unconditional Lien and Claim Waiver for Stage 2 EXHIBIT K-8-1 Subcontractor’s Final Unconditional Lien Waiver for Stage 2 EXHIBIT K-8-2 Subcontractor’s Final Unconditional Claim Waiver for Stage 2 ATTACHMENT L Form of RFSU Completion Certificate [Intentionally Not Used] ATTACHMENT M Form of Substantial Completion Certificate for Stage 2 ATTACHMENT N Form of Final Completion Certificate for Stage 2 ATTACHMENT O Insurance Requirements for Stage 2 ATTACHMENT P Contractor Permits for Stage 2 ATTACHMENT Q Owner Permits for Stage 2 ATTACHMENT R Stage 2 Form of Irrevocable, Standby Letter of Credit ATTACHMENT S Stage 2 Performance Tests and Commissioning Tests ATTACHMENT T Stage 2 Performance Guarantee, Performance Liquidated Damages, Minimum Acceptance Criteria, and Delay Liquidated Damages ATTACHMENT U Owner Provided Items and Responsibility for Stage 2 ATTACHMENT V Pre-Commissioning, Commissioning, Start-Up, and Training for Stage 2 ATTACHMENT W Spare Parts for Stage 2 SCHEDULE W-1 Form of Operating Spare Parts List SCHEDULE W-2 Capital Spare Parts List ATTACHMENT X Work in Existing Stage 1 Liquefaction Facility ATTACHMENT Y Site, Stage 1 Site, Stage 2 Site and Off-Site Rights of Way and Easements ATTACHMENT Z Landowner Access ATTACHMENT AA for Xxxxx 0 XXXXXXXXXX XX Form of Acknowledgement and Consent Agreement with Lender for Stage 2 ATTACHMENT BB Form of Owner Confirmations for Stage 2 SCHEDULE BB-1 Form of Owner Monthly Confirmation SCHEDULE BB-2 Form of Owner Quarterly Confirmation ATTACHMENT CC Independent Engineer Activities for Stage 2 ATTACHMENT DD Form of Escrow Agreement for Stage 2 ATTACHMENT EE Provisional Sums for Stage 2 ATTACHMENT FF Form of Parent Guarantee SABINE PASS LNG for Stage 2 AMENDED AND RESTATED CORPUS CHRISTI STAGE 2 LIQUEFACTION FACILITY ENGINEERING, PROCUREMENT AND CONSTRUCTION AGREEMENT THIS AMENDED AND RESTATED ENGINEERING, PROCUREMENT AND CONSTRUCTION AGREEMENT (this “Agreement”), dated as of the 11th 12th Day of NovemberDecember, 2011 2017 (the “Contract Date”), is entered into by and between SABINE PASS CORPUS CHRISTI LIQUEFACTION, LLC, a Delaware limited liability company, having its principal place of business at 000 700 Xxxxx, Suite 800Xxxxx 0000, HoustonXxxxxxx, Texas 77002 Xxxxx 00000 (“Owner”), and XXXXXXX OIL, GAS AND CHEMICALS, INC., a Delaware corporation, having an address at 0000 Xxxx Xxx Xxxxxxxxx, Xxxxxxx, Xxxxx 00000 (“Contractor” and, together with Owner, each a “Party” and together the “Parties”).

Appears in 3 contracts

Samples: Procurement and Construction Agreement (Cheniere Corpus Christi Holdings, LLC), Procurement and Construction Agreement (Cheniere Energy Inc), Procurement and Construction Agreement (Corpus Christi Pipeline GP, LLC)

LIST OF ATTACHMENTS AND SCHEDULES. ATTACHMENT A Scope of Work and Design Basis SCHEDULE A-1 Scope of Design Work SCHEDULE A-2 Design, Engineering and Codes SCHEDULE A-3 Engineered Equipment List SCHEDULE A-4 Utility Interface Schedule SCHEDULE A-5 Engineering Drawings SCHEDULE A-6 Grading and Drainage Drawing ATTACHMENT B Contractor Deliverables SCHEDULE B-1 Outline of Owner Document Submittal Requirements for Review or Information SCHEDULE B-2 Outline of Minimum Vendor Document Requirements by Equipment Category ATTACHMENT C Payment Schedule SCHEDULE C-1 Milestone EPC Payment Schedule Milestones SCHEDULE C-2 Monthly Siemens Equipment Payment Milestones SCHEDULE C-3 Maximum Cumulative Payment Schedule ATTACHMENT D Form of Change Order SCHEDULE D-1 Change Order Form SCHEDULE D-2 Unilateral Owner-Directed Change Order Form SCHEDULE D-3 Contractor’s Change Order Request Form/Contractor’s Response to a Change Order Proposed by Owner Form SCHEDULE D-4 Unit Rates Pricing for Change Orders Performed on a Time and Material Basis SCHEDULE D-5 Existing Facility Labor Unit Rates ATTACHMENT E Project Key Milestone Schedule ATTACHMENT F Key Personnel and Contractor’s Organization ATTACHMENT G Approved Subcontractors and Sub-subcontractors and List of Major Equipment ATTACHMENT H Form of Limited Notice to Proceed and Notice to Proceed Forms SCHEDULE H-1 Form of Limited Notice to Proceed SCHEDULE H-2 Form of Notice to Proceed ATTACHMENT I Form of Contractor’s Invoices SCHEDULE I-1 Form of Contractor’s Interim Invoice SCHEDULE I-2 Form of Contractor’s Final Invoice ATTACHMENT J HSE Plan Requirements Health, Safety and Environmental Policies ATTACHMENT K Form of Lien and Claim Waivers SCHEDULE K-1 Contractor’s Interim Conditional Lien Waiver and Release of Liens SCHEDULE K-2 Contractor’s Interim Unconditional Lien Claim Waiver SCHEDULE K-3 Subcontractor’s Interim Conditional Lien Waiver and Release of Liens SCHEDULE K-4 Subcontractor’s Subcontractor Interim Unconditional Lien Claim Waiver SCHEDULE K-5 Contractor’s Final Conditional Lien Waiver and Claim Waiver Release of Liens SCHEDULE K-6 Contractor’s Final Unconditional Lien and Claim Waiver SCHEDULE K-7 Subcontractor’s Final Conditional Lien Waiver and Claim Waiver Release of Liens SCHEDULE K-8 Subcontractor’s Final Unconditional Lien and Claim Waiver ATTACHMENT L Form of RFSU Mechanical Completion Certificate ATTACHMENT M Form of Substantial Completion Certificate ATTACHMENT N Form of Final Completion Certificate ATTACHMENT O Insurance Requirements ATTACHMENT P Contractor Permits ATTACHMENT Q Owner Permits ATTACHMENT R Form of Irrevocable, Irrevocable Standby Letters of Credit SCHEDULE R-1 Form of Contractor Letter of Credit SCHEDULE R-2 Form of Owner Letter of Credit ATTACHMENT S Performance Tests and Commissioning Tests ATTACHMENT T Performance GuaranteeGuarantees, Performance Liquidated Damages, *** and Minimum Acceptance Criteria, and Delay Liquidated Damages Criteria ATTACHMENT U Owner Provided Items and Responsibility Critical Path Method Schedule Requirements ATTACHMENT V Pre-Commissioning, Commissioning, Start-Up, Up and Training Program ATTACHMENT W Spare Parts SCHEDULE W-1 Form of Operating Spare Parts List SCHEDULE W-2 Capital Spare Parts List ATTACHMENT X Work in Existing Facility Reporting Requirements ATTACHMENT Y Site SCHEDULE Y-1 Description of the Site SCHEDULE Y-2 Site and Off-Site Rights of Way and Easements Surrounding Areas SCHEDULE Y-3 Parcel Map ATTACHMENT Z Landowner Access Parent Guarantees SCHEDULE Z-1 Form of Contractor’s Parent Guarantee SCHEDULE Z-2 Form of Owner’s Parent Guarantee ATTACHMENT AA Form of Acknowledgement Demolition Work and Consent Agreement with Lender Demolition Information ATTACHMENT BB Form of Owner Confirmations SCHEDULE BB-1 Form of Owner Monthly Confirmation SCHEDULE BB-2 Form of Owner Quarterly Confirmation Confidentiality Obligations for Siemens Confidential Information ATTACHMENT CC Independent Engineer Activities ATTACHMENT DD Form of Escrow Agreement ATTACHMENT EE Provisional Sums ATTACHMENT FF Form of Parent Guarantee SABINE PASS LNG LIQUEFACTION FACILITY Ground Water Specifications ENGINEERING, PROCUREMENT AND CONSTRUCTION AGREEMENT THIS ENGINEERING, PROCUREMENT AND CONSTRUCTION AGREEMENT (this “Agreement”), dated as of the 11th 6th Day of NovemberMay, 2011 2010 (the “Contract Effective Date”), is entered into by and between SABINE PASS LIQUEFACTIONMirant Xxxxx Landing, LLC, a Delaware limited liability company, having its principal place of business at 000 Xxxxx, Suite 800, Houston, Texas 77002 company (“Owner”), and XXXXXXX OIL, GAS AND CHEMICALS, INC.Kiewit Power Constructors Co., a Delaware corporation, having an address at 0000 Xxxx Xxx Xxxxxxxxx, Xxxxxxx, Xxxxx 00000 corporation (“Contractor” and, together with Owner, each a “Party” and together the “Parties”).

Appears in 2 contracts

Samples: Engineering, Procurement and Construction Agreement (Mirant Corp), Engineering, Procurement and Construction Agreement (Mirant Corp)

LIST OF ATTACHMENTS AND SCHEDULES. ATTACHMENT A Scope of Work and Basis of Design SCHEDULE A-1 Scope of Work SCHEDULE A-2 FEED Documents ATTACHMENT B Contractor Deliverables ATTACHMENT C Payment Schedule SCHEDULE C-1 Milestone Payment Schedule SCHEDULE C-2 Monthly Payment Schedule ATTACHMENT D Form of Change Order SCHEDULE D-1 Change Order Form SCHEDULE D-2 Unilateral Change Order Form SCHEDULE D-3 Contractor’s Change Order Request Form/Contractor’s Response to a Change Order Proposed by Owner SCHEDULE D-4 Unit Rates for Change Orders Performed on a Time and Material Basis SCHEDULE D-5 Existing & Stages 1 and 2 Liquefaction Facility Labor Unit Rates ATTACHMENT E Project Schedule ATTACHMENT F Key Personnel and Contractor’s Organization ATTACHMENT G Approved Subcontractors and Sub-subcontractors and List of Major Equipment ATTACHMENT H Form of Limited Notice to Proceed and Notice to Proceed SCHEDULE H-1 Form of Limited Notice to Proceed SCHEDULE H-2 Form of Notice to Proceed ATTACHMENT I Form of Contractor’s Invoices SCHEDULE I-1 Form of Contractor’s Interim Invoice SCHEDULE I-2 Form of Contractor’s Final Invoice ATTACHMENT J HSE Plan Requirements ATTACHMENT K Form of Lien and Claim Waivers SCHEDULE K-1 Contractor’s Interim Conditional Lien Waiver SCHEDULE K-2 Contractor’s Interim Unconditional Lien Waiver SCHEDULE K-3 Subcontractor’s Interim Conditional Lien Waiver SCHEDULE K-4 Subcontractor’s Interim Unconditional Lien Waiver SCHEDULE K-5 Contractor’s Final Conditional Lien and Claim Waiver SCHEDULE K-6 Contractor’s Final Unconditional Lien and Claim Waiver SCHEDULE K-7 Subcontractor’s Final Conditional Lien and Claim Waiver SCHEDULE K-8 Subcontractor’s Final Unconditional Lien and Claim Waiver ATTACHMENT L Form of RFSU Completion Certificate ATTACHMENT M Form of Substantial Completion Certificate ATTACHMENT N Form of Final Completion Certificate ATTACHMENT O Insurance SCHEDULE O-1 Insurance Requirements SCHEDULE O-2 Form of Umbrella Agreement ATTACHMENT P Contractor Permits ATTACHMENT Q Owner Permits ATTACHMENT R Form of Irrevocable, Standby Letter of Credit ATTACHMENT S Performance Tests and Commissioning Tests ATTACHMENT T Performance Guarantee, Performance Liquidated Damages, Minimum Acceptance Criteria, and Delay Liquidated Damages ATTACHMENT U Owner Provided Items and Responsibility ATTACHMENT V Pre-Commissioning, Commissioning, Start-Up, and Training ATTACHMENT W Spare Parts SCHEDULE W-1 Form of Operating Spare Parts List SCHEDULE W-2 Capital Spare Parts List ATTACHMENT X Work in Existing Facility, Stage 1 Liquefaction Facility and Stage 2 Liquefaction Facility ATTACHMENT Y Site and Off-Site Rights of Way and Easements ATTACHMENT Z Landowner Access ATTACHMENT AA Form of Acknowledgement and Consent Agreement with Lender ATTACHMENT BB Form of Owner Confirmations SCHEDULE BB-1 Form of Owner Monthly Confirmation SCHEDULE BB-2 Form of Owner Quarterly Confirmation ATTACHMENT CC Independent Engineer Activities ATTACHMENT DD Form of Escrow Agreement ATTACHMENT EE Provisional Sums ATTACHMENT FF Form of Parent Guarantee SABINE PASS LNG STAGE 3 LIQUEFACTION FACILITY ENGINEERING, PROCUREMENT AND CONSTRUCTION AGREEMENT THIS ENGINEERING, PROCUREMENT AND CONSTRUCTION AGREEMENT (this “Agreement”), dated as of the 11th 4th Day of NovemberMay, 2011 2015 (the “Contract Date”), is entered into by and between SABINE PASS LIQUEFACTION, LLC, a Delaware limited liability company, having its principal place of business at 000 700 Xxxxx, Suite 800Xxxxx 0000, HoustonXxxxxxx, Texas 77002 Xxxxx 00000 (“Owner”), and XXXXXXX OIL, GAS AND CHEMICALS, INC., a Delaware corporation, having an address at 0000 Xxxx Xxx Xxxxxxxxx, Xxxxxxx, Xxxxx 00000 (“Contractor” and, together with Owner, each a “Party” and together the “Parties”).

Appears in 2 contracts

Samples: Escrow Agreement (Cheniere Energy Partners, L.P.), Escrow Agreement (Cheniere Energy Partners, L.P.)

LIST OF ATTACHMENTS AND SCHEDULES. ATTACHMENT A Scope of Work and Basis of Design SCHEDULE A-1 Scope of Work SCHEDULE A-2 Basis of Design ATTACHMENT B Contractor Deliverables ATTACHMENT C Payment Schedule SCHEDULE C-1 Milestone Earned Value Contract Price Breakdown SCHEDULE C-2 Payment Milestones SCHEDULE C-3 Maximum Cumulative Payment Schedule SCHEDULE C-2 Monthly Payment Schedule C-4 Additional Work Options Pricing SCHEDULE C-5 Escalation Table ATTACHMENT D Form of Change Order SCHEDULE D-1 Change Order Form SCHEDULE D-2 Unilateral Change Order Directive Form SCHEDULE D-3 Owner’s Change Request Form SCHEDULE D-4 Contractor’s Change Order Request Form/Contractor’s Response to a Change Order Proposed by Owner Notice Form SCHEDULE D-4 Unit Rates D-5 Pricing for Change Orders Performed on a Time and Material Basis SCHEDULE D-5 Existing Facility Labor Unit Rates Change Directives ATTACHMENT E Project Schedule Key Dates and Delay Liquidated Damages SCHEDULE E-1 Key Dates SCHEDULE E-2 Delay Liquidated Damages ATTACHMENT F Key Personnel and Contractor’s Organization ATTACHMENT G Approved Subcontractors and Sub-subcontractors and List of Major Equipment ATTACHMENT H Form of Limited Notice to Proceed and Notice to Proceed Forms SCHEDULE H-1 Form of Limited Notice to Proceed SCHEDULE H-2 Form of Notice to Proceed SCHEDULE H-3 Not used ATTACHMENT I Form of Contractor’s Invoices SCHEDULE I-1 Form of Contractor’s Interim Invoice SCHEDULE I-2 Form of Contractor’s Final Invoice ATTACHMENT J HSE Plan Requirements Health, Safety and Environmental Policies ATTACHMENT K Form of Lien and Claim Waivers SCHEDULE K-1 Contractor’s Interim Conditional Lien Waiver and Release upon Progress Payment SCHEDULE K-2 Contractor’s Interim Unconditional Lien Conditional Claim Waiver upon Progress Payment SCHEDULE K-3 Subcontractor’s Interim Conditional Lien Waiver and Release upon Progress Payment SCHEDULE K-4 Subcontractor’s Interim Unconditional Lien Conditional Claim Waiver upon Progress Payment SCHEDULE K-5 Contractor’s Final Conditional Lien Waiver and Claim Waiver Release upon Final Payment SCHEDULE K-6 Contractor’s Final Unconditional Lien and Claim Waiver and Release upon Final Payment SCHEDULE K-7 Subcontractor’s Final Conditional Lien Waiver and Claim Waiver Release upon Final Payment SCHEDULE K-8 Subcontractor’s Final Unconditional Lien and Claim Waiver and Release upon Final Payment ATTACHMENT L Form of RFSU Completion Certificates SCHEDULE L-1 Form of Mechanical Completion Certificate ATTACHMENT M SCHEDULE L-2 Not Used SCHEDULE L-3 Form of RFSU Certificate SCHEDULE L-4 Not used SCHEDULE L-5 Form of Substantial Completion Certificate ATTACHMENT N SCHEDULE L-6 Form of Final Completion Certificate ATTACHMENT M Pre-Commissioning, Commissioning, Start-up, Training and Turnover Program ATTACHMENT N Not Used ATTACHMENT O Insurance Requirements ATTACHMENT P Contractor Permits ATTACHMENT Q Owner Permits ATTACHMENT R Form of Irrevocable, Standby Letter of Credit ATTACHMENT S Performance Tests and Commissioning Tests ATTACHMENT T Performance Guarantee, Performance Liquidated Damages, Minimum Acceptance Criteria, Performance Guarantees and Delay Performance Liquidated Damages ATTACHMENT U Owner Provided Items and Responsibility Form of Parent Guarantee ATTACHMENT V PreOwner-Commissioning, Commissioning, Start-Up, and Training Furnished Items ATTACHMENT W Spare Parts SCHEDULE W-1 Form of Operating Spare Parts List SCHEDULE W-2 Capital Spare Parts List ATTACHMENT X Work in Existing Facility Meeting and Reporting Requirements ATTACHMENT Y Site and Off-Site Rights of Way and Easements Quality Plan ATTACHMENT Z Landowner Access Site Plan ATTACHMENT AA Form of Acknowledgement and Consent Agreement with Lender Direct Agreements ATTACHMENT BB Form of Owner Confirmations SCHEDULE BB-1 Form of Owner Monthly Confirmation SCHEDULE BB-2 Form of Owner Quarterly Confirmation Rely Upon Information ATTACHMENT CC Independent Engineer Activities Not used ATTACHMENT DD Form List of Escrow Agreement Equipment and Texas Direct Pay Exemption Certificate ATTACHMENT EE Provisional Sums Not Used ATTACHMENT FF Form Relief for changes in U.S. Tariffs or Duties ATTACHMENT GG Not used ATTACHMENT HH List of Parent Guarantee SABINE PASS LNG LIQUEFACTION FACILITY Post-Substantial Completion Interfering Work ENGINEERING, PROCUREMENT AND CONSTRUCTION AGREEMENT THIS ENGINEERING, PROCUREMENT AND CONSTRUCTION AGREEMENT (this “Agreement”), dated as of the 11th 24th Day of NovemberMay, 2011 2019 (the “Contract Effective Date”), is entered into by and between SABINE PASS LIQUEFACTIONRio Grande LNG, LLC, LLC a Delaware limited liability company, having its principal place company organized under the laws of business at 000 Xxxxx, Suite 800, Houston, Texas 77002 (“Owner”), and XXXXXXX OILXxxxxxx Oil, GAS AND CHEMICALSGas and Chemicals, INC.Inc., a corporation organized under the laws of Delaware corporation, having an address at 0000 Xxxx Xxx Xxxxxxxxx, Xxxxxxx, Xxxxx 00000 (hereinafter referred to as “Contractor” and, together with Owner”), each sometimes referred to individually herein as a “Party” and together collectively as the “Parties.).

Appears in 1 contract

Samples: Epc Agreement (NextDecade Corp.)

LIST OF ATTACHMENTS AND SCHEDULES. ATTACHMENT A Scope of Work and Basis of Design for Stage 1 SCHEDULE A-1 Scope of Work SCHEDULE A-2 FEED Documents ATTACHMENT B Contractor Deliverables for Stage 1 ATTACHMENT C Payment Schedule for Stage 1 SCHEDULE C-1 Aggregate Labor and Skills Price Milestone Payment Schedule SCHEDULE C-2 Aggregate Labor and Skills Price Monthly Payment Schedule SCHEDULE C-3 Aggregate Equipment Price Milestone Payment Schedule SCHEDULE C-4 Estimated Monthly Payments for Stage 1 Liquefaction Facility ATTACHMENT D Form of Change Order SCHEDULE D-1 for Xxxxx 0 XXXXXXXX X-0 Change Order Form for Stage 1 SCHEDULE D-2 Unilateral Change Order Form SCHEDULE D-3 for Xxxxx 0 XXXXXXXX X-0 Contractor’s Change Order Request FormForm for Stage 1/Contractor’s Response to a Change Order Proposed by Owner for Stage 1 SCHEDULE D-4 Unit Rates for Change Orders Performed on a Time and Material Basis SCHEDULE D-5 Existing Facility Labor Unit Rates ATTACHMENT E Project Schedule for Stage 1 ATTACHMENT F Key Personnel and Contractor’s Organization for Stage 1 ATTACHMENT G Major Subcontracts, Major Sub-subcontracts, Bulk Subcontracts, Major Equipment, Approved Subcontractors and Sub-subcontractors and List of Major Equipment for Stage 1 ATTACHMENT H Form of Limited Notice to Proceed and Notice to Proceed for Stage 1 SCHEDULE H-1 Form of Limited Notice to Proceed for Stage 1 SCHEDULE H-2 Form of Notice to Proceed for Stage 1 ATTACHMENT I Form of Contractor’s Invoices for Stage 1 SCHEDULE I-1 Form of Contractor’s Interim Invoice SCHEDULE I-2 Form of Contractor’s Final Invoice ATTACHMENT J HSE Plan Requirements for Stage 1 ATTACHMENT K Form of Lien and Claim Waivers for Stage 1 SCHEDULE K-1 Contractor’s Interim Conditional Lien Waiver for Stage 1 SCHEDULE K-2 Contractor’s Interim Unconditional Lien Waiver for Stage 1 SCHEDULE K-3 Subcontractor’s Interim Conditional Lien Waiver for Stage 1 SCHEDULE K-4 Subcontractor’s Interim Unconditional Lien Waiver for Stage 1 SCHEDULE K-5 Contractor’s Final Conditional Lien and Claim Waiver for Stage 1 EXHIBIT K-5-1 Contractor’s Final Conditional Lien Waiver for Stage 1 EXHIBIT K-5-2 Contractor’s Final Conditional Claim Waiver for Stage 1 SCHEDULE K-6 Contractor’s Final Unconditional Lien and Claim Waiver for Stage 1 EXHIBIT K-6-1 Contractor’s Final Unconditional Lien Waiver for Stage 1 EXHIBIT K-6-2 Contractor’s Final Unconditional Claim Waiver for Stage 1 SCHEDULE K-7 Subcontractor’s Final Conditional Lien and Claim Waiver for Stage 1 EXHIBIT K-7-1 Subcontractor’s Final Conditional Lien Waiver for Stage 1 EXHIBIT K-7-2 Subcontractor’s Final Conditional Claim Waiver for Stage 1 SCHEDULE K-8 Subcontractor’s Final Unconditional Lien and Claim Waiver for Stage 1 EXHIBIT K-8-1 Subcontractor’s Final Unconditional Lien Waiver for Stage 1 EXHIBIT K-8-2 Subcontractor’s Final Unconditional Claim Waiver for Stage 1 ATTACHMENT L Form of RFSU Completion Certificate for Stage 1 ATTACHMENT M Form of Substantial Completion Certificate for Stage 1 ATTACHMENT N Form of Final Completion Certificate for Stage 1 ATTACHMENT O Insurance Requirements for Stage 1 ATTACHMENT P Contractor Permits for Stage 1 ATTACHMENT Q Owner Permits for Stage 1 ATTACHMENT R Stage 1 Form of Irrevocable, Standby Letter of Credit ATTACHMENT S Stage 1 Performance Tests and Commissioning Tests ATTACHMENT T Stage 1 Performance Guarantee, Performance Liquidated Damages, Minimum Acceptance Criteria, and Delay Liquidated Damages ATTACHMENT U Owner Provided Items and Responsibility for Stage 1 ATTACHMENT V Pre-Commissioning, Commissioning, Start-Up, and Training for Stage 1 ATTACHMENT W Spare Parts for Stage 1 SCHEDULE W-1 Form of Operating Spare Parts List for Stage 1 SCHEDULE W-2 Capital Spare Parts List ATTACHMENT X Work in Existing Facility Subproject 1 after Substantial Completion of Subproject 1 ATTACHMENT Y Site, Stage 1 Site, Stage 2 Site and Off-Site Rights of Way and Easements ATTACHMENT Z Landowner Access ATTACHMENT AA for Xxxxx 0 XXXXXXXXXX XX Form of Acknowledgement and Consent Agreement with Lender ATTACHMENT BB for Xxxxx 0 XXXXXXXXXX XX Form of Owner Confirmations for Stage 1 SCHEDULE BB-1 Form of Owner Monthly Confirmation SCHEDULE BB-2 Form of Owner Quarterly Confirmation ATTACHMENT CC Independent Engineer Activities for Stage 1 ATTACHMENT DD Form of Escrow Agreement for Stage 1 ATTACHMENT EE Provisional Sums for Stage 1 ATTACHMENT FF Form of Parent Guarantee SABINE PASS LNG for Xxxxx 0 XXXXXX XXXXXXX XXXXX 0 LIQUEFACTION FACILITY ENGINEERING, PROCUREMENT AND CONSTRUCTION AGREEMENT THIS ENGINEERING, PROCUREMENT AND CONSTRUCTION AGREEMENT (this “Agreement”), dated as of the 11th 6th Day of NovemberDecember, 2011 2013 (the “Contract Date”), is entered into by and between SABINE PASS CORPUS CHRISTI LIQUEFACTION, LLC, a Delaware limited liability company, having its principal place of business at 000 Xxxxx, Suite 800, Houston, Texas 77002 (“Owner”), and XXXXXXX OIL, GAS AND CHEMICALS, INC., a Delaware corporation, having an address at 0000 Xxxx Xxx Xxxxxxxxx, Xxxxxxx, Xxxxx 00000 (“Contractor” and, together with Owner, each a “Party” and together the “Parties”).

Appears in 1 contract

Samples: Engineering, Procurement and Construction Agreement (Cheniere Energy Inc)

LIST OF ATTACHMENTS AND SCHEDULES. ATTACHMENT A Scope of Work and Basis of Design Contract Documents ATTACHMENT B Contractor Deliverables Key Personnel ATTACHMENT C Payment Schedule SCHEDULE C-1 Milestone Payment Schedule SCHEDULE C-2 Monthly Payment Schedule Form of Notice to Proceed ATTACHMENT D SCHEDULE D-1 SCHEDULE D-2 SCHEDULE D-3 Form of Change Order SCHEDULE D-1 Change Order Form SCHEDULE D-2 Unilateral Change Order Form SCHEDULE D-3 Contractor’s Change Order Request Form/Contractor’s Response to a Change Order Proposed by Owner SCHEDULE D-4 Unit Rates Pricing for Change Orders Performed on a Time and Material Basis SCHEDULE D-5 Existing Facility Labor Unit Rates ATTACHMENT E Project Schedule ATTACHMENT F Key Personnel and Insurance Requirements ATTACHMENT G Form of Contractor’s Organization ATTACHMENT G Approved Subcontractors and Sub-subcontractors and List of Major Equipment Invoice ATTACHMENT H Form of Limited Notice to Proceed and Notice to Proceed SCHEDULE H-1 Form of Limited Notice to Proceed SCHEDULE H-2 Form of Notice to Proceed Payment and Performance Bonds Form of Payment Bond Form of Performance Bond ATTACHMENT I Form of Contractor’s Invoices SCHEDULE I-1 Form of Contractor’s Interim Invoice SCHEDULE I-2 Form of Contractor’s Final Invoice ATTACHMENT J HSE Plan Requirements ATTACHMENT K SCHEDULE I-3 SCHEDULE I-4 Form of Lien and Claim Waivers SCHEDULE K-1 Contractor’s Interim Conditional Lien Waiver SCHEDULE K-2 Contractor’s Interim Unconditional Lien Waiver SCHEDULE K-3 Subcontractor’s Interim Conditional Lien Waiver SCHEDULE K-4 Subcontractor’s Interim Unconditional Lien Waiver SCHEDULE K-5 Contractor’s Final Conditional Lien and Claim Waiver SCHEDULE K-6 ContractorSubcontractor’s Final Unconditional Interim Lien and Claim Waiver SCHEDULE K-7 SubcontractorContractor’s Final Conditional Lien and Claim Waiver SCHEDULE K-8 Subcontractor’s Final Unconditional Lien and Claim Waiver ATTACHMENT J Pricing Schedule ATTACHMENT K Project Scope of Work ATTACHMENT L Form of RFSU Completion Certificate Approved Subcontractors ATTACHMENT M Form of Substantial Completion Certificate Contractor Assumptions and Clarifications ATTACHMENT N Form of Final Completion Certificate ATTACHMENT O Insurance Requirements ATTACHMENT P Contractor Permits ATTACHMENT Q Owner Permits ATTACHMENT R Form of Irrevocable, Standby Letter of Credit ATTACHMENT S Performance Tests and Commissioning Tests ATTACHMENT T Performance Guarantee, Performance Liquidated Damages, Minimum Acceptance Criteria, and Delay Liquidated Damages ATTACHMENT U Owner Provided Items and Responsibility ATTACHMENT V Pre-Commissioning, Commissioning, Start-Up, and Training ATTACHMENT W Spare Parts SCHEDULE W-1 Form of Operating Spare Parts List SCHEDULE W-2 Capital Spare Parts List ATTACHMENT X Work in Existing Facility ATTACHMENT Y Site and Off-Site Rights of Way and Easements ATTACHMENT Z Landowner Access ATTACHMENT AA Form of Acknowledgement and Consent Guaranty Agreement with Lender ATTACHMENT BB Form of Owner Confirmations SCHEDULE BB-1 Form of Owner Monthly Confirmation SCHEDULE BB-2 Form of Owner Quarterly Confirmation ATTACHMENT CC Independent Engineer Activities ATTACHMENT DD Form of Escrow Agreement ATTACHMENT EE Provisional Sums ATTACHMENT FF Form of Parent Guarantee SABINE PASS LNG LIQUEFACTION FACILITY ENGINEERING, PROCUREMENT AND CONSTRUCTION AGREEMENT THIS ENGINEERING, PROCUREMENT AND CONSTRUCTION AGREEMENT (this “Agreement”), dated as of the 11th 5th Day of NovemberJanuary, 2011 2007 (the “Contract Effective Date”), is entered into by and between SABINE PASS LIQUEFACTIONCheniere Creole Trail Pipeline, LLCL.P., a limited partnership organized under the laws of the State of Delaware limited liability company, having its principal place of business at 000 Xxxxx, Suite 800, Houston, Texas 77002 (“Owner”), and XXXXXXX OILSunland Construction, GAS AND CHEMICALS, INC.Inc., a Delaware corporation, having an address at 0000 Xxxx Xxx Xxxxxxxxx, Xxxxxxx, Xxxxx 00000 company organized under the laws of the State of Louisiana (“Contractor” and, together with Owner, each a “Party” and together the “Parties”).

Appears in 1 contract

Samples: Construction Agreement (Cheniere Energy Inc)

LIST OF ATTACHMENTS AND SCHEDULES. ATTACHMENT A Scope of Work and Basis of Design ATTACHMENT B Contractor Deliverables Key Personnel and Contractor’s Organization ATTACHMENT C Payment Schedule Notice to Proceed Forms SCHEDULE C-1 Milestone Payment Schedule Form of Limited Notice to Proceed SCHEDULE C-2 Monthly Payment Schedule Form of Notice to Proceed ATTACHMENT D Form of Change Order SCHEDULE D-1 Change Order Form SCHEDULE D-2 Unilateral Change Order Form SCHEDULE D-3 Contractor’s Change Order Request Form/Contractor’s Response to a Change Order Proposed by Owner Form SCHEDULE D-4 Unit Rates Pricing for Change Orders Performed on a Time and Material Basis SCHEDULE D-5 Existing Facility Labor Unit Rates ATTACHMENT E Project Schedule ATTACHMENT F Key Personnel and Contractor’s Organization Insurance Requirements ATTACHMENT G Approved Subcontractors and Sub-subcontractors and List of Major Equipment ATTACHMENT H Form of Limited Notice to Proceed and Notice to Proceed SCHEDULE H-1 Form of Limited Notice to Proceed SCHEDULE H-2 Form of Notice to Proceed ATTACHMENT I Form of Contractor’s Invoices Invoice SCHEDULE I-1 G-1 Form of Contractor’s Interim Invoice SCHEDULE I-2 G-2 Form of Contractor’s Final Invoice ATTACHMENT J HSE Plan Requirements H Owner’s Safety and Environmental Policies and Procedures ATTACHMENT K I Form of Lien and Claim Waivers SCHEDULE K-1 I-1 Contractor’s Interim Conditional Lien Waiver and Release on Progress Payment SCHEDULE K-2 I-2 Contractor’s Interim Unconditional Lien Conditional Claim Waiver and Release on Progress Payment SCHEDULE K-3 I-3 Subcontractor’s Interim Conditional Lien Waiver and Release on Progress Payment SCHEDULE K-4 I-4 Subcontractor’s Interim Unconditional Lien Conditional Claim Waiver and Release on Progress Payment SCHEDULE K-5 I-5 Contractor’s Conditional Waiver and Release on Final Payment SCHEDULE I-6 Contractor’s Conditional Lien and Claim Waiver and Release on Final Payment SCHEDULE K-6 ContractorI-7 Subcontractor’s Conditional Waiver and Release on Final Unconditional Lien and Payment SCHEDULE I-8 Subcontractor’s Conditional Claim Waiver and Release on Final Payment ATTACHMENT J Payment and Allowable Costs SCHEDULE K-7 Subcontractor’s Final Conditional Lien and Claim Waiver J-1 Compensation SCHEDULE K-8 Subcontractor’s Final Unconditional Lien and Claim Waiver J-2 Schedule of Hourly Rates SCHEDULE J-3 Assignment Policy SCHEDULE J-4 Business Travel Policy SCHEDULE J-5 Incentive Plan ATTACHMENT K [Not Used] ATTACHMENT L Site ATTACHMENT M [Not Used] ATTACHMENT N Owner Provided Equipment ATTACHMENT O Meeting and Reporting Requirements ATTACHMENT P Approved List ATTACHMENT Q Owner Permits ATTACHMENT R Completion Certificates SCHEDULE R-1 Form of RFSU Mechanical Completion Certificate ATTACHMENT M Form of Substantial Completion Certificate ATTACHMENT N SCHEDULE R-2 Form of Final Completion Certificate ATTACHMENT O Insurance Requirements ATTACHMENT P Contractor Permits ATTACHMENT Q Owner Permits ATTACHMENT R Form of Irrevocable, Standby Letter of Credit ATTACHMENT S Performance Tests and Commissioning Tests [Not Used] ATTACHMENT T Performance Guarantee, Performance Liquidated Damages, Minimum Acceptance Criteria, and Delay Liquidated Damages ATTACHMENT U Owner Provided Items and Responsibility ATTACHMENT V Pre-Commissioning, Commissioning, Start-Up, and Training ATTACHMENT W Spare Parts SCHEDULE W-1 Form of Operating Spare Parts Equipment List SCHEDULE W-2 Capital Spare Parts List ATTACHMENT X Work in Existing Facility ATTACHMENT Y Site and Off-Site Rights of Way and Easements ATTACHMENT Z Landowner Access ATTACHMENT AA Form of Acknowledgement and Consent Agreement with Lender ATTACHMENT BB Form of Owner Confirmations SCHEDULE BB-1 Form of Owner Monthly Confirmation SCHEDULE BB-2 Form of Owner Quarterly Confirmation ATTACHMENT CC Independent Engineer Activities ATTACHMENT DD Form of Escrow Agreement ATTACHMENT EE Provisional Sums ATTACHMENT FF Form of Parent Guarantee SABINE PASS LNG LIQUEFACTION FACILITY ENGINEERING, PROCUREMENT AND CONSTRUCTION AGREEMENT THIS ENGINEERING, PROCUREMENT AND CONSTRUCTION AGREEMENT (this “Agreement”), dated as of the 11th 10th Day of November, 2011 2016 (the “Contract Agreement Date”), is entered into by and between SABINE PASS LIQUEFACTIONCheniere Corpus Christi Pipeline, LLCL.P., a limited partnership organized under the laws of the State of Delaware limited liability company, having its principal place of business at 000 Xxxxx, Suite 800, Houston, Texas 77002 (“Owner”), and XXXXXXX OILAssociated Pipe Line Contractors, GAS AND CHEMICALS, INC.Inc., a Corporation organized under the laws of the State of Delaware corporation, having an address at 0000 Xxxx Xxx Xxxxxxxxx, Xxxxxxx, Xxxxx 00000 (“Contractor” and, together with Owner, each a “Party” and together the “Parties”).

Appears in 1 contract

Samples: Construction Agreement (Cheniere Corpus Christi Holdings, LLC)

LIST OF ATTACHMENTS AND SCHEDULES. ATTACHMENT A Scope of Work and Basis of Design Contract Documents ATTACHMENT B Contractor Deliverables Key Personnel ATTACHMENT C Payment Schedule SCHEDULE C-1 Milestone Payment Schedule SCHEDULE C-2 Monthly Payment Schedule Form of Notice to Proceed ATTACHMENT D Form of Change Order SCHEDULE D-1 Change Order Form SCHEDULE D-2 Unilateral Change Order Form SCHEDULE D-3 Contractor’s Change Order Request Form/Contractor’s Response to a Change Order Proposed by Owner SCHEDULE D-4 Unit Rates Pricing for Change Orders Performed on a Time and Material Basis SCHEDULE D-5 Existing Facility Labor Unit Rates ATTACHMENT E Project Schedule ATTACHMENT F Key Personnel and Insurance Requirements ATTACHMENT G Form of Contractor’s Organization ATTACHMENT G Approved Subcontractors and Sub-subcontractors and List of Major Equipment Invoice ATTACHMENT H Form of Limited Notice to Proceed Payment and Notice to Proceed Performance Bonds SCHEDULE H-1 Form of Limited Notice to Proceed Payment Bond SCHEDULE H-2 Form of Notice to Proceed Performance Bond ATTACHMENT I Form of Contractor’s Invoices SCHEDULE I-1 Form of Contractor’s Interim Invoice SCHEDULE I-2 Form of Contractor’s Final Invoice ATTACHMENT J HSE Plan Requirements ATTACHMENT K Form of Lien and Claim Waivers SCHEDULE K-1 I-1 Contractor’s Interim Conditional Lien Waiver SCHEDULE K-2 Contractor’s Interim Unconditional Lien Waiver SCHEDULE K-3 Subcontractor’s Interim Conditional Lien Waiver SCHEDULE K-4 Subcontractor’s Interim Unconditional Lien Waiver SCHEDULE K-5 Contractor’s Final Conditional Lien and Claim Waiver SCHEDULE K-6 ContractorI-2 Subcontractor’s Final Unconditional Interim Lien and Claim Waiver SCHEDULE K-7 SubcontractorI-3 Contractor’s Final Conditional Lien and Claim Waiver SCHEDULE K-8 I-4 Subcontractor’s Final Unconditional Lien and Claim Waiver ATTACHMENT J Pricing Schedule ATTACHMENT K Project Scope of Work ATTACHMENT L Form of RFSU Completion Certificate Approved Subcontractors ATTACHMENT M Form of Substantial Completion Certificate Contractor Assumptions and Clarifications ATTACHMENT N Form of Final Completion Certificate ATTACHMENT O Insurance Requirements ATTACHMENT P Contractor Permits ATTACHMENT Q Owner Permits ATTACHMENT R Form of Irrevocable, Standby Letter of Credit ATTACHMENT S Performance Tests Amended and Commissioning Tests ATTACHMENT T Performance Guarantee, Performance Liquidated Damages, Minimum Acceptance Criteria, and Delay Liquidated Damages ATTACHMENT U Owner Provided Items and Responsibility ATTACHMENT V Pre-Commissioning, Commissioning, Start-Up, and Training ATTACHMENT W Spare Parts SCHEDULE W-1 Form of Operating Spare Parts List SCHEDULE W-2 Capital Spare Parts List ATTACHMENT X Work in Existing Facility ATTACHMENT Y Site and Off-Site Rights of Way and Easements ATTACHMENT Z Landowner Access ATTACHMENT AA Form of Acknowledgement and Consent Restated Guaranty Agreement with Lender ATTACHMENT BB Form of Owner Confirmations SCHEDULE BB-1 Form of Owner Monthly Confirmation SCHEDULE BB-2 Form of Owner Quarterly Confirmation ATTACHMENT CC Independent Engineer Activities ATTACHMENT DD Form of Escrow Agreement ATTACHMENT EE Provisional Sums ATTACHMENT FF Form of Parent Guarantee SABINE PASS LNG LIQUEFACTION FACILITY ENGINEERING, PROCUREMENT AND CONSTRUCTION AGREEMENT THIS ENGINEERING, PROCUREMENT AND CONSTRUCTION AGREEMENT (this “Agreement”), dated as of the 11th 12th Day of NovemberMarch, 2011 2007 (the “Contract Effective Date”), is entered into by and between SABINE PASS LIQUEFACTIONCheniere Creole Trail Pipeline, LLCL.P., a limited partnership organized under the laws of the State of Delaware limited liability company, having its principal place of business at 000 Xxxxx, Suite 800, Houston, Texas 77002 (“Owner”), and XXXXXXX OILSunland Construction, GAS AND CHEMICALS, INC.Inc., a Delaware corporation, having an address at 0000 Xxxx Xxx Xxxxxxxxx, Xxxxxxx, Xxxxx 00000 company organized under the laws of the State of Louisiana (“Contractor” and, together with Owner, each a “Party” and together the “Parties”).

Appears in 1 contract

Samples: Construction Agreement (Cheniere Energy Inc)

LIST OF ATTACHMENTS AND SCHEDULES. ATTACHMENT A Scope of Work and Basis of Design SCHEDULE A-1 Scope of Work SCHEDULE A-2 Basis of Design ATTACHMENT B Contractor Deliverables ATTACHMENT C Payment Schedule SCHEDULE C-1 Milestone Aggregate Labor and Skills Price Payment Milestones SCHEDULE C-2 Aggregate Labor and Skills Price Monthly Payment Schedule SCHEDULE C-2 C-3 Aggregate Equipment Price Payment Milestones SCHEDULE C-4 Estimated Monthly Payment Schedule Payments for the Project ATTACHMENT D Form of Change Order SCHEDULE D-1 Change Order Form SCHEDULE D-2 Unilateral Change Order Form SCHEDULE D-3 Contractor’s Change Order Request Form/Contractor’s Response to a Change Order Proposed by Owner Forms SCHEDULE D-4 Unit Rates for Change Orders Performed on a Time and Material Basis SCHEDULE D-5 Existing Facility Labor Unit Rates Rate Sheet ATTACHMENT E Project Schedule Delay Liquidated Damages ATTACHMENT F Key Personnel and Contractor’s Organization ATTACHMENT G Approved Major Subcontractors and Sub-subcontractors and List of Major Equipment ATTACHMENT H Form of Limited Notice to Proceed and Forms SCHEDULE H-1 Form of Notice to Proceed SCHEDULE H-1 H-2 Form of Limited Notice to Proceed SCHEDULE H-2 H-3 Form of Limited Notice to Proceed No. 1 ATTACHMENT I Form of Contractor’s Invoices SCHEDULE I-1 Form of Contractor’s Interim Invoice SCHEDULE I-2 Form of Contractor’s Final Invoice SCHEDULE I-3 Form of contractor LNTP Invoice ATTACHMENT J HSE Plan Requirements for Stage 3 ATTACHMENT K Form of Lien and Claim Waivers SCHEDULE K-1 Contractor’s Interim Conditional Lien Waiver and Release upon Progress Payment SCHEDULE K-2 Contractor’s Interim Unconditional Lien Waiver and Release upon Progress Payment SCHEDULE K-3 Major Subcontractor’s Interim Conditional Lien Waiver and Release upon Progress Payment SCHEDULE K-4 Major Subcontractor’s Interim Unconditional Lien Waiver and Release upon Progress Payment SCHEDULE K-5 Major Sub-subcontractor’s Interim Conditional Lien Waiver and Release upon Progress Payment SCHEDULE K-6 Major Sub-subcontractor’s Interim Unconditional Lien Waiver and Release upon Progress Payment SCHEDULE K-7 Contractor’s Final Conditional Lien Waiver and Claim Waiver Release upon Final Payment SCHEDULE K-6 K-8 Contractor’s Final Unconditional Lien Waiver and Release upon Final Payment SCHEDULE K-9 Contractor’s Final Claim Waiver and Release upon Final Payment SCHEDULE K-7 K-10 Major Subcontractor’s Final Conditional Lien Waiver and Claim Waiver Release upon Final Payment SCHEDULE K-8 K-11 Major Subcontractor’s Final Unconditional Lien Waiver and Release upon Final Payment SCHEDULE K-12 Major Subcontractor’s Final Claim Waiver and Release upon Final Payment SCHEDULE K-13 Major Sub-subcontractor’s Final Conditional Lien Waiver and Release upon Final Payment SCHEDULE K-14 Major Sub-subcontractor’s Final Unconditional Lien Waiver and Release upon Final Payment SCHEDULE K-15 Major Sub-subcontractor’s Final Claim Waiver and Release upon Final Payment ATTACHMENT L Form of Completion Certificates SCHEDULE L-1 Form of RFFGI Certificate SCHEDULE L-2 Form of RFSU Completion Certificate ATTACHMENT M SCHEDULE L-3 Form of Substantial Completion Certificate ATTACHMENT N SCHEDULE L-4 Form of Final Completion Certificate ATTACHMENT M Pre-Commissioning, Commissioning, Start-up, Training and Turnover Program ATTACHMENT N Not used ATTACHMENT O Insurance Requirements ATTACHMENT P Contractor Permits ATTACHMENT Q Owner Permits ATTACHMENT R Form of Irrevocable, Standby Letter of Credit ATTACHMENT S Performance Tests and Commissioning Tests ATTACHMENT T Performance Guarantee, Performance Liquidated Damages, Minimum Acceptance Criteria, Performance Guarantees and Delay Performance Liquidated Damages ATTACHMENT U Owner Provided Items Form of Parent Guarantee SCHEDULE U-1 Guarantor Form of Acknowledgment and Responsibility Consent Agreement with Lender for Stage 3 ATTACHMENT V PreOwner-Commissioning, Commissioning, Start-Up, and Training Furnished Items ATTACHMENT W Spare Parts SCHEDULE W-1 Form of Operating Spare Parts List SCHEDULE W-2 Capital Spare Parts List ATTACHMENT X Work in Existing Facility Meeting and Reporting Requirements ATTACHMENT Y Site and Off-Site Rights of Way and Easements Quality Plan ATTACHMENT Z Landowner Access Real Estate Matters ATTACHMENT AA Form of Acknowledgement Acknowledgment and Consent Agreement with Lender ATTACHMENT BB Form of Owner Confirmations SCHEDULE BB-1 Form of Owner Monthly Confirmation SCHEDULE BB-2 Form of Owner Quarterly Confirmation for Xxxxx 0 XXXXXXXXXX XX Rely Upon Information ATTACHMENT CC Independent Engineer List of Equipment ATTACHMENT DD Owner’s Texas Direct Pay Exemption Certificate ATTACHMENT EE Scheduled Activities ATTACHMENT DD Form of Escrow Agreement FF Not used ATTACHMENT EE GG Provisional Sums ATTACHMENT FF HH Form of Parent Guarantee SABINE PASS LNG LIQUEFACTION FACILITY Novation Agreement ATTACHMENT II BASF Sublicense Agreement ATTACHMENT JJ Chart Assignment Agreement ATTACHMENT KK Contractor’s COVID-19 Countermeasures, Means, and Methods and Provisional Sum ATTACHMENT LL FTZ Agreement ATTACHMENT MM Commodity Price Rise and Fall ATTACHMENT NN Scoping Adjustment ENGINEERING, PROCUREMENT AND CONSTRUCTION AGREEMENT THIS ENGINEERING, PROCUREMENT AND CONSTRUCTION AGREEMENT (this “Agreement”), dated as of the 11th 1st Day of NovemberMarch, 2011 2022 (the “Contract Agreement Date”), is entered into by and between SABINE PASS LIQUEFACTIONCorpus Christi Liquefaction Stage III, LLC, a Delaware limited liability company, company organized under the laws of the State of Delaware having its principal place of business at 000 Xxxxx700 Milam, Suite 800Xxxxx 0000, Houston, Texas 77002 Xxxxxxx Xxxxx 00000 (“Owner”), and XXXXXXX OIL, GAS AND CHEMICALS, INC.Xxxxxxx Energy Inc., a Delaware corporation, corporation having an address at 0000 Xxxx Xxx Xxxxxxxxx, Xxxxxxx, Xxxxx 00000 (“Contractor” and, together with Owner, each ”). Each of Owner and Contractor are a “Party” and together the “Parties.).

Appears in 1 contract

Samples: Engineering, Procurement and Construction Agreement (Cheniere Energy, Inc.)

AutoNDA by SimpleDocs

LIST OF ATTACHMENTS AND SCHEDULES. ATTACHMENT A Scope of Work and Basis of Design SCHEDULE A-1 Scope of Subproject 6 SCHEDULE A-2 FEED Documents ATTACHMENT B Contractor Deliverables ATTACHMENT C Payment Schedule SCHEDULE C-1 Milestone Payment Schedule SCHEDULE C-2 Monthly Payment Schedule ATTACHMENT D Form of Change Order SCHEDULE D-1 Change Order Form SCHEDULE D-2 Unilateral Change Order Form SCHEDULE D-3 Contractor’s Change Order Request Form/Contractor’s Response to a Change Order Proposed by Owner SCHEDULE D-4 Unit Rates for Change Orders Performed on a Time and Material Basis SCHEDULE D-5 Existing & Stage 1, 2 and 3 Liquefaction Facility Labor Unit Rates ATTACHMENT E Project Schedule ATTACHMENT F Key Personnel and Contractor’s Organization ATTACHMENT G Approved Subcontractors and Sub-subcontractors and List of Major Equipment ATTACHMENT H Form of Limited Notice Notices to Proceed and Notice Notices to Proceed Proceeds SCHEDULE H-1 Form of Limited Notice to Proceed SCHEDULE H-2 Form of Notice to Proceed for Subproject 6(a) SCHEDULE H-3 Form of Notice to Proceed for Subproject 6(b) SCHEDULE H-4 Form of Limited Notice to Proceed No. 1 SCHEDULE H-5 Form of Limited Notice to Proceed No. 2 SCHEDULE H-6 Form of Limited Notice to Proceed No. 3 ATTACHMENT I Form of Contractor’s Invoices SCHEDULE I-1 Form of Contractor’s Interim Invoice SCHEDULE I-2 Form of Contractor’s Final Invoice ATTACHMENT J HSE Plan Requirements ATTACHMENT K Form of Lien and Claim Waivers SCHEDULE K-1 Contractor’s Interim Conditional Lien Waiver SCHEDULE K-2 Contractor’s Interim Unconditional Lien Waiver SCHEDULE K-3 Subcontractor’s Interim Conditional Lien Waiver SCHEDULE K-4 Subcontractor’s Interim Unconditional Lien Waiver SCHEDULE K-5 Contractor’s Final Conditional Lien and Claim Waiver SCHEDULE K-6 Contractor’s Final Unconditional Lien and Claim Waiver SCHEDULE K-7 Subcontractor’s Final Conditional Lien and Claim Waiver SCHEDULE K-8 Subcontractor’s Final Unconditional Lien and Claim Waiver ATTACHMENT L Form of RFSU Completion Certificate [Intentionally Not Used] ATTACHMENT M Form of Substantial Completion Certificate SCHEDULE M-1 Form of Substantial Completion Certificate for Subproject 6(a) SCHEDULE M-2 Form of Substantial Completion Certificate for Subproject 6(b) ATTACHMENT N Form of Final Completion Certificate ATTACHMENT O Insurance SCHEDULE O-1 Insurance Requirements SCHEDULE O-2 Form of Umbrella Agreement ATTACHMENT P Contractor Permits ATTACHMENT Q Owner Permits ATTACHMENT R Form of Irrevocable, Standby Letter of Credit SCHEDULE R-1 Form of Irrevocable, Standby Letter of Credit for Subproject 6(a) SCHEDULE R-2 Form of Irrevocable, Standby Letter of Credit for Subproject 6(b) ATTACHMENT S Performance Tests and Commissioning Tests ATTACHMENT T Performance Guarantee, Performance Liquidated Damages, Minimum Acceptance Criteria, and Delay Liquidated Damages ATTACHMENT U Owner Provided Items and Responsibility ATTACHMENT V Pre-Commissioning, Commissioning, Start-Up, and Training ATTACHMENT W Spare Parts SCHEDULE W-1 Form of Operating Spare Parts List SCHEDULE W-2 Capital Spare Parts List ATTACHMENT X Work in Existing Facility, Stage 1 Liquefaction Facility, Stage 2 Liquefaction Facility, and Stage 3 Liquefaction Facility ATTACHMENT Y Site and Off-Site Rights of Way and Easements ATTACHMENT Z Landowner Access ATTACHMENT AA Form of Acknowledgement and Consent Agreement with Lender ATTACHMENT BB Form of Owner Confirmations SCHEDULE BB-1 Form of Owner Monthly Confirmation SCHEDULE BB-2 Form of Owner Quarterly Confirmation ATTACHMENT CC Independent Engineer Activities ATTACHMENT DD Form of Escrow Agreement ATTACHMENT EE Provisional Sums ATTACHMENT FF Form of Parent Guarantee SABINE PASS LNG STAGE 4 LIQUEFACTION FACILITY ENGINEERING, PROCUREMENT AND CONSTRUCTION AGREEMENT THIS ENGINEERING, PROCUREMENT AND CONSTRUCTION AGREEMENT (this “Agreement”), dated as of the 11th 7th Day of November, 2011 2018 (the “Contract Date”), is entered into by and between SABINE PASS LIQUEFACTION, LLC, a Delaware limited liability company, having its principal place of business at 000 700 Xxxxx, Suite 800Xxxxx 0000, HoustonXxxxxxx, Texas 77002 Xxxxx 00000 (“Owner”), and XXXXXXX OIL, GAS AND CHEMICALS, INC., a Delaware corporation, having an address at 0000 Xxxx Xxx Xxxxxxxxx, Xxxxxxx, Xxxxx 00000 (“Contractor” and, together with Owner, each a “Party” and together the “Parties”).

Appears in 1 contract

Samples: Escrow Agreement (Sabine Pass Liquefaction, LLC)

LIST OF ATTACHMENTS AND SCHEDULES. ATTACHMENT A Scope of Work and Basis of Design for Stage 2 SCHEDULE A-1 Scope of Work SCHEDULE A-2 FEED Documents ATTACHMENT B Contractor Deliverables for Stage 2 ATTACHMENT C Payment Schedule for Stage 2 SCHEDULE C-1 Aggregate Labor and Skills Price Milestone Payment Schedule SCHEDULE C-2 Aggregate Labor and Skills Price Monthly Payment Schedule SCHEDULE C-3 Aggregate Equipment Price Milestone Payment Schedule SCHEDULE C-4 Estimated Monthly Payments for Stage 2 Liquefaction Facility ATTACHMENT D Form of Change Order SCHEDULE D-1 for Xxxxx 0 XXXXXXXX X-0 Change Order Form for Stage 2 SCHEDULE D-2 Unilateral Change Order Form SCHEDULE D-3 for Xxxxx 0 XXXXXXXX X-0 Contractor’s Change Order Request FormForm for Stage 2/Contractor’s Response to a Change Order Proposed by Owner for Stage 2 SCHEDULE D-4 Unit Rates for Change Orders Performed on a Time and Material Basis SCHEDULE D-5 Existing Facility Labor Unit Rates ATTACHMENT E Project Schedule for Stage 2 ATTACHMENT F Key Personnel and Contractor’s Organization for Stage 2 ATTACHMENT G Major Subcontracts, Major Sub-subcontracts, Bulk Subcontracts, Major Equipment, Approved Subcontractors and Sub-subcontractors and List of Major Equipment for Stage 2 ATTACHMENT H Form of Limited Notice to Proceed and Notice to Proceed for Stage 2 SCHEDULE H-1 Form of Limited Notice to Proceed for Stage 2 SCHEDULE H-2 Form of Notice to Proceed for Stage 2 vi ATTACHMENT I Form of Contractor’s Invoices for Stage 2 SCHEDULE I-1 Form of Contractor’s Interim Invoice SCHEDULE I-2 Form of Contractor’s Final Invoice ATTACHMENT J HSE Plan Requirements for Stage 2 ATTACHMENT K Form of Lien and Claim Waivers for Stage 2 SCHEDULE K-1 Contractor’s Interim Conditional Lien Waiver for Stage 2 SCHEDULE K-2 Contractor’s Interim Unconditional Lien Waiver for Stage 2 SCHEDULE K-3 Subcontractor’s Interim Conditional Lien Waiver for Stage 2 SCHEDULE K-4 Subcontractor’s Interim Unconditional Lien Waiver for Stage 2 SCHEDULE K-5 Contractor’s Final Conditional Lien and Claim Waiver for Stage 2 EXHIBIT K-5-1 Contractor’s Final Conditional Lien Waiver for Stage 2 EXHIBIT K-5-2 Contractor’s Final Conditional Claim Waiver for Stage 2 SCHEDULE K-6 Contractor’s Final Unconditional Lien and Claim Waiver for Stage 2 EXHIBIT K-6-1 Contractor’s Final Unconditional Lien Waiver for Stage 2 EXHIBIT K-6-2 Contractor’s Final Unconditional Claim Waiver for Stage 2 SCHEDULE K-7 Subcontractor’s Final Conditional Lien and Claim Waiver for Stage 2 EXHIBIT K-7-1 Subcontractor’s Final Conditional Lien Waiver for Stage 2 EXHIBIT K-7-2 Subcontractor’s Final Conditional Claim Waiver for Stage 2 SCHEDULE K-8 Subcontractor’s Final Unconditional Lien and Claim Waiver for Stage 2 EXHIBIT K-8-1 Subcontractor’s Final Unconditional Lien Waiver for Stage 2 EXHIBIT K-8-2 Subcontractor’s Final Unconditional Claim Waiver for Stage 2 ATTACHMENT L Form of RFSU Completion Certificate for Stage 2 ATTACHMENT M Form of Substantial Completion Certificate for Stage 2 ATTACHMENT N Form of Final Completion Certificate for Stage 2 ATTACHMENT O Insurance Requirements for Stage 2 ATTACHMENT P Contractor Permits for Stage 2 ATTACHMENT Q Owner Permits for Stage 2 ATTACHMENT R Stage 2 Form of Irrevocable, Standby Letter of Credit ATTACHMENT S Stage 2 Performance Tests and Commissioning Tests ATTACHMENT T Stage 2 Performance Guarantee, Performance Liquidated Damages, Minimum Acceptance Criteria, and Delay Liquidated Damages ATTACHMENT U Owner Provided Items and Responsibility for Stage 2 ATTACHMENT V Pre-Commissioning, Commissioning, Start-Up, and Training for Stage 2 ATTACHMENT W Spare Parts for Stage 2 SCHEDULE W-1 Form of Operating Spare Parts List SCHEDULE W-2 Capital Spare Parts List ATTACHMENT X Work in Existing Stage 1 Liquefaction Facility ATTACHMENT Y Site, Stage 1 Site, Stage 2 Site and Off-Site Rights of Way and Easements ATTACHMENT Z Landowner Access ATTACHMENT AA for Xxxxx 0 XXXXXXXXXX XX Form of Acknowledgement and Consent Agreement with Lender ATTACHMENT BB for Xxxxx 0 XXXXXXXXXX XX Form of Owner Confirmations for Stage 2 SCHEDULE BB-1 Form of Owner Monthly Confirmation SCHEDULE BB-2 Form of Owner Quarterly Confirmation ATTACHMENT CC Independent Engineer Activities for Stage 2 ATTACHMENT DD Form of Escrow Agreement for Stage 2 ATTACHMENT EE Provisional Sums for Stage 2 ATTACHMENT FF Form of Parent Guarantee SABINE PASS LNG for Stage 2 CORPUS CHRISTI STAGE 2 LIQUEFACTION FACILITY ENGINEERING, PROCUREMENT AND CONSTRUCTION AGREEMENT THIS ENGINEERING, PROCUREMENT AND CONSTRUCTION AGREEMENT (this “Agreement”), dated as of the 11th 6th Day of NovemberDecember, 2011 2013 (the “Contract Date”), is entered into by and between SABINE PASS CORPUS CHRISTI LIQUEFACTION, LLC, a Delaware limited liability company, having its principal place of business at 000 Xxxxx, Suite 800, Houston, Texas 77002 (“Owner”), and XXXXXXX OIL, GAS AND CHEMICALS, INC., a Delaware corporation, having an address at 0000 Xxxx Xxx Xxxxxxxxx, Xxxxxxx, Xxxxx 00000 (“Contractor” and, together with Owner, each a “Party” and together the “Parties”).

Appears in 1 contract

Samples: Escrow Agreement (Cheniere Energy Inc)

LIST OF ATTACHMENTS AND SCHEDULES. ATTACHMENT A Scope of Work and Design Basis of Design SCHEDULE A-1 BKRF Project Received Data Log SCHEDULE A-2 Reused Equipment Repair Plan SCHEDULE A-3 Pre-Effective Date Engineering Documentation ATTACHMENT B Contractor Deliverables Not Used ATTACHMENT C Payment Schedule SCHEDULE C-1 Milestone Payment Schedule Rates SCHEDULE C-2 Monthly Schedule of Values SCHEDULE C-3 Maximum Cumulative Payment Schedule ATTACHMENT D Form of Change Order SCHEDULE D-1 Change Order Form SCHEDULE D-2 Unilateral Change Order Form SCHEDULE D-3 ContractorOwner’s Change Order Request Form/Form SCHEDULE D-4 Contractor’s Response to a Change Order Proposed by Owner SCHEDULE D-4 Unit Rates for Change Orders Performed on a Time and Material Basis SCHEDULE D-5 Existing Facility Labor Unit Rates Notice Form ATTACHMENT E Project Schedule Milestone Dates ATTACHMENT F Key Personnel and Contractor’s Organization ATTACHMENT G Approved Subcontractors and Sub-subcontractors and List of Major Equipment ATTACHMENT H Form of Limited Notice to Proceed and Notice to Proceed SCHEDULE H-1 Form of Limited Notice to Proceed SCHEDULE H-2 Form of Notice to Proceed ATTACHMENT I Form of Contractor’s Invoices SCHEDULE I-1 Form of Contractor’s Interim Invoice SCHEDULE I-2 Form of Contractor’s Final Invoice ATTACHMENT J HSE Plan Requirements Owner’s Safety and Environmental Policies and Procedures ATTACHMENT K Form of Lien and Claim Waivers SCHEDULE K-1 Contractor’s Interim Conditional Lien Waiver and Release upon Progress Payment SCHEDULE K-2 Contractor’s Interim Conditional Lien Waiver and Release upon Final Payment SCHEDULE K-3 Unconditional Lien Waiver SCHEDULE K-3 Subcontractor’s Interim Conditional Lien Waiver and Release upon Final Payment SCHEDULE K-4 Subcontractor’s Interim Unconditional Lien Waiver SCHEDULE K-5 Contractor’s Final Conditional Lien and Claim Waiver and Release upon Final Payment SCHEDULE K-6 Contractor’s Final Unconditional Lien and Claim Waiver SCHEDULE K-7 K-5 Subcontractor’s Final Conditional Lien and Claim Waiver SCHEDULE K-8 Subcontractor’s and Release upon Final Unconditional Lien and Claim Waiver Payment ATTACHMENT L Form of RFSU Mechanical Completion Certificate ATTACHMENT M Form of Substantial Completion Certificate ATTACHMENT N Form of Final Completion Certificate ATTACHMENT O Insurance Requirements ATTACHMENT P Contractor Owner Permits ATTACHMENT Q Owner Permits Performance Tests and Minimum Acceptance Criteria ATTACHMENT R Reporting Requirements ATTACHMENT S Rely Upon Information ATTACHMENT T Site ATTACHMENT U Delay Liquidated Damages ATTACHMENT V Owner-Supplied Items ATTACHMENT W Not Used ATTACHMENT X Form of Irrevocable, Standby Parent Guarantee ATTACHMENT Y Not Used ATTACHMENT Z Form of Consent Agreement ATTACHMENT AA Form of Letter of Credit ATTACHMENT S Performance Tests BB GMP Breakdown and Commissioning Tests ATTACHMENT T Performance Guarantee, Performance Liquidated Damages, Minimum Acceptance Criteria, and Delay Liquidated Damages ATTACHMENT U Owner Provided Items and Responsibility ATTACHMENT V Pre-Commissioning, Commissioning, Start-Up, and Training ATTACHMENT W Spare Parts SCHEDULE W-1 Form of Operating Spare Parts List SCHEDULE W-2 Capital Spare Parts List ATTACHMENT X Work in Existing Facility ATTACHMENT Y Site and Off-Site Rights of Way and Easements ATTACHMENT Z Landowner Access ATTACHMENT AA Form of Acknowledgement and Consent Agreement with Lender ATTACHMENT BB Form of Owner Confirmations SCHEDULE BB-1 Form of Owner Monthly Confirmation SCHEDULE BB-2 Form of Owner Quarterly Confirmation ATTACHMENT CC Independent Engineer Activities ATTACHMENT DD Form of Escrow Agreement ATTACHMENT EE Provisional Sums ATTACHMENT FF Form of Parent Guarantee SABINE PASS LNG LIQUEFACTION FACILITY Credits ENGINEERING, PROCUREMENT AND CONSTRUCTION AGREEMENT THIS ENGINEERING, PROCUREMENT AND CONSTRUCTION AGREEMENT (this “Agreement”), dated as of the 11th 18th Day of NovemberMay, 2011 2021 (the “Contract Effective Date”), is entered into by and between SABINE PASS LIQUEFACTIONBAKERSFIELD RENEWABLE FUELS, LLC, a Delaware limited liability company, having its principal place of business at 000 Xxxxx, Suite 800, Houston, Texas 77002 LLC (“Owner”), and XXXXXXX OIL, GAS AND CHEMICALSCTCI AMERICAS, INC., a Delaware corporation, having an address at 0000 Xxxx Xxx Xxxxxxxxx, Xxxxxxx, Xxxxx 00000 . (“Contractor” and, together with Owner, each a “Party” and together the “Parties”).

Appears in 1 contract

Samples: Engineering, Procurement and Construction Agreement (Global Clean Energy Holdings, Inc.)

LIST OF ATTACHMENTS AND SCHEDULES. ATTACHMENT A Scope of Work and Basis of Design ATTACHMENT B Contractor Deliverables ATTACHMENT C Payment Schedule SCHEDULE C-1 Milestone Payment Schedule SCHEDULE C-2 Monthly Payment Schedule ATTACHMENT D Form of Change Order SCHEDULE D-1 Change Order Form SCHEDULE D-2 Unilateral Change Order Form SCHEDULE D-3 Contractor’s Change Order Request Form/Contractor’s Response to a Change Order Proposed by Owner SCHEDULE D-4 Unit Rates for Change Orders Performed on a Time and Material Basis SCHEDULE D-5 Existing Facility Labor Unit Rates ATTACHMENT E Project Schedule ATTACHMENT F Key Personnel and Contractor’s Organization ATTACHMENT G Approved Subcontractors and Sub-subcontractors and List of Major Equipment ATTACHMENT H C SCHEDULE C-1 SCHEDULE C-2 Notice to Proceed Forms Form of Limited Notice to Proceed and Notice to Proceed SCHEDULE H-1 Form of Limited Notice to Proceed SCHEDULE H-2 Form of Notice to Proceed ATTACHMENT I D SCHEDULE D-1 SCHEDULE D-2 SCHEDULE D-3 SCHEDULE D-4 Form of Change Order Change Order Form Unilateral Change Order Form Contractor’s Change Order Request Form Pricing for Change Orders ATTACHMENT E Project Schedule ATTACHMENT F Insurance Requirements ATTACHMENT G SCHEDULE G-1 SCHEDULE G-2 Form of Contractor’s Invoices SCHEDULE I-1 Invoice Form of Contractor’s Interim Invoice SCHEDULE I-2 Form of Contractor’s Final Invoice ATTACHMENT J HSE Plan Requirements H Owner’s Safety and Environmental Policies and Procedures ATTACHMENT K I SCHEDULE I-1 SCHEDULE I-2 SCHEDULE I-3 SCHEDULE I-4 SCHEDULE I-5 SCHEDULE I-6 SCHEDULE I-7 SCHEDULE I-8 Form of Lien and Claim Waivers SCHEDULE K-1 Contractor’s Interim Conditional Lien Waiver SCHEDULE K-2 and Release on Progress Payment Contractor’s Interim Unconditional Lien Conditional Claim Waiver SCHEDULE K-3 and Release on Progress Payment Subcontractor’s Interim Conditional Lien Waiver SCHEDULE K-4 and Release on Progress Payment Subcontractor’s Interim Unconditional Lien Conditional Claim Waiver SCHEDULE K-5 and Release on Progress Payment Contractor’s Conditional Waiver and Release on Final Payment Contractor’s Conditional Lien and Claim Waiver SCHEDULE K-6 Contractorand Release on Final Payment Subcontractor’s Conditional Waiver and Release on Final Unconditional Lien and Payment Subcontractor’s Conditional Claim Waiver and Release on Final Payment ATTACHMENT J SCHEDULE K-7 Subcontractor’s Final Conditional Lien J-1 SCHEDULE J-2 SCHEDULE J-3 SCHEDULE J-4 SCHEDULE J-5 Payment and Claim Waiver SCHEDULE K-8 Subcontractor’s Final Unconditional Lien and Claim Waiver Allowable Costs Compensation Schedule of Hourly Rates Assignment Policy Business Travel Policy Incentive Plan ATTACHMENT K [Not Used] ATTACHMENT L Site ATTACHMENT M [Not Used] ATTACHMENT N Owner Provided Equipment ATTACHMENT O Meeting and Reporting Requirements ATTACHMENT P ATTACHMENT Q ATTACHMENT R SCHEDULE R-1 SCHEDULE R-2 ATTACHMENT S ATTACHMENT T Approved List Owner Permits Completion Certificates Form of RFSU Mechanical Completion Certificate ATTACHMENT M Form of Substantial Completion Certificate ATTACHMENT N Form of Final Completion Certificate ATTACHMENT O Insurance Requirements ATTACHMENT P Contractor Permits ATTACHMENT Q Owner Permits ATTACHMENT R Form of Irrevocable, Standby Letter of Credit ATTACHMENT S Performance Tests and Commissioning Tests ATTACHMENT T Performance Guarantee, Performance Liquidated Damages, Minimum Acceptance Criteria, and Delay Liquidated Damages ATTACHMENT U Owner Provided Items and Responsibility ATTACHMENT V Pre-Commissioning, Commissioning, Start-Up, and Training ATTACHMENT W Spare Parts SCHEDULE W-1 Form of Operating Spare Parts [Not Used] Equipment List SCHEDULE W-2 Capital Spare Parts List ATTACHMENT X Work in Existing Facility ATTACHMENT Y Site and Off-Site Rights of Way and Easements ATTACHMENT Z Landowner Access ATTACHMENT AA Form of Acknowledgement and Consent Agreement with Lender ATTACHMENT BB Form of Owner Confirmations SCHEDULE BB-1 Form of Owner Monthly Confirmation SCHEDULE BB-2 Form of Owner Quarterly Confirmation ATTACHMENT CC Independent Engineer Activities ATTACHMENT DD Form of Escrow Agreement ATTACHMENT EE Provisional Sums ATTACHMENT FF Form of Parent Guarantee SABINE PASS LNG LIQUEFACTION FACILITY ENGINEERING, PROCUREMENT AND CONSTRUCTION AGREEMENT THIS ENGINEERING, PROCUREMENT AND CONSTRUCTION AGREEMENT (this “Agreement”), dated as of the 11th 4th Day of November, 2011 2016 (the “Contract Agreement Date”), is entered into by and between SABINE PASS LIQUEFACTIONCheniere Corpus Christi Pipeline, LLCL.P., a limited partnership organized under the laws of the State of Delaware limited liability company, having its principal place of business at 000 Xxxxx, Suite 800, Houston, Texas 77002 (“Owner”), and XXXXXXX OILSunland Construction, GAS AND CHEMICALS, INC.Inc., a Delaware corporation, having an address at 0000 Xxxx Xxx Xxxxxxxxx, Xxxxxxx, Xxxxx 00000 corporation organized under the laws of the State of Louisiana (“Contractor” and, together with Owner, each a “Party” and together the “Parties”).

Appears in 1 contract

Samples: Construction Agreement (Cheniere Corpus Christi Holdings, LLC)

LIST OF ATTACHMENTS AND SCHEDULES. ATTACHMENT A Scope of Work and Basis of Design SCHEDULE A-1 Scope of Work SCHEDULE A-2 Basis of Design ATTACHMENT B Contractor Deliverables ATTACHMENT C Payment Schedule SCHEDULE C-1 Milestone Earned Value Contract Price Breakdown SCHEDULE C-2 Payment Milestones SCHEDULE C-3 Maximum Cumulative Payment Schedule SCHEDULE C-2 Monthly Payment Schedule C-4 Additional Work Options Pricing SCHEDULE C-5 Escalation Table ATTACHMENT D Form of Change Order SCHEDULE D-1 Change Order Form SCHEDULE D-2 Unilateral Change Order Directive Form SCHEDULE D-3 Owner’s Change Request Form SCHEDULE D-4 Contractor’s Change Order Request Form/Contractor’s Response to a Change Order Proposed by Owner Notice Form SCHEDULE D-4 Unit Rates D-5 Pricing for Change Orders Performed on a Time and Material Basis SCHEDULE D-5 Existing Facility Labor Unit Rates Change Directives ATTACHMENT E Project Schedule Key Dates and Delay Liquidated Damages SCHEDULE E-1 Key Dates SCHEDULE E-2 Delay Liquidated Damages ATTACHMENT F Key Personnel and Contractor’s Organization ATTACHMENT G Approved Subcontractors and Sub-subcontractors and List of Major Equipment ATTACHMENT H Form of Limited Notice to Proceed and Notice to Proceed Forms SCHEDULE H-1 Form of Limited Notice to Proceed SCHEDULE H-2 Form of Notice to Proceed SCHEDULE X-0 XXXX Xx. 0 ATTACHMENT I Form of Contractor’s Invoices SCHEDULE I-1 Form of Contractor’s Interim Invoice SCHEDULE I-2 Form of Contractor’s Final Invoice ATTACHMENT J HSE Plan Requirements Health, Safety and Environmental Policies ATTACHMENT K Form of Lien and Claim Waivers SCHEDULE K-1 Contractor’s Interim Conditional Lien Waiver and Release upon Progress Payment SCHEDULE K-2 Contractor’s Interim Unconditional Lien Conditional Claim Waiver upon Progress Payment SCHEDULE K-3 Subcontractor’s Interim Conditional Lien Waiver and Release upon Progress Payment SCHEDULE K-4 Subcontractor’s Interim Unconditional Lien Conditional Claim Waiver upon Progress Payment SCHEDULE K-5 Contractor’s Final Conditional Lien Waiver and Claim Waiver Release upon Final Payment SCHEDULE K-6 Contractor’s Final Unconditional Lien and Claim Waiver and Release upon Final Payment SCHEDULE K-7 Subcontractor’s Final Conditional Lien Waiver and Claim Waiver Release upon Final Payment SCHEDULE K-8 Subcontractor’s Final Unconditional Lien and Claim Waiver and Release upon Final Payment ATTACHMENT L Form of RFSU Completion Certificates SCHEDULE L-1 Form of Mechanical Completion Certificate ATTACHMENT M SCHEDULE L-2 Not Used vii SCHEDULE L-3 Form of RFSU Certificate SCHEDULE L-4 Form of RLFC Certificate SCHEDULE L-5 Form of Substantial Completion Certificate ATTACHMENT N SCHEDULE L-6 Form of Final Completion Certificate ATTACHMENT M Pre-Commissioning, Commissioning, Start-up, Training and Turnover Program ATTACHMENT N Not Used ATTACHMENT O Insurance Requirements ATTACHMENT P Contractor Permits ATTACHMENT Q Owner Permits ATTACHMENT R Form of Irrevocable, Standby Letter of Credit ATTACHMENT S Performance Tests and Commissioning Tests ATTACHMENT T Performance Guarantee, Performance Liquidated Damages, Minimum Acceptance Criteria, Performance Guarantees and Delay Performance Liquidated Damages ATTACHMENT U Owner Provided Items and Responsibility Form of Parent Guarantee ATTACHMENT V PreOwner-Commissioning, Commissioning, Start-Up, and Training Furnished Items ATTACHMENT W Spare Parts SCHEDULE W-1 Form of Operating Spare Parts List SCHEDULE W-2 Capital Spare Parts List ATTACHMENT X Work in Existing Facility Meeting and Reporting Requirements ATTACHMENT Y Site and Off-Site Rights of Way and Easements Quality Plan ATTACHMENT Z Landowner Access Site Plan ATTACHMENT AA Form of Acknowledgement and Consent Agreement with Lender Direct Agreements ATTACHMENT BB Form of Owner Confirmations SCHEDULE BB-1 Form of Owner Monthly Confirmation SCHEDULE BB-2 Form of Owner Quarterly Confirmation Rely Upon Information ATTACHMENT CC Independent Engineer Activities Not used ATTACHMENT DD Form List of Escrow Agreement Equipment and Texas Direct Pay Exemption Certificate ATTACHMENT EE Provisional Sums Not Used ATTACHMENT FF Form Relief for changes in U.S. Tariffs or Duties ATTACHMENT GG Additional Work Options ATTACHMENT HH List of Parent Guarantee SABINE PASS LNG LIQUEFACTION FACILITY ENGINEERING, PROCUREMENT AND CONSTRUCTION AGREEMENT THIS ENGINEERING, PROCUREMENT AND CONSTRUCTION AGREEMENT (this “Agreement”), dated as of the 11th Day of November, 2011 (the “Contract Date”), is entered into by and between SABINE PASS LIQUEFACTION, LLC, a Delaware limited liability company, having its principal place of business at 000 Xxxxx, Suite 800, Houston, Texas 77002 (“Owner”), and XXXXXXX OIL, GAS AND CHEMICALS, INC., a Delaware corporation, having an address at 0000 Xxxx Xxx Xxxxxxxxx, Xxxxxxx, Xxxxx 00000 (“Contractor” and, together with Owner, each a “Party” and together the “Parties”).Post-Substantial Completion Interfering Work

Appears in 1 contract

Samples: Epc Agreement (NextDecade Corp.)

LIST OF ATTACHMENTS AND SCHEDULES. ATTACHMENT A Scope of Work and Design Basis SCHEDULE A-1 Scope of Work SCHEDULE A-2 Design Basis SCHEDULE A-3 Conceptual Engineering Documents and Trends List ATTACHMENT B Contractor Deliverables ATTACHMENT C Payment Schedule SCHEDULE C-1 Milestone Payment Schedule SCHEDULE C-2 Monthly Payment Schedule ATTACHMENT D Form of Change Order SCHEDULE D-1 Change Order Form SCHEDULE D-2 Unilateral Change Order Form SCHEDULE D-3 Contractor’s Change Order Request Form/Contractor’s Response to a Change Order Proposed by Owner SCHEDULE D-4 Unit Rates for Change Orders Performed on a Time and Material Materials Basis SCHEDULE D-5 Existing Facility Labor Unit Rates ATTACHMENT E Project Schedule ATTACHMENT F Key Personnel and Contractor’s Organization ATTACHMENT G Approved Subcontractors and Sub-subcontractors and List of Major Equipment ATTACHMENT H Form of Limited Notice to Proceed and Notice to Proceed SCHEDULE H-1 Form of Limited Notice to Proceed SCHEDULE H-2 Form of Notice to Proceed ATTACHMENT I Form of Contractor’s Invoices SCHEDULE I-1 Form of Contractor’s Interim Invoice SCHEDULE I-2 Form of Contractor’s Final Invoice ATTACHMENT J HSE Plan Requirements ATTACHMENT K Form of Lien and Claim Waivers SCHEDULE K-1 Contractor’s Interim Conditional Lien Waiver SCHEDULE K-2 Contractor’s Interim Unconditional Lien Waiver SCHEDULE K-3 Subcontractor’s Interim Conditional Lien Waiver SCHEDULE K-4 Subcontractor’s Interim Unconditional Lien Waiver SCHEDULE K-5 Contractor’s Final Conditional Lien and Claim Waiver SCHEDULE K-6 Contractor’s Final Unconditional Lien and Claim Waiver SCHEDULE K-7 Subcontractor’s Final Conditional Lien and Claim Waiver SCHEDULE K-8 Subcontractor’s Final Unconditional Lien and Claim Waiver ATTACHMENT L Form of RFSU RFCD Completion Certificate ATTACHMENT M Form of Substantial Completion Certificate ATTACHMENT N Form of Final Completion Certificate ATTACHMENT O Insurance Requirements ATTACHMENT P Contractor Permits ATTACHMENT Q Owner Permits ATTACHMENT R Form of Irrevocable, Standby Letters of Credit SCHEDULE R-1 Form of Performance Letter of Credit SCHEDULE R-2 Form of Payment Letter of Credit ATTACHMENT S Performance Tests and Commissioning Tests ATTACHMENT T Performance GuaranteeGuarantees, Performance Liquidated Damages, Minimum Acceptance Criteria, Criteria and Delay Liquidated Damages ATTACHMENT U Owner Owner-Provided Items and Responsibility ATTACHMENT V Pre-Commissioning, Commissioning, Start-Up, Up and Training ATTACHMENT W Spare Parts SCHEDULE W-1 Form of Operating Spare Parts List SCHEDULE W-2 Capital Spare Parts List ATTACHMENT X Work in Existing Facility [Not Used.] ATTACHMENT Y Site and Off-Site Rights of Way and Easements ATTACHMENT Z Landowner Access [Not Used.] ATTACHMENT AA Form of Acknowledgement and Consent Agreement with Lender ATTACHMENT BB Form of Contractor and Owner Confirmations SCHEDULE BB-1 Form of Contractor Quarterly Confirmation SCHEDULE BB-2 Form of Owner Monthly Confirmation SCHEDULE BB-2 BB-3 Form of Owner Quarterly Confirmation ATTACHMENT CC Independent Engineer Activities ATTACHMENT DD Form of Escrow Agreement ATTACHMENT EE Provisional Sums ATTACHMENT FF Form of Parent Guarantee Stainless Steel Adjustment, Tank Subcontract Materials Adjustment, Marine Loading Arm Adjustment and BOG Compressor Adjustment SABINE PASS LNG LIQUEFACTION FACILITY RECEIVING, STORAGE AND REGASIFICATION TERMINAL ENGINEERING, PROCUREMENT AND CONSTRUCTION AGREEMENT THIS ENGINEERING, PROCUREMENT AND CONSTRUCTION AGREEMENT (this “Agreement”), dated as of the 11th 18th Day of NovemberDecember, 2011 2004 (the “Contract Date”), is entered into by and between SABINE PASS LIQUEFACTIONLNG, LLCL.P., a Delaware limited liability companypartnership, having its principal place of business at 000 XxxxxXxxxx Xxxxxx, Suite 800Xxxxx 0000, HoustonXxxxxxx, Texas 77002 Xxxxx 00000 (“Owner”), and XXXXXXX OIL, GAS AND CHEMICALS, INC.CORPORATION, a Delaware Nevada corporation, having an address at 0000 Xxxx Xxx Xxxxxxxxx, Xxxxxxx, Xxxxx 00000 (“Contractor” and, together with Owner, each a “Party” and together the “Parties”).

Appears in 1 contract

Samples: Engineering, Procurement and Construction Agreement (Cheniere Energy Inc)

LIST OF ATTACHMENTS AND SCHEDULES. ATTACHMENT A Scope of Work and Design Basis of Design ATTACHMENT B Contractor Deliverables Not Used ATTACHMENT C Payment Schedule SCHEDULE C-1 Milestone Payment Schedule SCHEDULE C-2 Monthly Payment Schedule ATTACHMENT D Form of Change Order SCHEDULE D-1 Change Order Form SCHEDULE D-2 Unilateral Change Order Form SCHEDULE D-3 Contractor’s Change Order Request Form/Contractor’s Response to a Change Order Proposed by Owner SCHEDULE D-4 Unit Rates for Change Orders Performed on a Time and Material Basis SCHEDULE D-5 Existing Facility Labor Unit Rates Form ATTACHMENT E Project Schedule Milestone Dates ATTACHMENT F Key Personnel and Contractor’s Organization ATTACHMENT G Approved Subcontractors and Sub-subcontractors and List of Major Equipment ATTACHMENT H Form of Limited Notice to Proceed and Notice to Proceed Forms SCHEDULE H-1 Form of Limited Notice to Proceed No. 1 SCHEDULE H-2 Form of Limited Notice to Proceed SCHEDULE H-3 Form of Notice to Proceed ATTACHMENT I Form of Contractor’s Invoices SCHEDULE I-1 Form of Contractor’s Interim Invoice SCHEDULE I-2 Form of Contractor’s Final Invoice ATTACHMENT J HSE Plan Requirements Owner’s Safety and Environmental Policies and Procedures ATTACHMENT K Form of Lien and Claim Waivers SCHEDULE K-1 Contractor’s Interim Conditional Lien Waiver and Release upon Progress Payment SCHEDULE K-2 Contractor’s Interim Conditional Lien Waiver and Release upon Final Payment SCHEDULE K-3 Unconditional Lien Waiver SCHEDULE K-3 Subcontractor’s Interim Conditional Lien Waiver and Release upon Final Payment SCHEDULE K-4 Subcontractor’s Interim Unconditional Lien Waiver SCHEDULE K-5 Contractor’s Final Conditional Lien and Claim Waiver and Release upon Final Payment SCHEDULE K-6 Contractor’s Final Unconditional Lien and Claim Waiver SCHEDULE K-7 K-5 Subcontractor’s Final Conditional Lien and Claim Waiver SCHEDULE K-8 Subcontractor’s and Release upon Final Unconditional Lien and Claim Waiver Payment ATTACHMENT L Form of RFSU Mechanical Completion Certificate ATTACHMENT M Form of Substantial Completion Certificate ATTACHMENT N Form of Final Completion Certificate ATTACHMENT O Insurance Requirements ATTACHMENT P Contractor Owner Permits ATTACHMENT Q Owner Permits ATTACHMENT R Form of Irrevocable, Standby Letter of Credit ATTACHMENT S Performance Tests and Commissioning Tests Minimum Acceptance Criteria ATTACHMENT R Reporting Requirements ATTACHMENT S Rely Upon Information ATTACHMENT T Performance Guarantee, Performance Liquidated Damages, Minimum Acceptance Criteria, and Site ATTACHMENT U Delay Liquidated Damages ATTACHMENT U Owner Provided V Owner-Supplied Items and Responsibility ATTACHMENT V Pre-Commissioning, Commissioning, Start-Up, and Training ATTACHMENT W Spare Parts SCHEDULE W-1 Not Used ATTACHMENT X Form of Operating Spare Parts List SCHEDULE W-2 Capital Spare Parts List ATTACHMENT X Work in Existing Facility ATTACHMENT Y Site and Off-Site Rights of Way and Easements Parent Guarantee ATTACHMENT Z Landowner Access Form of Consent Agreement ATTACHMENT AA Form of Acknowledgement and Consent Agreement with Lender ATTACHMENT BB Form Letter of Owner Confirmations SCHEDULE BB-1 Form of Owner Monthly Confirmation SCHEDULE BB-2 Form of Owner Quarterly Confirmation ATTACHMENT CC Independent Engineer Activities ATTACHMENT DD Form of Escrow Agreement ATTACHMENT EE Provisional Sums ATTACHMENT FF Form of Parent Guarantee SABINE PASS LNG LIQUEFACTION FACILITY Credit ENGINEERING, PROCUREMENT AND CONSTRUCTION AGREEMENT THIS ENGINEERING, PROCUREMENT AND CONSTRUCTION AGREEMENT (this “Agreement”), dated as of the 11th __ Day of November_________, 2011 2020 (the “Contract Effective Date”), is entered into by and between SABINE PASS LIQUEFACTIONGCE HOLDINGS ACQUISITIONS, LLC, a Delaware limited liability company, having its principal place of business at 000 Xxxxx, Suite 800, Houston, Texas 77002 LLC (“Owner”), and XXXXXXX OIL, GAS AND CHEMICALSARB, INC., a Delaware corporation, having an address at 0000 Xxxx Xxx Xxxxxxxxx, Xxxxxxx, Xxxxx 00000 . (“Contractor” and, together with Owner, each a “Party” and together the “Parties”).

Appears in 1 contract

Samples: Engineering, Procurement and Construction Agreement (Global Clean Energy Holdings, Inc.)

Time is Money Join Law Insider Premium to draft better contracts faster.