Monitoring of Site Availability, Land Acquisitions and Permits Sample Clauses

Monitoring of Site Availability, Land Acquisitions and Permits. 4.1Monitor, obtain information from Contractors (as relevant) and report to the Authority and the Concessionaire on the status and progress of land acquisition by the Authority for the purpose of the Project and the permits applied for in relation to the Project.
AutoNDA by SimpleDocs

Related to Monitoring of Site Availability, Land Acquisitions and Permits

  • Notice to Proceed - Land Acquisition The acquisition of the Land shall not occur until the Director has issued a written Notice to Proceed for land acquisition to the Recipient (the "Notice to Proceed"). Such Notice to Proceed will not be issued until the Director has received a Request to Proceed acceptable to the Director and is assured that the Recipient has complied with all requirements for the approval of a grant under Revised Code Sections 164.20 through 164.27 and any requirements for land acquisition set forth in this Agreement, including without limitation the OPWC's approval of the proposed Deed Restrictions and Title Agent. The Notice to Proceed also shall specify the time frame for the Closing.

  • Unbundled Loop Modifications (Line Conditioning 2.5.1 Line Conditioning is defined as routine network modification that BellSouth regularly undertakes to provide xDSL services to its own customers. This may include the removal of any device, from a copper Loop or copper Sub-loop that may diminish the capability of the Loop or Sub-loop to deliver high-speed switched wireline telecommunications capability, including xDSL service. Such devices include, but are not limited to, load coils, excessive bridged taps, low pass filters, and range extenders. Excessive bridged taps are bridged taps that serves no network design purpose and that are beyond the limits set according to industry standards and/or the XxxxXxxxx XX 00000.

  • OFFICE OF MANAGEMENT AND BUDGET (OMB) AUDIT REQUIREMENTS The parties shall comply with the requirements of the Single Audit Act of 1984, P.L. 98-502, ensuring that the single audit report includes the coverage stipulated in 2 CFR 200.

  • Land Acquisition Disbursement To initiate the purchase of the Land, the Recipient must first complete and submit a written Request to Proceed to the Director prior to Closing. The Request to Proceed must name the proposed Title Agent and must indicate the amount of Funds requested from the OPWC for the land acquisition, including expected settlement costs, based upon the participation ratio and the amount of funds expected from any Matching Funds. The Request to Proceed must contain as attachments: (a) a copy of the proposed Deed Restrictions; (b) a copy of the executed purchase agreement with respect to, or such other agreement to convey an interest in, the Land between the Recipient and the Land owner; (c) a copy of the performed appraisal according to the specifications provided by the Director; (d) evidence satisfactory to the Director that Recipient will acquire marketable title to the Land at Closing; and (d) if the Recipient desires to elect the pre-closing option described below (i) a copy of the signed escrow agreement among Recipient, Title Agent and the OPWC, executed by Recipient and Title Agent, substantially in the form of Appendix F of this Agreement (the "Escrow Agreement") and (ii) if the Title Agent is an agent for a title insurance company, rather than a title company itself, a closing protection letter issued by the title insurance company to the OPWC. Funds for land acquisition shall be disbursed to the Recipient, as part of a grant to the Recipient pursuant to Revised Code Sections 164.20 through 164.27, pursuant to the pre-closing option and/or the reimbursement option, as described in subsections 5(a) and 5(b), respectively.

  • Permitted and Required Uses/Disclosures of PHI 3.1 Except as limited in this Agreement, Business Associate may use or disclose PHI to perform Services, as specified in the underlying grant or contract with Covered Entity. The uses and disclosures of Business Associate are limited to the minimum necessary, to complete the tasks or to provide the services associated with the terms of the underlying agreement. Business Associate shall not use or disclose PHI in any manner that would constitute a violation of the Privacy Rule if used or disclosed by Covered Entity in that manner. Business Associate may not use or disclose PHI other than as permitted or required by this Agreement or as Required by Law.

  • Please see the current Washtenaw Community College catalog for up-to-date program requirements Secondary / Post-Secondary Program Alignment Welding HIGH SCHOOL COURSE SEQUENCE 9th Grade 10th Grade 11th Grade 12th Grade English 9 Algebra I World History/Geography Biology World Language Phys Ed/Health English 10 Geometry U.S. History/Geography Physics or Chemistry World Language Visual/Performing/Applied Arts English 11 Algebra II Civics/Economics Welding English 12 Math Credit Science Credit Welding WASHTENAW COMMUNITY COLLEGE Welding Associate in Applied Science Semester 1 Math Elective(s)* 3 WAF 105 Introduction to Welding Processes 2 WAF 111 Oxy-fuel Welding 4 WAF 112 Shielded Metal Arc Welding 4 Semester Total 13 Semester 2 Speech Elective(s) 3 WAF 106 Blueprint Reading for Welders 3 WAF 123 Advanced Oxy-fuel Welding 4 WAF 124 Advanced Shielded Metal Arc Welding 4 Semester Total 14 Semester 3 Arts/Human. Elective(s) 3 Computer Lit. Elective(s) 3 WAF 215 Advanced Gas Tungsten Arc Welding 4 WAF 288 Gas Metal Arc Welding 4 Semester Total 14 Semester 4 WAF 200 Layout Theory Welding 3 WAF 210 Welding Metallurgy 3 Soc. Sci. Elective(s) 3 WAF 226 Specialized Welding Procedures 4 Semester Total 13 Semester 5 Nat. Sci. Elective(s) 4 WAF 227 Basic Fabrication 3 WAF 229 Shape Cutting Operations 3 Writing Elective(s) 3 Semester Total 13 Program Totals 67

  • Land Acquisition Reimbursement for the costs associated with acquiring interest and/or rights to real property (including access rights through ingress/egress easements, leases, license agreements, or other site access agreements; and/or obtaining record title ownership of real property through purchase) must be supported by the following, as applicable: Copies of Property Appraisals, Environmental Site Assessments, Surveys and Legal Descriptions, Boundary Maps, Acreage Certification, Title Search Reports, Title Insurance, Closing Statements/Documents, Deeds, Leases, Easements, License Agreements, or other legal instrument documenting acquired property interest and/or rights. If land acquisition costs are used to meet match requirements, Xxxxxxx agrees that those funds shall not be used as match for any other Agreement supported by State or Federal funds.

  • Modifications and Updates to the Wire Center List and Subsequent Transition Periods 2.1.4.12.1 In the event BellSouth identifies additional wire centers that meet the criteria set forth in Section 2.1.4.5, but that were not included in the Initial Wire Center List, BellSouth shall include such additional wire centers in a carrier notification letter (CNL). Each such list of additional wire centers shall be considered a “Subsequent Wire Center List”.

  • DNS name server availability Refers to the ability of a public-­‐DNS registered “IP address” of a particular name server listed as authoritative for a domain name, to answer DNS queries from an Internet user. All the public DNS-­‐registered “IP address” of all name servers of the domain name being monitored shall be tested individually. If 51% or more of the DNS testing probes get undefined/unanswered results from “DNS tests” to a name server “IP address” during a given time, the name server “IP address” will be considered unavailable.

  • ECR Number Environmental Commitment Record Requirements Description of ADOT Responsibilities TMP-3 The following measures will be implemented for the Selected Alternative: • All equipment exhaust systems will be in good working order. Properly designed engine enclosures and intake silencers will be used. • Equipment will be maintained on a regular basis. New equipment will be subject to new product emission standards. • Stationary equipment will be located as far away from sensitive receivers as possible. • Construction-related noise generators will be shielded from noise receivers (e.g., use temporary enclosures to shield generators or crushers, take advantage of site conditions to provide topographic separation). • Construction alerts will be distributed to keep the public informed of construction activities, and a toll-free number for construction-related complaints will be provided. • During the design phase, hours of operation will be evaluated to minimize disruptions during construction. ADOT to oversee for compliance TMP-4 Congestion from construction-related traffic will create temporary impacts in the project vicinity. The magnitude of these impacts will vary depending on the location of the sources of the fill material and of the disposition sites for surplus material, the land uses along the routes, the duration of hauling operations, staging locations, and the construction phasing. To identify acceptable routes and times of operation, ADOT, or its representative, will prepare an agreement with local agencies regarding hauling of construction materials on public streets. ADOT to oversee for compliance TP Attachment 000-0 Xxxxx Xxxxxxxx Xxxxxxx Project Record of Decision (ROD) Developer’s Environmental Commitment Requirements The following table includes the Project-specific environmental commitments as written in the ROD, with minor modifications for clarification purposes. As it relates to these Technical Provisions, references to freeway, project, South Mountain Freeway, proposed action, proposed freeway, and Selected Alternative mean the Project, and references to contractor mean Developer. Developer shall comply with and perform all of the contractor and ADOT requirements, including the ADOT obligations, commitments, and responsibilities, identified in the following table, except to the extent of those requirements that are specifically identified in the third column, entitled “Description of ADOT Responsibilities,” which are not delegated to Developer.

Time is Money Join Law Insider Premium to draft better contracts faster.