Common use of Payment of Liquidated Damages Clause in Contracts

Payment of Liquidated Damages. WITH RESPECT TO ANY TERMINATION FEES PAYABLE IN CONNECTION WITH ANY EARLY TERMINATION RIGHT SET FORTH IN THIS SECTION 2.03, OR IN SECTION 18.04 BELOW, LESSEE RECOGNIZES AND AGREES THAT, IF THIS AGREEMENT IS TERMINATED WITH RESPECT TO ANY OF THE HOTELS FOR THE REASONS SPECIFIED IN THIS SECTION 2.03 OR IN SECTION 18.04 BELOW, THEREBY ENTITLING MANAGER TO RECEIVE THE TERMINATION FEES AS SET FORTH IN THIS SECTION 2.03 OR IN SECTION 18.04 BELOW, MANAGER WOULD SUFFER AN ECONOMIC LOSS BY VIRTUE OF THE RESULTING LOSS OF MANAGEMENT FEES WHICH WOULD OTHERWISE HAVE BEEN EARNED UNDER THIS AGREEMENT. BECAUSE SUCH FEES VARY IN AMOUNT DEPENDING ON THE TOTAL GROSS REVENUES EARNED AT THE HOTELS AND ACCORDINGLY WOULD BE EXTREMELY DIFFICULT AND IMPRACTICAL TO ASCERTAIN WITH CERTAINTY, THE PARTIES AGREE THAT THE TERMINATION FEES PROVIDED IN THIS SECTION 2.03 AND IN SECTION 18.04 BELOW CONSTITUTE A REASONABLE ESTIMATE OF LIQUIDATED DAMAGES TO MANAGER FOR PURPOSES OF ANY AND ALL LEGAL REQUIREMENTS, AND IT IS AGREED THAT MANAGER SHALL NOT BE ENTITLED TO MAINTAIN A CAUSE OF ACTION AGAINST LESSEE, EXCEPT AS SPECIFICALLY PROVIDED HEREIN, FOR ACTUAL DAMAGES IN EXCESS OF THE TERMINATION FEES IN ANY CONTEXT WHERE THE TERMINATION FEES ARE PROVIDED BY THIS AGREEMENT, AND RECEIPT OF SUCH FEES (TOGETHER WITH ALL OTHER AMOUNTS DUE AND PAYABLE BY LESSEE TO MANAGER WITH RESPECT TO EVENTS OCCURRING PRIOR TO TERMINATION OF THIS AGREEMENT WITH RESPECT TO THE APPLICABLE HOTELS OR AS OTHERWISE PROVIDED HEREIN) SHALL BE MANAGER’S SOLE REMEDY FOR DAMAGES AGAINST LESSEE IN ANY SUCH CASE. The foregoing shall in no way affect any other sums due Manager under this Article II or otherwise hereunder, including, without limitation, the Management Fees earned during the Term, or any other rights or remedies, at law or in equity of Manager under this Agreement or under Legal Requirements, including any indemnity obligations of Lessee to Manager under this Agreement.

Appears in 6 contracts

Samples: Loan Agreement (Ashford Hospitality Prime, Inc.), Master Management Agreement (Braemar Hotels & Resorts Inc.), Hotel Master Management Agreement (Ashford Hospitality Trust Inc)

AutoNDA by SimpleDocs

Payment of Liquidated Damages. WITH RESPECT TO ANY TERMINATION FEES PAYABLE IN CONNECTION WITH ANY EARLY TERMINATION RIGHT SET FORTH IN THIS SECTION 2.03, OR IN SECTION 18.04 BELOW, LESSEE RECOGNIZES AND AGREES THAT, IF THIS AGREEMENT IS TERMINATED WITH RESPECT TO ANY OF THE HOTELS FOR THE REASONS SPECIFIED IN THIS SECTION 2.03 OR IN SECTION 18.04 BELOW2.03, THEREBY ENTITLING MANAGER TO RECEIVE THE TERMINATION FEES AS SET FORTH IN THIS SECTION 2.03 OR IN SECTION 18.04 BELOW2.03, MANAGER WOULD SUFFER AN ECONOMIC LOSS BY VIRTUE OF THE RESULTING LOSS OF MANAGEMENT FEES WHICH WOULD OTHERWISE HAVE BEEN EARNED UNDER THIS AGREEMENT. BECAUSE SUCH FEES VARY IN AMOUNT DEPENDING ON THE TOTAL GROSS REVENUES EARNED CAPITAL IMPROVEMENT BUDGET AT THE HOTELS AND ACCORDINGLY WOULD BE EXTREMELY DIFFICULT AND IMPRACTICAL TO ASCERTAIN WITH CERTAINTY, THE PARTIES AGREE THAT THE TERMINATION FEES PROVIDED IN THIS SECTION 2.03 AND IN SECTION 18.04 BELOW CONSTITUTE A REASONABLE ESTIMATE OF LIQUIDATED DAMAGES TO MANAGER FOR PURPOSES OF ANY AND ALL LEGAL REQUIREMENTS, AND IT IS AGREED THAT MANAGER SHALL NOT BE ENTITLED TO MAINTAIN A CAUSE OF ACTION AGAINST LESSEE, EXCEPT AS SPECIFICALLY PROVIDED HEREIN, FOR ACTUAL DAMAGES IN EXCESS OF THE TERMINATION FEES IN ANY CONTEXT WHERE THE TERMINATION FEES ARE PROVIDED BY THIS AGREEMENT, AND RECEIPT OF SUCH FEES (TOGETHER WITH ALL OTHER AMOUNTS DUE AND PAYABLE BY LESSEE TO MANAGER WITH RESPECT TO EVENTS OCCURRING PRIOR TO TERMINATION OF THIS AGREEMENT WITH RESPECT TO THE APPLICABLE HOTELS OR AS OTHERWISE PROVIDED HEREIN) SHALL BE MANAGER’S SOLE REMEDY FOR DAMAGES AGAINST LESSEE IN ANY SUCH CASE. The foregoing shall in no way affect any other sums due Manager under this Article II or otherwise hereunder, including, without limitation, the Management Fees earned during the Term, or any other rights or remedies, at law or in equity of Manager under this Agreement or under Legal Requirements, including any indemnity obligations of Lessee to Manager under this Agreement.

Appears in 4 contracts

Samples: Master Project Management Agreement (Ashford Hospitality Trust Inc), Master Project Management Agreement (Braemar Hotels & Resorts Inc.), Master Project Management Agreement (Ashford Inc.)

Payment of Liquidated Damages. WITH RESPECT TO ANY TERMINATION FEES PAYABLE IN CONNECTION WITH ANY EARLY TERMINATION RIGHT SET FORTH IN THIS SECTION 2.03, OR IN SECTION 18.04 BELOW, LESSEE RECOGNIZES AND AGREES THAT, IF THIS AGREEMENT IS TERMINATED WITH RESPECT TO ANY OF THE HOTELS A HOTEL FOR THE REASONS SPECIFIED IN THIS SECTION 2.03 OR IN SECTION 18.04 BELOW, THEREBY ENTITLING MANAGER TO RECEIVE THE TERMINATION FEES AS SET FORTH IN THIS SECTION 2.03 OR IN SECTION 18.04 BELOW, MANAGER WOULD SUFFER AN ECONOMIC LOSS BY VIRTUE OF THE RESULTING LOSS OF MANAGEMENT FEES WHICH WOULD OTHERWISE HAVE BEEN EARNED UNDER THIS AGREEMENT. BECAUSE SUCH FEES VARY IN AMOUNT DEPENDING ON THE TOTAL GROSS REVENUES EARNED AT THE HOTELS HOTEL AND ACCORDINGLY WOULD BE EXTREMELY DIFFICULT AND IMPRACTICAL TO ASCERTAIN WITH CERTAINTY, THE PARTIES AGREE THAT THE TERMINATION FEES PROVIDED IN THIS SECTION 2.03 AND IN SECTION 18.04 BELOW CONSTITUTE A REASONABLE ESTIMATE OF LIQUIDATED DAMAGES TO MANAGER FOR PURPOSES OF ANY AND ALL LEGAL REQUIREMENTS, AND IT IS AGREED THAT MANAGER SHALL NOT BE ENTITLED TO MAINTAIN A CAUSE OF ACTION AGAINST LESSEE, EXCEPT AS SPECIFICALLY PROVIDED HEREIN, FOR ACTUAL DAMAGES IN EXCESS OF THE TERMINATION FEES IN ANY CONTEXT WHERE THE TERMINATION FEES ARE PROVIDED BY THIS AGREEMENT, AND RECEIPT OF SUCH FEES (TOGETHER WITH ALL OTHER AMOUNTS DUE AND PAYABLE BY LESSEE TO MANAGER WITH RESPECT TO EVENTS OCCURRING PRIOR TO TERMINATION OF THIS AGREEMENT WITH RESPECT TO THE APPLICABLE HOTELS HOTEL OR AS OTHERWISE PROVIDED HEREIN) SHALL BE MANAGER’S SOLE REMEDY FOR DAMAGES AGAINST LESSEE IN ANY SUCH CASE. The foregoing shall in no way affect any other sums due Manager under this Article II or otherwise hereunder, including, without limitation, the Management Fees earned during the Term, or any other rights or remedies, at law or in equity of Manager under this Agreement or under Legal Requirements, including any indemnity obligations of Lessee to Manager under this Agreement.

Appears in 3 contracts

Samples: Hotel Master Management Agreement (Ashford Inc.), Hotel Master Management Agreement (Ashford Hospitality Trust Inc), Hotel Master Management Agreement (Stirling Hotels & Resorts, Inc.)

Payment of Liquidated Damages. WITH RESPECT TO ANY TERMINATION FEES PAYABLE IN CONNECTION WITH ANY EARLY TERMINATION RIGHT SET FORTH IN THIS SECTION 2.03, OR IN SECTION 18.04 BELOW, LESSEE XXXXXX RECOGNIZES AND AGREES THAT, IF THIS AGREEMENT IS TERMINATED WITH RESPECT TO ANY OF THE HOTELS HOTEL FOR THE REASONS SPECIFIED IN THIS SECTION 2.03 OR IN SECTION 18.04 BELOW2.03, THEREBY ENTITLING MANAGER TO RECEIVE THE TERMINATION FEES AS SET FORTH IN THIS SECTION 2.03 OR IN SECTION 18.04 BELOW2.03, MANAGER WOULD SUFFER AN ECONOMIC LOSS BY VIRTUE OF THE RESULTING LOSS OF MANAGEMENT FEES WHICH WOULD OTHERWISE HAVE BEEN EARNED UNDER THIS AGREEMENT. BECAUSE SUCH FEES VARY IN AMOUNT DEPENDING ON THE TOTAL GROSS REVENUES EARNED CAPITAL IMPROVEMENT BUDGET AT THE HOTELS HOTEL AND ACCORDINGLY WOULD BE EXTREMELY DIFFICULT AND IMPRACTICAL TO ASCERTAIN WITH CERTAINTY, THE PARTIES AGREE THAT THE TERMINATION FEES PROVIDED IN THIS SECTION 2.03 AND IN SECTION 18.04 BELOW CONSTITUTE A REASONABLE ESTIMATE OF LIQUIDATED DAMAGES TO MANAGER FOR PURPOSES OF ANY AND ALL LEGAL REQUIREMENTS, AND IT IS AGREED THAT MANAGER SHALL NOT BE ENTITLED TO MAINTAIN A CAUSE OF ACTION AGAINST LESSEE, EXCEPT AS SPECIFICALLY PROVIDED HEREIN, FOR ACTUAL DAMAGES IN EXCESS OF THE TERMINATION FEES IN ANY CONTEXT WHERE THE TERMINATION FEES ARE PROVIDED BY THIS AGREEMENT, AND RECEIPT OF SUCH FEES (TOGETHER WITH ALL OTHER AMOUNTS DUE AND PAYABLE BY LESSEE TO MANAGER WITH RESPECT TO EVENTS OCCURRING PRIOR TO TERMINATION OF THIS AGREEMENT WITH RESPECT TO THE APPLICABLE HOTELS HOTEL OR AS OTHERWISE PROVIDED HEREIN) SHALL BE MANAGER’S SOLE REMEDY FOR DAMAGES AGAINST LESSEE IN ANY SUCH CASE. The foregoing shall in no way affect any other sums due Manager under this Article II or otherwise hereunder, including, without limitation, the Management Fees earned during the Term, or any other rights or remedies, at law or in equity of Manager under this Agreement or under Legal Requirements, including any indemnity obligations of Lessee to Manager under this Agreement.

Appears in 2 contracts

Samples: Master Project Management Agreement (Ashford Inc.), Master Project Management Agreement (Ashford Hospitality Trust Inc)

Payment of Liquidated Damages. WITH RESPECT TO ANY TERMINATION FEES PAYABLE IN CONNECTION WITH ANY EARLY TERMINATION RIGHT SET FORTH IN THIS SECTION 2.03, OR IN SECTION 18.04 BELOW, LESSEE RECOGNIZES AND AGREES THAT, IF THIS AGREEMENT IS TERMINATED WITH RESPECT TO ANY OF THE HOTELS FOR THE REASONS SPECIFIED IN THIS SECTION 2.03 OR IN SECTION 18.04 BELOW, THEREBY ENTITLING MANAGER TO RECEIVE THE TERMINATION FEES AS SET FORTH IN THIS SECTION 2.03 OR IN SECTION 18.04 BELOW, MANAGER WOULD SUFFER AN ECONOMIC LOSS BY VIRTUE OF THE RESULTING LOSS OF MANAGEMENT FEES WHICH WOULD OTHERWISE HAVE BEEN EARNED UNDER THIS AGREEMENT. BECAUSE SUCH FEES VARY IN AMOUNT DEPENDING ON THE TOTAL GROSS REVENUES EARNED AT THE HOTELS AND ACCORDINGLY WOULD BE EXTREMELY DIFFICULT AND IMPRACTICAL TO ASCERTAIN WITH CERTAINTY, THE PARTIES AGREE THAT THE TERMINATION FEES PROVIDED IN THIS SECTION 2.03 AND IN SECTION 18.04 BELOW CONSTITUTE A REASONABLE ESTIMATE OF LIQUIDATED DAMAGES TO MANAGER FOR PURPOSES OF ANY AND ALL LEGAL REQUIREMENTS, AND IT IS AGREED THAT MANAGER SHALL NOT BE ENTITLED TO MAINTAIN A CAUSE OF ACTION AGAINST LESSEE, Hotel Master Management Agreement Ashford TRS Corporation EXCEPT AS SPECIFICALLY PROVIDED HEREIN, FOR ACTUAL DAMAGES IN EXCESS OF THE TERMINATION FEES IN ANY CONTEXT WHERE THE TERMINATION FEES ARE PROVIDED BY THIS AGREEMENT, AND RECEIPT OF SUCH FEES (TOGETHER WITH ALL OTHER AMOUNTS DUE AND PAYABLE BY LESSEE TO MANAGER WITH RESPECT TO EVENTS OCCURRING PRIOR TO TERMINATION OF THIS AGREEMENT WITH RESPECT TO THE APPLICABLE HOTELS OR AS OTHERWISE PROVIDED HEREIN) SHALL BE MANAGER’S 'S SOLE REMEDY FOR DAMAGES AGAINST LESSEE IN ANY SUCH CASE. The foregoing shall in no way affect any other sums due Manager under this Article ARTICLE II or otherwise hereunder, including, without limitation, the Management Fees earned during the Term, or any other rights or remedies, at law or in equity of Manager under this Agreement or under Legal Requirements, including any indemnity obligations of Lessee to Manager under this Agreement.

Appears in 1 contract

Samples: Hotel Master Management Agreement (Ashford Hospitality Trust Inc)

Payment of Liquidated Damages. WITH RESPECT TO ANY TERMINATION FEES PAYABLE IN CONNECTION WITH ANY EARLY TERMINATION RIGHT SET FORTH IN THIS SECTION 2.03, OR IN SECTION 18.04 BELOW, LESSEE RECOGNIZES AND AGREES THAT, IF THIS AGREEMENT IS TERMINATED WITH RESPECT TO ANY OF THE HOTELS FOR THE REASONS SPECIFIED IN THIS SECTION 2.03 OR IN SECTION 18.04 BELOW, THEREBY ENTITLING MANAGER TO RECEIVE THE TERMINATION FEES AS SET FORTH IN THIS SECTION 2.03 OR IN SECTION 18.04 BELOW, MANAGER WOULD SUFFER AN ECONOMIC LOSS BY VIRTUE OF THE RESULTING LOSS OF MANAGEMENT FEES WHICH WOULD OTHERWISE HAVE BEEN EARNED UNDER THIS AGREEMENT. BECAUSE SUCH FEES VARY IN AMOUNT DEPENDING ON THE TOTAL GROSS REVENUES EARNED AT THE HOTELS AND ACCORDINGLY WOULD BE EXTREMELY DIFFICULT AND IMPRACTICAL TO ASCERTAIN WITH CERTAINTY, THE PARTIES AGREE THAT THE TERMINATION FEES PROVIDED IN THIS SECTION 2.03 AND IN SECTION 18.04 BELOW CONSTITUTE A REASONABLE ESTIMATE OF LIQUIDATED DAMAGES TO MANAGER FOR PURPOSES OF ANY AND ALL LEGAL REQUIREMENTS, AND IT IS AGREED THAT MANAGER SHALL NOT BE ENTITLED TO MAINTAIN A CAUSE OF ACTION AGAINST LESSEE, EXCEPT AS SPECIFICALLY PROVIDED HEREIN, FOR ACTUAL DAMAGES IN EXCESS OF THE TERMINATION FEES IN ANY CONTEXT WHERE THE TERMINATION FEES ARE PROVIDED BY THIS AGREEMENT, AND RECEIPT OF SUCH FEES (TOGETHER WITH ALL OTHER AMOUNTS DUE AND PAYABLE BY LESSEE TO MANAGER WITH RESPECT TO EVENTS OCCURRING PRIOR TO TERMINATION OF THIS AGREEMENT WITH RESPECT TO THE APPLICABLE HOTELS OR AS OTHERWISE PROVIDED HEREIN) SHALL BE MANAGER’S SOLE REMEDY FOR DAMAGES AGAINST LESSEE IN ANY SUCH CASE. The foregoing shall in no way affect any other sums due Manager under this Article II or otherwise hereunder, including, without limitation, the Hotel Master Management Agreement Ashford TRS Corporation File No. 145765 Management Fees earned during the Term, or any other rights or remedies, at law or in equity of Manager under this Agreement or under Legal Requirements, including any indemnity obligations of Lessee to Manager under this Agreement.

Appears in 1 contract

Samples: Hotel Master Management Agreement (Ashford Hospitality Trust Inc)

AutoNDA by SimpleDocs

Payment of Liquidated Damages. WITH RESPECT LIQUIDATED DAMAGES SHALL BE REMITTED TO ANY TERMINATION FEES PAYABLE SELLER ACCORDING TO THE FOLLOWING PROCEDURES: (a) SELLER SHALL GIVE WRITTEN NOTICE TO ESCROW HOLDER AND TO BUYER, IN CONNECTION WITH ANY EARLY TERMINATION RIGHT SET FORTH IN THIS THE MANNER PRESCRIBED BY SECTION 2.03, OR IN SECTION 18.04 BELOW, LESSEE RECOGNIZES AND AGREES THAT, IF THIS AGREEMENT IS TERMINATED WITH RESPECT TO ANY 116.340 OF THE HOTELS CODE OF CIVIL PROCEDURE FOR SERVICE IN A SMALL CLAIMS ACTION, OF SELLER’S DETERMINATION THAT BUYER IS IN DEFAULT, AND DEMAND THAT ESCROW HOLDER DISBURSE THE REASONS SPECIFIED IN THIS SECTION 2.03 OR IN SECTION 18.04 BELOW, THEREBY ENTITLING MANAGER TO RECEIVE THE TERMINATION FEES AS SET FORTH IN THIS SECTION 2.03 OR IN SECTION 18.04 BELOW, MANAGER WOULD SUFFER AN ECONOMIC LOSS BY VIRTUE OF THE RESULTING LOSS OF MANAGEMENT FEES WHICH WOULD OTHERWISE HAVE BEEN EARNED UNDER THIS AGREEMENT. BECAUSE SUCH FEES VARY IN AMOUNT DEPENDING ON THE TOTAL GROSS REVENUES EARNED AT THE HOTELS AND ACCORDINGLY WOULD BE EXTREMELY DIFFICULT AND IMPRACTICAL TO ASCERTAIN WITH CERTAINTY, THE PARTIES AGREE THAT THE TERMINATION FEES PROVIDED IN THIS SECTION 2.03 AND IN SECTION 18.04 BELOW CONSTITUTE A REASONABLE ESTIMATE OF LIQUIDATED DAMAGES TO MANAGER SELLER (“SELLER’S DEMAND”). (b) WITHIN TWENTY (20) DAYS AFTER BUYER’S RECEIPT OF SELLER’S DEMAND, BUYER MAY DELIVER A WRITTEN NOTICE TO ESCROW HOLDER INSTRUCTING ESCROW HOLDER NOT TO DISBURSE SUCH FUNDS TO SELLER (“BUYER’S OBJECTION”). (c) IF BUYER DOES NOT DELIVER BUYER’S OBJECTION TO ESCROW HOLDER WITHIN THE TWENTY (20) DAY TIME PERIOD (1) ESCROW HOLDER SHALL RELEASE THE LIQUIDATED DAMAGES TO SELLER, AND REMIT THE BALANCE OF FUNDS IN ESCROW, IF ANY, TO BUYER OTHER THAN ANY AMOUNTS TO THIRD PARTIES FOR PURPOSES THIRD PARTY CHARGES, AND (2) BUYER SHALL BE DEEMED TO HAVE WAIVED BUYER’S RIGHT TO RECOVER DAMAGES, IF ANY, OR FOR SPECIFIC PERFORMANCE HEREUNDER, INCLUDING THE RIGHT TO FILE A LIS PENDENS AGAINST THE PROPERTY. (d) UPON RECEIPT OF THE BUYER’S OBJECTION, ESCROW HOLDER SHALL IMMEDIATELY NOTIFY SELLER AND THE CONTROVERSY REGARDING THE DISPOSITION OF FUNDS DEPOSITED INTO ESCROW BY BUYER SHALL BE RESOLVED IN ACCORDANCE WITH PARAGRAPH 7.3 BELOW. (e) SELLER AGREES TO INDEMNIFY AND HOLD ESCROW HOLDER HARMLESS FROM ANY CLAIM ARISING OUT OF ANY AND ALL LEGAL REQUIREMENTS, AND IT IS AGREED THAT MANAGER SHALL NOT BE ENTITLED TO MAINTAIN A CAUSE OF ACTION AGAINST LESSEE, EXCEPT AS SPECIFICALLY PROVIDED HEREIN, FOR ACTUAL DAMAGES IN EXCESS OF DISTRIBUTIONS MADE BY ESCROW HOLDER UNDER THE TERMINATION FEES IN ANY CONTEXT WHERE THE TERMINATION FEES ARE PROVIDED BY THIS AGREEMENT, AND RECEIPT OF SUCH FEES (TOGETHER WITH ALL OTHER AMOUNTS DUE AND PAYABLE BY LESSEE TO MANAGER WITH RESPECT TO EVENTS OCCURRING PRIOR TO TERMINATION PROVISIONS OF THIS AGREEMENT WITH RESPECT TO THE APPLICABLE HOTELS OR AS OTHERWISE PROVIDED HEREIN) SHALL BE MANAGER’S SOLE REMEDY FOR DAMAGES AGAINST LESSEE IN ANY SUCH CASE. The foregoing shall in no way affect any other sums due Manager under this Article II or otherwise hereunder, including, without limitation, the Management Fees earned during the Term, or any other rights or remedies, at law or in equity of Manager under this Agreement or under Legal Requirements, including any indemnity obligations of Lessee to Manager under this AgreementSECTION 7.2.

Appears in 1 contract

Samples: Purchase Agreement

Payment of Liquidated Damages. WITH RESPECT TO ANY TERMINATION FEES PAYABLE IN CONNECTION WITH ANY EARLY TERMINATION RIGHT SET FORTH IN THIS SECTION 2.03, OR IN SECTION 18.04 BELOW, LESSEE RECOGNIZES AND AGREES THAT, IF THIS AGREEMENT IS TERMINATED WITH RESPECT TO ANY OF THE HOTELS FOR THE REASONS SPECIFIED IN THIS SECTION 2.03 OR IN SECTION 18.04 BELOW, THEREBY ENTITLING MANAGER TO RECEIVE THE TERMINATION FEES AS SET FORTH IN THIS SECTION 2.03 OR IN SECTION 18.04 BELOW, MANAGER WOULD SUFFER AN ECONOMIC LOSS BY VIRTUE OF THE RESULTING LOSS OF MANAGEMENT FEES WHICH WOULD OTHERWISE HAVE BEEN EARNED UNDER THIS AGREEMENT. BECAUSE SUCH FEES VARY IN AMOUNT DEPENDING ON THE TOTAL GROSS REVENUES EARNED AT THE HOTELS AND ACCORDINGLY WOULD BE EXTREMELY DIFFICULT AND IMPRACTICAL TO ASCERTAIN WITH CERTAINTY, THE PARTIES AGREE THAT THE TERMINATION FEES PROVIDED IN THIS SECTION 2.03 AND IN SECTION 18.04 BELOW CONSTITUTE A REASONABLE ESTIMATE OF LIQUIDATED DAMAGES TO MANAGER FOR PURPOSES OF ANY AND ALL LEGAL REQUIREMENTS, AND IT IS AGREED THAT MANAGER SHALL NOT BE ENTITLED TO MAINTAIN A CAUSE OF ACTION AGAINST LESSEE, EXCEPT AS SPECIFICALLY PROVIDED HEREIN, FOR ACTUAL DAMAGES IN EXCESS OF THE TERMINATION FEES IN ANY CONTEXT WHERE THE TERMINATION FEES ARE PROVIDED BY THIS AGREEMENT, AND RECEIPT OF SUCH FEES (TOGETHER WITH ALL OTHER AMOUNTS DUE AND PAYABLE BY LESSEE TO MANAGER WITH RESPECT TO EVENTS OCCURRING PRIOR TO TERMINATION OF THIS AGREEMENT WITH RESPECT TO THE APPLICABLE HOTELS OR AS OTHERWISE PROVIDED HEREIN) SHALL BE MANAGER’S SOLE REMEDY FOR DAMAGES AGAINST LESSEE IN ANY SUCH CASE. The foregoing shall in no way affect any other sums due Manager under this Article II or otherwise hereunder, including, without limitation, the Management Fees earned during the Term, or any other rights or remedies, at law or in equity of Manager under this Agreement or under Legal Requirements, including any indemnity obligations of Lessee to Manager under this Agreement.. Hotel Master Management Agreement Ashford TRS Corporation File No. 145765

Appears in 1 contract

Samples: Hotel Master Management Agreement (Ashford Hospitality Trust Inc)

Payment of Liquidated Damages. WITH RESPECT TO ANY TERMINATION FEES PAYABLE IN CONNECTION WITH ANY EARLY TERMINATION RIGHT SET FORTH IN THIS SECTION 2.03, OR IN SECTION 18.04 BELOW, LESSEE LXXXXX RECOGNIZES AND AGREES THAT, IF THIS AGREEMENT IS TERMINATED WITH RESPECT TO ANY OF THE HOTELS HOTEL FOR THE REASONS SPECIFIED IN THIS SECTION 2.03 OR IN SECTION 18.04 BELOW2.03, THEREBY ENTITLING MANAGER TO RECEIVE THE TERMINATION FEES AS SET FORTH IN THIS SECTION 2.03 OR IN SECTION 18.04 BELOW2.03, MANAGER WOULD SUFFER AN ECONOMIC LOSS BY VIRTUE OF THE RESULTING LOSS OF MANAGEMENT FEES WHICH WOULD OTHERWISE HAVE BEEN EARNED UNDER THIS AGREEMENT. BECAUSE SUCH FEES VARY IN AMOUNT DEPENDING ON THE TOTAL GROSS REVENUES EARNED CAPITAL IMPROVEMENT BUDGET AT THE HOTELS HOTEL AND ACCORDINGLY WOULD BE EXTREMELY DIFFICULT AND IMPRACTICAL TO ASCERTAIN WITH CERTAINTY, THE PARTIES AGREE THAT THE TERMINATION FEES PROVIDED IN THIS SECTION 2.03 AND IN SECTION 18.04 BELOW CONSTITUTE A REASONABLE ESTIMATE OF LIQUIDATED DAMAGES TO MANAGER FOR PURPOSES OF ANY AND ALL LEGAL REQUIREMENTS, AND IT IS AGREED THAT MANAGER SHALL NOT BE ENTITLED TO MAINTAIN A CAUSE OF ACTION AGAINST LESSEE, EXCEPT AS SPECIFICALLY PROVIDED HEREIN, FOR ACTUAL DAMAGES IN EXCESS OF THE TERMINATION FEES IN ANY CONTEXT WHERE THE TERMINATION FEES ARE PROVIDED BY THIS AGREEMENT, AND RECEIPT OF SUCH FEES (TOGETHER WITH ALL OTHER AMOUNTS DUE AND PAYABLE BY LESSEE TO MANAGER WITH RESPECT TO EVENTS OCCURRING PRIOR TO TERMINATION OF THIS AGREEMENT WITH RESPECT TO THE APPLICABLE HOTELS HOTEL OR AS OTHERWISE PROVIDED HEREIN) SHALL BE MANAGER’S SOLE REMEDY FOR DAMAGES AGAINST LESSEE IN ANY SUCH CASE. The foregoing shall in no way affect any other sums due Manager under this Article II or otherwise hereunder, including, without limitation, the Management Fees earned during the Term, or any other rights or remedies, at law or in equity of Manager under this Agreement or under Legal Requirements, including any indemnity obligations of Lessee to Manager under this Agreement.

Appears in 1 contract

Samples: Master Project Management Agreement (Stirling Hotels & Resorts, Inc.)