Outcomes of the technical demonstrator Sample Clauses

Outcomes of the technical demonstrator. The two technical demonstrators have led to a common view for the second year demonstrator of the LinkedTV player. The detected entities showed on the second screen will always be grouped into three different layers by dividing entities based on “who, what, where” to identify respectively persons, objects and locations (Image 5). While the video is playing on the mainscreen the entities in the three different layers on the second screen will be highlighted once the entity passes on the screen. If a user wants to know more about a certain entity the user can click the entity on his second screen and is presented with a short abstract and a larger image of the entity (Image 6). If the user wants to read more he can simply rotate his device. By means of this the user switches his second screen from a lean backward mode to a lean forward mode. Because of this the video stops playing allowing the user to read the entry. Once finished the user can rotate the device back and the video continues to play while only the abstract is displayed. Recommendations are displayed in the form of links that might be of interest for the user based on the selected entity.
AutoNDA by SimpleDocs

Related to Outcomes of the technical demonstrator

  • For Product Development Projects and Project Demonstrations  Published documents, including date, title, and periodical name.  Estimated or actual energy and cost savings, and estimated statewide energy savings once market potential has been realized. Identify all assumptions used in the estimates.  Greenhouse gas and criteria emissions reductions.  Other non-energy benefits such as reliability, public safety, lower operational cost, environmental improvement, indoor environmental quality, and societal benefits.  Data on potential job creation, market potential, economic development, and increased state revenue as a result of the project.  A discussion of project product downloads from websites, and publications in technical journals.  A comparison of project expectations and performance. Discuss whether the goals and objectives of the Agreement have been met and what improvements are needed, if any.

  • Technical Feasibility of String While ICANN has encouraged and will continue to encourage universal acceptance of all top-­‐level domain strings across the Internet, certain top-­‐level domain strings may encounter difficulty in acceptance by ISPs and webhosters and/or validation by web applications. Registry Operator shall be responsible for ensuring to its satisfaction the technical feasibility of the TLD string prior to entering into this Agreement.

  • Technical Objections No grievance shall be defeated merely because of a technical error, other than time limitations in the processing of the grievance through the grievance procedure. To this end, an arbitrator shall have the power to waive formal procedural irregularities in the processing of the grievance in order to determine the real matter in dispute.

  • Failure to Supply Workmen or Materials or to Prosecute the Work A Notice of Non-Compliant Work may be issued for failure of the Contractor to supply enough workers or enough materials or proper materials to prosecute the Work. A Notice of Non-Compliant Work in such event may be based on Article 3.3.2 (Competent Management of Time), and upon the definition of Work as set forth under Paragraph 1.1.9.58.

  • DEVELOPMENT OR ASSISTANCE IN DEVELOPMENT OF SPECIFICATIONS REQUIREMENTS/ STATEMENTS OF WORK Firms and/or individuals that assisted in the development or drafting of the specifications, requirements, statements of work, or solicitation documents contained herein are excluded from competing for this solicitation. This shall not be applicable to firms and/or individuals providing responses to a publicly posted Request for Information (RFI) associated with a solicitation.

  • Laboratory Testing All laboratories selected by UPS Freight for analyzing Controlled Substances Testing will be HHS certified.

  • Technical Standards Applicable to a Wind Generating Plant i. Low Voltage Ride-Through (LVRT) Capability A wind generating plant shall be able to remain online during voltage disturbances up to the time periods and associated voltage levels set forth in the standard below. The LVRT standard provides for a transition period standard and a post-transition period standard.

  • Technical Specifications The Technical Specifications furnished on the CD are intended to establish the standards for quality, performance and technical requirements for all labor, workmanship, material, methods and equipment necessary to complete the Work. When specifications and drawings are provided or referenced by the County, these are to be considered part of the Scope of Work, and to be specifically documented in the Detailed Scope of Work. For convenience, the County supplied specifications, if any, and the Technical Specifications furnished on the CD.

  • ODUF Packing Specifications 6.3.1 The data will be packed using ATIS EMI records. A pack will contain a minimum of one (1) message record or a maximum of ninety-nine thousand nine hundred and ninety-nine (99,999) message records plus a pack header record and a pack trailer record. One transmission can contain a maximum of ninety-nine (99) packs and a minimum of one (1) pack.

  • Notice for Technological Change This subclause sets out the notice provisions to be applied to terminations by the employer for reasons arising from "technology" in accordance subparagraph (1) of paragraph (a) of subclause (i)

Time is Money Join Law Insider Premium to draft better contracts faster.