Other Required Documentation. Operations and maintenance manuals with respect to each Block shall be submitted no later than the date set forth in the Table Of Contractor Submittals shown at the end of this Exhibit 7. If a piece of equipment was “wholesale” changed out during the construction process for whatever reason the contractor shall provide updated maintenance and technical documentation to account for the change. · System descriptions · System turnover packages · SCADA graphics/configuration guidelines · Drawings that show equipment, instrument, device and SCADA schematics containing content mutually agreed upon by Owner and Contractor · Subcontractor drawings, documentation, and manuals required for Owner review · Schedules, including engineering, procurement, and construction (EPC) activities; integrated AVSP II schedules, and progress reports required pursuant to this Agreement. · Quality assurance and quality control program manuals · Project Health and Safety Plan attached as Exhibit 22 to this Agreement · Commissioning plan as required under this Agreement · Commissioning logs shall be submitted as required under Exhibit [16] to this Agreement · Performance test procedures/reports as required under the Agreement · Instructions for handling, storage, and pre-operational maintenance of Facility Equipment · Site and shop inspection and testing plans or requirements · Original Equipment Manufacturer's quality assurance (QA) documentation as provided by Manufacturer · Procurement specifications for all Equipment supplied by Major Subcontractors/ installation areas · Power transformer data sheets, as applicable · Instrument data sheets · Training program and manuals · Required Manuals · Contractor / Acquired Permits and Subcontractor permits · Meeting minutes for Owner/Contractor meetings · Electrical and structural calculations and studies submitted to permit agencies · Other non-proprietary engineering calculations applicable to the design and construction of the Project
Appears in 2 contracts
Samples: Engineering, Procurement and Construction Agreement (Sunpower Corp), Engineering, Procurement and Construction Agreement (Sunpower Corp)
Other Required Documentation. Operations and maintenance manuals with respect to each Block shall be submitted no later than the date set forth in the Table Of Contractor Submittals shown at the end of this Exhibit 7. If a piece of equipment was “wholesale” changed out during the construction process for whatever reason the contractor shall provide updated maintenance and technical documentation to account for the change. · System descriptions · System turnover packages · SCADA graphics/configuration guidelines · Drawings that show equipment, instrument, device and SCADA schematics containing content mutually agreed upon by Owner and Contractor · Subcontractor drawings, documentation, and manuals required for Owner review · Schedules, including engineering, procurement, and construction (EPC) activities; integrated AVSP II I schedules, and progress reports required pursuant to this Agreement. · Quality assurance and quality control program manuals · Project Health and Safety Plan attached as Exhibit 22 to this Agreement · Commissioning plan as required under this Agreement · Commissioning logs shall be submitted as required under Exhibit [16] to this Agreement · Performance test procedures/reports as required under the Agreement · Instructions for handling, storage, and pre-operational maintenance of Facility Equipment · Site and shop inspection and testing plans or requirements · Original Equipment Manufacturer's quality assurance (QA) documentation as provided by Manufacturer · Procurement specifications for all Equipment supplied by Major Subcontractors/ installation areas · Power transformer data sheets, as applicable · Instrument data sheets · Training program and manuals · Required Manuals · Contractor / Acquired Permits and Subcontractor permits · Meeting minutes for Owner/Contractor meetings · Electrical and structural calculations and studies submitted to permit agencies · Other non-proprietary engineering calculations applicable to the design and construction of the Project
Appears in 2 contracts
Samples: Engineering, Procurement and Construction Agreement (Sunpower Corp), Engineering, Procurement and Construction Agreement (Sunpower Corp)