Objective Tab, Context Area and Context Menu Sample Clauses

Objective Tab, Context Area and Context Menu. ‌ Selecting one of the tabs updates the Context Area with that item. In the previous example, the Objective tab is selected. The objective is intended as a brief summary or description of the test plan and will be automatically included in the test report. Test engineer can type directly into the context area or copy and paste text or graphics from another application. Right-clicking the context area displays the Context Menu. Test engineer can Load or Save the objective from a Rich Text (*.rtf) or Plain Text (*.txt) file. Go-to... shows the current cursor location and allows test engineer to position the cursor to a particular line and column.
AutoNDA by SimpleDocs

Related to Objective Tab, Context Area and Context Menu

  • Strategic Context This Agreement is informed by a wider strategic context related to the delivery of safe, quality, financially sustainable and accountable healthcare for all Western Australians. The delivery of health services within the following strategic context is the mutual responsibility of both Parties, whether with reference to supporting information and guidelines or mandatory policy requirements.

  • Operational Context The System Managers will be responsible for managing the Fleetmap information of the users they are representing. This information is also shared with the other system managers; the ID information also must be kept.

  • GEOGRAPHIC AREA AND SECTOR SPECIFIC ALLOWANCES, CONDITIONS AND EXCEPTIONS The following allowances and conditions shall apply where relevant: Where the company does work which falls under the following headings, the company agrees to pay and observe the relevant respective conditions and/or exceptions set out below in each case.

  • Commingling of Resold Services with Unbundled Network Elements and Combinations of Unbundled Network Elements 6.7.1 To the extent it is Technically Feasible and pursuant to the terms of Section 9.1, CLEC may Commingle Telecommunications Services purchased on a resale basis with an Unbundled Network Element or combination of Unbundled Network Elements.

  • Reactive Power and Primary Frequency Response 9.6.1 Power Factor Design Criteria

  • Power Factor Design Criteria (Reactive Power A wind generating plant shall maintain a power factor within the range of 0.95 leading to 0.95 lagging, measured at the Point of Interconnection as defined in this LGIA, if the ISO’s System Reliability Impact Study shows that such a requirement is necessary to ensure safety or reliability. The power factor range standards can be met using, for example without limitation, power electronics designed to supply this level of reactive capability (taking into account any limitations due to voltage level, real power output, etc.) or fixed and switched capacitors if agreed to by the Connecting Transmission Owner for the Transmission District to which the wind generating plant will be interconnected, or a combination of the two. The Developer shall not disable power factor equipment while the wind plant is in operation. Wind plants shall also be able to provide sufficient dynamic voltage support in lieu of the power system stabilizer and automatic voltage regulation at the generator excitation system if the System Reliability Impact Study shows this to be required for system safety or reliability.

  • Technical Standards Applicable to a Wind Generating Plant i. Low Voltage Ride-Through (LVRT) Capability A wind generating plant shall be able to remain online during voltage disturbances up to the time periods and associated voltage levels set forth in the standard below. The LVRT standard provides for a transition period standard and a post-transition period standard.

  • Unbundled Voice Loop – SL2 (UVL-SL2 Loops may be 2-wire or 4-wire circuits, shall have remote access test points, and will be designed with a DLR provided to NewPhone. SL2 circuits can be provisioned with loop start, ground start or reverse battery signaling. OC is provided as a standard feature on XX0 Xxxxx. The OC feature will allow NewPhone to coordinate the installation of the Loop with the disconnect of an existing customer’s service and/or number portability service. In these cases, BellSouth will perform the order conversion with standard order coordination at its discretion during normal work hours.

  • Emergency Action on Imports of Particular Products Where any product is being imported in such increased quantities and under such conditions as to cause, or threaten to cause:

  • Access Toll Connecting Trunk Group Architecture 9.2.1 If CBB chooses to subtend a Verizon access Tandem, CBB’s NPA/NXX must be assigned by CBB to subtend the same Verizon access Tandem that a Verizon NPA/NXX serving the same Rate Center Area subtends as identified in the LERG.

Draft better contracts in just 5 minutes Get the weekly Law Insider newsletter packed with expert videos, webinars, ebooks, and more!