OPENCL COMPILATION TESTS Sample Clauses

OPENCL COMPILATION TESTS. To verify a flat build approach would be sufficient for the OPERA project various OpenCL designs were compiled to test that timing was met for the PCIe interface. Nallatech has an example Lattice Boltzmann code that is representative of a real HPC problem and can be easily tailored to utilise the entire device. It is rare that an FPGA use more than 80% of the device as designs greater in size than this have trouble routing, which results in a poor fMax or, worse still, failure to meet timing. Compiling the lattice boltzman code utilising > 80% of the DSP logic met timing with an fMax of 226 MHz. This is a typical clock frequency for an OpenCL Arria 10 design. In conclusion, the flat build process will be adequate for the needs of the OPERA project. Device Feature Lattice Boltzman resource requirements ALUTs 118710 Registers 291,960 Logic utilization 129,102 / 251,680 (51 % ) DSP blocks 1,381 / 1,687 (82 % ) Memory bits 33,990,040 / 43,642,880 (78 % ) RAM blocks 2,131 / 2,131 (100 % ) Table 12 : Flat compilation test resources Figure 20 : Flat build of the Lattice Boltzmann code Figure 20 shows the logic placement of an OpenCL lattice Boltzmann code compiled and built using the SOC board support package. The items in red are the logic elements that form part of the BSP, such as the PCIe memory interface. The Items in blue are logic elements that form the OpenCL kernels of the Lattice Boltzmann code.
AutoNDA by SimpleDocs

Related to OPENCL COMPILATION TESTS

  • Evaluation, Testing, and Monitoring 1. The System Agency may review, test, evaluate and monitor Grantee’s Products and services, as well as associated documentation and technical support for compliance with the Accessibility Standards. Review, testing, evaluation and monitoring may be conducted before and after the award of a contract. Testing and monitoring may include user acceptance testing. Neither the review, testing (including acceptance testing), evaluation or monitoring of any Product or service, nor the absence of review, testing, evaluation or monitoring, will result in a waiver of the State’s right to contest the Grantee’s assertion of compliance with the Accessibility Standards.

  • Evaluation Software If the Software is an evaluation version or is provided to You for evaluation purposes, then, unless otherwise approved in writing by an authorized representative of Licensor, Your license to use the Software is limited solely for internal evaluation purposes in non-production use and in accordance with the terms of the evaluation offering under which You received the Software, and expires 90 days from installation (or such other period as may be indicated within the Software). Upon expiration of the evaluation period, You must discontinue use of the Software, return to an original state any actions performed by the Software, and delete the Software entirely from Your system and You may not download the Software again unless approved in writing by an authorized representative of Licensor. The Software may contain an automatic disabling mechanism that prevents its use after a certain period of time. RESTRICTIONS

  • LIMITATIONS ON REVERSE ENGINEERING, DECOMPILATION AND DISASSEMBLY You may not reverse engineer, decompile, or disassemble the Software, except and only to the extent that such activity is expressly permitted by applicable law notwithstanding this limitation.

  • Laboratory Testing All laboratories selected by UPS Freight for analyzing Controlled Substances Testing will be HHS certified.

  • Trunk Group Architecture and Traffic Routing The Parties shall jointly engineer and configure Local/IntraLATA Trunks over the physical Interconnection arrangements as follows:

  • COMMERCIAL COMPUTER SOFTWARE If performance involves acquisition of existing computer software, the following Company Exhibit is incorporated by reference: CCS Commercial Computer Software License (Company – July 2010).

  • INSPECTION/TESTING All Products sold pursuant to this Agreement will be subject to inspection/testing by or at the direction of H- GAC and/or the ordering Customer, either at the delivery destination or the place of manufacture. In the event a Product fails to meet or exceed all requirements of this Agreement, and unless otherwise agreed in advance, the cost of any inspection and/or testing, will be the responsibility of the Contractor.

  • Post-Commercial Operation Date Testing and Modifications Each Party shall at its own expense perform routine inspection and testing of its facilities and equipment in accordance with Good Utility Practice as may be necessary to ensure the continued interconnection of the Large Generating Facility with the Participating TO’s Transmission System in a safe and reliable manner. Each Party shall have the right, upon advance written notice, to require reasonable additional testing of the other Party’s facilities, at the requesting Party’s expense, as may be in accordance with Good Utility Practice.

  • Commercial Operation Date Testing and Modifications Prior to the Commercial Operation Date, the Connecting Transmission Owner shall test the Connecting Transmission Owner’s Attachment Facilities and System Upgrade Facilities and System Deliverability Upgrades and Developer shall test the Large Generating Facility and the Developer Attachment Facilities to ensure their safe and reliable operation. Similar testing may be required after initial operation. Developer and Connecting Transmission Owner shall each make any modifications to its facilities that are found to be necessary as a result of such testing. Developer shall bear the cost of all such testing and modifications. Developer shall generate test energy at the Large Generating Facility only if it has arranged for the injection of such test energy in accordance with NYISO procedures.

  • SERVICE MONITORING, ANALYSES AND ORACLE SOFTWARE 11.1 We continuously monitor the Services to facilitate Oracle’s operation of the Services; to help resolve Your service requests; to detect and address threats to the functionality, security, integrity, and availability of the Services as well as any content, data, or applications in the Services; and to detect and address illegal acts or violations of the Acceptable Use Policy. Oracle monitoring tools do not collect or store any of Your Content residing in the Services, except as needed for such purposes. Oracle does not monitor, and does not address issues with, non-Oracle software provided by You or any of Your Users that is stored in, or run on or through, the Services. Information collected by Oracle monitoring tools (excluding Your Content) may also be used to assist in managing Oracle’s product and service portfolio, to help Oracle address deficiencies in its product and service offerings, and for license management purposes.

Time is Money Join Law Insider Premium to draft better contracts faster.