Post Construction Monumentation Sample Clauses

Post Construction Monumentation. AKS shall verify the disturbance (or non-disturbance) of existing monuments previously documented and recorded under Task 1.4. A post-construction survey shall be recorded with Clackamas County following construction and shall include all monuments replaced during construction and the verified locations of undisturbed monuments. If any impacts to existing monuments occur, a supplement for work necessary to reset all monuments disturbed during construction will be submitted.
AutoNDA by SimpleDocs
Post Construction Monumentation. Provide post-construction survey monumentation for property pins that are disrupted by construction activities. Monumentation shall be documented per City approved standard format. Completion time: The Consulting Engineer hereby agrees to complete preliminary plans suitable for a public information meeting including easement and right-of-way descriptions and drawings (Task I) by September 30, 2014 and to complete all work necessary to and including preparation of final plans (Task II) by March 31, 2015. Affinis Corp. Supplemental Agreement Two Date: 12/4/2013 Client: Overland Park, KS Project: 000xx Xxxxxx (Metcalf to Nall) Exhibit B Made By: RBF Principal Project Sr. Project Project Design CADD Land Land Survey Crew Clerical LABOR DIRECT EXPENSES TOTAL Manager Engineer Engineer Technician II Technician II Surveyor II Surveyor I Member II COSTS ITEM COST FEE
Post Construction Monumentation. Provide post-construction survey monumentation for property pins that are disrupted by construction activities. Monumentation shall be documented per City approved standard format. Completion time: The Consulting Engineer hereby agrees to complete preliminary plans suitable for a public information meeting including easement and right-of-way descriptions and drawings (Task I) by December 31, 2014 and to complete all work necessary to and including preparation of final plans (Task II) by October 31, 2015. Affinis Corp. Date: 1/29/2014 Client: Overland Park, KS Contract Agreement Project: 000xx Xxxxxx (Xxxx to Mission) Exhibit B Made By: RBF Principal Project Sr. Project Project Design CADD Land Land Survey Crew Clerical LABOR DIRECT EXPENSES TOTAL Manager Engineer Engineer II Technician II Technician II Surveyor II Surveyor I Member II COSTS ITEM COST FEE Tasks $208.00 $165.00 $192.00 $135.00 $125.00 $80.00 $145.00 $95.00 $90.00 $70.00 TASK I. PRELIMINARY DESIGN
Post Construction Monumentation. Provide post-construction survey monumentation for property pins that are disrupted by construction activities. Monumentation shall be documented per City approved standard format.

Related to Post Construction Monumentation

  • Interconnection Facilities Engineering Procurement and Construction Interconnection Facilities, Network Upgrades, and Distribution Upgrades shall be studied, designed, and constructed pursuant to Good Utility Practice. Such studies, design and construction shall be based on the assumed accuracy and completeness of all technical information received by the Participating TO and the CAISO from the Interconnection Customer associated with interconnecting the Large Generating Facility.

  • Design and Construction In complying with the requirements of the specification both with respect to arrangement and detail, design is to conform to the best current engineering practice. Each of the several parts of the material is to be of the maker’s standard design provided that this design is in general accordance with the specification. The essence of design should be simplicity and reliability in order to give long continuous service with high economy and low maintenance cost. Particular attention should be paid to internal and external access in order to facilitate inspection, cleaning and maintenance. The design dimensions and materials of all parts are to be such that they will not suffer damage as a result of stresses under the most severe conditions. Fully detailed specifications of the several parts of the material are to be submitted describing particularly the materials to be used. The materials used in the construction of the material are to be of the highest quality and selected particularly to meet the duties required of them. Mechanisms are to be constructed to avoid sticking due to rust or corrosion. Workmanship and general finish are to be of the highest class throughout. All similar parts of the material are to be interchangeable. All equipment is to operate without undue vibration and with the least possible amount of noise and is not to cause a nuisance. All equipment is to be designed to minimize the risk of fire and any damage, which may be caused in the event of fire. The equipment is also to be designed to prevent ingress of all vermin, accidental contact with live parts and to minimize the ingress of dust and dirt. The use of materials, which may be liable to attack by termites or other insects, is to be avoided.

Time is Money Join Law Insider Premium to draft better contracts faster.