Training Plan 19.6.1 An apprentice shall be a party to an individual Training Plan. 19.6.2 The Training Plan sets out the training that the apprentice will do both on – the – job and off – the – job. The Training Plan also sets out how the Registered Training Organisation (RTO) will ensure the apprentice will receive quality training – both on – the – job and off – the – job. 19.6.3 The Training Plan reflects the choices made by the employer and the apprentice in relation to:-
Project Planning GOVERNMENTAL APPROVALS; ENVIRONMENTAL COMPLIANCE; PUBLIC INFORMATION 30 4.1 Planning and Engineering Activities 30 4.2 Site Conditions 30 4.3 Governmental Approvals 30 4.4 Environmental Compliance 34 4.5 Community Outreach and Public Information 35
Parameters In calculating the MtM Exposure for each Transaction, the following parameters are set on the Transaction Date: ▪ On-Peak Initial Xxxx Xxxxx ▪ Off-Peak/On-Peak Price Ratio ▪ Off-Peak Initial Xxxx Xxxxx ▪ MW-Measure: initial Capacity PLC Per Tranche ▪ On-Peak Estimated Energy Quantity Per MW-Measure for each of the twelve calendar months ▪ Off-Peak Estimated Energy Quantity Per MW-Measure for each of the twelve calendar months ▪ Number of awarded Tranches In calculating the MtM Exposure for each Transaction, the following parameters are set each Business Day subsequent to the Transaction Date: ▪ On-Peak Forward Price ▪ Off-Peak Forward Price ▪ Current Capacity PLC Per Tranche ▪ On-Peak Estimated Energy Quantity ▪ Off-Peak Estimated Energy Quantity Process to Update the On-Peak Initial Mark Prices and Off-Peak Initial Mark Prices on a Daily Basis On each Business Day subsequent to the Transaction Date, the Pricing Agent will contact four Reference Market-Makers to obtain price quotes for on-peak and off-peak energy for PJM Western Hub. The Pricing Agent may not rely upon quotes from Seller or any Affiliate of Seller. The updated mark for a month will be equal to the average mark for that month over all sources from which a quote is available. If a monthly quote is available from any source, only the monthly quote or monthly quotes shall be used. Where quotes provide a bid and ask, the average shall be used. Where a quote for an individual month is unavailable, but the month is quoted as part of a “packaged” quote (e.g., January 2011 is only available in the form of a January/February 2011 “packaged” quote or an annual quote): ▪ If the other month/months of the package quote is/are also unavailable, then the marks for all months of the package will be calculated by multiplying the packaged quote by the ratio of the corresponding month to the corresponding calculated package quote from the previous day. Example: There are no On-Peak quotes available on day X during the contract for July 2011 or August 2011. However, there is an On-Peak July/August 2011 packaged quote of $73.00/MWh available. The On-Peak marks from day X-1 for July 2011 and August 2011 were $73.50/MWh and $76.50/MWh respectively. The day X On-Peak mark for July 2011 is set at 73.00 * [73.50] / [( (73.50 * 352) + (76.50 * 336) ) / (352+336) ] = 73 * (73.50/ 74.97) = $71.57/MWh. The day X On-Peak mark for August 2011 is set at 73.00 * [76.50] / [( (73.50 * 352) + (76.50*336) ) / (352+336) ] = 73 * (76.50 / 74.97) = $74.49/MWh. ▪ If the other month/months of the package quote is/are available, then the mark for the month will be set such that the average of the month and the other month(s) (weighted for either the On-Peak Hours or Off-Peak Hours as applicable) equals the packaged quote (see calculation example below).
Configuration The configuration for the Purchase Right Aircraft will be the Detail Specification for Model 767-3S2F aircraft at the revision level in effect at the time of the Supplemental Agreement. Such Detail Specification will be revised to include (i) changes required to obtain required regulatory certificates and (ii) other changes as mutually agreed upon by Boeing and Customer.
Training Program It is agreed that there shall be an Apprenticeship Training Program, the provisions of which are set forth in Exhibit "D", which is attached hereto and forms part of this Agreement.
Configuration Management The Contractor shall maintain a configuration management program, which shall provide for the administrative and functional systems necessary for configuration identification, control, status accounting and reporting, to ensure configuration identity with the UCEU and associated cables produced by the Contractor. The Contractor shall maintain a Contractor approved Configuration Management Plan that complies with ANSI/EIA-649 2011. Notwithstanding ANSI/EIA-649 2011, the Contractor’s configuration management program shall comply with the VLS Configuration Management Plans, TL130-AD-PLN-010-VLS, and shall comply with the following:
Planning The Operating Committee shall implement the transmission system expansion process described in Article 18. The Operating Committee shall review and approve ISO staff assessments of proposed projects that impact transmission capability to confirm that those projects meet all applicable reliability criteria. The Operating Committee shall review and approve the NYS Transmission Plan prepared by the ISO staff and reliability assessments performed using such NYS Transmission Plan, to ensure conformance with the Reliability Rules. The Operating Committee shall review and approve illustrative NYS Transmission System expansion options developed by ISO staff in response to PSC requests. The Operating Committee, at the request of a Committee member, may review the adequacy of cost recovery mechanisms for transmission expansion.
Pre-Commencement Phase Services The services required to be provided by the Contractor for the Pre- Commencement Phase of the Project in accordance with the Contract Documents.
Marketing Plan The MCOP shall submit an annual marketing plan to ODM including all planned activities for promoting membership in or increasing awareness of the MCOP. The marketing plan submission shall include an attestation by the MCOP that the plan is accurate and is not intended to mislead, confuse, or defraud the eligible individuals or ODM.
Synchronization, Commissioning and Commercial Operation 4.1.1 The Power Producer shall give at least fifteen (15) days written notice to the SLDC / ALDC / DISCOM as the case may be, of the date on which it intends to synchronize the Power Project to the Grid System. 4.1.2 Subject to Article 4.1.1, the Power Project may be synchronized by the Power Producer to the Grid System when it meets all the connection conditions prescribed in the Grid Code and otherwise meets all other Indian legal requirements for synchronization to the Grid System. 4.1.3 The synchronization equipment and all necessary arrangements / equipment including Remote Terminal Unit (RTU) for scheduling of power generated from the Project and transmission of data to the concerned authority as per applicable regulation shall be installed by the Power Producer at its generation facility of the Power Project at its own cost. The Power Producer shall synchronize its system with the Grid System only after the approval of GETCO / SLDC / ALDC and GEDA. 4.1.4 The Power Producer shall immediately after each synchronization / tripping of generator, inform the sub-station of the Grid System to which the Power Project is electrically connected in accordance with applicable Grid Code. 4.1.5 The Power Producer shall commission the Project within SCOD. 4.1.6 The Power Producer shall be required to obtain Developer and/ or Transfer Permission, Key Plan drawing etc, if required, from GEDA. In cases of conversion of land from Agricultural to Non-Agriculture, the commissioning shall be taken up by GEDA only upon submission of N.A. permission by the Power Producer. 4.1.7 The Power Producer shall be required to follow the Forecasting and Scheduling procedures as per the Regulations issued by Hon’ble GERC from time to time. It is to clarify that in terms of GERC (Forecasting, Scheduling, Deviation Settlement and Related Matters of Solar and Wind Generation Sources) Regulations, 2019 the procedures for Forecasting, Scheduling & Deviation Settlment are applicable to all solar generators having combined installed capacity above 1 MW connected to the State Grid / Substation including those connected via pooling stations.