Member Assuming Ownership or Operational Control of an Existing Interconnected Member-Generator System Sample Clauses

Member Assuming Ownership or Operational Control of an Existing Interconnected Member-Generator System. Complete Sections A, B, C, D, F, G and H attaching all required documents, diagrams, etc. as required by the applicable section(s) of this Application and Agreement and return to Cooperative for review and final approval of the Cooperative (Section I).
AutoNDA by SimpleDocs

Related to Member Assuming Ownership or Operational Control of an Existing Interconnected Member-Generator System

  • Interconnection Customer’s Interconnection Facilities The Interconnection Customer shall design, procure, construct, install, own and/or control the Interconnection Customer’s Interconnection Facilities described in Appendix A at its sole expense.

  • Information regarding Interconnection Facilities 4.2.1 The SPD shall be required to obtain all information from the STU/CTU/concerned authority with regard to the Interconnection Facilities as is reasonably necessary to enable it to design, install and operate all interconnection plant and apparatus on the SPD’s side of the Delivery Point to enable delivery of electricity at the Delivery Point. The transmission of power up to the point of interconnection where the metering is done for energy accounting shall be the responsibility of the SPD at his own cost.

  • Interconnection Customer Compensation for Actions During Emergency Condition The CAISO shall compensate the Interconnection Customer in accordance with the CAISO Tariff for its provision of real and reactive power and other Emergency Condition services that the Interconnection Customer provides to support the CAISO Controlled Grid during an Emergency Condition in accordance with Article 11.6.