Lot Grading / Plot Plans Sample Clauses

Lot Grading / Plot Plans. Lot grading must adhere to the latest approved Laurel 22 Lot Grading Plan (found on The Xxxxxxx of Xxxxxx (Phase 2) website), not to adjacent lots or unfinished lanes. The Buyer is responsible for meeting the required grade elevations and ensuring drainage patterns are maintained within the property lines to the satisfaction of the Municipality. Drainage xxxxxx, bioretention areas (rain gardens) and retaining walls, where required and approved must be designed to enhance the site’s natural character and conform to the overall approved site grading and drainage plans. Drainage xxxxxx, bioretention areas (rain gardens) and retaining walls that are installed by the Developer shall not be altered in any way. The costs of obtaining proper grading and drainage are the responsibility of the Buyer. Plot plans must be prepared by an Alberta Land Surveyor (A.L.S.) and include the information required as per Appendix E. The minimum width of all homes must be within 2’-0” of the recommended building pocket as identified in the neighbourhood plan in Appendix A. The maximum garage offset allowed is 2’-0” or at the discretion of the DRC. SAMPLE
AutoNDA by SimpleDocs

Related to Lot Grading / Plot Plans

  • Design Criteria The Engineer shall develop the roadway design criteria based on the controlling factors specified by the State (i.e. 4R, 3R, 2R, or special facilities), by use of the funding categories, design speed, functional classification, roadway class and any other set criteria as set forth in PS&E Preparation Manual, Roadway Design Manual, Bridge Design Manual, Hydraulic Design Manual, and other deemed necessary State approved manuals. In addition, the Engineer shall prepare the Design Summary Report (DSR) and submit it electronically. The Engineer shall obtain written concurrence from the State prior to proceeding with a design if any questions arise during the design process regarding the applicability of State’s design criteria.

  • Technical Standards Applicable to a Wind Generating Plant i. Low Voltage Ride-Through (LVRT) Capability A wind generating plant shall be able to remain online during voltage disturbances up to the time periods and associated voltage levels set forth in the standard below. The LVRT standard provides for a transition period standard and a post-transition period standard.

  • Rating Impact on Student Learning Growth ESE will provide model contract language and guidance on rating educator impact on student learning growth based on state and district-determined measures of student learning. Upon receiving this model contract language and guidance, the parties agree to bargain with respect to this matter.

  • Approval of Contractor’s Staff 7.3.1 County has the absolute right to approve or disapprove all of the Contractor’s staff performing work hereunder and any proposed changes in the Contractor’s staff, including, but not limited to, the Contractor’s Project Manager.

  • Design Criteria and Standards All PROJECTS/SERVICES shall be performed in accordance with instructions, criteria and standards set forth by the DIRECTOR.

  • Loop Testing/Trouble Reporting 2.1.6.1 Think 12 will be responsible for testing and isolating troubles on the Loops. Think 12 must test and isolate trouble to the BellSouth portion of a designed/non- designed unbundled Loop (e.g., UVL-SL2, UCL-D, UVL-SL1, UCL-ND, etc.) before reporting repair to the UNE Customer Wholesale Interconnection Network Services (CWINS) Center. Upon request from BellSouth at the time of the trouble report, Think 12 will be required to provide the results of the Think 12 test which indicate a problem on the BellSouth provided Loop.

  • Statistical Sampling Documentation a. A copy of the printout of the random numbers generated by the “Random Numbers” function of the statistical sampling software used by the IRO.

  • Performance indicators and targets The purpose of the innovation performance indicators and targets is to assist the University and the Commonwealth in monitoring the University's progress against the Commonwealth's objectives and the University's strategies for innovation. The University will report principal performance information and aim to meet the innovation performance indicators and targets set out in the following tables.

  • State Approval of Replacement Personnel The Engineer may not replace the project manager or key personnel without prior consent of the State. The State must be satisfied that the new project manager or other key personnel is qualified to provide the authorized services. If the State determines that the new project manager or key personnel is not acceptable, the Engineer may not use that person in that capacity and shall replace him or her with one satisfactory to the State within forty-five (45) days.

  • Power Factor Design Criteria Developer shall design the Large Generating Facility to maintain an effective power delivery at demonstrated maximum net capability at the Point of Interconnection at a power factor within the range established by the Connecting Transmission Owner on a comparable basis, until NYISO has established different requirements that apply to all generators in the New York Control Area on a comparable basis. The Developer shall design and maintain the plant auxiliary systems to operate safely throughout the entire real and reactive power design range. The Connecting Transmission Owner shall not unreasonably restrict or condition the reactive power production or absorption of the Large Generating Facility in accordance with Good Utility Practice.

Time is Money Join Law Insider Premium to draft better contracts faster.