Common use of Mechanics Liens, Stop Notices, and Notices of Completion Clause in Contracts

Mechanics Liens, Stop Notices, and Notices of Completion. (a) If any claim of lien is filed against the Property or a stop notice affecting the Loan is served on the County or any other lender or other third party in connection with the Development, then Borrower shall, within twenty (20) days after such filing or service, either pay and fully discharge the lien or stop notice, effect the release of such lien or stop notice by delivering to the County a surety bond in sufficient form and amount, or provide the County with other assurance satisfactory to the County that the claim of lien or stop notice will be paid or discharged. (b) If Borrower fails to discharge any lien, encumbrance, charge, or claim in the manner required in this Section, then in addition to any other right or remedy, the County may (but is under no obligation to) discharge such lien, encumbrance, charge, or claim at Borrower's expense. Alternately, the County may require Borrower to immediately deposit with the County the amount necessary to satisfy such lien or claim and any costs, pending resolution thereof. The County may use such deposit to satisfy any claim or lien that is adversely determined against Borrower. (c) Borrower shall file a valid notice of cessation or notice of completion upon cessation of construction work on the Development for a continuous period of thirty (30) days or more, and take all other steps necessary to forestall the assertion of claims of lien against the Property. Borrower authorizes the County, but the County has no obligation, to record any notices of completion or cessation of labor, or any other notice that the County deems necessary or desirable to protect its interest in the Development and Property.

Appears in 7 contracts

Samples: Home Loan Agreement, Home and Hopwa Loan Agreement, Development Loan Agreement

AutoNDA by SimpleDocs

Mechanics Liens, Stop Notices, and Notices of Completion. (a) If any claim of lien is filed against the Property or a stop notice affecting the Combined County Loan is served on the County or any other lender or other third party in connection with the Development, then Borrower shall, within twenty (20) days after such filing or service, either pay and fully discharge the lien or stop notice, effect the release of such lien or stop notice by delivering to the County a surety bond in sufficient form and amount, or provide the County with other assurance satisfactory to the County that the claim of lien or stop notice will be paid or discharged. (b) If Borrower fails to discharge any lien, encumbrance, charge, or claim in the manner required in this Section, then in addition to any other right or remedy, the County may (but is under no obligation to) discharge such lien, encumbrance, charge, or claim at Borrower's expense. Alternately, the County may require Borrower to immediately deposit with the County the amount necessary to satisfy such lien or claim and any costs, pending resolution thereof. The County may use such deposit to satisfy any claim or lien that is adversely determined against Borrower. (c) Borrower shall file a valid notice of cessation or notice of completion upon cessation of construction work on the Development for a continuous period of thirty (30) days or more, and take all other steps necessary to forestall the assertion of claims of lien against the Property. Borrower authorizes the County, but the County has no obligation, to record any notices of completion or cessation of labor, or any other notice that the County deems necessary or desirable to protect its interest in the Development and Property.

Appears in 4 contracts

Samples: Development Loan Agreement, Development Loan Agreement, Development Loan Agreement

Mechanics Liens, Stop Notices, and Notices of Completion. (a) If any claim of lien is filed against the Property or a stop notice affecting the Loan is served on the County or any other lender or other third party in connection with the DevelopmentImprovements, then Borrower Developer shall, within twenty (20) days after such filing or service, either pay and fully discharge the lien or stop notice, effect the release of such lien or stop notice by delivering to the County a surety bond in sufficient form and amount, or provide the County with other assurance satisfactory to the County that the claim of lien or stop notice will be paid or discharged. (b) If Borrower Developer fails to discharge any lien, encumbrance, charge, or claim in the manner required in this Section, then in addition to any other right or remedy, the County may (but is under no obligation to) discharge such lien, encumbrance, charge, or claim at BorrowerDeveloper's expense. Alternately, the County may require Borrower Developer to immediately deposit with the County the amount necessary to satisfy such lien or claim and any costs, pending resolution thereof. The County may use such deposit to satisfy any claim or lien that is adversely determined against BorrowerDeveloper. (c) Borrower Developer shall file a valid notice of cessation or notice of completion upon cessation of construction work on the Development Improvements for a continuous period of thirty (30) days or more, and take all other steps necessary to forestall the assertion of claims of lien against the Property. Borrower Developer authorizes the County, but the County has no obligation, to record any notices of completion or cessation of labor, or any other notice that the County deems necessary or desirable to protect its interest in the Development and Property.

Appears in 4 contracts

Samples: Disposition, Development, and Loan Agreement, Disposition, Development, and Loan Agreement, Master Development Agreement

Mechanics Liens, Stop Notices, and Notices of Completion. (a) If any claim of lien is filed against the Property or a stop notice affecting the Loan is served on the County or any other lender or other third party in connection with the Development, then Borrower shall, within twenty (20) days after such filing or service, either pay and fully discharge the lien or stop notice, effect the release of such lien or stop notice by delivering to the County a surety bond in sufficient form and amount, or provide the County with other assurance satisfactory to the County that the claim of lien or stop notice will be paid or discharged. (b) If Borrower fails to discharge any lien, encumbrance, charge, or claim in the manner required in this Section, then in addition to any other right or remedy, the County may (but is under no obligation to) discharge such lien, encumbrance, charge, or claim at Borrower's expense. Alternately, the County may require Borrower to immediately deposit with the County the amount necessary to satisfy such lien or claim and any costs, pending resolution thereof. The County may use such deposit to satisfy any claim or lien that is adversely determined against Borrower. (c) Borrower shall file a valid notice of cessation or notice of completion upon cessation of construction work on the Development for a continuous period of thirty (30) days or more, and take all other steps necessary to forestall the assertion of claims of lien against the Property. Borrower authorizes the County, but the County has no obligation, to record any notices of completion or cessation of labor, or any other notice that the County deems necessary or desirable to protect its interest in the Development and Property.thirty

Appears in 3 contracts

Samples: Development Loan Agreement, Development Loan Agreement, Home and Hopwa Loan Agreement

Mechanics Liens, Stop Notices, and Notices of Completion. (a) If any claim of lien is filed against the Property or a stop notice affecting the Loan is served on the County or any other lender or other third party in connection with the DevelopmentRehabilitation, then Borrower shall, within twenty (20) days after such filing or service, either pay and fully discharge the lien or stop notice, effect the release of such lien or stop notice by delivering to the County a surety bond in sufficient form and amount, or provide the County with other assurance satisfactory to the County that the claim of lien or stop notice will be paid or discharged. (b) If Borrower fails to discharge any lien, encumbrance, charge, or claim in the manner required in this Section, then in addition to any other right or remedy, the County may (but is under no obligation to) discharge such lien, encumbrance, charge, or claim at Borrower's expense. Alternately, the County may require Borrower to immediately deposit with the County the amount necessary to satisfy such lien or claim and any costs, pending resolution thereof. The County may use such deposit to satisfy any claim or lien that is adversely determined against Borrower. (c) Borrower shall file a valid notice of cessation or notice of completion upon cessation of construction work on the Development Rehabilitation for a continuous period of thirty (30) days or more, and take all other steps necessary to forestall the assertion of claims of lien against the Property. Borrower authorizes the County, but the County has no obligation, to record any notices of completion or cessation of labor, or any other notice that the County deems necessary or desirable to protect its interest in the Development and Property.

Appears in 3 contracts

Samples: CDBG Loan Agreement, CDBG Loan Agreement, CDBG Loan Agreement

Mechanics Liens, Stop Notices, and Notices of Completion. (a) If any claim of lien is filed against the Property or a stop notice affecting the Loan is served on the County or any other lender or other third party in connection with the Development, then Borrower shall, within twenty (20) days after such filing or service, either pay and fully discharge the lien or stop notice, effect the release of such lien or stop notice by delivering to the County a surety bond in sufficient form and amount, or provide the County with other assurance satisfactory to the County that the claim of lien or stop notice will be paid or discharged. (b) If Borrower fails to discharge any lien, encumbrance, charge, or claim in the manner required in this SectionSection or obtain a surety bond, then in addition to any other right or remedy, the County may (but is under no obligation to) discharge such lien, encumbrance, charge, or claim at Borrower's expense. Alternately, the County may require Borrower to immediately deposit with the County the amount necessary to satisfy such lien or claim and any costs, pending resolution thereof. The County may use such deposit to satisfy any claim or lien that is adversely determined against Borrower. (c) Borrower shall file a valid notice of cessation or notice Notice of completion Completion upon cessation of construction work on the Development for a continuous period of thirty (30) days or more, and take all other steps necessary to forestall the assertion of claims of lien against the Property. Borrower authorizes the County, but the County has no obligation, to record any notices of completion or cessation of labor, or any other notice that the County deems necessary or desirable to protect its interest in the Development and PropertyDevelopment.

Appears in 2 contracts

Samples: Community Development Block Grant Agreement, Subrecipient Agreement

Mechanics Liens, Stop Notices, and Notices of Completion. (a) If any claim of lien is filed against the Property Development or a stop notice affecting the Loan is served on the County or any other lender or other third party in connection with the Development, then Borrower shall, within twenty (20) days after such filing or service, either pay and fully discharge the lien or stop notice, effect the release of such lien or stop notice by delivering to the County a surety bond from a surety acceptable to the County in sufficient form and amount, or provide the County with other assurance satisfactory to the County that the claim of lien or stop notice will be paid or discharged. (b) If Borrower fails to discharge any lien, encumbrance, charge, or claim in the manner required in this Section, then in addition to any other right or remedy, the County may (but is shall be under no obligation to) discharge such lien, encumbrance, charge, or claim at Borrower's expense. Alternately, the County may require Borrower to immediately deposit with the County the amount necessary to satisfy such lien or claim and any costs, pending resolution thereof. The County may use such deposit to satisfy any claim or lien that is adversely determined against Borrower. (c) Borrower shall file a valid notice of cessation or notice of completion upon cessation of construction work on of the Development for a continuous period of thirty (30) days or more, and take all other reasonable steps necessary to forestall the assertion of claims of lien against the PropertyProperty and/or Development. Borrower authorizes the County, but the County has no without any obligation, to record any notices of completion or cessation of labor, or any other notice that the County deems necessary or desirable to protect its interest in the Development and PropertyProperty and/or Development.

Appears in 2 contracts

Samples: Construction Loan Agreement, Loan Agreement

Mechanics Liens, Stop Notices, and Notices of Completion. β€Œ (a) If any claim of lien is filed against the Property Development, or a stop notice affecting the County Loan is served on the County or any other lender or other third party in connection with the Development, then Borrower the Developer shall, within twenty (20) days after such filing or service, either pay and fully discharge the lien or stop notice, effect the release of such lien or stop notice by delivering to the County a surety bond from a surety acceptable to the County in sufficient form an amount 1 and amount1/2 times the amount of such claim, or provide the County with other assurance satisfactory to the County that the claim of lien or stop notice is invalid and/or will be paid or discharged. (b) If Borrower fails the Developer fail to discharge any lien, encumbrance, charge, or claim in the manner required in this SectionSection or obtain a surety bond, then in addition to any other right or remedy, the County may (but is shall be under no obligation to) discharge such lien, encumbrance, charge, or claim at Borrowerthe Developer's expense. AlternatelyAlternatively, the County may require Borrower the Developer to immediately deposit with the County the amount necessary to satisfy such lien or claim and any costs, pending resolution thereof. The County may use such deposit to satisfy any claim or lien that is adversely determined against Borrowerthe Developer. (c) Borrower The Developer shall file a valid notice of cessation or notice of completion upon cessation of construction work on of the Development Improvements for a continuous period of thirty (30) days or more, and take all other reasonable steps necessary to forestall the assertion of claims of lien against any portions of the PropertyDevelopment. Borrower authorizes The Developer authorize the County, but the County has no without any obligation, to record any notices of completion or cessation of labor, or any other notice that the County deems necessary or desirable to protect its interest in the Development and the Property.

Appears in 1 contract

Samples: Land Disposition, Development and Loan Agreement

Mechanics Liens, Stop Notices, and Notices of Completion. (a) If any claim of lien is filed against the Property or a stop notice affecting the Loan is served on the County or any other lender or other third party in connection with the Development, then Borrower shall, within twenty (20) days after such filing or service, either pay and fully discharge the lien or stop notice, effect the release of such lien or stop notice by delivering to the County a surety bond in sufficient form and amount, or provide the County with other assurance satisfactory to the County that the claim of lien or stop notice will be paid or discharged. (b) If Borrower fails to discharge any lien, encumbrance, charge, or claim in the manner required in this Section, then in addition to any other right or remedy, the County may (but is shall be under no obligation to) discharge such lien, encumbrance, charge, or claim at Borrower's expense. Alternately, the County may require Borrower to immediately deposit with the County the amount necessary to satisfy such lien or claim and any costs, pending resolution thereof. The County may use such deposit to satisfy any claim or lien that is adversely determined against Borrower. (c) Borrower shall file a valid notice of cessation or notice of completion upon cessation of [construction work or rehabilitation] on the Development for a continuous period of thirty (30) days or more, and take all other reasonable steps necessary to forestall the assertion of claims of lien against the Property. Borrower authorizes the County, but the County has no without any obligation, to record any notices of completion or cessation of labor, or any other notice that the County deems necessary or desirable to protect its interest in the Development and Property.

Appears in 1 contract

Samples: Loan Agreement

Mechanics Liens, Stop Notices, and Notices of Completion. (a) If any claim of lien is filed against the Property or a stop notice affecting the Loan is served on the County or any other lender or other third party in connection with the DevelopmentRehabilitation, then Borrower shall, within twenty (20) days after such filing or service, either pay and fully discharge the lien or stop notice, effect the release of such lien or stop notice by delivering to the County a surety bond in sufficient form and amount, or provide the County with other assurance satisfactory to the County that the claim of lien or stop notice will be paid or discharged. (b) If Borrower fails to discharge any lien, encumbrance, charge, or claim in the manner required in this Section, then in addition to any other right or remedy, the County may (but is under no obligation to) discharge such lien, encumbrance, charge, or claim at Borrower's expense. Alternately, the County may require Borrower to immediately deposit with the County the amount necessary to satisfy such lien or claim and any costs, pending resolution thereof. The County may use such deposit to satisfy any claim or lien that is adversely determined against Borrower. (c) Borrower shall file a valid notice of cessation or notice of completion upon cessation of construction work on the Development Rehabilitation for a continuous period of thirty (30) days or more, and take all other steps necessary to forestall the assertion of claims of lien against the Property. Borrower authorizes the County, but the County has no obligation, to record any notices of completion or cessation of labor, or any other notice that the County deems necessary or desirable to protect its interest in the Development and Property.

Appears in 1 contract

Samples: Hopwa Loan Agreement

Mechanics Liens, Stop Notices, and Notices of Completion. β€Œ (a) If any claim of or lien is filed against the Property or a stop notice affecting the Loan is served on the County or any other lender or other third party in connection with the DevelopmentProperty, then Borrower shall, within twenty (20) days after such filing or service, either pay and fully discharge the lien or stop notice, effect the release of such lien or stop notice by delivering to the County a surety bond in sufficient form and amount, or provide the County with other assurance satisfactory to the County that the claim of or lien or stop notice will be paid or discharged. (b) If Borrower fails to discharge any lien, encumbrance, charge, or claim in the manner required in this Section, then in addition to any other right or remedy, the County may (but is under no obligation to) discharge such lien, encumbrance, charge, or claim at Borrower's expense. Alternately, the County may require Borrower to immediately deposit with the County the amount necessary to satisfy such lien or claim and any costs, pending resolution thereof. The County may use such deposit to satisfy any claim or lien that is adversely determined against Borrower. (c) Borrower shall file a valid notice of cessation or notice of completion upon cessation of construction work on of the Development Units for a continuous period of thirty (30) days or more, more and take all other reasonable steps necessary to forestall the assertion of claims of lien against the Property. Borrower authorizes the CountyThe County may, but the County has no obligationis not obligated to, to record any notices of completion or cessation of labor, or any other notice that the County deems necessary or desirable to protect its interest in the Development and Property.

Appears in 1 contract

Samples: Neighborhood Stabilization Program Loan Agreement

Mechanics Liens, Stop Notices, and Notices of Completion. (a) If any claim of lien is filed against the Leasehold Interest or the Property or a stop notice affecting the Loan is served on the County or any other lender or other third party in connection with the Development, then Borrower shall, within twenty (20) days after such filing or service, either pay and fully discharge the lien or stop notice, effect the release of such lien or stop notice by delivering to the County a surety bond in sufficient form and amount, or provide the County with other assurance satisfactory to the County that the claim of lien or stop notice will be paid or discharged. (b) If Borrower fails to discharge any lien, encumbrance, charge, or claim in the manner required in this Section, then in addition to any other right or remedy, the County may (but is under no obligation to) discharge such lien, encumbrance, charge, or claim at Borrower's expense. Alternately, the County may require Borrower to immediately deposit with the County the amount necessary to satisfy such lien or claim and any costs, pending resolution thereof. The County may use such deposit to satisfy any claim or lien that is adversely determined against Borrower. (c) Borrower shall file a valid notice of cessation or notice of completion upon cessation of construction work on the Development Property for a continuous period of thirty (30) days or more, and take all other steps necessary to forestall the assertion of claims of lien against the PropertyProperty or the Leasehold Interest. Borrower authorizes the County, but the County has no obligation, to record any notices of completion or cessation of labor, or any other notice that the County deems necessary or desirable to protect its interest in the Development and PropertyDevelopment.

Appears in 1 contract

Samples: Development Loan Agreement

Mechanics Liens, Stop Notices, and Notices of Completion. (a) If any claim of lien is filed against the Property or a stop notice affecting the Loan is served on the County or any other lender or other third party in connection with the Development, then Borrower shall, within twenty (20) days after such filing or service, either pay and fully discharge the lien or stop notice, effect the release of such lien or stop notice by delivering to the County a surety bond in sufficient form and amount, or provide the County with other assurance satisfactory to the County that the claim of lien or stop notice will be paid or discharged. (b) If Borrower fails to discharge any lien, encumbrance, charge, or claim in the manner required in this Section, then in addition to any other right or remedy, the County may (but is shall be under no obligation to) discharge such lien, encumbrance, charge, or claim at Borrower's expense. Alternately, the County may require Borrower to immediately deposit with the County the amount necessary to satisfy such lien or claim and any costs, pending resolution thereof. The County may use such deposit to satisfy any claim or lien that is adversely determined against Borrower. (c) Borrower shall file a valid notice of cessation or notice of completion upon cessation of construction work on the Development for a continuous period of thirty (30) days or more, and take all other reasonable steps necessary to forestall the assertion of claims of lien against the Property. Borrower authorizes the County, but the County has no without any obligation, to record any notices of completion or cessation of labor, or any other notice that the County deems necessary or desirable to protect its interest in the Development and Property.

Appears in 1 contract

Samples: CDBG and Home Loan Agreement

AutoNDA by SimpleDocs

Mechanics Liens, Stop Notices, and Notices of Completion. (a) If any claim of lien is filed against the Property or a stop notice affecting the Loan is served on the County or any other lender or other third party in connection with the DevelopmentRepairs, then Borrower shall, within twenty (20) days after such filing or service, either pay and fully discharge the lien or stop notice, effect the release of such lien or stop notice by delivering to the County a surety bond in sufficient form and amount, or provide the County with other assurance satisfactory to the County that the claim of lien or stop notice will be paid or discharged. (b) If Borrower fails to discharge any lien, encumbrance, charge, or claim in the manner required in this Section, then in addition to any other right or remedy, the County may (but is under no obligation to) discharge such lien, encumbrance, charge, or claim at Borrower's expense. Alternately, the County may require Borrower to immediately deposit with the County the amount necessary to satisfy such lien or claim and any costs, pending resolution thereof. The County may use such deposit to satisfy any claim or lien that is adversely determined against Borrower. (c) Borrower shall file a valid notice of cessation or notice of completion upon cessation of construction work on the Development for a continuous period of thirty (30) days or more, and take all other steps necessary to forestall the assertion of claims of lien against the Property. Borrower authorizes the County, but the County has no obligation, to record any notices of completion or cessation of labor, or any other notice that the County deems necessary or desirable to protect its interest in the Development and Property.

Appears in 1 contract

Samples: CDBG and Home Loan Agreement

Mechanics Liens, Stop Notices, and Notices of Completion. (a) If any claim of lien is filed against the Property or the Improvements or a stop notice affecting the County Loan is served on the County or any other lender or other third party in connection with the Development, then Borrower shall, within twenty (20) days after such filing or service, either pay and fully discharge the lien or stop notice, effect the release of such lien or stop notice by delivering to the County a surety bond from a surety acceptable to the County in sufficient form and amount, or provide the County with other assurance satisfactory to the County that the claim of lien or stop notice will be paid or discharged. (b) If Borrower fails to discharge any lien, encumbrance, charge, or claim in the manner required in this Section, then in addition to any other right or remedy, the County may (but is shall be under no obligation to) discharge such lien, encumbrance, charge, or claim at Borrower's expense. Alternately, the County may require Borrower to immediately deposit with the County the amount necessary to satisfy such lien or claim and any costs, pending resolution thereof. The County may use such deposit to satisfy any claim or lien that is adversely determined against Borrower. (c) Borrower shall file a valid notice of cessation or notice of completion upon cessation of construction work on of the Development Improvements for a continuous period of thirty (30) days or more, and take all other reasonable steps necessary to forestall the assertion of claims of lien against the PropertyProperty and/or Improvements. Borrower authorizes the County, but the County has no without any obligation, to record any notices of completion or cessation of labor, or any other notice that the County deems necessary or desirable to protect its interest in the Development and Property.

Appears in 1 contract

Samples: Construction and Permanent Loan Agreement

Mechanics Liens, Stop Notices, and Notices of Completion. (a) If any claim of lien is filed against the Property Development or a stop notice affecting the Loan is served on the County or any other lender or other third party in connection with the Development, then Borrower shall, within twenty (20) days after such filing or service, either pay and fully discharge the lien or stop notice, effect the release of such lien or stop notice by delivering to the County a surety bond in sufficient form and amount, or provide the County with other assurance satisfactory to the County that the claim of lien or stop notice will be paid or discharged. (b) If Borrower fails to discharge any lien, encumbrance, charge, or claim in the manner required in this Section, then in addition to any other right or remedy, the County may (but is under no obligation to) discharge such lien, encumbrance, charge, or claim at Borrower's expense. Alternately, the County may require Borrower to immediately deposit with the County the amount necessary to satisfy such lien or claim and any costs, pending resolution thereof. The County may use such deposit to satisfy any claim or lien that is adversely determined against Borrower. (c) Borrower shall file a valid notice of cessation or notice of completion upon cessation of construction work on the Development for a continuous period of thirty (30) days or more, and take all other steps necessary to forestall the assertion of claims of lien against the PropertyDevelopment. Borrower authorizes the County, but the County has no obligation, to record any notices of completion or cessation of labor, or any other notice that the County deems necessary or desirable to protect its interest in the Development and PropertyDevelopment.

Appears in 1 contract

Samples: Home and Hopwa Loan Agreement

Mechanics Liens, Stop Notices, and Notices of Completion. (a) If any claim of lien is filed against the Property or a the Building Improvements or any stop notice affecting the Loan is served on the County or any other lender or other third party is filed in connection with the Development, then Borrower the Developer shall, within twenty (20) days after such filing or service, either pay and fully discharge the lien or stop notice, effect the release of such lien or stop notice by delivering to the County a surety bond from a surety, reasonably acceptable to the County, or such other evidence reasonably acceptable to the County that the lien or stop notice has been discharged acceptable to the County in sufficient form and amount, or provide the County with other assurance satisfactory to the County that the claim of lien or stop notice will be paid or discharged. (b) If Borrower the Developer fails to discharge any lien, encumbrance, charge, or claim in the manner required in this SectionSection or obtain a surety bond, then in addition to any other right or remedy, the County may (but is shall be under no obligation to) discharge such lien, encumbrance, charge, or claim at Borrowerthe Developer's expense. AlternatelyAlternatively, the County may require Borrower the Developer to immediately deposit with the County the amount necessary to satisfy such lien or claim and any costs, pending resolution thereof. The County may use such deposit to satisfy any claim or lien that is adversely determined against Borrowerthe Developer. (c) Borrower The Developer shall file a valid notice of cessation or notice of completion upon cessation of construction work on of the Development for a continuous period of thirty (30) days or more, and take all other reasonable steps necessary to forestall the assertion of claims of lien against the PropertyProperty and/or Improvements. Borrower authorizes the County, but Nothing in this Section shall be deemed to require the County has no obligation, to record any notices issue the Certificate of completion or cessation of labor, or any other notice that the County deems necessary or desirable to protect its interest Completion which shall only be issued in the Development and Propertyaccordance with Section 4.20.

Appears in 1 contract

Samples: Disposition and Development Agreement

Mechanics Liens, Stop Notices, and Notices of Completion. (a) If any claim of lien is filed against the Property or a stop notice affecting the Loan is served on the County or any other lender or other third party in connection with the DevelopmentImprovements, then Borrower shall, within twenty (20) days after such filing or service, either pay and fully discharge the lien or stop notice, effect the release of such lien or stop notice by delivering to the County a surety bond in sufficient form and amount, or provide the County with other assurance satisfactory to the County that the claim of lien or stop notice will be paid or discharged. (b) If Borrower fails to discharge any lien, encumbrance, charge, or claim in the manner required in this Section, then in addition to any other right or remedy, the County may (but is under no obligation to) discharge such lien, encumbrance, charge, or claim at Borrower's expense. Alternately, the County may require Borrower to immediately deposit with the County the amount necessary to satisfy such lien or claim and any costs, pending resolution thereof. The County may use such deposit to satisfy any claim or lien that is adversely determined against Borrower. (c) Borrower shall file a valid notice of cessation or notice of completion upon cessation of construction work on the Development Improvements for a continuous period of thirty (30) days or more, and take all other steps necessary to forestall the assertion of claims of lien against the Property. Borrower authorizes the County, but the County has no obligation, to record any notices of completion or cessation of labor, or any other notice that the County deems necessary or desirable to protect its interest in the Development and Property.

Appears in 1 contract

Samples: Disposition, Development, and Loan Agreement

Mechanics Liens, Stop Notices, and Notices of Completion. (a) If any claim of lien is filed against the Property or a stop notice affecting the Combined County Loan is served on the County or any other lender or other third party in connection with the Development, then Borrower shall, within twenty (20) days after such filing or service, either pay and fully discharge the lien or stop notice, effect the release of such lien or stop notice by delivering to the County a surety bond in sufficient form and amount, or provide the County with other assurance satisfactory to the County that the claim of lien or stop notice will be paid or discharged. (b) If Borrower fails to discharge any lien, encumbrance, charge, or claim in the manner required in this Section, then in addition to any other right or remedy, the County may (but is under no obligation to) discharge such lien, encumbrance, charge, or claim at Borrower's expense. Alternately, the County may require Borrower to immediately deposit with the County the amount necessary to satisfy such lien or claim and any costs, pending resolution thereof. The County may use such deposit to satisfy any claim or lien that is adversely determined against Borrower. (c) Borrower shall file a valid notice of cessation or notice of completion upon cessation of construction work on the Development for a continuous period of thirty (30) days or more, and take all other steps necessary to forestall the assertion of claims of lien against the Property. Borrower authorizes the County, but the County has no obligation, to record any notices of completion or cessation of labor, or any other notice that the County deems necessary or desirable to protect its interest in the Development and Property.thirty

Appears in 1 contract

Samples: Home and Hopwa Loan Agreement

Mechanics Liens, Stop Notices, and Notices of Completion. (a) If any claim of lien is filed against the Property or a stop notice affecting the Loan is served on the County or any other lender or other third party in connection with the Development, then Borrower shall, within twenty (20) days after such filing or service, either pay and fully discharge the lien or stop notice, effect the release of such lien or stop notice by delivering to the County a surety bond in sufficient form and amount, or provide the County with other assurance satisfactory to the County that the claim of lien or stop notice will be paid or discharged. (b) If Borrower fails to discharge any lien, encumbrance, charge, or claim in the manner required in this Section, then in addition to any other right or remedy, the County may (but is under no obligation to) discharge such lien, encumbrance, charge, or claim at BorrowerXxxxxxxx's expense. Alternately, the County may require Borrower to immediately deposit with the County the amount necessary to satisfy such lien or claim and any costs, pending resolution thereof. The County may use such deposit to satisfy any claim or lien that is adversely determined against Borrower. (c) Borrower shall file a valid notice of cessation or notice of completion upon cessation of construction work on the Development for a continuous period of thirty (30) days or more, and take all other steps necessary to forestall the assertion of claims of lien against the Property. Borrower authorizes the County, but the County has no obligation, to record any notices of completion or cessation of labor, or any other notice that the County deems necessary or desirable to protect its interest in the Development and Property.

Appears in 1 contract

Samples: Hopwa Loan Agreement