Parking, Circulation and Access. 3.6.1 Vehicle parking shall be provided as generally shown on Schedule B and shall have a hard finished surface such as asphalt, concrete, interlocking precast paver stones, or an acceptable equivalent in the opinion of the Development Officer. 3.6.2 Parking spaces, stop bars, pedestrian circulation (walkways and on-site crosswalks) and access shall be generally as shown on Schedule B. 3.6.3 A designated pedestrian pathway connecting the main building on Proposed Lot 1 to the main building on Proposed Lot 2 shall be provided as shown on Schedule B. The designated pedestrian walkway shall have a finished hard surface such as poured in place concrete, interlocking paving stones, or an acceptable equivalent in the opinion of the Development Officer. On-site crosswalks associated with the designated pedestrian pathway are shown as dashed lines on Schedule B and shall be demarcated with signs and pavement markings. The on-site crosswalks may be finished with an alternative hard surface, such as asphalt.
Appears in 2 contracts
Samples: Development Agreement, Development Agreement
Parking, Circulation and Access. 3.6.1 Vehicle parking shall be provided as generally shown on Schedule B and shall have a hard finished surface such as asphalt, concrete, interlocking precast paver stones, or an acceptable equivalent in the opinion of the Development Officer.
3.6.2 Parking spaces, stop bars, pedestrian circulation (walkways and on-site crosswalks) and access shall be generally as shown on Schedule B.
3.6.3 A designated pedestrian pathway connecting shall connect the main building on Proposed Lot 1 to the main building on Proposed Lot 2 shall be provided edge of the site along the southern driveway in the direction of the existing transit stop as shown on Schedule B. The designated pedestrian walkway shall have a finished hard surface such as poured in place concrete, interlocking paving stones, or an acceptable equivalent in the opinion of the Development Officer. On-site crosswalks associated with the designated pedestrian pathway are shown as dashed lines on Schedule B and shall be demarcated with signs and pavement markings. The on-site crosswalks may be finished with an alternative hard surface, such as asphalt.
3.6.4 The Daylighting Triangle provisions of the Land Use By-law for Planning District 4 shall apply to all driveway accesses.