Power Factor. The Generator shall maintain the Power Factor as per the prevailing GERC regulations and as may be stipulated / specified by GETCO from time to time. The Power Producer shall provide suitable protection devices, so that the Electric Generators could be isolated automatically when grid supply fails. Connectivity criteria like short circuit level (for switchgear), neutral Grounding, fault clearance time, current unbalance (including negative and zero sequence currents), limit of harmonics etc. shall be as per Grid Code. 1. The nominal steady state electrical characteristics of the system are as follows: a) Three phase alternating current at 50 Hertz plus or minus 0.5 Hertz b) Nominal voltage of V with +10% to β 12.5% variation. 2. The Project shall be designed and capable of being synchronized and operated within a frequency range of 47.5 to 51.5 Hertz and voltage of V and _V 3. Operation of the Project outside the nominal voltage and frequency specified above will result in reduction of power output consistent with generator capability curves. 1. Consent from the GETCO for the evacuation scheme for evacuation of the power generated by the windmill power projects. 2. Approval of the Electrical Inspectorate, Government of Gujarat for commissioning of the transmission line and the wind energy converters installed at the Project Site. 3. Certificate of Commissioning of the Wind Farm Project issued by GEDA.
Appears in 5 contracts
Samples: Bulk Power Transmission Agreement, Bulk Power Transmission Agreement, Bulk Power Transmission Agreement