Physical Examination The Employer, at its own expense, shall have the right and be given the opportunity to have a medical doctor appointed by the Employer examine, as often as it may reasonably require, any employee whose injury, sickness, mental or nervous disorder is the basis of claim upon this Plan.
Quality All products will be new and unused. All products provided by the Contractor must meet all federal, state, and local standards for quality and safety requirements. Products not meeting the requirements of this section will be deemed unacceptable and returned to the Contractor for credit at no charge to the State.
Annual Physical The Executive may, if the Executive so elects, within the twelve (12) months following the Date of Termination, receive an annual physical at the Company’s expense consistent with, and subject to the requirements of, the physical provided under the Company’s annual physical program as in effect immediately prior to the Date of Termination.
Interior (a) Ceilings, sidewalls and bulkhead panels shall be clean and free of cracks and stains;
Physical Condition Except as disclosed in the Physical Conditions Reports delivered to Lender in connecting with this Loan, to Borrower's knowledge, the Property, including, without limitation, all buildings, improvements, parking facilities, sidewalks, storm drainage systems, roofs, plumbing systems, HVAC systems, fire protection systems, electrical systems, equipment, elevators, exterior sidings and doors, landscaping, irrigation systems and all structural components, are in good condition, order and repair in all material respects; there exists no structural or other material defects or damages in the Property, whether latent or otherwise, and Borrower has not received notice from any insurance company or bonding company of any defects or inadequacies in the Property, or any part thereof, which would adversely affect the insurability of the same or cause the imposition of extraordinary premiums or charges thereon or of any termination or threatened termination of any policy of insurance or bond.
Electrical (i) Lighting, power, signal and communication plans showing all switching and controls. Fixture schedule and lighting details development started.
Physical Inventory The Contractor shall periodically perform, record, and disclose physical inventory results. A final physical inventory shall be performed upon contract completion or termination. The Property Administrator may waive this final inventory requirement, depending on the circumstances (e.g., overall reliability of the Contractor’s system or the property is to be transferred to a follow-on contract).