Optional Transfer Station Processing System Sample Clauses

Optional Transfer Station Processing System. On or before June 30, 2010, 12 Contractor shall submit to the Authority a proposal to install a materials processing 13 system in the Transfer Station. The system is to be capable of accepting and efficiently 14 processing Self-haul construction/demolition debris (wood, concrete, insulation, roofing, 15 metals, drywall, dirt and other inerts) and Organic Materials (including Plant Materials 16 and wood waste). The system shall be capable of operating at a cost per Ton 17 (including capital costs amortized as provided in Attachment 12) which is equal to or 18 less than the current total cost of transporting construction and demolition debris to the 19 existing off-site facility used by the Authority and the payment to the operator of that 20 facility for processing. The proposal shall include plans and specifications for the 21 equipment, cost forms showing estimates for design, equipment purchase, installation 22 and operation, and a detailed operational plan. 23 The Authority will carefully evaluate the proposal, but is under no obligation to approve 24 it nor arrange for or permit the installation of such a processing systems.
AutoNDA by SimpleDocs

Related to Optional Transfer Station Processing System

  • Dark Fiber Transport Dark Fiber Transport is defined as Dedicated Transport that consists of unactivated optical interoffice transmission facilities without attached signal regeneration, multiplexing, aggregation or other electronics. Except as set forth in Section 6.9.1 below, BellSouth shall not be required to provide access to Dark Fiber Transport Entrance Facilities pursuant to this Agreement.

Time is Money Join Law Insider Premium to draft better contracts faster.