Other Wall/Ceiling Coverings Sample Clauses

Other Wall/Ceiling Coverings. Tenants must obtain the written permission of the Corporation prior to applying wall coverings. The following wall/ceiling coverings are not permitted; - wallpaper and border that is not dry strippable - wallboard, panelling and wood trims - mirror and cork tiles - cloth wall/ceiling coverings Adhesive used to apply wall/ceiling coverings must be that which has been recommended by the product manufacturer. Alternate adhesives, glues, etc. must not be used. It will be the responsibility of the tenant to remove wall/ceiling coverings prior to vacating the premises and to restore any damage to the wall/ceiling surface as a result of the alteration.
AutoNDA by SimpleDocs

Related to Other Wall/Ceiling Coverings

  • Maintenance and Repair – Line Sharing 3.6.1 C.M. shall have access for repair and maintenance purposes to any Loop for which it has access to the High Frequency Spectrum. If C.M. is using a BellSouth owned splitter, C.M. may access the Loop at the point where the combined voice and data signal exits the central office splitter via a bantam test jack. If C.M. provides its own splitter, it may test from the collocation space or the Termination Point.

  • UNIFORMS & EQUIPMENT Uniforms and equipment required by the Department to be worn/used by employees will be furnished by the Department.

  • Walls 12 Developer shall provide rustication patterns on all walls, except drainage headwalls, in Aesthetic 13 Area 3 in accordance with Exhibit L2.24 of the LAADCR. The final designs shall resemble these 14 simulations.

  • Maintenance – Line Splitting 3.6.1 BellSouth will be responsible for repairing voice troubles and the troubles with the physical loop between the NID at the End User’s premises and the termination point.

  • Ceiling Company and its subcontractors will not affix, attach, or suspend any lighting fixtures, signs, or other fixtures or devices of any kind or nature from the ceiling above any of the Premises without the prior written approval of Authority.

  • Roof Any leaks or evidence of moisture? Yes No Unknown Type of Roof: Age Comments: Is there any existing fire retardant treated plywood? Yes No Unknown Comments:

  • Interior (a) Ceilings, sidewalls and bulkhead panels shall be clean and free of cracks and stains;

  • Cleaning 8.1 CONTRACTOR shall, at his own expenses, at all times keep the premises free from accumulation of debris, waste materials, and rubbish, and at the completion of the work, he shall remove his tools and equipment and all surplus materials, debris, waste material, and rubbish and shall leave the premises in a neat and clean condition. If CONTRACTOR does not attend to such cleaning immediately upon request, OWNER shall have the right to have this work done by others and deduct the cost therefore from the payment due CONTRACTOR hereunder.

  • 000 TOOL ROOMS 24.100 The Company and the Unions agree that it shall be the Owner's prerogative to maintain and operate a general centrally located tool room and warehouse. The Unions agree that the manpower required for the operation of the centrally located tool room and warehouse may at the Owner's option be employed directly by them.

  • Maintenance Windows 12.3.23.1 Generally, Qwest performs major Switch maintenance activities off-hours, during certain “maintenance windows”. Major Switch maintenance activities include Switch conversions, Switch generic upgrades and Switch equipment additions.

Time is Money Join Law Insider Premium to draft better contracts faster.