PROGRESS SCHEDULE The Contractor, within ten (10) working days of receiving notice of the award of the contract, shall prepare and submit for the State's and Architect's information an estimated progress schedule for the Work. The progress schedule shall be related to the entire Project to the extent required by the Contract Documents, and shall provide for expeditious and practicable execution of the Work.
Service Descriptions Credit Card processing services: Global Direct’s actions to the appropriate card associations and/or issuers (e.g., Visa, MasterCard, Diners, Discover); settlement; dispute resolution with cardholders’ banks; and transaction-related reporting, statements and products. Debit/ATM Processing Services: Global Direct has connected to the following debit card networks (“Networks”): Accel, AFFN, Interlink, MAC, Maestro, NYCE, Pulse, Star, and Tyme. Global Direct will provide Merchant with the ability to access the Networks that Global Direct has connected to for the purpose of authorizing debit card transactions at the point of sale from cards issued by the members of the respective Networks. Global Direct will provide connection to such Networks, terminal applications, settlement and reporting activities. EBT Transaction Processing Services: Global Direct offers electronic interfaces to Electronic Benefits Transfer (“EBT”) networks for the processing of cash payments or credits to or for the benefit of benefit recipients (“Recipients”). Global Direct will provide settlement and switching services for various Point of Sale transactions initiated through Merchant for the authorization of the issuance of the United States Department of Agriculture, Food and Nutrition Services (“FNS”) food stamp benefits (“FS Benefits”) and/or government delivered cash assistance benefits (“Cash Benefits, ”with FS Benefits, “Benefits”) to Recipients through the use of a state-issued card (“EBT Card”). With respect to Visa and MasterCard products, Merchant agrees to pay and Merchant's account(s) will be charged pursuant to Section 5 of this Agreement for any additional fees incurred as a result of Merchant's subsequent acceptance of transactions with any Visa or MasterCard product that it has not elected to accept.
Service Description 2.1 General
Product Description The lead products covered by this Settlement Agreement are limited to following Amazon Identification Number (ASIN) B0932PW2FY with the description, "YALANLE 63/37 Solder Tin Lead Rosin Core Solder Wire For Electrical Soldering and DIY 0.22lbs (0.8mm/100g)," which was offered for sale by the Settling Entity on xxxxxx.xxx, hereinafter the “Product” or “Products.”
System Description The wet detention basin is designed to trap 80% of sediment in runoff and maintain pre-development downstream peak flows. The basin has two forebays (smaller ponds) located at the low end of two grass xxxxxx. In addition to runoff conveyance, the grass xxxxxx also allow infiltration and filtering of pollutants, especially from smaller storms. The forebays are each 4 feet deep. They are connected to the main pool by 18 and 24-inch metal pipes that outlet onto a rock chute. The forebays will trap coarse sediments in runoff, such as road sands, thus reducing maintenance of the main basin. The main pool will trap the finer suspended sediment. To do this, the pond size, water level and outlet structures must be maintained as specified in this Agreement (see Figures 1, 2 and 3). The main basin receives runoff from a 67.1 acre drainage area (41.2 acres within the subdivision and 25.9 acres off-site drainage coming from the east). During high rainfall or snow melt events, the water level will temporarily rise and slowly drain down to the elevation of the control structure. The water level is controlled by a 12-inch concrete pipe extending through the berm in the northwest corner of the basin (see Figures 1 and 3). On the face of the 12-inch pipe, there is metal plate with a 3-inch drilled hole (orifice) with stone in front of it. This orifice controls the water level and causes the pond to temporarily rise during runoff events. Washed stone (1- 2” diameter) is placed in front of the orifice to prevent clogging. High flows may enter the grated concrete riser or flow over the rock lined emergency spillway. “As-built” construction drawings of the basin, showing actual dimensions, elevations, outlet structures, etc. will be recorded as an addendum(s) to this agreement within 60 days after [Municipality Name] accepts verification of construction from the project engineer.
Flexible Work Schedule A flexible work schedule is any schedule that is not a regular, alternate, 9/80, or 4/10 work schedule and where the employee is not scheduled to work more than 40 hours in the "workweek" as defined in Subsections F. and H., below.
Newsletter ☐ Yes, I would like to receive the newsletter. The monthly newsletter serves to keep you informed about new courses, new teachers, new developments, as well as internal and external events hosted by the GMS, its teachers and its partners. To send the newsletter, we use the mail service provider 'Mailchimp' from the United States. The provider is the Rocket Science Group LLC, 000 Xxxxx Xx Xxxx Ave NE, Suite 5000,Atlanta,GA 30308, USA. They store the mail address, and, where applicable, the first name and the IP address. For further information, please read the data protection agreement. ☐ Yes, I hereby grant my consent. Without the agreement it is not possible to subscribe to the newsletter. I can cancel the agreement at any point in the future. Use of photo, audio and video-material To promote itself and its own events, courses and programs the GMS uses photo material and sometimes audio or video recordings. ☐ Yes, I hereby grant my consent to the GMS to use photos of myself (or of my child) as well as audio/video recordings made of courses, workshops or events for promotional purposes without requiring special permission. I can cancel this agreement any point in the future.
Work Description T-804 Opening Roads - Removal of closure devices, cleaning ditches, removing berms, and blading the traveled-way T-811 Closing Roads - Water bar frequency per BMPs for remainder of road T-811 Closing Roads - Engineering Rep. or Construction Inspector must be notified prior to performing closeout 76A Single Lane / Level 1 76 0.00 Ending 0.70
Project Summary The main objective of the LIFE GAIA Sense project is to demonstrate gaiasense, an innovative “Smart Farming” (SF) solution that aims at reducing the consumption of natural resources, as a way to protect the environment and support Circular Economy (CE) models. More specifically, this project will launch 18 demonstrators across Greece, Spain and Portugal covering 9 crops (olives, peaches, cotton, pistachio, potatoes, table tomatoes, industrial tomatoes, grapes, kiwi) in various terrain and microclimatic conditions. They will demonstrate an innovative method, based on high-end technology, which is suitable for being replicated and will be accessible and affordable to Farmers either as individuals or collectively through Agricultural Cooperatives. Moreover, LIFE GAIA Sense aims to promote resource efficiency practices in SMEs of the agricultural sector and eventually, contribute to the implementation of the Roadmap to a Resource Efficient Europe. This project will demonstrate a method on how the farmer will be able to decide either to use or avoid inputs (irrigation, fertilizers, pesticides etc.) in a most efficient way, without risking the annual production. The focus is on the resource consumption reduction side of CE, and the results will be both qualitatively and quantitatively, considering the resources’ efficiency in agricultural sector.
Work Schedule (A) Where an employee has an established schedule, a change in workdays or shifts will be posted no less than 14 calendar days in advance and will reflect at least a two workweek schedule; however, the state will make a good faith effort to reflect a one month schedule. (B) In the event of a declared emergency the notice requirement of this Section may be void. (C) The state will continue to observe the scheduling structures currently in place at each agency and agrees to bargain any change in the overall practice of how schedules are established.