Order of Preference of Operations. (A) Except as otherwise specifically provided in this Agreement, if any Party desires to propose the conduct of an operation that will conflict with an existing proposal for an Exclusive Operation, such Party shall have the right exercisable for five (5) Days (or twenty-four (24) hours for Urgent Operational Matters) from receipt of the proposal for the Exclusive Operation, to deliver such Party’s alternative proposal to all Parties entitled to participate in the proposed operation. Such alternative proposal shall contain the information required under Article 7.2(A). (B) Each Party receiving such proposals shall elect by delivery of notice to Operator and to the proposing Parties within the appropriate response period set out in Article 7.2(B) to participate in one of the competing proposals. Any Party not notifying Operator and the proposing Parties within the response period shall be deemed to have voted against the proposals. (C) The proposal receiving the largest aggregate Participating Interest vote shall have priority over all other competing proposals. In the case of a tie vote, Operator shall choose among the proposals receiving the largest aggregate Participating Interest vote. Operator shall deliver notice of such result to all Parties entitled to participate in the operation within five (5) Days (or twenty-four (24) hours for Urgent Operational Matters). (D) Each Party shall then have two (2) Days (or twenty-four (24) hours for Urgent Operational Matters) from receipt of such notice to elect by delivery of notice to Operator and the proposing Parties whether such Party will participate in such Exclusive Operation, or will relinquish its interest pursuant to Article 7.4(B). Failure by a Party to deliver such notice within such period shall be deemed an election not to participate in the prevailing proposal. (E) Notwithstanding the provisions of Article 7.4(B), if for reasons other than the encountering of granite or other practically impenetrable substance or any other condition in the hole rendering further operations impracticable, a well drilled as an Exclusive Operation fails to reach the deepest objective Zone described in the notice proposing such well, Operator shall give notice of such failure to each Non-Consenting Party who submitted or voted for an alternative proposal under this Article 7.6 to drill such well to a shallower Zone than the deepest objective Zone proposed in the notice under which such well was drilled. Each such Non-Consenting Party shall have the option exercisable for forty-eight (48) hours from receipt of such notice to participate for its Participating Interest share in the initial proposed Completion of such well. Each such Non-Consenting Party may exercise such option by notifying Operator that it wishes to participate in such Completion and by paying its Participating Interest share of the cost of drilling such well to its deepest depth drilled in the Zone in which it is Completed. All liabilities and expenses for drilling and Testing the Exclusive Well below that depth shall be for the sole account of the Consenting Parties. If any such Non-Consenting Party does not properly elect to participate in the first Completion proposed for such well, the relinquishment provisions of Article 7.4(B) shall continue to apply to such Non-Consenting Party’s interest.

Appears in 6 contracts

Samples: Purchase and Sale Agreement (Hyperdynamics Corp), Joint Operating Agreement (Bontan Corp Inc), Joint Operating Agreement (Bontan Corp Inc)

AutoNDA by SimpleDocs

Order of Preference of Operations. (A) Except as otherwise specifically provided in this Agreement, if any Party party desires to propose the conduct of an operation that will conflict conflicts with an existing a proposal for an Exclusive Operationthat has been made by a party under this Article VI, such Party party shall have fifteen (15) days from delivery of the right exercisable for five (5) Days (initial proposal, in the case of a proposal to perform an operation on a well where no drilling rig is on location, or twenty-four (24) hours for Urgent Operational Matters) hours, exclusive of Saturday, Sunday and legal holidays, from receipt delivery of the proposal initial proposal, if a drilling rig is on location for the Exclusive Operationwell on which such operation is to be conducted, to deliver such Party’s alternative proposal to all Parties parties entitled to participate in the proposed operation. Such operation such party’s alternative proposal, such alternate proposal shall to contain the same information required under Article 7.2(A). (B) to be included in the initial proposal. Each Party party receiving such proposals shall elect by delivery of notice to Operator within five (5) days after expiration of the proposal period, or within twenty-four (24) hours (exclusive of Saturday, Sunday and to legal holidays) if a drilling rig is on location for the proposing Parties within well that is the appropriate response period set out in Article 7.2(B) subject of the proposals, to participate in one of the competing proposals. Any Party party not notifying Operator and the proposing Parties electing within the response period time required shall be deemed not to have voted against the proposals. (C) voted. The proposal receiving the vote of parties owning the largest aggregate Participating Interest vote percentage interest of the parties voting shall have priority over all other competing proposals. In ; in the case of a tie vote, Operator the initial proposal shall choose among the proposals receiving the largest aggregate Participating Interest voteprevail. Operator shall deliver notice of such result to all Parties parties entitled to participate in the operation within five (5) Days days after expiration of the election period (or within twenty-four (24) hours, exclusive of Saturday, Sunday and legal holidays, if a drilling rig is on location). Each party shall then have two (2) days (or twenty-four (24) hours for Urgent Operational Matters). (D) Each Party shall then have two (2) Days (or twenty-four (24) hours for Urgent Operational Mattersif a rig is on location) from receipt of such notice to elect by delivery of notice to Operator and the proposing Parties whether such Party will to participate in such Exclusive Operation, operation or will to relinquish its interest in the affected well pursuant to the provisions of Article 7.4(B). Failure VI.B.2.; failure by a Party party to deliver such notice within such period shall be deemed an election not to participate in the prevailing proposal. (E) Notwithstanding the provisions of Article 7.4(B), if for reasons other than the encountering of granite or other practically impenetrable substance or any other condition in the hole rendering further operations impracticable, a well drilled as an Exclusive Operation fails to reach the deepest objective Zone described in the notice proposing such well, Operator shall give notice of such failure to each Non-Consenting Party who submitted or voted for an alternative proposal under this Article 7.6 to drill such well to a shallower Zone than the deepest objective Zone proposed in the notice under which such well was drilled. Each such Non-Consenting Party shall have the option exercisable for forty-eight (48) hours from receipt of such notice to participate for its Participating Interest share in the initial proposed Completion of such well. Each such Non-Consenting Party may exercise such option by notifying Operator that it wishes to participate in such Completion and by paying its Participating Interest share of the cost of drilling such well to its deepest depth drilled in the Zone in which it is Completed. All liabilities and expenses for drilling and Testing the Exclusive Well below that depth shall be for the sole account of the Consenting Parties. If any such Non-Consenting Party does not properly elect to participate in the first Completion proposed for such well, the relinquishment provisions of Article 7.4(B) shall continue to apply to such Non-Consenting Party’s interest.

Appears in 4 contracts

Samples: Operating Agreement (Vanguard Natural Resources, LLC), Operating Agreement (Vanguard Natural Resources, LLC), Operating Agreement (Vanguard Natural Resources, LLC)

Order of Preference of Operations. (Aa) Except as otherwise specifically provided in this Agreement, if any Party desires to propose the conduct of an operation that will conflict with an existing proposal for an Exclusive Operation, such Party shall have the right exercisable for five (5) Days (Days, or twenty-twenty four (24) hours for Urgent Operational Matters) if the drilling rig to be used is standing by in the Contract Area, from receipt of the proposal for the Exclusive Operation, to deliver such Party’s alternative proposal to all Parties entitled to participate in the proposed operationoperation such Party’s alternative proposal. Such alternative proposal shall contain the information required under Article 7.2(AClause 7.2(a). (B) . Each Party receiving such proposals shall elect by delivery of notice to Operator and to the proposing Parties within the appropriate response period set out in Article 7.2(BClause 7.2(b) to participate in one of the competing completing proposals. Any Party not notifying Operator and the proposing Parties within the response period shall be deemed to have voted against the proposalsproposal. (Cb) The proposal receiving the largest aggregate Participating Interest vote shall have priority over all other competing proposals. In the case of a tie vote, the Operator shall choose among the proposals receiving the largest aggregate Participating Interest vote. Operator shall deliver notice of such result to all Parties entitled to participate in the operation within five (5) Days (of the end of the response period, or twenty-twenty four (24) hours for Urgent Operational Matters)if the drilling rig to be used is standing by in the Contract Area. (Dc) Each Party shall then have two (2) Days (or twenty-twenty four (24) hours for Urgent Operational Mattersif the drilling rig to be used is standing by in the Contract Area) from receipt of such notice to elect by delivery of notice to Operator and the proposing Parties whether such Party will participate in such Exclusive Operation, or will relinquish its interest pursuant to Article 7.4(BClause 7.4(b). Failure by a Party to deliver such notice within such period shall be deemed an election not to participate in the prevailing proposal. (Ed) Notwithstanding the provisions of Article 7.4(BClause 7.4(b), if for reasons other than the encountering of granite or other practically impenetrable substance or any other condition in the hole rendering further operations impracticable, a well drilled as an Exclusive Operation fails to reach the deepest objective Zone described in the notice proposing such well, Operator shall give notice of such failure to each Non-Consenting Party who submitted or voted for an alternative proposal under this Article Clause 7.6 to drill such well to a shallower Zone than the deepest objective Zone proposed in the notice under which such well was drilled. Each such Non-Consenting Party shall have the option exercisable for forty-forty eight (48) hours from receipt of such notice to participate for its Participating Interest share in the initial proposed Completion of such well. Each such Non-Consenting Party may exercise such option by notifying the Operator that it wishes to participate in such Completion and by paying its Participating Interest share of the cost of drilling such well to its deepest depth drilled in the Zone in which it is Completed. All liabilities and expenses for drilling and Testing the Exclusive Well below that depth shall be for the sole account of the Consenting Parties. If any such Non-Consenting Party does not properly elect to participate in the first Completion proposed for such well, the relinquishment provisions of Article 7.4(BClause 7.4(b) shall continue to apply to such Non-Consenting Party’s interest.

Appears in 3 contracts

Samples: Joint Operating Agreement, Joint Operating Agreement, Joint Operating Agreement (Kosmos Energy Ltd.)

Order of Preference of Operations. (A) 10.6.1 Except as otherwise specifically provided in this Agreement, if any Party desires to propose the conduct of an operation that will conflict with an existing proposal for an Exclusive Risk Operation, such Party shall have the right exercisable for five (5) Days (days, or twenty-twenty four (24) hours for Urgent Operational Matters) if the drilling rig to be used is standing by in the License Area, from receipt of the proposal for the Exclusive Risk Operation, to deliver such Party’s alternative proposal to all Parties entitled to participate in the proposed operation. Such operation such Party's alternative proposal shall contain the information required under Article 7.2(A)proposal. (B) 10.6.2 Each Party receiving such proposals shall elect by delivery of notice to Operator and to the proposing Parties within the appropriate response period set out in Article 7.2(B) 10.2.2 to participate in one of the competing proposals. Any Party not notifying Operator and the proposing Parties within the response period shall be deemed to have voted against the proposalsproposal. (C) 10.6.3 The proposal receiving the largest aggregate Participating Percentage Interest vote shall have priority over all other competing proposals. In the case of a tie vote, Operator shall choose among the proposals receiving the largest aggregate Participating Interest vote. Operator shall deliver notice of such result to all Parties entitled to participate in the operation within five (5) Days (days of the end of the response period, or twenty-twenty four (24) hours for Urgent Operational Matters).if the drilling rig to be used is standing by in the License Area, (D) 10.6.4 Each Party shall then have two (2) Days (days or twenty-twenty four (24) hours for Urgent Operational Matters) if the drilling rig to be used is standing by in the License Area, from receipt of such notice to elect by delivery of notice to Operator and the proposing Parties whether such Party will participate in such Exclusive Risk Operation, or will relinquish its interest pursuant to Article 7.4(B)10.4.2. Failure by a Party to deliver such notice within such period shall be deemed an election not to participate in the prevailing proposal. (E) Notwithstanding the provisions of Article 7.4(B), if for reasons other than the encountering of granite or other practically impenetrable substance or any other condition in the hole rendering further operations impracticable, a well drilled as an Exclusive Operation fails to reach the deepest objective Zone described in the notice proposing such well, Operator shall give notice of such failure to each Non-Consenting Party who submitted or voted for an alternative proposal under this Article 7.6 to drill such well to a shallower Zone than the deepest objective Zone proposed in the notice under which such well was drilled. Each such Non-Consenting Party shall have the option exercisable for forty-eight (48) hours from receipt of such notice to participate for its Participating Interest share in the initial proposed Completion of such well. Each such Non-Consenting Party may exercise such option by notifying Operator that it wishes to participate in such Completion and by paying its Participating Interest share of the cost of drilling such well to its deepest depth drilled in the Zone in which it is Completed. All liabilities and expenses for drilling and Testing the Exclusive Well below that depth shall be for the sole account of the Consenting Parties. If any such Non-Consenting Party does not properly elect to participate in the first Completion proposed for such well, the relinquishment provisions of Article 7.4(B) shall continue to apply to such Non-Consenting Party’s interest.

Appears in 2 contracts

Samples: Joint Operating Agreement (Avenue Group Inc), Joint Operating Agreement (Avenue Group Inc)

Order of Preference of Operations. (A) Except as otherwise specifically provided in this Agreement, if any Party desires to propose the conduct of an operation that will conflict with an existing proposal for an Exclusive Operation, such Party shall have the right exercisable for five (5) Days (Days, or twenty-four (24) hours for Urgent Operational Matters) if the drilling rig or seismic vessel to be used is standing by under contract in the Contract Area, from receipt of the proposal for the Exclusive Operation, to deliver such Party’s alternative proposal to all Parties entitled to participate in the proposed operationoperation such Party’s alternative proposal. Such alternative proposal shall contain the information required under Article 7.2(A). (B) Each Party receiving such proposals shall elect by delivery of notice to Operator and to the proposing Parties within the appropriate response period set out in Article 7.2(B) to participate in one of the competing proposals. Any Party not notifying Operator and the proposing Parties within the response period shall be deemed to have voted against the proposalsproposal. (C) The proposal receiving the largest aggregate Participating Interest vote shall have priority over all other competing proposals. In the case of a tie vote, the Operator shall choose among the proposals receiving the largest aggregate Participating Interest vote. Operator shall deliver notice of such result to all Parties entitled to participate in the operation within five (5) Days (of the end of the response period, or twenty-four (24) hours for Urgent Operational Matters)if the drilling rig or seismic acquisition vehicle to be used is standing by under contract in the Contract Area. (D) Each Party shall then have two (2) Days (or twenty-four (24) hours for Urgent Operational Mattersif the drilling rig or seismic acquisition vehicle to be used is standing by under contract in the Contract Area) from receipt of such notice to elect by delivery of notice to Operator and the proposing Parties whether such Party will participate in such Exclusive Operation, or will relinquish its interest pursuant to Article 7.4(B). Failure by a Party to deliver such notice within such period shall be deemed an election not to participate in the prevailing proposal. (E) Notwithstanding the provisions of Article 7.4(B), if for reasons other than the encountering of granite or other practically impenetrable substance or any other condition in the hole rendering further operations impracticable, a well drilled as an Exclusive Operation fails to reach the deepest objective Zone described in the notice proposing such well, Operator shall give notice of such failure to each Non-Consenting Party who submitted or voted for an alternative proposal under this Article 7.6 to drill such well to a shallower Zone than the deepest objective Zone proposed in the notice under which such well was drilled. Each such Non-Consenting Party shall have the option exercisable for forty-eight (48) hours from receipt of such notice to participate for its Participating Interest share in the initial proposed Completion of such well. Each such Non-Consenting Party may exercise such option by notifying Operator that it wishes to participate in such Completion and by paying its Participating Interest share of the cost of drilling such well to its deepest depth drilled in the Zone in which it is Completed. All liabilities and expenses for drilling and Testing the Exclusive Well below that depth shall be for the sole account of the Consenting Parties. If any such Non-Consenting Party does not properly elect to participate in the first Completion proposed for such well, the relinquishment provisions of Article 7.4(B) shall continue to apply to such Non-Consenting Party’s interest.

Appears in 2 contracts

Samples: Joint Operating Agreement, Joint Operating Agreement (Kosmos Energy Ltd.)

Order of Preference of Operations. (A) Except as otherwise specifically provided in this Agreement, if any Party desires to propose the conduct of an operation that will conflict with an existing proposal for an Exclusive Operation, such Party shall have the right exercisable for five (5) Days (Days, or twenty-four (24) hours for Urgent Operational Matters) if the drilling rig to be used is standing by in the Concession Area, from receipt of the proposal for the Exclusive Operation, to deliver such Party’s alternative proposal to all Parties entitled to participate in the proposed operationoperation such Party's alternative proposal. Such alternative proposal shall contain the information required under Article 7.2(A). (B) Each Party receiving such proposals shall elect by delivery of notice to Operator and to the proposing Parties within the appropriate response period set out in Article 7.2(B) to participate in one of the competing proposals. Any Party not notifying Operator and the proposing Parties within the response period shall be deemed not to have voted against the proposalsvoted. (C) The proposal receiving the largest aggregate Participating Interest vote shall have priority over all other competing proposals. In the case of a tie vote, the Operator shall choose among the proposals receiving the largest aggregate Participating Interest vote. Operator shall deliver notice of such result to all Parties entitled to participate in the operation within five (5) Days (of the end of the response period, or twenty-four (24) hours for Urgent Operational Matters)if the drilling rig to be used is standing by in the Concession Area. (D) Each Party shall then have two (2) Days (or twenty-four (24) hours for Urgent Operational Mattersif the drilling rig to be used is standing by in the Concession Area) from receipt of such notice to elect by delivery of notice to Operator and the proposing Parties whether such Party will participate in such Exclusive Operation, or will relinquish its interest pursuant to Article 7.4(B). Failure by a Party to deliver such notice within such period shall be deemed an election not to participate in the prevailing proposal. (E) Notwithstanding the provisions of Article 7.4(B), if for reasons other than the encountering of granite or other practically impenetrable substance or any other condition in the hole rendering further operations impracticable, a well drilled as an Exclusive Operation fails to reach the deepest objective Zone described in the notice proposing such well, Operator shall give notice of such failure to each Non-Consenting Party who submitted or voted for an alternative proposal under this Article 7.6 to drill such well to a shallower Zone than the deepest objective Zone proposed in the notice under which such well was drilled. Each such Non-Consenting Party shall have the option exercisable for forty-eight (48) hours from receipt of such notice to participate for its Participating Interest share in the initial proposed Completion of such well. Each such Non-Consenting Party may exercise such option by notifying the Operator that it wishes to participate in such Completion and by paying its Participating Interest share of the cost of drilling such well well, calculated in the manner provided in Article 7.8(B), to its deepest depth drilled in the Zone in which it is Completed. All liabilities and expenses for drilling and Testing the Exclusive Well below that depth shall be for the sole account of the Consenting Parties. If any such Non-Consenting Party does not properly elect to participate in the first Completion proposed for such well, the relinquishment provisions of Article 7.4(B) shall continue to apply to such Non-Consenting Party’s 's interest.

Appears in 1 contract

Samples: Joint Operating Agreement (Drucker Industries Inc)

Order of Preference of Operations. (A) Except as otherwise specifically provided in this Agreement, if any Party desires to propose the conduct of an operation that will conflict with an existing proposal for an Exclusive Operation, such Party shall have the right exercisable for five (5) Days (Days, or twenty-four (24) hours for Urgent Operational Matters) if the drilling rig to be used is standing by in the Contract Area, from receipt of the proposal for the Exclusive Operation, to deliver such Party’s alternative proposal to all Parties entitled to participate in the proposed operationoperation such Party's alternative proposal. Such alternative proposal shall contain the information required under Article 7.2(A). (B) Each Party receiving such proposals shall elect by delivery of notice to Operator and to the proposing Parties within the appropriate response period set out in Article 7.2(B) to participate in one of the competing proposals. Any Party not notifying Operator and the proposing Parties within the response period shall be deemed not to have voted against the proposalsvoted. (C) The proposal receiving the largest aggregate Participating Interest vote shall have priority over all other competing proposals. In the case of a tie vote, the Operator shall choose among the proposals receiving the largest aggregate Participating Interest vote. Operator shall deliver notice of such result to all Parties entitled to participate in the operation within five (5) Days (of the end of the response period, or twenty-four (24) hours for Urgent Operational Matters)if the drilling rig to be used is standing by in the Contract Area. (D) Each Party shall then have two (2) Days (or twenty-four (24) hours for Urgent Operational Mattersif the drilling rig to be used is standing by in the Contract Area) from receipt of such notice to elect by delivery of notice to Operator and the proposing Parties whether such Party will participate in such Exclusive Operation, or will relinquish its interest pursuant to Article 7.4(B). Failure by a Party to deliver such notice within such period shall be deemed an election not to participate in the prevailing proposal. Check if desired. (E) Notwithstanding the provisions of Article 7.4(B), if for reasons other than the encountering of granite or other practically impenetrable substance or any other condition in the hole rendering further operations impracticable, a well drilled as an Exclusive Operation fails to reach the deepest objective Zone described in the notice proposing such well, Operator shall give notice of such failure to each Non-Consenting Party who submitted or voted for an alternative proposal under this Article 7.6 to drill such well to a shallower Zone than the deepest objective Zone proposed in the notice under which such well was drilled. Each such Non-Consenting Party shall have the option exercisable for forty-eight (48) hours from receipt of such notice to participate for its Participating Interest share in the initial proposed Completion of such well. Each such Non-Consenting Party may exercise such option by notifying Operator that it wishes to participate in such Completion and by paying its Participating Interest share of the cost of drilling such well to its deepest depth drilled in the Zone in which it is Completed. All liabilities and expenses for drilling and Testing the Exclusive Well below that depth shall be for the sole account of the Consenting Parties. If any such Non-Consenting Party does not properly elect to participate in the first Completion proposed for such well, the relinquishment provisions of Article 7.4(B) shall continue to apply to such Non-Consenting Party’s interest.

Appears in 1 contract

Samples: International Joint Venture Operating Agreement (Abacan Resource Corp)

Order of Preference of Operations. (Aa) Except as otherwise specifically provided in this Agreement, if any Party desires to propose the conduct of an operation that will conflict with an existing proposal for an Exclusive Operation, such Party shall have the right exercisable for five ten (510) Days (or twenty-four (24) hours for Urgent Operational Matters) from receipt of the proposal for the Exclusive Operation, to deliver such Party’s alternative proposal to all Parties entitled to participate in the proposed operation. Such alternative proposal shall contain the information required under Article 7.2(Aclause 7.2(a). (Bb) Each Party receiving such proposals shall elect by delivery of notice to Operator and to the proposing Parties within the appropriate response period set out in Article 7.2(Bclause 7.2(b) to participate in one of the competing proposals. Any Party not notifying Operator and the proposing Parties within the response period shall be deemed to have voted against the proposals. (Cc) The proposal receiving the largest aggregate Participating Interest vote shall have priority over all other competing proposals. In the case of a tie vote, Operator shall choose among the proposals receiving the largest aggregate Participating Interest vote. Operator shall deliver notice of such result to all Parties entitled to participate in the operation within five (5) Days (or twenty-four (24) hours for Urgent Operational Matters). (Dd) Each Party shall then have two five (25) Days (or twenty-four (24) hours for Urgent Operational Matters) from receipt of such notice to elect by delivery of notice to Operator and the proposing Parties whether such Party will participate in such Exclusive Operation, or will relinquish its interest pursuant to Article 7.4(Bclause 7.4(b). Failure by a Party to deliver such notice within such period shall be deemed an election not to participate in the prevailing proposal. (Ee) Notwithstanding the provisions of Article 7.4(Bclause 7.4(b), if for reasons other than the encountering of granite granite, basalt or other practically impenetrable substance or any other condition in the hole rendering further operations impracticable, a well drilled as an Exclusive Operation fails to reach the deepest objective Zone described in the notice proposing such well, Operator shall give notice of such failure to each Non-Consenting Party who submitted or voted for an alternative proposal under this Article clause 7.6 to drill such well to a shallower Zone than the deepest objective Zone proposed in the notice under which such well was drilled. Each such Non-Consenting Party shall have the option exercisable for forty-eight (48) hours from receipt of such notice to participate for its Participating Interest share in the initial proposed Completion of such well. Each such Non-Consenting Party may exercise such option by notifying Operator that it wishes to participate in such Completion and by paying its Participating Interest share of the cost of drilling such well to its deepest depth drilled in the Zone in which it is Completed. All liabilities and expenses for drilling and Testing the Exclusive Well below that depth shall be for the sole account of the Consenting Parties. If any such Non-Consenting Party does not properly elect to participate in the first Completion proposed for such well, the relinquishment provisions of Article 7.4(Bclause 7.4(b) shall continue to apply to such Non-Consenting Party’s interest.

Appears in 1 contract

Samples: Farmout Agreement (Hyperdynamics Corp)

Order of Preference of Operations. (Aa) Except as otherwise specifically provided in this Agreement, if any Party desires to propose the conduct of an operation that will conflict with an existing proposal for an Exclusive Operation, such Party shall have the right exercisable for five (5) Days (Days, or twenty-four (24) hours for Urgent Operational Matters) if the drilling rig or seismic vessel to be used is standing by under contract in the Contract Area, from receipt of the proposal for the Exclusive Operation, to deliver such Party’s alternative proposal to all Parties entitled to participate in the proposed operationoperation such Party’s alternative proposal. Such alternative proposal shall contain the information required under Article 7.2(A8.2(a). (Bb) Each Party receiving such proposals shall elect by delivery of notice to Operator and to the proposing Parties Service Provider within the appropriate response period set out in Article 7.2(B8.2(b) to participate in one of the competing proposals. Any Party not notifying Operator and the proposing Parties Operating Committee within the response period shall be deemed to have voted against the proposalsproposal. (Cc) The proposal receiving the largest aggregate Participating Interest vote voting interest shall have priority over all other competing proposals. In the case of a tie vote, Operator the Operating Committee shall choose among the proposals receiving the largest aggregate Participating Interest votevoting interest. Operator The chairman of the Operating Committee shall deliver notice of such result to all Parties entitled to participate in the operation within five (5) Days (of the end of the response period, or twenty-four (24) hours for Urgent Operational Matters)if the drilling rig or seismic vessel to be used is standing by under contract in the Contract Area. (Dd) Each Party shall then have two (2) Days (or twenty-four (24) hours for Urgent Operational Mattersif the drilling rig or seismic vessel to be used is standing by under contract in the Contract Area) from receipt of such notice to elect by delivery of notice to Operator and the proposing Parties Service Provider whether such Party will participate in such Exclusive Operation, or will relinquish its interest pursuant to Article 7.4(B8.4(b). Failure by a Party to deliver such notice within such period shall be deemed an election not to participate in the prevailing proposal. (Ee) Notwithstanding the provisions of Article 7.4(B8.4(b), if for reasons other than the encountering of granite or other practically impenetrable substance or any other condition encountered in the hole rendering further operations impracticable, a well drilled as an Exclusive Operation fails to reach the deepest objective Zone described in the notice proposing such well, Operator the operator of such Exclusive Operation shall give notice of such failure to each Non-Consenting Party who submitted or voted for an alternative proposal under this Article 7.6 8.6 to drill such well to a shallower Zone than the deepest objective Zone proposed in the notice under which such well was drilled. Each such Non-Consenting Party shall have the option exercisable for forty-eight (48) hours from receipt of such notice to participate for its Participating Interest share in the initial proposed Completion of such well. Each such Non-Consenting Party may exercise such option by notifying Operator the Service Provider that it wishes to participate in such Completion and by paying its Participating Interest share of the cost of drilling such well to its deepest depth drilled in the Zone in which it is Completedcompleted. All liabilities and expenses for drilling and Testing the Exclusive Well below that depth shall be for the sole account of the Consenting Parties. If any such Non-Consenting Party does not properly elect to participate in the first Completion proposed for such well, the relinquishment provisions of Article 7.4(B8.4(b) shall continue to apply to such Non-Consenting Party’s interest.

Appears in 1 contract

Samples: Asset Purchase Agreement (AsherXino Corp)

Order of Preference of Operations. (A) Except as otherwise specifically provided in this Agreement, if any Party desires to propose the conduct of an operation that will conflict with an existing proposal for an Exclusive Operation, such Party shall have the right exercisable for five (5) Days (or twenty-four (24) hours for Urgent Operational Matters) from receipt of the proposal for the Exclusive Operation, to deliver such Party’s alternative proposal to all Parties entitled to participate in the proposed operation. Such alternative proposal shall contain the information required under Article 7.2(A). (B) Each Party receiving such proposals shall elect by delivery of notice to the Operator and to the proposing Parties within the appropriate response period set out in Article 7.2(B) to participate in one of the competing proposals. Any Party not notifying the Operator and the proposing Parties within the response period shall be deemed to have voted against the proposals. (C) The proposal receiving the largest aggregate Participating Interest vote shall have priority over all other competing proposals. In the case of a tie vote, the Operator shall choose among the proposals receiving the largest aggregate Participating Interest vote. The Operator shall deliver notice of such result to all Parties entitled to participate in the operation within five (5) Days (or twenty-four (24) hours for Urgent Operational Matters). (D) Each Party shall then have two (2) Days (or twenty-four (24) hours for Urgent Operational Matters) from receipt of such notice to elect by delivery of notice to the Operator and the proposing Parties whether such Party will participate in such Exclusive Operation, or will relinquish its interest pursuant to Article 7.4(B). Failure by a Party to deliver such notice within such period shall be deemed an election not to participate in the prevailing proposal. (E) Notwithstanding the provisions of Article 7.4(B), if for reasons other than the encountering of granite or other practically impenetrable substance or any other condition in the hole rendering further operations impracticable, a well drilled as an Exclusive Operation fails to reach the deepest objective Zone described in the notice proposing such well, the Operator shall give notice of such failure to each Non-Consenting Party who submitted or voted for an alternative proposal under this Article 7.6 to drill such well to a shallower Zone than the deepest objective Zone proposed in the notice under which such well was drilled. Each such Non-Consenting Party shall have the option exercisable for forty-eight (48) hours from receipt of such notice to participate for its Participating Interest share in the initial proposed Completion of such well. Each such Non-Consenting Party may exercise such option by notifying the Operator that it wishes to participate in such Completion and by paying its Participating Interest share of the cost of drilling such well to its deepest depth drilled in the Zone in which it is Completed. All liabilities and expenses for drilling and Testing the Exclusive Well below that depth shall be for the sole account of the Consenting Parties. If any such Non-Consenting Party does not properly elect to participate in the first Completion proposed for such well, the relinquishment provisions of Article 7.4(B) shall continue to apply to such Non-Non- Consenting Party’s interest.

Appears in 1 contract

Samples: Joint Operating Agreement

Order of Preference of Operations. (A) Except as otherwise specifically provided in this Agreement, if any Party desires to propose the conduct of an operation that will conflict with an existing proposal for an Exclusive Operation, such Party shall have the right exercisable for five (5) Days (or twenty-four (24) hours for Urgent Operational Matters) from receipt of the proposal for the Exclusive Operation, to deliver such Party’s alternative proposal to all Parties entitled to participate in the proposed operation. Such alternative proposal shall contain the information required under Article 7.2(A). (B) Each Party receiving such proposals shall elect by delivery of notice to Operator and to the proposing Parties within the appropriate response period set out in Article 7.2(B) to participate in one of the competing proposals. Any Party not notifying Operator and the proposing Parties within the response period shall be deemed to have voted against the proposals. (C) The proposal receiving the largest aggregate Participating Interest vote shall have priority over all other competing proposals. In the case of a tie vote, Operator shall choose among the proposals receiving the largest aggregate Participating Interest vote. Operator shall deliver notice of such result to all Parties entitled to participate in the operation within five (5) Days (or twenty-four (24) hours for Urgent Operational Matters). (D) Each Party shall then have two (2) Days (or twenty-four (24) hours for Urgent Operational Matters) from receipt of such notice to elect by delivery of notice to Operator and the proposing Parties whether such Party will participate in such Exclusive Operation, or will relinquish its interest pursuant to Article 7.4(B). Failure by a Party to deliver such notice within such period shall be deemed an election not to participate in the prevailing proposal. (E) Notwithstanding the provisions of Article 7.4(B), if for reasons other than the encountering of granite or other practically impenetrable substance or any other condition in the hole rendering further operations impracticable, a well drilled as an Exclusive Operation fails to reach the deepest objective Zone described in the notice proposing such well, Operator shall give notice of such failure to each Non-Consenting Party who submitted or voted for an alternative proposal under this Article 7.6 to drill such well to a shallower Zone than the deepest objective Zone proposed in the notice under which such well was drilled. Each such Non-Consenting Party shall have the option exercisable for forty-eight (48) hours from receipt of such notice to participate for its Participating Interest share in the initial proposed Completion of such well. Each such Non-Consenting Party may exercise such option by notifying Operator that it wishes to participate in such Completion and by paying its Participating Interest share of the cost of drilling such well to its deepest depth drilled in the Zone in which it is Completed. All liabilities and expenses for drilling and Testing the Exclusive Well below that depth shall be for the sole account of the Consenting Parties. If any such Non-Consenting Party does not properly elect to participate in the first Completion proposed for such well, the relinquishment provisions of Article 7.4(B) shall continue to apply to such Non-Non- Consenting Party’s interest.

Appears in 1 contract

Samples: Joint Operating Agreement

Order of Preference of Operations. (A) Except as otherwise specifically provided in this Agreement, if any Party desires to propose the conduct of an operation that will conflict with an existing proposal for an Exclusive Operation, such Party shall have the right exercisable for five (5) Days (days, or twenty-four (24) hours for Urgent Operational Matters) if the drilling rig to be used is standing by in the Contract Area, from receipt of the proposal for the Exclusive Operation, to deliver such Party’s alternative proposal to all Parties entitled to participate in the proposed operationoperation such Party's alternative proposal. Such alternative proposal shall contain the information required under Article 7.2(A). (B) Section 5.2. Each Party receiving such proposals shall elect by delivery of notice to Operator and to the proposing Parties within the appropriate response period set out in Article 7.2(BSections 5.2(a) through (c) to participate in one of the competing proposals. Any Party not notifying Operator and the proposing Parties within the response period shall be deemed not to have voted against the proposals. (C) voted. The proposal receiving the largest aggregate Participating Interest vote shall have priority over all other competing proposals. In the case of a tie vote, the Operator shall choose among the proposals receiving the largest aggregate Participating Interest vote. Operator shall deliver notice of such result to all Parties entitled to participate in the operation within five (5) Days days of the end of the response period, or twenty-four (24) hours if the drilling rig to be used is standing by in the Contract Area. Each Party shall then have two (2) days (or twenty-four (24) hours for Urgent Operational Matters). (D) Each Party shall then have two (2) Days (or twenty-four (24) hours for Urgent Operational Mattersif the drilling rig to be used is standing by in the Contract Area) from receipt of such notice to elect by delivery of notice to Operator and the proposing Parties whether such Party will participate in such Exclusive Operation, or will relinquish its interest pursuant to Article 7.4(BSection 5.4(b). Failure by a Party to deliver such notice within such period shall be deemed an election not to participate in the prevailing proposal. (E) Notwithstanding the provisions of Article 7.4(B), if for reasons other than the encountering of granite or other practically impenetrable substance or any other condition in the hole rendering further operations impracticable, a well drilled as an Exclusive Operation fails to reach the deepest objective Zone described in the notice proposing such well, Operator shall give notice of such failure to each Non. STAND-Consenting Party who submitted or voted for an alternative proposal under this Article 7.6 to drill such well to a shallower Zone than the deepest objective Zone proposed in the notice under which such well was drilled. Each such Non-Consenting Party shall have the option exercisable for forty-eight (48) hours from receipt of such notice to participate for its Participating Interest share in the initial proposed Completion of such well. Each such Non-Consenting Party may exercise such option by notifying Operator that it wishes to participate in such Completion and by paying its Participating Interest share of the cost of drilling such well to its deepest depth drilled in the Zone in which it is Completed. All liabilities and expenses for drilling and Testing the Exclusive Well below that depth shall be for the sole account of the Consenting Parties. If any such Non-Consenting Party does not properly elect to participate in the first Completion proposed for such well, the relinquishment provisions of Article 7.4(B) shall continue to apply to such Non-Consenting Party’s interest.BY COSTS

Appears in 1 contract

Samples: Farmout Agreement (Ivanhoe Energy Inc)

Order of Preference of Operations. (A) 10.6.1 Except as otherwise specifically provided in this Agreement, if any Party desires to propose the conduct of an operation that will conflict with an existing proposal for an Exclusive Risk Operation, such Party shall have the right exercisable for five (5) Days (days, or twenty-twenty four (24) hours for Urgent Operational Matters) if the drilling rig to be used is standing by in the License Area from receipt of the proposal for the Exclusive Risk Operation, to deliver such Party’s alternative proposal to all Parties entitled to participate in the proposed operation. Such operation such Party's alternative proposal shall contain the information required under Article 7.2(A)proposal. (B) 10.6.2 Each Party receiving such proposals shall elect by delivery of notice to Operator and to the proposing Parties within the appropriate response period set out in Article 7.2(B) 10.2.2 to participate in one of the competing proposals. Any Party not notifying Operator and the proposing Parties within the response period shall be deemed to have voted against the proposalsproposal. (C) 10.6.3 The proposal receiving the largest aggregate Participating Percentage Interest vote shall have priority over all other competing proposals. In the case of a tie vote, Operator shall choose among the proposals receiving the largest aggregate Participating Interest vote. Operator shall deliver notice of such result to all Parties entitled to participate in the operation within five (5) Days (days of the end of the response period, or twenty-twenty four (24) hours for Urgent Operational Matters).if the drilling rig to be used is standing by in the License Area (D) 10.6.4 Each Party shall then have two (2) Days days (or twenty-twenty four (24) hours for Urgent Operational Matters) if the drilling rig to be used is standing by in the License Area from receipt of such notice to elect by delivery of notice to Operator and the proposing Parties whether such Party will participate in such Exclusive Risk Operation, or will relinquish its interest pursuant to Article 7.4(B)10.4.2. Failure by a Party to deliver such notice within such period shall be deemed an election not to participate in the prevailing proposal. (E) Notwithstanding the provisions of Article 7.4(B), if for reasons other than the encountering of granite or other practically impenetrable substance or any other condition in the hole rendering further operations impracticable, a well drilled as an Exclusive Operation fails to reach the deepest objective Zone described in the notice proposing such well, Operator shall give notice of such failure to each Non-Consenting Party who submitted or voted for an alternative proposal under this Article 7.6 to drill such well to a shallower Zone than the deepest objective Zone proposed in the notice under which such well was drilled. Each such Non-Consenting Party shall have the option exercisable for forty-eight (48) hours from receipt of such notice to participate for its Participating Interest share in the initial proposed Completion of such well. Each such Non-Consenting Party may exercise such option by notifying Operator that it wishes to participate in such Completion and by paying its Participating Interest share of the cost of drilling such well to its deepest depth drilled in the Zone in which it is Completed. All liabilities and expenses for drilling and Testing the Exclusive Well below that depth shall be for the sole account of the Consenting Parties. If any such Non-Consenting Party does not properly elect to participate in the first Completion proposed for such well, the relinquishment provisions of Article 7.4(B) shall continue to apply to such Non-Consenting Party’s interest.

Appears in 1 contract

Samples: Joint Operating Agreement (Avenue Group Inc)

AutoNDA by SimpleDocs

Order of Preference of Operations. (A) Except as otherwise specifically provided in this Agreement, if any Party desires to propose the conduct of an operation that will conflict with an existing proposal for an Exclusive Operation, such Party shall have the right exercisable for five (5) Days (or twenty-four (24) hours for Urgent Operational Matters) from receipt of the proposal for the Exclusive Operation, to deliver such Party’s alternative proposal to all Parties entitled to participate in the proposed operation. Such alternative proposal shall contain the information required under Article 7.2(A). (B) Each Party receiving such proposals shall elect by delivery of notice to Operator and to the proposing Parties within the appropriate response period set out in Article 7.2(B) to participate in one of the competing proposals. Any Party not notifying Operator and the proposing Parties within the response period shall be deemed to have voted against the proposals. (C) The proposal receiving the largest aggregate Participating Interest vote shall have priority over all other competing proposals. In the case of a tie vote, Operator shall choose among the proposals receiving the largest aggregate Participating Interest vote. Operator shall deliver notice of such result to all Parties entitled to participate in the operation within five (5) Days (or twenty-four (24) hours for Urgent Operational Matters). (D) Each Party shall then have two (2) Days (or twenty-four (24) hours for Urgent Operational Matters) from receipt of such notice to elect by delivery of notice to Operator and the proposing Parties whether such Party will participate in such Exclusive Operation, or will relinquish its interest pursuant to Article 7.4(B). Failure by a Party to deliver such notice within such period shall be deemed an election not to participate in the prevailing proposal. (E) Notwithstanding the provisions of Article 7.4(B), if for reasons other than the encountering of granite or other practically impenetrable substance or any other condition in the hole rendering further operations impracticable, a well drilled as an Exclusive Operation fails to reach the deepest objective Zone described in the notice proposing such well, Operator shall give notice of such failure to each Non-Consenting Party who submitted or voted for an alternative proposal under this Article 7.6 7.5 to drill such well to a shallower Zone than the deepest objective Zone proposed in the notice under which such well was drilled. Each such Non-Consenting Party shall have the option exercisable for forty-eight (48) hours from receipt of such notice to participate for its Participating Interest share in the initial proposed Completion of such well. Each such Non-Consenting Party may exercise such option by notifying Operator that it wishes to participate in such Completion and by paying its Participating Interest share of the cost of drilling such well to its deepest depth drilled in the Zone in which it is Completed. All liabilities and expenses for drilling and Testing the Exclusive Well below that depth shall be for the sole account of the Consenting Parties. If any such Non-Consenting Party does not properly elect to participate in the first Completion proposed for such well, the relinquishment provisions of Article 7.4(B) shall continue to apply to such Non-Consenting Party’s interest.

Appears in 1 contract

Samples: International Operating Agreement (Geoglobal Resources Inc.)

Order of Preference of Operations. (A) Except as otherwise specifically provided in this Agreement, if any Party desires to propose the conduct of an operation that will conflict with an existing proposal for an Exclusive Operation, such Party shall have the right exercisable for five (5) Days (Days, or twenty-four (24) hours for Urgent Operational Matters) if the drilling rig to be used is standing by in the Concession Area, from receipt of the proposal for the Exclusive Operation, to deliver such Party’s alternative proposal to all Parties entitled to participate in the proposed operationoperation such Party's alternative proposal. Such alternative proposal shall contain the information required under Article 7.2(A). (B) Each Party receiving such proposals shall elect by delivery of notice to Operator and to the proposing Parties within the appropriate response period set out in Article 7.2(B) to participate in one of the competing proposals. Any Party not notifying Operator and the proposing Parties within the response period shall be deemed to have voted against the proposalsproposal. (C) The proposal receiving the largest aggregate Participating Interest vote shall have priority over all other competing proposals. In the case of a tie vote, the Operator shall choose among the proposals receiving the largest aggregate Participating Interest vote. Operator shall deliver notice of such result to all Parties entitled to participate in the operation within five (5) Days (of the end of the response period, or twenty-four (24) hours for Urgent Operational Matters)if the drilling rig to be used is standing by in the Concession Area. (D) Each Party shall then have two (2) Days (or twenty-four (24) hours for Urgent Operational Mattersif the drilling rig to be used is standing by in the Concession Area) from receipt of such notice to elect by delivery of notice to Operator and the proposing Parties whether such Party will participate in such Exclusive Operation, or will relinquish its interest pursuant to Article 7.4(B). Failure by a Party to deliver such notice within such period shall be deemed an election not to participate in the prevailing proposal.. Alliance Operating Agreement - 20F (E) Notwithstanding the provisions of Article 7.4(B), if for reasons other than the encountering of granite or other practically impenetrable substance or any other condition in the hole rendering further operations impracticable, a well drilled as an Exclusive Operation fails to reach the deepest objective Zone described in the notice proposing such well, Operator shall give notice of such failure to each Non-Consenting Party who submitted or voted for an alternative proposal under this Article 7.6 to drill such well to a shallower Zone than the deepest objective Zone proposed in the notice under which such well was drilled. Each such Non-Consenting Party shall have the option exercisable for forty-eight (48) hours from receipt of such notice to participate for its Participating Interest share in the initial proposed Completion of such well. Each such Non-Consenting Party may exercise such option by notifying the Operator that it wishes to participate in such Completion and by paying its Participating Interest share of the cost of drilling such well to its deepest depth drilled in the Zone in which it is Completed. All liabilities and expenses for drilling and Testing the Exclusive Well below that depth shall be for the sole account of the Consenting Parties. If any such Non-Consenting Party does not properly elect to participate in the first Completion proposed for such well, the relinquishment provisions of Article 7.4(B) shall continue to apply to such Non-Consenting Party’s 's interest.

Appears in 1 contract

Samples: Operating Agreement (Transatlantic Petroleum Corp)

Order of Preference of Operations. (A) Except as otherwise specifically provided in this Agreement, if any Party desires to propose the conduct of an operation that will conflict with an existing proposal for an Exclusive Operation, such Party shall have the right exercisable for five (5) Days Days, or forty-eight (or twenty-four (2448) hours for Urgent Operational Matters) if the drilling rig to be used is standing by in the Contract Area, from receipt of the proposal for the Exclusive Operation, to deliver such Party’s alternative proposal to all Parties entitled to participate in the proposed operationoperation such Party's alternative proposal. Such alternative proposal shall contain the information required under Article 7.2(A). (B) Each Party receiving such proposals shall elect by delivery of notice to Operator and to the proposing Parties within the appropriate response period set out in Article 7.2(B) to participate in one of the competing proposals. Any Party not notifying Operator and the proposing Parties within the response period shall be deemed not to have voted against the proposalsvoted. (C) The proposal receiving the largest aggregate Participating Interest vote shall have priority over all other competing proposals. In the case of a tie vote, the Operator shall choose among the proposals receiving the largest aggregate Participating Interest vote. Operator shall deliver notice of such result to all Parties entitled to participate in the operation within five (5) Days of the end of the response period, or forty-eight (or twenty-four (2448) hours for Urgent Operational Matters)if the drilling rig to be used is standing by in the Contract Area. (D) Each Party shall then have two (2) Days (or twentyforty-four eight (2448) hours for Urgent Operational Mattersif the drilling rig to be used is standing by in the Contract Area) from receipt of such notice to elect by delivery of notice to Operator and the proposing Parties whether such Party will participate in such Exclusive Operation, or will relinquish its interest pursuant to Article 7.4(B). Failure by a Party to deliver such notice within such period shall be deemed an election not to participate in the prevailing proposal. (E) Notwithstanding the provisions of Article 7.4(B), if for reasons other than the encountering of granite or other practically impenetrable substance or any other condition in the hole rendering further operations impracticable, a well drilled as an Exclusive Operation fails to reach the deepest objective Zone described in the notice proposing such well, Operator shall give notice of such failure to each Non-Consenting Party who submitted or voted for an alternative proposal under this Article 7.6 to drill such well to a shallower Zone than the deepest objective Zone proposed in the notice under which such well was drilled. Each such Non-Consenting Party shall have the option exercisable for forty-eight (48) hours from receipt of such notice to participate for its Participating Interest share in the initial proposed Completion of such well. Each such Non-Consenting Party may exercise such option by notifying Operator that it wishes to participate in such Completion and by paying its Participating Interest share of the cost of drilling such well to its deepest depth drilled in the Zone in which it is Completed. All liabilities and expenses for drilling and Testing the Exclusive Well below that depth shall be for the sole account of the Consenting Parties. If any such Non-Consenting Party does not properly elect to participate in the first Completion proposed for such well, the relinquishment provisions of Article 7.4(B) shall continue to apply to such Non-Consenting Party’s interest.

Appears in 1 contract

Samples: International Operating Agreement (Seven Seas Petroleum Inc)

Order of Preference of Operations. (A) Except as otherwise specifically provided in this Agreement, if any Party desires to propose the conduct of an operation that will conflict with an existing proposal for an Exclusive Operation, such Party shall have the right exercisable for five (5) Days (Days, or twenty-four (24) hours for Urgent Operational Matters) , from receipt of the proposal for the Exclusive Operation, to deliver such Party’s alternative proposal to all Parties entitled to participate in the proposed operationoperation such Party’s alternative proposal. Such alternative proposal shall contain the information required under Article 7.2(A). (B) Each Party receiving such proposals shall elect by delivery of notice to Operator and to the proposing Parties within the appropriate response period set out in Article 7.2(B) to participate in one of the competing proposals. Any Party not notifying Operator and the proposing Parties within the response period shall be deemed to have voted against the proposalsproposal. (C) The proposal receiving the largest aggregate Participating Interest vote shall have priority over all other competing proposals. In the case of a tie vote, then (1) with respect to Joint Operations delegated to Technical Operations Manager under the Operating Services Agreement Technical Operations Manager shall choose between those competing proposals; and (2) with respect to Joint operations not delegated to Technical Operations Manager under the Operating Services Agreement Operator shall choose among the proposals receiving the largest aggregate Participating Interest votebetween those competing proposals. Operator shall deliver notice of such result to all Parties entitled to participate in the operation within five (5) Days (of the end of the response period, or twenty-four (24) hours for Urgent Operational Matters). (D) Each Party shall then have two (2) Days (or twenty-four (24) hours for Urgent Operational Matters) from receipt of such notice to elect by delivery of notice to Operator and the proposing Parties whether such Party will participate in such Exclusive Operation, or will relinquish its interest pursuant to Article 7.4(B). Failure by a Party to deliver such notice within such period shall be deemed an election not to participate in the prevailing proposal. (E) Notwithstanding the provisions of Article 7.4(B), if for reasons other than the encountering of granite or other practically impenetrable substance or any other condition in the hole rendering further operations impracticable, a well drilled as an Exclusive Operation fails to reach the deepest objective Zone described in the notice proposing such well, Operator shall give notice of such failure to each Non-Consenting Party who submitted or voted for an alternative proposal under this Article 7.6 to drill such well to a shallower Zone than the deepest objective Zone proposed in the notice under which such well was drilled. Each such Non-Consenting Party shall have the option exercisable for forty-eight (48) hours from receipt of such notice to participate for its Participating Interest share in the initial proposed Completion of such well. Each such Non-Consenting Party may exercise such option by notifying Operator that it wishes to participate in such Completion and by paying its Participating Interest share of the cost of drilling such well to its deepest depth drilled in the Zone in which it is Completed. All liabilities and expenses for drilling and Testing the Exclusive Well below that depth shall be for the sole account of the Consenting Parties. If any such Non-Consenting Party does not properly elect to participate in the first Completion proposed for such well, the relinquishment provisions of Article 7.4(B) shall continue to apply to such Non-Consenting Party’s interest.

Appears in 1 contract

Samples: Joint Operating Agreement (BPZ Resources, Inc.)

Order of Preference of Operations. (A) Except as otherwise specifically provided in this Agreement, if any Party desires to propose the conduct of an operation that will conflict with an existing proposal for an Exclusive Operation, such Party shall have the right exercisable for five (5) Days (or twenty-four (24) hours for Urgent Operational Matters) from receipt of the proposal for the Exclusive Operation, to deliver such Party’s 's alternative proposal to all Parties entitled to participate in the proposed operation. Such alternative proposal shall contain the information required under Article 7.2(A). (B) Each Party receiving such proposals shall elect by delivery of notice to Operator and to the proposing Parties within the appropriate response period set out in Article 7.2(B) to participate in one of the competing proposals. Any Party not notifying Operator and the proposing Parties within the response period shall be deemed to have voted against the proposals. (C) The proposal receiving the largest aggregate Participating Interest vote shall have priority over all other competing proposals. In the case of a tie vote, Operator shall choose among the proposals receiving the largest aggregate Participating Interest vote. Operator shall deliver notice of such result to all Parties entitled to participate in the operation within five (5) Days (or twenty-four (24) hours for Urgent Operational Matters). (D) Each Party shall then have two (2) Days (or twenty-four (24) hours for Urgent Operational Matters) from receipt of such notice to elect by delivery of notice to Operator and the proposing Parties whether such Party will participate in such Exclusive Operation, or will relinquish its interest pursuant to Article 7.4(B). Failure by a Party to deliver such notice within such period shall be deemed an election not to participate in the prevailing proposal.. Check Paragraph (E), if desired. [X] OPTIONAL PROVISION (E) Notwithstanding the provisions of Article 7.4(B), if for reasons other than the encountering of granite or other practically impenetrable substance or any other condition in the hole rendering further operations impracticable, a well drilled as an Exclusive Operation fails to reach the deepest objective Zone described in the notice proposing such well, Operator shall give notice of such failure to each Non-Consenting Party who submitted or voted for an alternative proposal under this Article 7.6 to drill such well to a shallower Zone than the deepest objective Zone proposed in the notice under which such well was drilled. Each such Non-Consenting Party shall have the option exercisable for forty-eight (48) hours from receipt of such notice to participate for its Participating Interest share in the initial proposed Completion of such well. Each such Non-Consenting Party may exercise such option by notifying Operator that it wishes to participate in such Completion and by paying its Participating Interest share of the cost of drilling such well to its deepest depth drilled in the Zone in which it is Completed. All liabilities and expenses for drilling and Testing the Exclusive Well below that depth shall be for the sole account of the Consenting Parties. If any such Non-Consenting Party does not properly elect to participate in the first Completion proposed for such well, the relinquishment provisions of Article 7.4(B) shall continue to apply to such Non-Consenting Party’s 's interest.

Appears in 1 contract

Samples: Joint Operating Agreement (Calibre Energy, Inc.)

Order of Preference of Operations. (A) Except as otherwise specifically provided in this Agreement, if any Party desires to propose the conduct of an operation that will conflict with an existing proposal for an Exclusive Operation, such Party shall have the right exercisable for five (5) Days (or twenty-four (24) hours for Urgent Operational Matters) from receipt of the proposal for the Exclusive Operation, to deliver such Party’s alternative proposal to all Parties entitled to participate in the proposed operation. Such alternative proposal shall contain the information required under Article 7.2(A). (B) Each Party receiving such proposals shall elect by delivery of notice to Operator and to the proposing Parties within the appropriate response period set out in Article 7.2(B) to participate in one of the competing proposals. Any Party not notifying Operator and the proposing Parties within the response period shall be deemed to have voted against the proposals. (C) The proposal receiving the largest aggregate Participating Interest vote shall have priority over all other competing proposals. In the case of a tie vote, Operator shall choose among the proposals receiving the largest aggregate Participating Interest vote. Operator shall deliver notice of such result to all Parties entitled to participate in the operation within five (5) Days (or twenty-four (24) hours for Urgent Operational Matters). (D) Each Party shall then have two (2) Days (or twenty-four (24) hours for Urgent Operational Matters) from receipt of such notice to elect by delivery of notice to Operator and the proposing Parties whether such Party will participate in such Exclusive Operation, or will relinquish its interest pursuant to Article 7.4(B). Failure by a Party to deliver such notice within such period shall be deemed an election not to participate in the prevailing proposal. (E) Notwithstanding the provisions of Article 7.4(B), if for reasons other than the encountering of granite or other practically impenetrable substance or any other condition in the hole rendering further operations impracticable, a well drilled as an Exclusive Operation fails to reach the deepest objective Zone described in the notice proposing such well, Operator shall give notice of such failure to each Non-Consenting Party who submitted or voted for an alternative proposal under this Article 7.6 to drill such well to a shallower Zone than the deepest objective Zone proposed in the notice under which such well was drilled. Each such Non-Consenting Party shall have the option exercisable for forty-eight (48) hours from receipt of such notice to participate for its Participating Interest share in the initial proposed Completion of such well. Each such Non-Consenting Party may exercise such option by notifying Operator that it wishes to participate in such Completion and by paying its Participating Interest share of the cost of drilling such well to its deepest depth drilled in the Zone in which it is Completed. All liabilities and expenses for drilling and Testing the Exclusive Well below that depth shall be for the sole account of the Consenting Parties. If any such Non-Consenting Party does not properly elect to participate in the first Completion proposed for such well, the relinquishment provisions of Article 7.4(B) shall continue to apply to such Non-Consenting Party’s interest.

Appears in 1 contract

Samples: Joint Operating Agreement (Fortune Oil & Gas Inc)

Order of Preference of Operations. (A) Except as otherwise specifically provided in this Agreement, if any Party desires to propose the conduct of an operation that will conflict with an existing proposal for an Exclusive Operation, such Party shall have the right exercisable for five (5) Days (Days, or twenty-four (24) hours for Urgent Operational Matters) if the drilling rig to be used is standing by in the Concession Area, from receipt of the proposal for the Exclusive Operation, to deliver such Party’s alternative proposal to all Parties entitled to participate in the proposed operationoperation such Party's alternative proposal. Such alternative proposal shall contain the information required under Article 7.2(A).. West Xxxxxx XXX 20F (B) Each Party party receiving such proposals shall elect by delivery of notice to Operator and to the proposing Parties within the appropriate response period set out in Article 7.2(B) to participate in one of the competing proposals. Any Party party not notifying Operator and the proposing Parties within the response period shall be deemed not to have voted against the proposalsvoted. (C) The proposal receiving the largest aggregate Participating Interest vote shall have priority over all other competing proposals. In the case of a tie vote, the Operator shall choose among the proposals receiving the largest aggregate Participating Interest vote. Operator shall deliver notice of such result to all Parties entitled to participate in the operation within five (5) Days (of the end of the response period, or twenty-four (24) hours for Urgent Operational Matters)if the drilling rig to be used is standing by in the Concession Area. (D) Each Party shall then have two (2) Days (or twenty-four (24) hours for Urgent Operational Mattersif the drilling rig to be used is standing by in the Concession Area) from receipt of such notice to elect by delivery of notice to Operator and the proposing Parties whether such Party will participate in such Exclusive Operation, or will relinquish its interest pursuant to Article 7.4(B). Failure by a Party to deliver such notice within such period shall be deemed an election not to participate in the prevailing proposal. (E) Notwithstanding the provisions of Article 7.4(B), if for reasons other than the encountering of granite or other practically impenetrable substance or any other condition in the hole rendering further operations impracticable, a well drilled as an Exclusive Operation fails to reach the deepest objective Zone described in the notice proposing such well, Operator shall give notice of such failure to each Non-Consenting Party who submitted or voted for an alternative proposal under this Article 7.6 to drill such well to a shallower Zone than the deepest objective Zone proposed in the notice under which such well was drilled. Each such Non-Consenting Party shall have the option exercisable for forty-eight (48) hours from receipt of such notice to participate for its Participating Interest share in the initial proposed Completion of such well. Each such Non-Consenting Party may exercise such option by notifying the Operator that it wishes to participate in such Completion and by paying its Participating Interest share of the cost of drilling such well well, calculated in the manner provided in Article 7.8(B), to its deepest depth drilled in the Zone in which it is Completed. All liabilities and expenses for drilling and Testing the Exclusive Well below that depth shall be for the sole account of the Consenting Parties. If any such Non-Consenting Party does not properly elect to participate in the first Completion proposed for such well, the relinquishment provisions of Article 7.4(B) shall continue to apply to such Non-Consenting Party’s 's interest.

Appears in 1 contract

Samples: International Joint Operating Agreement (Transatlantic Petroleum Corp)

Order of Preference of Operations. (A) Except as otherwise specifically provided in this Agreement, if any Party Concessionaire desires to propose the conduct of an operation a Petroleum Operation that will conflict with an existing proposal for an Exclusive Petroleum Operation, such Party Concessionaire shall have the right exercisable for five (5) Days days (or twenty-four (24) hours for Urgent Operational Mattersproposals involving the use of a drilling rig that is on location in the EPCC Area) from receipt of the proposal for the Exclusive Petroleum Operation, to deliver such PartyConcessionaire’s alternative proposal to all Parties Concessionaires entitled to participate in the proposed operationactivities. Such alternative proposal shall contain the information required under Article 7.2(A8.2(A). (B) . Each Party Concessionaire receiving such proposals shall elect by delivery of notice to Operator and to the proposing Parties Concessionaires within the appropriate response period set out in Article 7.2(B8.2(B) to participate in one of the competing proposals. Any Party Concessionaire not notifying Operator and the proposing Parties Concessionaires within the response period shall be deemed to have voted against the proposals. (C) . The proposal receiving the largest aggregate Participating Interest vote shall have priority over all other competing proposals. In the case of a tie vote, Operator shall choose among the proposals receiving the largest aggregate Participating Interest vote. Operator shall deliver notice of such result to all Parties Concessionaires entitled to participate in the operation such Petroleum Operation within five (5) Days days (or twenty-four (24) hours for Urgent Operational Mattersurgent operational matters). (D) . Each Party Concessionaire shall then have two (2) Days (days, or twenty-four (24) hours for Urgent Operational Matters) urgent operational matters, from receipt of such notice to elect by delivery of notice to Operator and the proposing Parties Concessionaires whether such Party Concessionaire will participate in such Exclusive Petroleum Operation, or will relinquish its interest pursuant to Article 7.4(B8.4(B). Failure by a Party Concessionaire to deliver such notice within such period shall be deemed an election not to participate in the prevailing proposal. (E) . Notwithstanding the provisions of Article 7.4(B8.4(B), if for reasons other than the encountering of granite or other any practically impenetrable substance or any other condition in the hole rendering further operations impracticable, a well Well drilled as an Exclusive Petroleum Operation fails to reach the deepest objective Zone described in the notice proposing such wellWell, Operator shall give notice of such failure to each Non-Consenting Party Concessionaire who submitted or voted for an alternative proposal under this Article 7.6 8.6 to drill such well Well to a shallower Zone than the deepest objective Zone proposed in the notice under which such well Well was drilled. Each such Non-Consenting Party Concessionaire shall have the option exercisable for forty-eight (48) hours from receipt of such notice to participate for its Participating Interest share in the initial proposed Completion of such wellWell. Each such Non-Consenting Party Concessionaire may exercise such option by notifying Operator that it wishes to participate in such Completion and by paying its Participating Interest share of the cost of drilling such well Well to its deepest depth drilled in the Zone in which it is Completedcompleted. All liabilities and expenses for drilling and Testing the Well drilled as part of an Exclusive Well Petroleum Operation below that depth shall be for the sole account of the Consenting PartiesConcessionaires. If any such Non-Consenting Party Concessionaire does not properly elect to participate in the first Completion completion proposed for such wellWell, the relinquishment provisions of Article 7.4(B8.4(B) shall continue to apply to such Non-Consenting PartyConcessionaire’s interest.

Appears in 1 contract

Samples: Joint Operating Agreement