Maximum Impervious Surface Ratio Sample Clauses

Maximum Impervious Surface Ratio. (“ISR”) – The maximum ISR for the Project shall be 0.70.
AutoNDA by SimpleDocs

Related to Maximum Impervious Surface Ratio

  • Apprentice Ratio 25.9 The Employer recognises that in order to increase the efficiency and productivity of the Employer, a significant commitment to structured training and skill development is required. They also recognise the importance of the apprenticeship system to the construction industry. Therefore, the Parties agree:

  • Maximum Duration Up to five years. The five-year period is a cumulative total of all absences from employment at the University due to the employee’s service in the military. If it appears that an employee has exceeded the five-year total, the appropriate University Human Resources office must be contacted to verify the total length of the employee’s military service, and determine the department’s obligation to place the employee.

  • Longer/Shorter Length of Coverage If none of the above rules determine the order of benefits, the benefits of the plan that covered a member or subscriber longer are determined before those of the plan that covered that person for the shorter term.

  • Mileage Measurement Where required, the mileage measurement for LIS rate elements is determined in the same manner as the mileage measurement for V&H methodology as outlined in NECA Tariff No. 4.

  • INTERIM MAINTENANCE PERIOD During the interim maintenance period between obtaining of the completion certificate of Project and formation and operationalization of the Association the Promoter shall through itself or through a facility management company constitute a committee to run, operate, manage and maintain the Common Areas.

  • Heavy Blocks An employee shall not be required to lift a building block in excess of 20 kg in weight unless such employee is provided with a mechanical aid or with an assisting employee; provided that an employee shall not to manually lift any building block in excess of 20 kg weight to a height of more than 4 feet (1.2m) above the working platform.

  • Maximum Permissible Amount Except in the case of a rollover contribution (as permitted by Code Sections 402(c), 402(e)(6), 403(a)(4), 403(b)(8), 403(b)(10), 408(d)(3), and 457(e)(16)) or a contribution made in accordance with the terms of a simplified employee pension (SEP) plan as described in Code Section 408(k), no contributions will be accepted unless they are in cash, and the total of such contributions shall not exceed the lesser of 100 percent of the Traditional IRA Owner’s Compensation, or $5,000 for any taxable year beginning in 2008 and years thereafter. After 2008, the limit will be adjusted by the Secretary of the Treasury for cost-of-living increases under Code Section 219(b)(5)(D). Such adjustments will be in multiples of $500. If the Traditional IRA Owner makes regular contributions to both Traditional and Xxxx IRAs for a taxable year, the maximum regular contribution that can be made to all the Traditional IRA Owner’s Traditional IRAs for that taxable year is reduced by the regular contributions made to the Traditional IRA Owner’s Xxxx IRAs for the taxable year.

  • Withdrawals during Concession Period 31.3.1 The Concessionaire shall, at the time of opening the Escrow Account, give irrevocable instructions, by way of an Escrow Agreement, to the Escrow Bank instructing, inter alia, that deposits in the Escrow Account shall be appropriated in the following order every month, or at shorter intervals as necessary, and if not due in a month then appropriated proportionately in such month and retained in the Escrow Account and paid out therefrom in the month when due:

  • Excessive Load Company hereby agrees that it will use all paved and floor areas as constructed and in accordance with the permitted use of such areas, and Company will prohibit its Company Parties from placing excessive loads on paved or floor areas on the Premises or Common Use Areas. Company will be responsible for the repair of any paved or floor area damaged by non-conforming usage or excessive loading.

  • Non-Paid Status During Treatment After Positive Test The employee will be in a non-pay status during any absence for evaluation or treatment, while participating in a rehabilitation program.

Time is Money Join Law Insider Premium to draft better contracts faster.